HomeMy WebLinkAboutTV Inspection 1609 Central Ave S
Ar,___UGET Kent WA 98032
United States
CONS'1'RL C'1'1LINI
Stutvicrs, INC Pgylivx1A-1 -
C 1,1002-0-(6
Main Inspections Pipe Run
Project name: Mainline ID: City: Address:
MEADOW VIEW MV-SMH 25 TO MV-SMH 30 RENTON 13833 156TH AVE SE
Start date/time: Direction: Weather: Surface condition:
7/25/2018 12:16 PM Against the flow Dry Dirt
Pipe shape: Pipe material: Pipe height: Pipe width:
Circular PVC 8.0 in. 8.0 in.
Manhole'MV-SMH 30'
Stopped at 367,7 ft.against flaw— •! ! At 367.7 R.
on 7/25/2018 1:08:54 PM
End of Pipe
Category:Inventory
At 341,4 ft.9/.418 #
Lateral --- !a 4 I,At 333.6 ft.3/.
Category:Inventory Lateral
Category:Inventory
!al O At 245.7 R.3/.
At 237.9 ft.9/.0 a ! Lateral
Lateral ` Category:Inventory
Category:Inventory
1▪ t-,
h
:D cD
M M
S
N
a At 168.7 ft.9/•41,2 ! .a 41,t 173.2 ft.3/.
Lateral . . ..LLateral
Category: Inventory
Category:Inventory
- '3)..
E
At 94.8 R.9/. + 4 a 41b At 99.5 ft.3/.
Lateral Lateral
Category:Inventory Category:Inventory
At 25.6 ft 9/.4 a ! _!i�0 At ft.3/.
Lateral t Lateeralra/
Category:Inventory
Category:Inventory
Started at 0.0 ft.against flow i,
on 7/25/2018 12:16:42 PM --
Manhole'MV-SMH 25'
Main Inspections Pipe Run Wednesday,July 25, 2018 3:17 PM Page 1 of 1
1609 Central Ave S
Kent WA 98032
PUGET United States
CILIA S'l ILL CHUN
SERVICES, INC,
c,
Main Inspections Pipe Run
Project name: Mainline ID: City: Address:
MEADOW VIEW MV-SMH 25 TO MV-SMH 20 RENTON 13833 156TH AVE SE
Start date/time: Direction: Weather: Surface condition:
7/25/2018 1:11 PM With the flow Dry Dirt
Pipe shape: Pipe material: Pipe height: Pipe width:
Circular PVC 8.0 in. 8.0 in.
Manhole'MV-SMH 25'
Started at 0.0 ft.with flow-- +
on 7/25/2018 1:11:32 PM j
At 7.5 ft tel +.._..,.;,.,'1-
1/4
µ1/4"PONDING
At 27.2 ft. $ +...................
1/4"PONDING 01". 443 1•At 37.1 ft.9/.
At 40.4 ft. e + Lateral
1/2'PONDING Category: Inventory
At 44,2 ft.3/.41'$ +
Lateral
Category:Inventory
At 68.8 ft. f +
3/8"PONDING
N
At110.6ft. a +
3/8"PONDING
At 114,5 ft.3/.0$ +
taterat
Category:Inventory
At 140.7 ft. ilk +
1/4"PONDING
c
At 167.2 ft. el
1/4'PONDING ^�
At 175.8 ft.3/.41,iris +
Lateral
Category:Inventory
At197.7ft. $ i ��■
1/4"PONDING
At225.5ft. $ + c
1/4"PONDING
At 254.0 ft. i� +
1/4-PONDING
Stopped at 256.2 ft.with flow
on 7/25/2018 1:28:18 PM
Manhole'MV-SMH 20'
Main Inspections Pipe Run Wednesday,July 25, 2018 3:17 PM Page 1 of 1
1609 Central Ave S
Kent WA 98032
FL ET United States
(-ONiS 1"!!L CT/UN
SERVICER, INC.
Main Inspections Pipe Run
Project name: Mainline ID: City: Address:
MEADOW VIEW MV-SMH 15 TO MV-SMH 20 RENTON 13833 156TH AVE SE
Start date/time: Direction: Weather: Surface condition:
7/25/2018 1:58 PM Against the flow Dry Dirt
Pipe shape: Pipe material: Pipe height: Pipe width:
Circular PVC 8.0 in. 8.0 in.
