Construction Sequence:
1. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY, A PRECONSTRUCTION MEETING MUST BE HELD
BETWEEN THE CITY OF RENTON, THE APPLICANT AND THE APPLICANTS CONSTRUCTION REPRESENTATIVE.
2. VERIFY VERTICAL AND HORIZONTAL LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES. CONTACT ALL
UTILITY COMPANIES THAT MAY BE EFFECTED BY THE PROPOSED CONSTRUCTION. THE ONE CALL NUMBER IS
1-800-424-5555.
3. MAINTAIN ALL EXISTING UTILITY SERVICES DURING CONSTRUCTION.
4. VERIFY GRADES PRIOR TO CONSTRUCTION. FLAG CLEARING LIMITS.
5. NO WORK MAY OCCUR WITHIN OHWM OF CREEK UNTIL SPECIFICALLY AUTHORIZED BY ENGINEER AND CITY
INSPECTOR.
6. INSTALL FILTER FABRIC FENCING AND OTHER SEDIMENT CONTROL DEVICES PER DEMOLITION AND T.E.S.0 PLAN,
SHEET C3-101.
7. CLEAR AND GRUB AREA TO BE DISTURBED BY CONSTRUCTION.
8. REMOVE EX. GABION WALL AS NEEDED TO ACCESS CULVERTS. FILL REMAINING PORTIONS OF BASKETS AND
QUARRY SPALLS WITH FLOWABLE FILL. PROVIDE TEMPORARY STABILIZATION FOR ROADWAY AND EXISTING
WATERLINE. REMOVE END OF CULVERTS AND EXTEND THROUGH RETAINING WALL PER PLAN.
9. INSTALL HDPE ELBOW CONNECTIONS PER PLANS.
10. EXCAVATE CHANNEL AND INSTALL HILFIKER STRUCTURAL EARTH WALL.
11. BACKFILL ROAD GRADE AND SURROUNDING AREAS.
12. INSTALL ROADWAY UTILITIES AND ALL SURFACE IMPROVEMENTS.
13. VEGETATE AND STABILIZE SITE.
14. CLEAN SITE AND WORK AREA INCLUDING ALL STORM DRAINAGE SYSTEMS.
15. REMOVE TESC MEASURES WHEN SITE IS STABILIZED AS AUTHORIZED BY CITY ENGINEER.
Erosion Control Notes
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER
UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD
WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE
PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN
ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE
CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND
MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH
SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND TRACK OUT
TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO
LAND CLEARING AND/OR CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER,
DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A
SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR CONSTRUCTION IS COMPLETE AND POTENTIAL
FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND ADDITIONS TO
EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM
REQUIREMENTS TO MEET ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR
SEASONAL CONDITIONS DICTATE, THE PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND SEDIMENTATION
CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL ON THE PROPOSED SITE.
DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO
ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES,
OVER AND ABOVE MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER
QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL
OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS
DURING THE WET SEASON (OCTOBER 1ST THROUGH MARCH 30TH) OR SEVEN DAYS DURING DRAY SEASON (APRIL 1ST
THROUGH SEPTEMBER 30TH) SHALL BE IMMEDIATELY STABILIZED WITH APPROVED ESC COVER METHODS (E.G.,
SEEDING, MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES
CLEARING BETWEEN OCTOBER 1 AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH
AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL.
11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7)
DAYS.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR
WITHIN 12 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL
CATCH BASINS AND CONVEYANCE LINES SHALL BE CLEARED PRIOR PAVING. THE CLEANING OPERATION SHALL NOT
FLUSH SEDIMENT -LADEN WATER INTO THE DOWNSTREAM SYSTEM.
14. DURING THE TIME PERIOD OF OCTOBER 1ST THROUGH MARCH 30TH, ALL PROJECT DISTRIBUTED SOIL AREAS
GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH, SODDING
OR PLASTIC COVERING.
CONSTRUCTION RECORD DRAWING
This construction record drawing is a copy of a cad file prepared by
COUGHLIN PORTER LUNDEEN and has been edited to reflect field
verified invert and rim elevations of the storm, sanitary sewer and water
main systems. Field verified invert and rim elevations were obtained by
KLB IN AUGUST 2019
The on -site private storm drainage facilities and public/private water and
sewer systems were installed in accordance with the approved plans and
the documented field revisions and function as intended.
