Loading...
HomeMy WebLinkAboutTV Inspection 1609 Central Ave S Ar,___UGET Kent WA 98032 United States CONS'1'RL C'1'1LINI Stutvicrs, INC Pgylivx1A-1 - C 1,1002-0-(6 Main Inspections Pipe Run Project name: Mainline ID: City: Address: MEADOW VIEW MV-SMH 25 TO MV-SMH 30 RENTON 13833 156TH AVE SE Start date/time: Direction: Weather: Surface condition: 7/25/2018 12:16 PM Against the flow Dry Dirt Pipe shape: Pipe material: Pipe height: Pipe width: Circular PVC 8.0 in. 8.0 in. Manhole'MV-SMH 30' Stopped at 367,7 ft.against flaw— •! ! At 367.7 R. on 7/25/2018 1:08:54 PM End of Pipe Category:Inventory At 341,4 ft.9/.418 # Lateral --- !a 4 I,At 333.6 ft.3/. Category:Inventory Lateral Category:Inventory !al O At 245.7 R.3/. At 237.9 ft.9/.0 a ! Lateral Lateral ` Category:Inventory Category:Inventory 1▪ t-, h :D cD M M S N a At 168.7 ft.9/•41,2 ! .a 41,t 173.2 ft.3/. Lateral . . ..LLateral Category: Inventory Category:Inventory - '3).. E At 94.8 R.9/. + 4 a 41b At 99.5 ft.3/. Lateral Lateral Category:Inventory Category:Inventory At 25.6 ft 9/.4 a ! _!i�0 At ft.3/. Lateral t Lateeralra/ Category:Inventory Category:Inventory Started at 0.0 ft.against flow i, on 7/25/2018 12:16:42 PM -- Manhole'MV-SMH 25' Main Inspections Pipe Run Wednesday,July 25, 2018 3:17 PM Page 1 of 1 1609 Central Ave S Kent WA 98032 PUGET United States CILIA S'l ILL CHUN SERVICES, INC, c, Main Inspections Pipe Run Project name: Mainline ID: City: Address: MEADOW VIEW MV-SMH 25 TO MV-SMH 20 RENTON 13833 156TH AVE SE Start date/time: Direction: Weather: Surface condition: 7/25/2018 1:11 PM With the flow Dry Dirt Pipe shape: Pipe material: Pipe height: Pipe width: Circular PVC 8.0 in. 8.0 in. Manhole'MV-SMH 25' Started at 0.0 ft.with flow-- + on 7/25/2018 1:11:32 PM j At 7.5 ft tel +.._..,.;,.,'1- 1/4 µ1/4"PONDING At 27.2 ft. $ +................... 1/4"PONDING 01". 443 1•At 37.1 ft.9/. At 40.4 ft. e + Lateral 1/2'PONDING Category: Inventory At 44,2 ft.3/.41'$ + Lateral Category:Inventory At 68.8 ft. f + 3/8"PONDING N At110.6ft. a + 3/8"PONDING At 114,5 ft.3/.0$ + taterat Category:Inventory At 140.7 ft. ilk + 1/4"PONDING c At 167.2 ft. el 1/4'PONDING ^� At 175.8 ft.3/.41,iris + Lateral Category:Inventory At197.7ft. $ i ��■ 1/4"PONDING At225.5ft. $ + c 1/4"PONDING At 254.0 ft. i� + 1/4-PONDING Stopped at 256.2 ft.with flow on 7/25/2018 1:28:18 PM Manhole'MV-SMH 20' Main Inspections Pipe Run Wednesday,July 25, 2018 3:17 PM Page 1 of 1 1609 Central Ave S Kent WA 98032 FL ET United States (-ONiS 1"!!L CT/UN SERVICER, INC. Main Inspections Pipe Run Project name: Mainline ID: City: Address: MEADOW VIEW MV-SMH 15 TO MV-SMH 20 RENTON 13833 156TH AVE SE Start date/time: Direction: Weather: Surface condition: 7/25/2018 1:58 PM Against the flow Dry Dirt Pipe shape: Pipe material: Pipe height: Pipe width: Circular PVC 8.0 in. 8.0 in. Manhole'MV SMH 20' Stopped at 163.4 ft.against flow-- /N on 7/25/2018 2:12:57 PM # __...._. At 142.5 fL 11111 1/4"PONDING At128.0ft. a + 1/4"PONDING V: v rh ri 4 4 t 4 ,r At72.7ft. 1111 E . 