Loading...
HomeMy WebLinkAboutR-396108SEC. 14, TWP 23 N, R5E W.M. T (.0 (3) C'M 0 LEI Q II LU O 0 a LU 5 w Q z E. TOE FACE 1'TALL 1'WIDE CMU WALL (TYP.) NE9 COR BRICK PA — 1 'WIDE 3.3'TALL STEM WALL X FFE=387.5' WEST END OF UTILITY PAINT MARKINGS APPROX. LOCATION OF WATER MAIN NOTES: 1. TEMPORARY CULVERTS, INTERCEPTOR DITCHES, AND CHECK DAMS ARE SHOWN APPROXIMATE. ACTUAL LIMITS AND LOCATIONS MAY VARY TO FACILITATE SITE CONDITIONS AND CONSTRUCTION ACTIVITIES. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED AS DEEMED NECESSARY BY THE CITY OF RENTON INSPECTOR. 2. ALL EXISTING BUILDINGS, FENCES, AND OTHER STRUCTURAL IMPROVEMENTS IDENTIFIED WITHIN THE CLEARING LIMITS SHALL BE REMOVED AND PROPERLY DISPOSED PRIOR TO CLEARING. A SEPARATE DEMOLITION PERMIT SHALL BE SUBMITTED AND APPROVED BY THE CITY FOR ANY BUILDING OR STRUCTURE REMOVAL. 3. PERMANENT STORM DRAINAGE FACILITIES MAY BE USED FOR TEMPORARY STORM WATER COLLECTION AND CONVEYANCE CONTROLS IN CONJUNCTION WITH NECESSARY TEMPORARY BMP'S DURING CONSTRUCTION. ALL PERMANENT STORM DRAIN FACILITIES ACTIVE DURING CONSTRUCTION SHALL BE CLEANED AND/OR REPAIRED TO GOOD WORKING CONDITION PRIOR TO FINAL PROJECT CLOSEOUT. 4. ALL TREES WITHIN THE CLEARING LIMITS, EXCEPT AS NOTED TO BE PROTECTED SHALL BE REMOVED. 5. ADDITIONAL EROSION CONTROL MEASURES MAY BE REQUIRED AS DEEMED NECESSARY BY THE CITY OF REN TON. 6. THE SOIL MOISTURE HOLDING CAPACITY OF ALL NEW PERVIOUS SURFACE THAT AT PROJECT COMPLETION WILL NOT BE COVERED BY IMPERVIOUS SURFACE OR INCORPORATED INTO A DRAINAGE FACILITY MUST BE PROTECTED. THE DUFF LAYER AND NATIVE TOPSOIL SHALL BE RETAINED IN AN UNDISTURBED STATE TO THE MAXIMUM EXTENT FEASIBLE. 7. ANY DUFF LAYER OR TOPSOIL REMOVED DURING GRADING SHALL BE STOCKPILED ONSI TE IN A DESIGNATED, CONTROLLED AREA NOT ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS. THE MATERIAL SHALL BE REAPPLIED TO OTHER PORTIONS OF THE SITE WHERE FEASIBLE. 8. THE SOIL IN ANY AREA THAT HAS BEEN COMPACTED OR THAT HAS HAD SOME OR ALL OF THE DUFF LAYER OR UNDERLYING TOPSOIL REMOVED SHALL BE AMENDED TO MITIGATE FOR LOSS OF MOISTURE -HOLDING CAPACITY IN ACCORDANCE WITH THE REQUIRED SOIL AMENDMENTS ON SHEET C1.02. CONTRACTOR SHALL PROVIDE METHODS AND MATERIALS FOR SOIL AMENDMENT TO PROJECT ENGINEER AND/OR LANDSCAPE ARCHITECT FOR APPROVAL PRIOR TO CONSTRUCTION. 9. WATERING FOR DUST CONTROL MEASURES SHALL BE PERFORMED AND PROVIDED BY THE CONTRACTOR AS NECESSARY. 10. CLEARING, GRADING, AND RELATED ACTIVITIES FOR THIS PROJECT ARE SUBJECT TO THE APPLICABLE CONDITIONS OF THE DEPARTMENT OF ECOLOGY'S CONSTRUCTION STORMWATER GENERAL PERMIT (CSWGP). A COPY OF THE LETTER FROM THE DOE GRANTING COVERAGE UNDER THE CSWGP SHALL BE PROVIDED TO THE CITY PRIOR TO ANY CONSTRUCTION ACTIVITIES DISTURBING MORE THAN ONE ACRE OF THE SITE. NPDES PERMIT NO. WAR-305741. 