Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutCommittee of the Whole - 10 Jun 2019 - Agenda - PdfCITY OF RENTON
AGENDA Committee of the Whole Meeting
5:30 PM - Monday, June 10, 2019
Conferencing Center, 7th Floor, City Hall — 1055 S. Grady Way
1. Over -sized Vehicle Parking
a) Presentation
2. Public Art - The Renton Loop
a) AB - 2389 Community & Economic Development Department requests authorization to
negotiate a sole source contract with Western Neon to provide the design, fabrication,
and installation of the proposed Renton Loop public art project at the intersection of S
2nd St and Main Ave S. Staff would then submit the contract at a later date to Council for
final approval.
b) Presentation
3. Downtown Revitalization Update
4. Emerging Issues
REGULATING THE PARKING OF COMMERCIAL,
OVERSIZED, AND RECREATIONAL VEHICLES IN
THE RIGHT-OF-WAY
i .rr� Ja
CJl� C;%R
WHY IS THIS BEING PROPOSED?
1.
2.
3.
HOW IS PARKING IN THE ROW CURRENTLY
REGULATED?
General Provisions:
n
c�
• m
z
v
n
m
HOW IS PARKING IN THE ROW CURRENTLY
REGULATED? ...corvnNueo
Within the right-of-way of any residential zone, the following vehicles are
prohibited between 9:00 PM and 6:00 AM:
HOW IS PARKING IN THE ROW CURRENTLY
REGULATED? ...corvnNueo
Parking of commercial vehicles or vehicles with a Gross Vehicle Weight
(GVW) >12,000 lbs. on public ROW:
HOW IS PARKING IN THE ROW CURRENTLY
REGULATED? ...corvnNueo
Exemptions:
VEHICLES PROPOSED TO BE PROHIBITED
FROM PARKING IN THE ROW:
✓
•ll9l►` 2ORKOAMMU 91:11:11120
DM PARKING IN THE R❑
CLASS 1 6.000 !bs or less
oft 4
MINE VA H CARGO VAN
SPIV
PkrKuY TR21fx
CLASS 2 5.aQ1 to 1o.0oo as
MINIVAN CARED MAr
FULL-SUEPICKUP
STEP VM
CLASS 3 1a,aa1 to 14,000lbs
m
WALK-IN Bf�xTRUCK
HfAYFOLRYMCKUF
CLASS 4 1¢,001 to 1s.aaa !bs
MLAacEVMLX-u+�
CLASS S is,00i to j-,soo ibs
r4
0
9CKET TRUCK
LAf7GF Amw" IN
CLASS G 19.501 to 26,000 !bs
9EVERAGE Mfx
ShY E-AXLE
CLASS 7 26,001 to 33,aOo !bs
P.
Ow
REFUSE
CLASS 8 33,001 to REA[tY xUGf
CEMENT TRUCK
TRUCKTRACTRR
ff TY DFLWERY
flTV m fVERY
OEM
Sf}fdR! als RACK TRUCk
jf
CITY TRANSIT BUS TRUCK TRAC W
W"
PUMPTRIICK SfEEPERCAB
VEHICLES PROPOSED TO BE PROHIBITED
FROM PARKING IN THE ROW:
Width: 95.2"
VEHICLES PROPOSED TO BE PROHIBITED
FROM PARKING IN THE ROW:
W.-
lo t
VEHICLES PROPOSED TO BE PROHIBITED
FROM PARKING IN THE ROW:
m
z
0
EXCEPTIONS
1. Recreational vehicles:
provided
such parking may not occur
on more than two consecutive days or on more than two days in any
seven-day period and shall not be occupied while parked on street
2. Commercial vehicles:
Recommended next step:
I %k
.00.0 F
I W" w
AGENDA ITEM #2. a)
AB - 2389
CITY OF
enton
SUBJECT/TITLE:
Renton Loop Public Art at S 2nd St and Main Ave S
RECOMMENDED ACTION:
Refer to Committee of the Whole
DEPARTMENT:
Community & Economic Development Department
STAFF CONTACT:
Jessie Kotarski, Economic Development Specialist
EXT.:
7271
:E
In 2016, the Renton Municipal Arts Commission selected an artist team to design and execute the installation
of public art for the S 2nd St/Bronson Way/Main Ave S intersection reconfiguration project. The team worked
closely with members of the Arts Commission, representatives from the City's transportation division and
project engineers and submitted a design for consideration based on feedback from the group. The design
was approved by the Arts Commission, but in the end, the team was unable to complete the project due to
cost limitations and underestimations of the project scope by the artist team.
