HomeMy WebLinkAboutT-400510_0
0
ZAM
4:1 —1-11-H
-L4 =4u
FT-17-9 MI
4-1-44 FOR= =01A & 11
L4
------- --- ---
me
`4
I H
Nil
E
7—
L
REPLACEMENT REQUIREMENTS
• LOOP E SHALL BE IMSA 51-7 #12 OR #14 IN ORANGE PVC JACKET.
• LOOP INSTAL N SHALL FOLLOW WSDOT STANDARD PLAN J-50.12 AND J-50.15-01.
• LOOP INSTALLATION SH NOT TAKE PLACE IN TEMPERATU BELOW 40 DEGREES.
• LOOPS SHALL NOT BE SEALED N THERE IS MIDI RE ON THE GROUND.
• THE SAW CUTS SHALL BE OF UNIFORM S AND ANY SHARP EDGES, ABRASIONS, OR
RIDGES SHALL BE REMOVED PRIOR RO CI THE WIRE.
• ALL LOOPS SHALL BE INSTAL IN THE FINAL LEFT ASPHALT DESIGNATED IN THE
CONTRACT. LOOP CONDUC S SHALL BE HELD AT THE B OM OF THE SAW CUT BY
HIGH TEMPERATURE B ERS ROD SIZED TO FIT SNUGGLY IN SAWS CENTER ALONG
THE ENTIRE LOO ND HOME RUN(S) AND AT THE ENTRANCE AND T OF ALL TURNS
GREATER TA 45 DEGREES. IF NEW LOOPS ARE INSTALLED OVER EXIST LOOPS, THE
OLD LO SHALL BE REMOVED BY GRINDING AND THE GRINDING SHALL B OUGH TO
DE OY ANY EXISTING OPERATIONAL LOOP CONDUCTORS.
T-40051 0
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
I
2 1 FIBER VAULT AND UGHT POLE CONFUCT JLS 11/06/18
3 SIGNAGE R SIONS Ems 01/28/19 TRAFFIC SIGNAL PLAN DETAILS 10/01/2016
19TENW 4 LIGHTING & SIGNAGE REVISIONS EMS 03/20/19 — JLS CITY OF LAKE WA BLVD IMPROVEMENTS F—
Transportation Engineering NorthWest AS —GUILTS AW 09 04 19 jLS 0 RENTON PHASE III FOR SOUTHPORT DEVELOPMENT L
T111111111111nnn, nlT QNI l�
IF Cr 0 6
UDATUM .1, 1. 1—., A Is— Plan ning/Building/Pu Public Works Dept.
5)889 1747 EMS 1083 LAKE WASHINGTON BLVD N
Prq—t contact: ElV. St —lei. P.E. NO. REVISION BY DATE APPR RENTON, WA 98055 ol'
1— 29 29