420 ar'I� 15 420 Q, Q � OF SEWER MAIN I� L 390 EXIST. GRADE cn 390 8" PVC IE=378.69 360 360 330 330 CROSS SECTION A SCALE: 1 "=30' STA. 2+37.92 'BWFNC CONT'S N. GA TE 1'xl' CMU WALL — WEST CONT'S E. ALONG FENCE 16'F 16 ",18'; 20'F V_ 420 c�,4 15'420______ p Q OF SEWER MAIN I � I W i w 390 EXIST. GRADE � � 390 800 PVC SS—.�<�I IE=379.53 38`-� 360 360 330 330 CROSS SECTION B SCALE. 1 "=30' NOTE: DISTURBED AREA SHALL BE HYDROSEEDED AND RESTORED IN -KIND CONSTRUCTION PERMIT SUBMITTAL PCE 2/20/ CONSULTANTS , CONSTRUCTION RECORD DRAWINGS ACS 27 Site Planning - Civil Engineering , Land Use Consulting - Project Management 11431 WILLOWS RD. NE, SUITE 120 REDMOND, WA 98052 Phone: (425) 285-2390 1 FAX: (425) 285-2389 Know what's below. www.cphconsuItants.com N0. REVISION BY DATE sht n 901R CPH Cnnciiltnntc I I C All Riahtc RPRPY\/afI Call before you dip. STA. 3+85.48 J B S SURVEYED: VITCH EVANS JBS DESIGNED: JAVIE SCHROEDER DRAWN: PETER EVANS CHECKED: VJH AP P R APPROVED: xxx SCALE: 1 " = 30' ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY SEE C1.02 x � Ilk, I �I I- TALL CONCRETE— ^ ` RUBB�WALL I , CROSS SECTION C SCALE: 1 "=30' VERTICAL: NAVD 1988 HORIZONTAL: NAD 1983/1991 DATU M r T eI� I SEE C1.01 MY OF RENTON • Planning/Building/Public Works Dept. CONSTRUCTION NOTES OSTABILIZED CONSTRUCTION ENTRANCE PER COR STD. PLAN 215.10 ON SHEET C1.100. OTREE PROTECTION FENCE PER DETAIL ON SHEET C1.101. OSILT FENCE PER COR STD. PLAN 214.00 ON SHEET C1.100. OAPPROX. LIMIT OF GRADING, SEE TYPICAL CLEARING LIMITS DETAIL ON SHT. C1.101. OCONSTRUCTION FENCING PER DETAIL ON SHEET C1.101. OINTERCEPTOR SWALE PER COR STD. PLAN 217.10 ON SHEET C1.100. O7 CHECK DAM AND SPACING PER COR STD. PLAN 217.40. O12" TEMP. CULVERT, APPROX. LENGTH AND SIZE PER PLAN, S=27. MIN. OGRAVEL CONE FILTER AND RISER PER DETAIL ON SHEET C1.101. S1.0 CY MIN. QUARRY SPALLS AT PIPE OR DITCH INLET OR OUTFALL. 11 CATCH BASIN FILTER PER COR STD. PLAN 216.30 ON SHEET C1.100 12 TEMP. SED. POND PER DETAIL ON SHEET C1.101. 13 PERMANENT STORM DRAINAGE IMPROVEMENTS UTILIZED WITH TESC MEASURES, SEE SHT. C2.00 FOR DETAILS. LEGEND —X X X— SILT FENCE TREE PROTECTION FENCING CONSTRUCTION FENCING TEMPORARY INTERCEPTOR DITCH WITH ROCK CHECK DAM SD PERMANENT SD FACILITY (SEE NOTE 3) RIP-RAP/QUARRY SPALL PAD O CATCH BASIN INLET PROTECTION TEMPORARY CULVERT PROTECT EXIST. TREE, 0 SEE TREE PROTECTION DETAIL ON SHEET C1.101 STA. 6+10.49 ASS OVAL AR CONSTRUCTION RECORD DRAWING N THE AS —BUILT INFORMATION SHOWN ON THIS PLAN IS PER A FIELD SURVEY 0 30 60 PERFORMED AND DATA PROVIDED BY AXIS SURVEY & MAPPING AND/OR R-396108 PLAN IN FEET RECORD ITH�RMATION CON CONTRACTOR PROVIDEDBY IN COMPLIANCE WITH CITY OF RENTON STANDARDS MEADOWVUE ROADWA Y GRADING, DRAINAGE AND SANITARY SEWER IMPROVEMENTS TESC PLAN 7/25/18 FIELDBOOK: PAGE: DRAWING N0: C1.03 8 43