COUGHLIN
PORTER
LUNDEEN
Erosion Control Notes (Continued)
City of Renton Surface Water Standard Plan Notes
o
15.
ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED
1.
THESE NOTES SHALL APPEAR ON PROJECTS FOR THE SURFACE WATER UTILITY.
WITH THE NECESSARY EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE
2.
BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING 23.
ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF THE DEVELOPMENT
PERMANENT FACILITY IS TO FUNCTION ULTIMATELY AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST
MUST BE HELD BETWEEN THE CITY OF RENTON PLAN REVIEW SECTION AND THE APPLICANT.
SITE MUST DEMONSTRATE ONE OF THE FOLLOWING: THE EXISTING DUFF LAYER SHALL BE STAGED AND
T
V
BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST 3FEET ABOVE THE FINAL GRADE OF THE
REDISTRIBUTED TO MAINTAIN THE MOISTURE CAPACITY OF THE SOIL, OR; AMENDED SOIL SHALL BE
FACILITY.
3.
ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE RENTON MUNICIPAL CODE
ADDED TO MAINTAIN THE MOISTURE CAPACITY.
(RMC), THE LATEST EDITION OF THE STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
16.
PRIOR TO THE BEGINNING OF THE WET SEASON (OCT1) ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY
CONSTRUCTION PREPARED BY WSDOT AND THE AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS 24.
PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO CONSTRUCTION PERMIT
WHICH ONES CAN BE SEEDED IN PREP FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE
AMENDED BY THE CITY OF RENTON PUBLIC WORKS DEPARTMENT. IT SHALL BE THE SOLE
ISSUANCE.
WEEK OF THE BEGINNING OF THE WET SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE TO
RESPONSIBILITY OF THE APPLICANT AND THE PROFESSIONAL CIVIL ENGINEER TO CORRECT ANY 25.
ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON DOES NOT RELIEVE
REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
ERROR, OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THIS PLANS. ALL
THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR LIABILITY CONNECTED WITH STORM
LO
CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY.
SURFACE WATER DISPOSITION. FURTHER, THE CITY OF RENTON DOES NOT ACCEPT ANY OBLIGATION
17.
ALL ESC MEASURES MUST BE REMOVED AFTER CONSTRUCTION ACTIVITY IS COMPLETE.
4.
APPROVAL OF THIS ROAD, GRADING, PARKING AND DRAINAGE PLAN DOES NOT CONSTITUTE AN
FOR THE PROPER FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING
O
APPROVAL OF ANY OTHER CONSTRUCTION (E.G. DOMESTIC WATER CONVEYANCE, SEWER
CONSTRUCTION.
O
CONVEYANCE, GAS, ELECTRICAL. ETC.)THE SURFACE WATER DRAINAGE SYSTEM SHALL BE 26.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD, SAFETY DEVICES,
CONSTRUCTED ACCORDING TO THE APPROVED PLANS, WHICH ARE ON FILE IN WITH THE CITY. ANY
PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED ACTIONS TO PROTECT THE LIFE,
Q
DEVIATION FROM THE APPROVED PLANS WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF
HEALTH, AND SAFETY OF THE PUBLIC, AND TO PROTECT PROPERTY IN CONNECTION WITH THE
Demolition Notes
RENTON PUBLIC WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.
PERFORMANCE OF WORK. ANY WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT
J
5.
A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN
NORMAL TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVE BY THE PUBLIC WORKS
PROGRESS.
DEPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE WSDOT STANDARD
1.
EXISTING UTILITIES AND UNDERGROUND STRUCTURES SHOWN ON THE PLAN ARE BASED UPON THE BEST AVAILABLE
SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY.
PUBLIC RECORDS AND/OR PRIVATE RECORDS AS SUPPLIED BY THE PROJECT OWNER AND/OR DATA OBTAINED
6.
GRADING ACTIVITIES (SITE ALTERATION) ARE LIMITED TO THE HOURS OF 7 A.M. TO 7 P.M. MONDAY
VERBALLY FROM OWNERS OR OFFICIALS ASSOCIATED WITH THE PARTICULAR UTILITY. NEITHER THE OWNER NOR
THROUGH SATURDAY AND NO WORK ON SUNDAY IS ALLOWED, UNLESS OTHERWISE APPROVED WITH A 27.