Manhole'MV SMH 20'
Stopped at 163.4 ft.against flow--
/N
on 7/25/2018 2:12:57 PM # __...._.
At 142.5 fL 11111
1/4"PONDING
At128.0ft. a +
1/4"PONDING
V: v
rh ri
4 4
t
4 ,r
At72.7ft. 1111
E . 1/4'PONDING
At 29.9 ft. al +
114'PONDING
a:
At 7.9 f. lll!
1/4'PONDING
Started at 0.0 ft.against flow 4 ......_
on 7/25/2018 1:58:46 PM
Manhole'MV-15'
Main Inspections Pipe Run Wednesday,July 25, 2018 3:17 PM Page 1 of 1
1609 Central Ave S
Kent WA 98032
PCGIET United States
COIN D'L`!!L C'1'!U tN
SERVICES, INC,
Main Inspections Pipe Run
Project name: Mainline ID: City: Address:
MEADOW VIEW MV-SMH 15 TO MV-SMH 10 RENTON 13833 156TH AVE SE
Start date/time: Direction: Weather: Surface condition:
7/25/2018 2:15 PM With the flow Dry Dirt
Pipe shape: Pipe material: Pipe height: Pipe width:
Circular PVC 8.0 in. 8.0 in.
Manhole'MV-SMH 15'
Started at 0.0 ft.with flow--......................
on 7/25/2018 2:15:47 PM
At 0.0 ft. a
1/4"PONDING
At 57.0 ft. +
1/4"PONDING
At 74.4 ft. fid
1/4"PONDING
At98.8ft. @ + •
1/4"PONDING
At 128.6 ft. di +
1/4"PONDING ^�
ri
c o At157.2ft. � +
try Wi
M 1/4"PONDING
At 180.9 ft. ilk +
1/4"PONDING --1
At 199.7 ft.
1/4"PONDING
At206.2ft. a + '.
3/8"PONDING
At 207.8 ft. +
1/2"PONDING
At 222.6 ft. 18 +
3/8"PONDING
At 269.3 ft. f® i [
1/4"PONDING
At 298.0 ft. 1111 + •
1/4"PONDING � ..
At 324.9 ft. III +
1/4"PONDING
Stopped at 373.0 ft.with flow .. ...._....
on 7/25/2018 2:42:39 PM
Manhole'MV-SMH 10'
Main Inspections Pipe Run Wednesday,July 25, 2018 3:17 PM Page 1 of 1
• 1609 Central Ave S
Kent WA 98032
EGET United States
CON STILL crier
SERVICES, INC,
Main Inspections Pipe Run
Project name: Mainline ID: City: Address:
MEADOW VIEW MV-SMH 10 TO MV-SMH 5 RENTON 13833 156TH AVE SE
Start date/time: Direction: Weather: Surface condition:
7/25/2018 2:43 PM With the flow Dry Dirt
Pipe shape: Pipe material: Pipe height: Pipe width:
Circular PVC 8.0 in. 8.0 in.
Manhole'MV-SMH 10'
Started at 0.0 ft.w th flow—" + �r
on 7/25/2018 2:43:26 PM
At 38.9 ft, fl +
1/4"PONDING �.
At 50.5 ft. di +..... ... �.. .,
1/4 PONDING
At 65.1 ft. U + C":
1/4"PONDING
At79.6ft. id + �;t
1/4"PONDING
e At95.9ft. W +
rn Q 1/4"PONDING 1 .
r4 At 105.5 ft. di + '-
1/4
1/4"PONDING
fi At 127.8 ft. +
1/4"PONDING
At 138.2 ft. +
1/4"PONDING
'c At150.1ft. a + /ry
tR 1/4"PONDING
At 178.3 ft. a +
1/4"PONDING
At 193.4 ft. a +
3/4"PONDING
At 205.5 ft. a +
1/4"PONDING
At 218.2 ft. GI * •
1/4"PONDING
At 228.5 ft. +
1/4"PONDING fix"At 236.0 ft. ai + r,
1/4"PONDING
At 246.9 ft. id +
1/4"PONDING
At 265.2 ft. SI
3/8"PONDING Manhole'MV-SMH 5'
Stopped at 268.9 ft.with flow
on 7/25/2018 2:57:05 PM
Main Inspections Pipe Run Wednesday, July 25, 2018 3:17 PM Page 1 of 1