EXECUTIVE DEPARTMENT R
M E M O R A N D U M
DATE: February 12, 2018
TO: Ed Prince, Council President
Members of Renton City Council
FROM: Denis Law, Mayor
Jay Covington, Chief Administrative Officer
SUBJECT: Administrative Report
• On Wednesday, February 7th at approximately 9:30 a.m., a significant sinkhole at
900 Rainier Avenue North was noticed by police. Officer Marty Leverton
immediately contacted the Public Works Maintenance Division to report the
sinkhole affecting the northbound lanes. When maintenance crews arrived on -site it
was discovered that the sinkhole was caused by a failed storm system situated 15
feet deep. Further inspection of the system showed failure across the entire width
of Rainier Avenue North. City maintenance staff was required to close this portion
of Rainier Avenue North in both directions and set up detour routes shortly before
the afternoon commute began. Maintenance crews and the contractor worked non-
stop from Wednesday through Friday to repair the failed storm system and restore
pavement to a drivable condition before reopening the roadway.
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at
http://rentonwa.gov/trafficimpacts. Preventative street maintenance, traffic impact
projects, and road closures will be at the following locations:
✓ Monday, February 12th through Friday, February 16th, 7:00 a.m. to 3:30 p.m.
Utility maintenance crews will be conducting preventative sewer line
maintenance along Garden Avenue North. Expect intermittent lane closures
along Garden Avenue North between North 8th Street and Lake Washington
Blvd. (The Landing). Questions may be directed to Wastewater Maintenance
Lead Rocky Sittner at 425-902-2004.
✓ Monday, February 12th through Friday, February 16th, 7:00 a.m. to 3:30 p.m.
Additional truck traffic and hauling will occur in the vicinity of Valley Medical
Hospital related to the construction of the new Medical Office Building.
Questions may be directed to Tom Main at 206-999-1833.
Ed Prince, Council President
Members of Renton City Council
Page 2 of 3
February 12, 2018
✓ Monday, February 12th through Friday, February 16th, 9:00 a.m. to 3:00 p.m.
Single lane closure along northbound Talbot Road South between the
northbound 1-405 on -ramp and the southbound 1-405 off -ramp for the 1-405
Direct Connector Project. Questions may be directed to Rohini Nair at 206-999-
1822.
✓ Monday, February 12th through Friday, February 16th, 4:30 a.m. to 12:00 p.m.
Single lane closure along southbound Talbot Road South between the
northbound 1-405 on -ramp and the southbound 1-405 off -ramp for the 1-405
Direct Connector Project. Questions may be directed to Rohini Nair at 206-999-
1822.
✓ Monday, February 12th through Friday, February 16th, 9:00 a.m. to 2:30 p.m.
Expect intermittent lane closures and traffic delays along Talbot Road South (SR
515) related to the 1-405/SR 167 Interchange Direct Connector Project.
In addition, northbound and southbound nighttime lane restrictions and closures
along SR 167 and I-405 are also scheduled this week related to the project.
Questions may be directed to Craig Smiley, WSDOT 1-405/SR 167 Corridor
Communications, at 425-456-8624, or visit the project website at
http://www.wsdot.wa.gov/Pro*ects/1405/SR1671CDirectConnector.
✓ Monday, February 12th through Friday, February 16th, 8:30 a.m. to 3:00 p.m.
Lane closures on SR 169 at 152nd Avenue SE for utility construction. Questions
may be directed to Tom Main at 206-999-1833.
✓ Monday, February 12th through Friday, February 16th. Expect intermittent
daytime lane closures along SE 5th Street from the intersection of SE 5th Street
and SE 6th Street to Pierce Avenue SE to accommodate sidewalk rehabilitation
and replacement. Questions may be directed to Hebe Bernardo at 206-503-
4194.
✓ Monday, February 12th through August 2018, 8:30 a.m. to 4:45 p.m. Additional
construction traffic due to the construction of Sartori Elementary School at the
300 block of Park Avenue North and Garden Avenue North. Questions may be
directed to Patrick DeCaro at 425-207-6013.
✓ Monday, February 12th through December 2018. Road Closure on South 14th
Street between Smithers Avenue South and Davis Avenue South for utility
construction. Questions may be directed to Patrick DeCaro at 425-207-6013.
✓ Monday, February 12th through October 2019. Construction for the Renton Hill
Utility project has commenced and is expected to last 20 months, with
Ed Prince, Council President
Members of Renton City Council
Page 3 of 3
February 12, 2018
anticipated completion in May 2019. Following completion of the utility project,
an overlay of affected surface streets will be conducted as part of the 2019
overlay project. The overlay is scheduled to be completed prior to October 31,
2019.