HomeMy WebLinkAboutR-400515In
O
O
0
0
LJ
I-
13+00 W 13+50 � i i if I
I - 1S20
_ I
_ NEW CATCH BASIN - I
FlLTERRA, SEE
SHEET C3-301
14 i 00 'EWEu�v
CHANNEL
OWN
LWB STRUCTURAL
EARTH WALL
UTILITY
DURING
HILLSIDE STRUCTURAL
---------- EARTH WALL SEE
_------------------------- SHEET C3-201
\ \ _ — — _----__ ` — — — -- -- _ — — _ �\�------N\
---__ \ _-----__ --- —---- - - - - - - - - - - - - - - - - - _
— — — — — _---------- ----- -
PLAN: JOHNS CREEK CHANNEL
ELEV. = 10.00
AS -BUILT DRAWING
2.. Q
L FS�
a�9970NAL �1
7/ 16/18
BRIDGE RAILING
TYPE BP
Scale: 1" = 5'-0"
LWB STRUCTURAL EARTH WALL L = 132'-0"
PRECAST CONC. TRAFFIC BARRIER TYPE LWB STRUCTURAL
SINGLE -SLOPE, STA 13+18 TO 14+63 EARTH WALL
- NEW CATCH BASIN
& FILTERRA, SEE
SHEET C3-301
EXISTING PROPOSED LUMINAIRE
UTILITY
POLE CATCH BASIN
n F & FILTERRA
`-T- - --
100 YR WSEL 25 YR WSEL
L� -�-1 =21.07 20.94
L — ,
L_ — — — — — — — — — — — — — — — — J
SHEARER DESIGN
f3-boe7esbr. Ca;tr�chba ;rckeerh�„ In2ztmct,-e oesEyekNs
3613 Phinney Ave N. % B
Seattle WA 98103
(206) 781.7830
W V.SHEARERDESIGN.NET
ELEVATION: LWB STRUCTURAL EARTH WALL
Scale: 1" = 10'-0"
NO, I REVISION
3JL
BY I DATE I APPR I PP° DRS
DATUM
LEGEND
STRUCTURAL EARTH WALL STEPS
(PLAN VIEW)
STRUCTURAL EARTH WALL
(ELEVATION)
D o D o 0
STREAMBED SEDIMENT &
00 0000 00o
STREAMBED COBBLES
O O
QUARRY SPALLS
R-400515
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
CITY OF CHANNEL LAYOUT
' RENTON LAKE WA BLVD IMPROVEMENTS
IRW PHASE III FOR SOUTHPORT DEVELOPMENT
Planning/Building/Public Works Dept. 1083 LAKE WASHINGTON BLVD N
RENTON, WA 98055
077/16/2018
S201
00
m
co
It
O
O
U
7o
r
0
O
Q
J
N
00
O
O
O
l[L