PROJECT LOCATED WITHIN THE AQUIFER PROTECTION AREA (APA) SHALL COMPLY WITH SPECIAL
THE ENGINEER GUARANTEE ACCURACY OR COMPLETENESS OF THIS INFORMATION AND ASSUME NO
WRITTEN DECISION BY THE CITY OF RENTON.
REQUIREMENT #6 OF THE SURFACE WATER DESIGN MANUAL AND AQUIFER PROTECTION REGULATIONS
RESPONSIBILITY FOR IMPROPER LOCATIONS ON THE CONSTRUCTION PLANS. OTHER UNDERGROUND FACILITIES NOT
7.
IT SHALL BE THE APPLICANT'S/CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL CONSTRUCTION
(RMC 4-3-050).
SHOWN ON THE DRAWINGS MAY BE ENCOUNTERED DURING THE COURSE OF THE WORK. ALL INVERT ELEVATIONS
EASEMENTS NECESSARY BEFORE INITIATING OFF -SITE WORK. EASEMENTS REQUIRE CITY REVIEW AND
SHOWN ON THE DRAWINGS SHALL BE VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION.
APPROVAL PRIOR TO CONSTRUCTION.
CV
2.
IF CHANGED CONDITIONS ARE ENCOUNTERED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER PROMPTLY OF (1)
8.
FRANCHISED UTILITIES OR OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE APPROVED PLANS
OO
PREEXISTING SUBSURFACE CONDITIONS DIFFERING FROM THOSE INDICATED IN THE PLANS, OR (2) PREEXISTING
SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF PLANS THAT MEET ALL REQUIREMENTS
OF CHAPTER 4 OF THE SURFACE WATER DESIGN MANUAL ARE SUBMITTED TO THE CITY OF RENTON.
General Paving Notes
UNKNOWN SUBSURFACE CONDITIONS, OR AN UNUSUAL NATURE, DIFFERING MATERIALLY FROM THOSE ORIGINALLY
Q
ENCOUNTERED AND GENERALLY RECOGNIZED AS INHERENT IN WORK OF THE CHARACTER PROVIDED FOR IN THE
9.
DATUM SHALL BE NAVD 88 UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON. REFERENCE
1.
A COPY OF THE APPROVED PLANS SHALL BE ON SITE WHENEVER CONSTRUCTION IS IN PROGRESS. THE
O
O
CONTRACT. THE CONTRACTOR AND OR OWNER SHALL MAKE NO CLAIMS TO THE ENGINEER FOR RECOMPENSATION
BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS.
FOR EXTRA WORK RESULTING FROM CHANGED CONDITIONS UNLESS THE ENGINEER HAS APPROVED THE WORK IN
CONTRACTOR IS RESPONSIBLE FOR OBTAINING ANY OTHER REQUIRED OR RELATED PERMIT PRIOR TO
WRITING.
10.
ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER FACILITIES MUST
BEGINNING CONSTUCTION.
BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
T
3.
CONTRACTOR SHALL CALL THE UTILITIES UNDERGROUND LOCATION CENTER FOR FIELD LOCATION OF ALL UTILITIES
11.
ALL UTILITY TRENCHES AND ROADWAY SUBGRADE SHALL BE BACKFILLED AND COMPACTED TO 95 2.
ALL LOCATIONS OF EXISTING UTILITIES HAVE BEEN ESTABLISHED BY FIELD SURVEY AND AVAILABLE
AND SHALL NOT BEGIN EXCAVATION UNTIL ALL KNOWN UNDERGROUND FACILITIES IN THE VICINITY OF THE
PERCENT DENSITY, STANDARD PROCTOR.
RECORDS AND SHOULD THEREFORE, BE CONSIDERED ONLY APPROXIMATE AND NOT NECESSARILY
PROPOSED WORK HAVE BEEN LOCATED AND MARKED. IF THE UTILITY IS NOT A SUBSCRIBER OF THE UNDERGROUND
12.
OPEN CUTTING OF EXISTING ROADWAYS FOR NON -FRANCHISED UTILITY OR STORM DRAINAGE WORK IS
COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR TO INDEPENDENTLY VERIFY THE
LOCATION CENTER THEN THE CONTRACTOR SHALL GIVE NOTICE TO THAT UTILITY.
NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF RENTON AND NOTED ON THESE
ACCURACY OF ALL UTILITY LOCATIONS AND TO DISCOVER AND AVOID ANY OTHER UTILITIES NOT SHOWN
WHICH MAY BE AFFECTED BY THE IMPLEMENTATION OF THIS PLAN.
APPROVED PLANS. ANY OPEN CUT SHALL BE RESTORED IN ACCORDANCE WITH THE CITY OF RENTON
4.
THE CONTRACTOR IS RESPONSIBLE FOR REVIEW OF ALL UTILITY PURVEYOR, AND CITY OR STATE RECORDS
TRENCH RESTORATION STANDARDS.
RELATIVE TO THE EXISTING UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR AVOIDING DAMAGE
3.
ALL ASPHALT (HMA) WORK IN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO THE CITY OF RENTON
TO THESE FACILITIES AND SHALL RESTORE ALL UTILITIES AT CONTRACTOR'S OWN EXPENSE.
13.
ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO CLEARING AND BUILDING
STANDARDS AND SPECIFICATIONS.
CONSTRUCTION, AND THEY MUST BE SATISFACTORILY MAINTAINED UNTIL CONSTRUCTION IS
z
5.
VERIFY THAT ALL UTILITY SERVICES TO BE DEMOLISHED HAVE BEEN DISCONNECTED.
COMPLETED AND THE POTENTIAL FOR ON -SITE EROSION HAS PASSED. 4.
ALL ASPHALT (HMA) WORK ON THE PROJECT SITE SHALL CONFORM TO THE "2016 WASHINGTON STATE
w
14.
ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION PRIOR TO OR IN
DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL
CC
6.
ERECT BARRIERS, SHORING AND THE LIKE TO PROTECT PERSONNEL, CONSTRUCTION AND VEGETATION TO REMAIN.
CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS OTHERWISE APPROVED BY THE PUBLIC
CONSTRUCTION".
G
0-
COMPLY WITH ALL STATE AND LOCAL AGENCY REQUIREMENTS.
WORKS DEPARTMENT, SURFACE WATER UTILITY SECTION.
5.
ALL ASPHALT (HMA) PAVEMENT SHALL BE PLACED IN ACCORDANCE WITH WSDOT/APWA SECTION 5-04
O
7.
DO NOT SHUT OFF OR CAP UTILITIES WITHOUT PRIOR NOTICE. COORDINATE WORK WITH LOCAL UTILITY PURVEYORS.
15.
ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN
UNLESS OTHERWISE SPECIFICALLY NOTED.
J
ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON STANDARD SPECIFICATION FOR ROAD AND
w
8.
MAINTAIN VEHICULAR AND PEDESTRIAN TRAFFIC ROUTES: ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS,
BRIDGE CONSTRUCTION. THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE 6.
PROOF ROLL AND REMOVE ANY SOFT SPOTS. REPLACE REMOVED MATERIAL WITH STRUCTURAL FILL PER
> >
SIDEWALKS, AND ADJACENT FACILITIES; DO NOT CLOSE OR OBSTRUCT STREETS, SIDEWALKS, OR PASSAGEWAYS
TOP OF THE FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
THE GEOTECHNICAL ENGINEER. CONTRACTOR SHALL TEST AND VERIFY SUBGRADE MEETS COMPACTION
Ljj
WITHOUT PERMISSION FROM AUTHORITIES HAVING JURISDICTION; MAINTAIN FIRE ACCESS ALONG ACCESS ROAD AT
BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE
REQUIREMENTS PRIOR TO PAVING.
0
ALL TIMES; MEET ALL APPLICABLE CODES AND ORDINANCES.
SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING SHALL BE APWA
CLASS "C", WITH THE EXCEPTION OF PVC PIPE. 7.
STERILIZE ALL AREAS TO BE PAVED WITH A SOIL STERILANT, PRAMITOL 25E OR EQUAL, AS
9.
PROTECT FROM HARM ANY TREES, OR OTHER OBJECTS SELECTED TO REMAIN.
16.
STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT #1 OR BETTER INSIDE
RECOMMENDED BY THE MANUFACTURER.
