Loading...
HomeMy WebLinkAboutT-400510_0 0 ZAM 4:1 —1-11-H -L4 =4u FT-17-9 MI 4-1-44 FOR= =01A & 11 L4 ------- --- --- me `4 I H Nil E 7— L REPLACEMENT REQUIREMENTS • LOOP E SHALL BE IMSA 51-7 #12 OR #14 IN ORANGE PVC JACKET. • LOOP INSTAL N SHALL FOLLOW WSDOT STANDARD PLAN J-50.12 AND J-50.15-01. • LOOP INSTALLATION SH NOT TAKE PLACE IN TEMPERATU BELOW 40 DEGREES. • LOOPS SHALL NOT BE SEALED N THERE IS MIDI RE ON THE GROUND. • THE SAW CUTS SHALL BE OF UNIFORM S AND ANY SHARP EDGES, ABRASIONS, OR RIDGES SHALL BE REMOVED PRIOR RO CI THE WIRE. • ALL LOOPS SHALL BE INSTAL IN THE FINAL LEFT ASPHALT DESIGNATED IN THE CONTRACT. LOOP CONDUC S SHALL BE HELD AT THE B OM OF THE SAW CUT BY HIGH TEMPERATURE B ERS ROD SIZED TO FIT SNUGGLY IN SAWS CENTER ALONG THE ENTIRE LOO ND HOME RUN(S) AND AT THE ENTRANCE AND T OF ALL TURNS GREATER TA 45 DEGREES. IF NEW LOOPS ARE INSTALLED OVER EXIST LOOPS, THE OLD LO SHALL BE REMOVED BY GRINDING AND THE GRINDING SHALL B OUGH TO DE OY ANY EXISTING OPERATIONAL LOOP CONDUCTORS. T-40051 0 IN COMPLIANCE WITH CITY OF RENTON STANDARDS I 2 1 FIBER VAULT AND UGHT POLE CONFUCT JLS 11/06/18 3 SIGNAGE R SIONS Ems 01/28/19 TRAFFIC SIGNAL PLAN DETAILS 10/01/2016 19TENW 4 LIGHTING & SIGNAGE REVISIONS EMS 03/20/19 — JLS CITY OF LAKE WA BLVD IMPROVEMENTS F— Transportation Engineering NorthWest AS —GUILTS AW 09 04 19 jLS 0 RENTON PHASE III FOR SOUTHPORT DEVELOPMENT L T111111111111nnn, ­nlT QNI l� IF Cr 0 6 UDATUM .1, 1. 1—., A Is— Plan ning/Building/Pu Public Works Dept. 5)889 1747 EMS 1083 LAKE WASHINGTON BLVD N Prq—t contact: ElV. St —lei. P.E. NO. REVISION BY DATE APPR RENTON, WA 98055 ol' 1— 29 29