The Arts Commission has identified an artist team and received a proposal for the design, fabrication, and
installation of translation of the original concept that honors the community planning and discussions that
went into the initial conversations and will allow for the project to be completed as first intended.
A. Rendering of concept
B. Site location (S 2nd Street and Main Ave S)
Request staff negotiate a contract with Western Neon and return to the Council with that contract and a
resolution declaring Western Neon a sole source provider for the design, fabrication and installation of the
proposed Renton Loop public art project at the intersection of S 2nd St and Main Ave S.
X-ff
CITY OF RENTON LOOP
WESTERN NEON I PUBLIC ART CONCEPT PRESENTATION I © 2019
WESTERN NEON 2019
CITY OF RENTON LOOP 1 03.05.19 1 PAGP.1
XJy
THE STORY
The Renton Loop is a twelve -foot diameter sculpture made from a tightly edited selection of materials that reference the past, pres-
ent, and future of the City of Renton. Symbolizing Renton as a unique Pacific Northwest destination "for coal mining, then for jobs at PAC -
CAR and Boeing, and finally for today's high tech and service occupations," this large-scale Mbbius shape expresses the city's transitions
through time by incorporating a shifting surface comprised from Core -Ten steel, raw aluminum, and stainless steel culminating into an illu-
minated arc. Similarly, these components follow material guidelines outlined in the Renton Downtown Core Wayfinding Signage Design
package and will serve to augment this project with a firm sense of place while helping visitors navigate the downtown sector and beyond.
WESTERN NEON I PUBLIC ART CONCEPT PRESENTATION I © 2019
CITY OF RENTON LOOP 1 03.05.19 1 PAG&
X-ff
MATERIALS & THEMES MOOD BOARD
WESTERN NEON I PUBLIC ART CONCEPT PRESENTATION I © 2019
410
oalpp"F4
CITY OF RENTON LOOP 1 03.05.19 1 PACR3
X-ff
CONCEPT OVERVIEW
APPROX
12'
MIDDLE SECTION OF SCULPTURE TRANSITIONS INTO
ROUGH AND MILL -FINISHED ALUMINUM IN AN ODE
TO THE AEROSPACE INDUSTRY, THE METALS BECOME
FINER (STAINLESS STEEL) AND THE DEGREE OF POLISH
CONTINUES TO INCREASE INTO THE TOP OF THE RING
SCULPTURE TO BE "ROOTED IN THE PAST"
AKA MOUNTED ON TOP OF/WITHIN A SMALL FIELD
OF CRUSHED BLACK COAL -LIKE MATERIAL SUCH
AS LAVA ROCK, FIRE GLASS, OR BLACK RIVER ROCK
REMINISCENT OF RENTON'S START AS A COAL TOWN
WESTERN NEON I PUBLIC ART CONCEPT PRESENTATION I © 2019
THE TOP OF THE SCULPTURE PROJECTS TOWARDS
THE FUTURE, UTILIZING TRANSLUCENT MATERIAL
WHICH IS INTERNALLY ILLUMINATED ALONG THE TOP
OF THE RING, REPRESENTING THE TURN TO TECH,
THE ABSTRACT VISUALIZATION OF DATA, AND LEANING
FORWARD
BASE OF SCULPTURE TO BE COMPRISED
OF A "GRADIENT" OF ROUGH METAL MATERIALS,
BLACKENED STEEL GIVES WAY TO CLEAN CORTEN
STEEL AS WE MOVE UP THROUGH THE INDUSTRY
OF RAIL/SHIPPING
CITY OF RENTON LOOP 1 03.05.19 1 PAC
X-ff
RENDERED ALTERNATE VIEWS
3/4 RENDER VIEW
NOT TO SCALE
WESTERN NEON I PUBLIC ART CONCEPT PRESENTATION I © 2019
SIDE/TOP RENDER VIEW
NOT TO SCALE '
v
n
m
N
CITY OF RENTON LOOP 1 03.05.19 1 PAGP-5
X-ff
THANK YOU
WESTERN NEON I PUBLIC ART CONCEPT PRESENTATION I © 2019
WESTERN NEON 2019
CITY OF RENTON LOOP 1 03.05.19 1 PAC-i
S 2nd and Main Project Site
Legend City
Cit and Count Boundary
Other
1 City of Renton
Addresses
Parcels
0
107
11
1•
1 -
'!QQ
. c a
1QT 1023
�14 � k 123
�+J
J
All
�+11 I #
k%L
f —j.. A
Notes
2'1 I +�
211 94
None
ME2 6:WJ
Information Technology - GIS This map is a user generated static output from an Internet mapping site and
128 0 64 128 Feet is for reference only. Data layers that appear on this map may or may not be
RentonMapSupport@Rentonwa.gov accurate, current, or otherwise reliable.
