HomeMy WebLinkAboutAdmin Report � CITY OF
EXECUTIVE DEPARTMENT Renton �
�
M E M O R A N D U M
DATE: February 13, 2017
TO: Armondo Pavone, Counci) President
Members of the Renton City Counci)
FROM: Denis Law, Mayor
Jay Covington, Chief Administrative Officer
SUBJECT: Administrative Report
• Inclement Weather Response Reminder: Help prevent local residential street flooding by
monitoring catch basins near your home and keeping them clear of leaves and other debris.
Street sweepers are dispatched daily to clean up debris along major arterials. Please
remember during snow and ice events,the department sanders and snow plows are
dispatched to keep major arterials drivable. Visit our website at
http://rentonwa.�ov/livin�/default.aspx?id=21258 to view our snow route maps. Please do
not park or abandon your vehicle within any portion of the traffic lanes. Abandoned
vehicles impair snow and ice removal and impact response of emergency vehicles.
• Information about preventative street maintenance, traffic impact projects, and road
closures happening this week can be found at http://rentonwa.�ov/trafficimpacts.
Preventative street maintenance, traffic impact projects, and road closures will be at the
following locations:
✓ Monday, February 13th through Friday, February 17th, 8:00 a.m.to 3:00 p.m.
Potential intermittent lane closures along South Renton Village Place due to roadway
paving. Questions may be directed to Patrick DeCaro at 425-207-6013.
✓ Monday, February 13th through Friday, February 17th, 8:00 a.m. to 3:00 p.m.
Intermittent lane closures at Lake Washington Boulevard just north of Houser Way
North/Gene Coulon Park due to utility installation and possible road restoration.
Questions may be directed to Brad Stocco at 425-282-2373.
✓ Monday, February 13th through Friday, February 17th, 8:30 a.m. to 3:30 p.m.
Intermittent lane closures with alternating traffic due to the installation of sidewalk for
the 116th Avenue SE Sidewalk project. Questions can be directed to Flora Lee at 425-
430-7303 or Todd Freih at 206-999-1832.
✓ Monday, February 13th through approximately Friday, February 17th. Expect
intermittent lane closures along Oakesdale Avenue SW at the BNSF tracks while
maintenance crews perform repair work near the tracks. Southbound lanes will be
closed Monday and Tuesday at 3801 Oakesdale Avenue SW and northbound lanes will
be closed Wednesday and Thursday at the same location. Questions may be directed to
John Kalmbach at 425-766-6183.
. -
Armondo Pavone,Council President
Members of Renton City Council
Page 2
February 13,2017
✓ Monday, February 13th through Friday, February 17th, 7:00 a.m. to 5:00 p.m. Lane
closures along SW 7th Street between Powell Avenue SW and Lind Avenue SW due to
storm water Capital Improvement Project. Questions may be directed to Dan Carey at
425-430-7293 or Pat Miller at 206-794-6162.
✓ Monday, February 13th through Friday, February 17th, 8:30 a.m.to 3:30 p.m.
Intermittent lane closures due to road construction for the 2nd and Main Capital
Improvement Project. Questions can be directed to Keith Wooley at 425-430-7318 or
Mark Wetherbee at 206-999-1829.
✓ Monday, February 13th through Friday, February 17th. The northbound I-405 on-ramp
at Talbot Road South will be closed between 9:00 p.m. and 4:30 a.m. In addition, the
right lane of northbound I-405 from Talbot Road South to South 4th Street will be closed
between 10:00 p.m. and 4:30 a.m. More detailed information about these restrictions
and closures is available tonight on the back table.
✓ Monday, February 13th through Sunday, February 19th. Road closure will take place
on South 14th Street between Shattuck Avenue South through Smithers Avenue South
for WSDOTTalbot Hill project. Open to local access only. Questions may be directed to
Patrick DeCaro at 425-207-6013.
✓ Monday, February 13th through Sunday, February 19th. The two west lanes on Main
Avenue between 2nd and 3rd will be closed for project improvements while the east
lanes will be open for traffic flow. Additionally, potential lane closures will take place
along 2nd near Main Avenue for utility installation. The on-site inspector is Pat Miller,
206-794-6162.
✓ Monday, February 13th through Friday, February 17th, 7:00 a.m.to 5:00 p.m. SW 7th
Street will be reduced to one lane to accommodate construction of a surface water
utility project. Flaggers will be onsite managing traffic flow. One lane in each direction
along SW 7th Street will be open during non-construction hours between 5:00 p.m. and
7:00 a.m. Detour routes available are Lind Avenue SW, SW 10th Street, SW Grady Way,
Powell Avenue SW, and Oakesdale Avenue SW. Questions may be directed to Dan
Carey at 425-430-7293.
✓ Monday, February 13th through approximately Friday, March 3rd. Expect northbound
I-405 on-ramp restrictions and closures at NE 30th Street and NE 44th Street while the
WSDOT contractor reconfigures these on-ramps to improve safety and traffic flow that
will minimize backup on Renton neighborhood streets. Questions may be directed to
WSDOT Project Manager Mike Askarian at 206-768-5861 or the 24-hour project hotline
at 206-440-4368 or visit the project website at
http://www.wsdot.wa.�ov/news/2016/11/02/northbou nd-i-405-ra mp-widening-
proiect-renton-will-brin�-relief-city-streets. More detailed information about these on
ramp restrictions and closures is available tonight on the back table. The information
includes a list of dates and times for the on ramp closures and/or lane reductions.
M ;
Armondo Pavone,Council President
Members of Renton City Councii
Page 3
February 13, 2017
✓ Monday, February 13th through approximately Friday,July 28th. Complete road
closure of Harrington Avenue NE, Sunset Lane NE, and Glenwood Avenue NE will take
place for approximately one year to accommodate the Sunset Lane NE Roadway
Improvements Project. Detours are in place. Questions may be directed to Keith
Woolley at 425-430-7318.