IIr
AND OUTSIDE.
O
10.
DO NOT DAMAGE EXISTING CONSTRUCTION TO REMAIN.
17.
ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES SHALL HAVE SOLID LOCKING 8.
ASPHALT SHALL BE HMA CL. 1/2 INCH PG64-22, CONFORMING TO SECTION 9-3.8 OF THE WSDOT-APWA.
0
11.
RESTORE ANY IMPROVEMENTS DAMAGED BY THIS WORK TO THEIR ORIGINAL CONDITION, AS ACCEPTABLE TO
LIDS. ALL DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT RETENTION/DETENTION FACILITY 9.
SHALL HAVE SOLID LOCKING LIDS.
CRUSHED SURFACING SHALL BE PLACED IN ACCORDANCE WITH WSDOT- APWA SECTION 4-04 AND SHALL
OWNER. REPAIR ANY DAMAGE TO ADJACENT STRUCTURES, UTILITIES, SITE, AND WORK OF THIS CONTRACT TO
MEET THE REQUIREMENTS OF WSDOT-APWA 9-03.9(3).
REMAIN AT NO ADDITIONAL COST TO OWNER.
18.
BUILDING AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE 4.1 EASEMENT
12.
NO BLASTING ON SITE. DO NOT USE EXPLOSIVES.
WIDTHS AND BUILDING SETBACKS LINES. 10.
CONTRACTOR SHALL PREPARE THE EXISTING ASPHALT PAVEMENT SURFACE TO BE OVERLAID IN
O
19.
ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL.
ACCORDANCE WITH 5-04.3(5)A.
13.
SPRINKLE DEBRIS AS NECESSARY TO LIMIT DUST TO LOWEST PRACTICABLE LEVEL. DO NOT SPRINKLE TO EXTENT
CAUSING FLOODING, CONTAMINATED RUNOFF OR ICING.
20.
ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY OF RENTON RIGHT-OF-WAY SHALL BE OF SUFFICIENT 11.
SAWCUT EXISTING ASPHALT FULL DEPTH WHERE NEW PAVEMENT ABUTS EXISTING.Ir
14.
REMOVE EXISTING ABOVE -GRADE AND BELOW -GRADE IMPROVEMENTS AS INDICATED AND AS NECESSARY TO
LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF THE DRIVEWAY TO THE BOTTOM OF
O
FACILITATE NEW CONSTRUCTION. CARE SHALL BE TAKEN THAT DAMAGE DOES NOT OCCUR TO EXISTING PAVEMENT
THE DITCH. ROCK FOR EROSION PROTECTION OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF 12.
APPLY TACK COAT TO ALL EXISTING PAVEMENT SURFACES TO BE OVERLAID OR ABUTTED WITH NEW
LL
WHICH IS TO REMAIN IN PLACE AND THAT ALL PAVEMENT REMOVALS ARE ACCOMPLISHED BY MAKING A NEAT
SOUND QUARRY ROCK PLACED TO A DEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING
ASPHALT PAVEMENT. TACK COAT SHALL NOT BE APPLIED IN TEMPERATURES BELOW 50 DEGREES F.
VERTICAL SAW CUT AT THE BOUNDARIES OF THE AREA TO BE REMOVED.
SPECIFICATIONS:
4 - 8 INCH ROCK / 40 - 70% PASSING; 13.
CONTRACTOR SHALL PROTECT FROM DAMAGE ALL EXISTING FEATURES TO REMAIN. THE CONTRACTOR
15.
REMOVE TREES, GROWTH AND UNDERBRUSH AS REQUIRED FOR NEW CONSTRUCTION AND AS INDICATED. REMOVAL
o
2 4 INCH ROCK / 30 40 /o PASSING; AND
SHALL BE SOLELY RESPONSIBLE FOR REPAIRING OR REPLACING TO THE OWNER'S SATISFACTION ANY
w
OPERATIONS SHALL BE PERFORMED IN A MANNER TO PROTECT PROPERTY.
AREA THAT DEFACEMENT OR DAMAGE HAS OCCURRED AT NO COST TO THE OWNER.
( I)
LESS THAN 2 INCH ROCK / 10 - 20% PASSING.
Q
16.
MAKE CUTS AT CLOSEST PAVING JOINT.
21.
ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE STORM DRAINAGE 14.