1/4'PONDING At 29.9 ft. al + 114'PONDING a: At 7.9 f. lll! 1/4'PONDING Started at 0.0 ft.against flow 4 ......_ on 7/25/2018 1:58:46 PM Manhole'MV-15' Main Inspections Pipe Run Wednesday,July 25, 2018 3:17 PM Page 1 of 1 1609 Central Ave S Kent WA 98032 PCGIET United States COIN D'L`!!L C'1'!U tN SERVICES, INC, Main Inspections Pipe Run Project name: Mainline ID: City: Address: MEADOW VIEW MV-SMH 15 TO MV-SMH 10 RENTON 13833 156TH AVE SE Start date/time: Direction: Weather: Surface condition: 7/25/2018 2:15 PM With the flow Dry Dirt Pipe shape: Pipe material: Pipe height: Pipe width: Circular PVC 8.0 in. 8.0 in. Manhole'MV-SMH 15' Started at 0.0 ft.with flow--...................... on 7/25/2018 2:15:47 PM At 0.0 ft. a 1/4"PONDING At 57.0 ft. + 1/4"PONDING At 74.4 ft. fid 1/4"PONDING At98.8ft. @ + • 1/4"PONDING At 128.6 ft. di + 1/4"PONDING ^� ri c o At157.2ft. � + try Wi M 1/4"PONDING At 180.9 ft. ilk + 1/4"PONDING --1 At 199.7 ft. 1/4"PONDING At206.2ft. a + '. 3/8"PONDING At 207.8 ft. + 1/2"PONDING At 222.6 ft. 18 + 3/8"PONDING At 269.3 ft. f® i [ 1/4"PONDING At 298.0 ft. 1111 + • 1/4"PONDING � .. At 324.9 ft. III + 1/4"PONDING Stopped at 373.0 ft.with flow .. ...._.... on 7/25/2018 2:42:39 PM Manhole'MV-SMH 10' Main Inspections Pipe Run Wednesday,July 25, 2018 3:17 PM Page 1 of 1 • 1609 Central Ave S Kent WA 98032 EGET United States CON STILL crier SERVICES, INC, Main Inspections Pipe Run Project name: Mainline ID: City: Address: MEADOW VIEW MV-SMH 10 TO MV-SMH 5 RENTON 13833 156TH AVE SE Start date/time: Direction: Weather: Surface condition: 7/25/2018 2:43 PM With the flow Dry Dirt Pipe shape: Pipe material: Pipe height: Pipe width: Circular PVC 8.0 in. 8.0 in. Manhole'MV-SMH 10' Started at 0.0 ft.w th flow—" + �r on 7/25/2018 2:43:26 PM At 38.9 ft, fl + 1/4"PONDING �. At 50.5 ft. di +..... ... �.. ., 1/4 PONDING At 65.1 ft. U + C": 1/4"PONDING At79.6ft. id + �;t 1/4"PONDING e At95.9ft. W + rn Q 1/4"PONDING 1 . r4 At 105.5 ft. di + '- 1/4 1/4"PONDING fi At 127.8 ft. + 1/4"PONDING At 138.2 ft. + 1/4"PONDING 'c At150.1ft. a + /ry tR 1/4"PONDING At 178.3 ft. a + 1/4"PONDING At 193.4 ft. a + 3/4"PONDING At 205.5 ft. a + 1/4"PONDING At 218.2 ft. GI * • 1/4"PONDING At 228.5 ft. + 1/4"PONDING fix"At 236.0 ft. ai + r, 1/4"PONDING At 246.9 ft. id + 1/4"PONDING At 265.2 ft. SI 3/8"PONDING Manhole'MV-SMH 5' Stopped at 268.9 ft.with flow on 7/25/2018 2:57:05 PM Main Inspections Pipe Run Wednesday, July 25, 2018 3:17 PM Page 1 of 1