Loading...
HomeMy WebLinkAboutAdmin Report EXECUTIVE DEPARTMENT M E M O R A N D U M DATE: June 17, 2019 TO: Don Persson, Council President Members of Renton City Council FROM: Denis Law, Mayor Robert Harrison, Chief Administrative Officer SUBJECT: Administrative Report  Please join us for the Kennydale Reservoir groundbreaking ceremony on Wednesday, June 19 at 10:00 a.m. at 1404 North 30th Street (Kennydale Fire Station 15). The Kennydale Reservoir is a collaborative project between the city and the Renton Regional Fire Authority that will fulfill the need for a reservoir west of I-405. Completion of the project is anticipated to be summer 2020.  PSE and their tree trimming contractor Asplundh will be doing annual maintenance work on five electrical circuits in Renton this year. This will involve pruning trees close to electrical lines for public safety, fire prevention and safeguarding continuity of electrical service delivery. The following planning areas will be affected: 2 circuits in the Talbot area, 3 circuits in the Highlands area, and 1 circuit in the East Plateau area. All residents in proximity to work areas will be notified by PSE in advance of any work. Electrical power will not be interrupted. Residents can check work areas by going to PSE’s website at www.pse.com/tree-trimming and click on ‘Crews In Your Area’ for more information. PSE is hoping to start this season’s work in July in the President’s Park neighborhood.  Information about preventative street maintenance, traffic impact projects, and road closures happening this week can be found at http://rentonwa.gov/traffic. Preventative street maintenance, traffic impact projects, and road closures will be at the following locations:  Monday, June 17 through Friday, June 21. Road closure on South 14th Street between Smithers Avenue South and Davis Avenue South for utility construction. Questions may be directed to Patrick DeCaro at 425-207-6013.  Monday, June 17 through Friday, June 21, 7:00 a.m. to 5:00 p.m. Intermittent northbound curb lane closures on Renton Avenue South between Taylor Avenue South and South 130th Street for utility and roadway construction. Questions may be directed to Michelle Faltaous at 425-430-7301 or Todd Freih at 206-999- 1832. Don Persson, Council President Members of Renton City Council Page 2 of 3 June 17, 2019  Monday, June 17 through Friday, June 21, 7:00 a.m. to 10:00 p.m. Intermittent southbound curb lane closures on Renton Avenue South between South 130th Street and South 132nd Street for utility and roadway construction. Questions may be directed to Justin Johnson at 425-902-7102.  Monday, June 17 through Friday, June 21, 7:00 a.m. to 3:30 p.m. Single lane closure on Talbot Road South in the vicinity of Valley Medical Hospital related to the construction of the new Medical Office Building. Questions may be directed to Tom Main at 206-999-1833.  Monday, June 17 through Friday, June 21, 10:00 p.m. to 4:30 a.m. Talbot Road South will be fully closed between the northbound I-405 on-ramp and the southbound I-405 off-ramp for the I-405 Direct Connector Project. Signed detour routes will be provided for both directions of Talbot Road South. Questions may be directed to Justin Johnson at 425-430-7291.  Monday, June 17 through Friday, June 21, 8:30 a.m. to 3:00 p.m. Single lane closures in both directions at the 3200 block of NE 4th Street due to utility and roadway construction. Questions may be directed to Brad Stocco at 425-282- 2373.  Monday, June 17 through Friday, June 21. The northbound inside lane along Oakesdale Avenue SW between 900 Oakesdale Avenue SW and SW 7th Street will be on a 24-hour multi-day closure for concrete repair of three manhole repairs. Re-opening of this lane is anticipated for late Friday, June 21.  Tuesday, June 18 through Thursday, June 20, 7:00 a.m. to 4:30 p.m. Street maintenance crews will be conducting asphalt repairs along NE 10th Street between Hoquiam Avenue NE and Nile Avenue NE. Flaggers will be onsite to manage traffic flow.  Monday, June 17 through Wednesday, January 1, 2020. Intermittent single and double lane closures along Logan Avenue North between North 6th Street and near Garden Avenue North in support of the King County Eastside Sewer Interceptor Rehabilitation project. Questions may be directed to Brad Stocco at 425-282-2373 or Rohini Nair at 425-430-7298.  Monday, June 17 through Wednesday, January 1, 2020. Full road closure on Burnett Avenue North at North 6th Street in support of the King County Eastside Sewer Interceptor Rehabilitation project. Both the City of Renton and King County’s Wastewater Division have reached out to property owners along the approved detour route and to affected parties providing advanced notification of Don Persson, Council President Members of Renton City Council Page 3 of 3 June 17, 2019 the proposed road closure and detour route. In addition, notification was provided in the Renton Reporter and signage will be provided in the f ield prior to roadway closure. Resolution 4378 has been approved by City Council for the roadway closure of Burnett Avenue North. Questions may be directed to Brad Stocco at 425-282-2373 or Rohini Nair at 425-430-7298.