CONTRACTOR SHALL AVOID UNNECESSARY DISTURBANCE TO STEEP SLOPES AS TO NOT INCREASE THE
SYSTEM, UNLESS APPROVED BY THE CITY PLAN REVIEWER OR SURFACE WATER UTILITY SECTION. AN
POTENTIAL FOR INSTABILITY AND EROSION.
17.
THE CONTRACTOR WILL BE RESPONSIBLE FOR FURNISHING, SETTING AND MARKING ALL LINE AND LOCATION STAKES,
ACCURATELY DIMENSIONED, CERTIFIED AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE
INCLUDING OFFSETS AND GENERAL CONSTRUCTION STAKING. WHEN WORK REQUIRES BEING ON SITE A QUALIFIED
SUBMITTED TO THE CITY UPON COMPLETION. 15.
CONTRACTOR SHALL NOT PAVE IN RAIN, WHEN SUBGRADE IS WET OR FROZEN, AND WHEN
C%)
LAYOUT ENGINEER, SURVEYOR, OR TECHNICAL SPECIALIST MUST BE ASSIGNED TO THE CONTRACTOR'S CREW
22
DRAINAGE OUTLETS (STUB OUTS) SHALL BE PROVIDED FOR EACH INDIVIDUAL LOT, EXCEPT FOR THOSE
TEMPERATURES ARE BELOW 40 DEGREES F.
I _WHILE
CONTROL IS BEING PERFORMED, ALL NECESSARY RELATED EQUIPMENT, SUPPLIES AND INSTRUMENTS SHALL
BE PRESENT ON SITE FOR THIS WORK. THIS EQUIPMENT AND PERSONNEL MUST BE AVAILABLE, AT NO ADDITIONAL
STUB -OUTS SHALL CONFORM TO THE FOLLOWING:
LOTS APPROVED FOR INFILTRATION BY THE CITY. 16.
CONTRACTOR SHALL PROTECT ALL FINISHED SURFACES. ALLOW NO HEAVY OBJECTS TO BE MOVED
z
COST TO OWNER FOR THE PURPOSE OF VERIFYING LAYOUT AND CERTIFYING THE ACCURACY OF WORK ON THE SITE.
A.
EACH OUTLET SHALL BE SUITABLY LOCATED AT THE LOWEST ELEVATION ON THE LOT, SO AS TO SERVICE ALL
OVER FINISHED SURFACES. CONTRACTOR SHALL REPAIR AT NO COST TO THE OWNER ANY RUTS, AREAS
Lij
FUTURE ROOF DOWNSPOUTS AND FOOTING DRAINS, DRIVEWAYS, YARD DRAINS, AND ANY OTHER SURFACE
SHOWING SETTLEMENT, AND ANY OBSTRUCTIONS TO POSITIVE DRAINAGE. CONTRACTOR SHALL NOT
2
18.
PROVIDE FOR THE PROTECTION OF PERSONS PASSING AROUND OR THROUGH THE AREA OF DEMOLITION.
OR SUBSURFACE DRAINS NECESSARY TO RENDER THE LOTS SUITABLE FOR THEIR INTENDED USE. EACH
ALLOW VEHICULAR TRAFFIC ON ASPHALT PAVEMENT UNTIL IT IS COOLED AND HARDENED AND IN NO
w
OUTLET SHALL HAVE FREE -FLOWING, POSITIVE DRAINAGE TO AN APPROVED STORMWATER CONVEYANCE
CASE SOONER THAN 6 HOURS AFTER PLACING.
>
19.
TRAFFIC: DO NOT OBSTRUCT WALKS OR PUBLIC WAYS WITHOUT THE WRITTEN PERMISSION OF GOVERNING
SYSTEM OR TO AN APPROVED OUTFALL LOCATION.
AUTHORITIES AND OF THE OWNER. WHERE ROUTES ARE PERMITTED TO BE CLOSED, PROVIDE ALTERNATE ROUTES IF
B.
OUTLETS ON EACH LOT SHALL BE LOCATED WITH A FIVE -FOOT -HIGH, 2" X 4" STAKE MARKED "STORM" OR 17.
