Loading...
HomeMy WebLinkAboutAdmin Reportt;` EXECUTIVE DEPARTMENT R M E M O R A N D U M DATE: September 17, 2018 TO: Ed Prince, Council President Members of Renton City Council FROM: Denis Law, Mayor Robert Harrison, Chief Administrative Officer SUBJECT: Administrative Report • Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/trafficimpacts. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations: ✓ Monday, September 17 through Friday, September 21, 2018: Expect intermittent lane closures along 140th Way SE between SR 169 and SE 158th Street between 7 a.m. and 4:30 p.m. while street maintenance crews conduct crack sealing. Questions may be directed to Street Maintenance Supervisor John Kalmbach at (425) 766-6183. ✓ Monday, September 17th through Friday, September 21st, 8:00 p.m. to 7:00 a.m. East Valley Road will be reduced to one lane at the intersection of SW 19th Street for 1-405 Direct Connector Project. One lane of East Valley Road will remain open, with flaggers directing traffic through the work site. Questions may be directed to Justin Johnson at 425-430-7291. ✓ Thursday, September 20th through Friday, September 21st, 8:00 p.m. to 7:00 a.m. East Valley Road will be reduced to one lane between SW 19th Street and Taylor Ave SW for 1-405 Direct Connector Project. One lane of East Valley Road will remain open, with flaggers directing traffic through the work site. Questions may be directed to Justin Johnson at 425-430-7291. ✓ Friday, September 21st at 8:30 p.m. through Monday, September 24th at 5:00 a.m. East Valley Road will be reduced to one lane at the intersection of SW 19th Street for 1-405 Direct Connector Project. One lane of East Valley Road will remain open, with flaggers directing traffic through the work site. Questions may be directed to Justin Johnson at 425-430-7291. Ed Prince, Council President Members of Renton City Council Page 2 of 3 September 17, 2018 ✓ Monday, September 17th through Friday, September 21st, 9:00 a.m. to 3:00 p.m. Single lane closure along northbound Talbot Road South between the northbound 1-405 on -ramp and the southbound 1-405 off -ramp for the 1-405 Direct Connector Project. Questions may be directed to Justin Johnson at 425- 430-7291. ✓ Monday, September 17th through Friday, September 21st, 4:30 a.m. to 3:30 p.m. Single lane closure along southbound Talbot Road South between the northbound 1-405 on -ramp and the southbound 1-405 off -ramp for the 1-405 Direct Connector Project. Questions may be directed to Justin Johnson at 425- 430-7291. ✓ Monday, September 17th through Friday, September 21st, 9:00 a.m. to 2:30 p.m. Expect intermittent lane closures and traffic delays along Talbot Road South (SR 515) related to the 1-405/SR 167 Interchange Direct Connector Project. In addition, northbound and southbound nighttime lane restrictions and closures along SR 167 and 1-405 are also scheduled this week related to the project. The information outlines specific dates and times of the closure. Questions may be directed to Craig Smiley, WSDOT 1-405/SR 167 Corridor Communications, at 425- 456-8624 or visit the project website at http://www.wsdot.wa.gov/Pro*ects/1405/SR1671CDirectConnector. ✓ Monday, September 17th through Friday, September 21st, 9:00 a.m. to 3:00 p.m. Intermittent lane closures at the 1200 block of Lake Washington Blvd (near North 40th Street) due to utility construction. Questions may be directed to Brad Stocco at 206-282-2373. ✓ Monday, September 17th through Friday, September 21st, 9:00 a.m. to 3:00 p.m. Intermittent lane closures on Lake Washington Blvd between North 38th Street and North 40th Street due to utility construction. Questions may be directed to Brad Stocco at 206-282-2373. ✓ Monday, September 17th through Sunday, September 30th. SW 19th Street between 100 SW 19th Street and 204 SW 19th Street will be completely closed for up to 10 calendar days to accommodate the construction of the Rolling Hills Creek culvert tie-in to the existing 60-inch storm line as part of the 1-405/SR 167 Interchange Direct Connector project. Questions may be directed to Craig Smiley, WSDOT 1-405/SR 167 Corridor Communications, at 425-456-8624 or visit the project website at http://www.wsdot.wa.gov/Projects/1405/SR1671CDirectConnector. Ed Prince, Council President Members of Renton City Council Page 3 of 3 September 17, 2018 ✓ Monday, September 17th through Friday, October Sth. North 27th Place will be closed for the construction of the North 27th Place Bridge Scour Repair Project. Questions may be directed to Derek Akesson at 425-430-7337 or via email at dakesson@rentonwa.gov. For more information about this project, visit the project website at www.rentonwa.gov/N27thBridgeScourRepair. ✓ Monday, September 17th through Monday, October 22nd. NE 31st Street will be closed for the construction of the NE 31st Street Bridge Replacement Project. Questions may be directed to Derek Akesson at 425-430-7337 or via email at dakesson@rentonwa.gov. For more information about this project, visit the project website at www.rentonwa.gov/NE31stBridgeReplace. ✓ Monday, September 17th through December 2018. Road closure on South 14th Street between Smithers Avenue South and Davis Avenue South for utility construction. Questions may be directed to Patrick DeCaro at 425-207-6013. ✓ Monday, September 17th through approximately Friday, January 4th, 2019. Traffic revisions have been implemented near Talbot Hill Elementary School along Smithers Avenue South between South 21st Street and South 23rd Street to provide access to the school for buses and parents dropping off and picking up students. These revisions were needed due to the closure of the school's east parking lot which had been used by the buses. This is a temporary revision that will be in effect until repairs are made to the parking lot. ✓ Monday, September 17th through October 2019. The Renton Hill Utility Replacement Project is underway with anticipated completion in May 2019. Following completion of the utility project, an overlay of the affected surface streets will be conducted as part of the 2019 overlay project. The overlay is scheduled to be completed prior to October 31, 2019.