Clty Of R--O�
T
WGS_1984_Web_Mercator_Auxiliary_Sphere
03/24/2016 THIS MAP IS NOT TO BE USED FOR NAVIGATION
Finance & IT Division
fy
xJy
CITY OF RENTON LOOP
WESTERN NEON I PUBUCARTCONCEPT PRESEN MON I © 2019
WESTERN NEON 2019
CTTYOF RENTON LOOP 1 03.05.19 1 PAGE
XJy
THE STORY
The Renton Loop is a twelve foot diameter sculpture made from a tightly edited selection of materials that reference
the past, present, and future of the City of Renton. Symbolizing Renton as a unique Pacific Northwest destination "for
coal mining, then for jobs at PACCAR and Boeing, and finally for today's high tech and service occupations;' this large-
scale Mobius shape expresses the cites transitions through time by incorporating a shifting surface comprised from
Core -Ten steel, raw aluminum, and stainless steel culminating into an illuminated arc. Similarly, these components
follow material guidelines outlined in the Renton Downtown Core Wayfinding Signage Design package and will serve
to augment this project with a firm sense of place while helping visitors navigate the downtown sector and beyond.
WESTERN NEON I PUBUCAUCONCEPT PRESEUMON I © 2019
CfTYOF RENTON LOOP 1 03.05.19 1 PAGEIZ
J P •
3�11°00 p
CONCEPT OVERVIEW
MIDDLE SECTION OF SCULPTURE TRANSITIONS INTO
ROUGH AND MILL -FINISHED ALUMINUM IN AN ODE
TO THE AEROSPACE INDUSTRY, THE METALS BECOME
FINER (STAINLESS STEEL) AND THE DEGREE OF POLISH
CONTINUES TO INCREASE INTO THE TOP OF THE RING
APPRO
X
12' "
w
SCULPTURE TO BE "ROOTED IN THE PAST"
AKA MOUNTED ON TOP OF/WITHIN A SMALL FIELD
OF CRUSHED BLACK COAL -LIKE MATERIAL SUCH
AS LAVA ROCK, FIRE GLASS, OR BLACK RIVER ROCK
REMINISCENT OF RENTON'S START AS A COAL TOWN
WESTERN NEON I PUBUCARTCONCEPT PRESENTAflON I © 2019
THE TOP OF THE SCULPTURE PROJECTS TOWARDS
THE FUTURE, UTILIZING TRANSLUCENT MATERIAL
WHICH IS INTERNALLY ILLUMINATED ALONG THE TOP
OF THE RING, REPRESENTING THE TURN TO TECH,
THE ABSTRACT VISUALIZATION OF DATA, AND LEANING
FORWARD
rl
BASE OF SCULPTURE TO BE COMPRISED
OF A "GRADIENT" OF ROUGH METAL MATERIALS,
BLACKENED STEEL GIVES WAY TO CLEAN CORTEN
STEELAS WE MOVE UP THROUGH THE INDUSTRY
OF RAIUSHIPPING
CTTYOF RENTON LOOP 1 03.05.19 1 PAGEZ
RENDERED ALTERNATE VIEWS
3/4 RENDERVIEW
NOT TO SCALE
WESTERN NEON I PUBUCAUCONCEPT PRESENIMON I © 2019
SIDE/TOP RENDERVIEW +Ci
NOT TO SCALE z
v
n
m
N
CTTYOF RENTON LOOP 1 03.05.19 1 PAGE:
THANK YOU
WESTERN NEON 2019
17, ;.j I=16]«• «=• Pol