CONTRACTOR WORK CORRECTIONS INCLUDE AGGREGATE SEPARATION, SOFT SPOTS, AND EXCESS
POROSITY. CONTRACTOR SHALL REPAIR RACKS, UNSATISFACTORY ELEVATION IRREGULARITIES
Q
REQUIRED.
"DRAIN".
THE STUB -OUT SHALL EXTEND ABOVE SURFACE LEVEL, BE VISIBLE, AND BE SECURED TO THE
IMMEDIATELY UPON NOTIFICATION, AND REPLACE ANY PAVING NOT DRAINING PROPERLY AT THE
20.
THE CONTRACTOR IS RESPONSIBLE FOR PRESERVING ALL BENCHMARKS AND STAKES AND THE REPLACEMENT OF
STAKE.
CONTRACTORS SOLE EXPENSE.
C
ANY THAT ARE DISPLACED OR MISSING.
C.
PIPE MATERIAL SHALL CONFORM TO UNDERDRAIN SPECIFICATIONS DESCRIBED IN CHAPTER 4 OF THE
G
_
SURFACE WATER DESIGN MANUAL AND, IF NON-METALLIC, THE PIPE SHALL BE PLACED IN A TRENCH WITH A 18.
LEAVE PREMISES CLEAN AND FREE OF RESIDUE OF WORK FROM PAVING.
0
21.
THE REFUSE RESULTING FROM CLEARING AND GRUBBING SHALL BE DISPOSED OF BY THE CONTRACTOR IN A
TRACING WIRE ABOVE OR OTHER ACCEPTABLE DETECTION.
MANNER CONSISTENT WITH ALL GOVERNMENT REGULATIONS. IN NO CASE SHALL REFUSE MATERIAL BE LEFT ON THE
D.
PRIVATE DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE SYSTEMS DESIGNED TO CONVEY FLOWS
Q
THE PROJECT SITE. DEBRIS SHALL NOT BE DEPOSITED IN ANY STREAM OR BODY OF WATER, WETLAND, OR IN ANY
THROUGH INDIVIDUAL LOTS.
PROJECT SITE, SHOVED ONTO ABUTTING PRIVATE PROPERTIES, OR BE BURIED IN EMBANKMENTS OR TRENCHES ON
STREET OR ALLEY, OR UPON ANY PRIVATE PROPERTY EXCEPT BY WRITTEN CONSENT OF THE PRIVATE PROPERTY
E.
THE APPLICANT/CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE LOCATIONS OF ALL STUBOUT
R-400502
>
Lij
CONVEYANCE LINES WITH RESPECT TO OTHER UTILITIES (E.G. POWER, GAS, TELEPHONE, TELEVISION).
OWNER. MAINTAIN HAULING ROUTES CLEAN AND FREE OF ANY DEBRIS RESULTING FROM DEMOLITION WORK ON THIS
J
PROJECT.
F.
ALL INDIVIDUAL STUB -OUTS SHALL BE PRIVATELY OWNED AND MAINTAINED BY THE LOT HOME OWNER.
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
0
O
G.
STORM DRAINAGE PIPE SYSTEMS SHALL NOT PENETRATE BUILDING FOUNDATIONS, EXCEPT FOR SUMP PUMP
m
DISCHARGE LINES USED TO DRAIN CRAWL SPACES, PROVIDED THE SUMP PUMP SYSTEM INCLUDES
z
BACKFLOW PREVENTION OR A CHECK VALVE.
O
z_
Call before you
RECORD DRAWINGS
/03/201
SURVEYED:
SCALE:
VERTICAL: NAVD 1988
HORIZONTAL- NAD 1983/1991
CITY
OF
LAKE WA BLVD IMPROVEMENTS
DATE:
09-03 2019
Cn
Q
DESIGNED;DALC
Djg. 8-1-1
`
PHASE III FOR SOUTHPORT DEVELOPMENT
FIELD800K:
or 1-800-424-5555
RENTON
PAGE:
/
DRAWN:
UNDERGROUND
LBJ
ONE INCH
DATUM
•
LLJ
DRAWING NO:
CHECKED:
TBB
AT FULL SCALE
SERVICE (USA)
Planning/Building/Public
Works Dept.
C3-001
N 0.
REVISION
BY
DATE
AP P R
IF NOT ONE INCH
SCALE ACCORDINGLY
GENERAL NOTES
APPROVED:
SHEET: ^ OF;
29