Loading...
HomeMy WebLinkAboutR-400515In O O 0 0 LJ I- 13+00 W 13+50 � i i if I I - 1S20 _ I _ NEW CATCH BASIN - I FlLTERRA, SEE SHEET C3-301 14 i 00 'EWEu�v CHANNEL OWN LWB STRUCTURAL EARTH WALL UTILITY DURING HILLSIDE STRUCTURAL ---------- EARTH WALL SEE _------------------------- SHEET C3-201 \ \ _ — — _----__ ` — — — -- -- _ — — _ �\�------N\ ---__ \ _-----__ --- —---- - - - - - - - - - - - - - - - - - _ — — — — — _---------- ----- - PLAN: JOHNS CREEK CHANNEL ELEV. = 10.00 AS -BUILT DRAWING 2.. Q L FS� a�9970NAL �1 7/ 16/18 BRIDGE RAILING TYPE BP Scale: 1" = 5'-0" LWB STRUCTURAL EARTH WALL L = 132'-0" PRECAST CONC. TRAFFIC BARRIER TYPE LWB STRUCTURAL SINGLE -SLOPE, STA 13+18 TO 14+63 EARTH WALL - NEW CATCH BASIN & FILTERRA, SEE SHEET C3-301 EXISTING PROPOSED LUMINAIRE UTILITY POLE CATCH BASIN n F & FILTERRA `-T- - -- 100 YR WSEL 25 YR WSEL L� -�-1 =21.07 20.94 L — , L_ — — — — — — — — — — — — — — — — J SHEARER DESIGN f3-boe7esbr. Ca;tr�chba ;rckeerh�„ In2ztmct,-e oesEyekNs 3613 Phinney Ave N. % B Seattle WA 98103 (206) 781.7830 W V.SHEARERDESIGN.NET ELEVATION: LWB STRUCTURAL EARTH WALL Scale: 1" = 10'-0" NO, I REVISION 3JL BY I DATE I APPR I PP° DRS DATUM LEGEND STRUCTURAL EARTH WALL STEPS (PLAN VIEW) STRUCTURAL EARTH WALL (ELEVATION) D o D o 0 STREAMBED SEDIMENT & 00 0000 00o STREAMBED COBBLES O O QUARRY SPALLS R-400515 IN COMPLIANCE WITH CITY OF RENTON STANDARDS CITY OF CHANNEL LAYOUT ' RENTON LAKE WA BLVD IMPROVEMENTS IRW PHASE III FOR SOUTHPORT DEVELOPMENT Planning/Building/Public Works Dept. 1083 LAKE WASHINGTON BLVD N RENTON, WA 98055 077/16/2018 S201 00 m co It O O U 7o r 0 O Q J N 00 O O O l[L