DATE: March 6, 2017
TO: Armondo Pavone, Council President
Members of the Renton City Council
FROM: Denis Law, Mayor
Jay Covington, Chief Administrative Officer
SUBJECT: Administrative Report
• Inclement Weather Response Reminder: The Public Works Department would like to
remind residents to help us prevent local residential street flooding by monitoring catch
basins near your home and keep them clear of leaves and other debris. Street sweepers are
dispatched daily to clean up debris along major arterials. Also, snow is not far away. Please
remember that during snow and ice events, the department sanders and snow plows are
dispatched to keep major arterials drivable. Visit our website at
http://rentonwa.�ov/livin�/default.aspx?id=21258 to view our snow route maps. It is
imperative that motorists do not park or abandon their vehicles within any portion of the
traffic lanes. Abandoned vehicles impair snow and ice removal and impact response of
emergency vehicles.
• Upland construction work of the Bird Island Shoreline Enhancement Project will start this
week. Tasks include adding 200 feet of new boardwalk trail, planting new native trees, and
adding 3 interpretive signs along the boardwalk. A section of the south parking lot at
Coulon Park will be cordoned off for the contractor. The project will be complete by May
31st. This is Phase 1 of the overall project—in-water work or Phase 2 is scheduled for
November and December of this year.
• The record rainfall last month caused some landslides in the Kennydale area and in two
places along SR-169. After the devastating Oso mudslide in Snohomish County, the City
conducted a comprehensive LIDAR (Light Detection and Ranging) analysis to identify
potential future slide risks in Renton. Staff will present those findings, along with
information from these latest slides, at the Council's Committee of the Whole meeting on
April 17th.
• As the 2017 Washington State Legislature continues its work in Olympia, we continue to
monitor potential legislation that could impact Renton. Our lobbyist, Doug Levy, along with
Preeti Shridhar, our Deputy Administrator for Public Affairs, will provide the Council with a
mid-session update on March 13th.
, I
Armondo Pavone,Council President
Members of Renton City Council
Page 2
March 6, 2017
• Information about preventative street maintenance, traffic impact projects, and road
closures happening this week can be found at http://rentonwa.�ov/trafficimpacts.
Preventative street maintenance, traffic impact projects, and road closures will be at the
following locations:
✓ Monday, March 6th through Friday, March 10th. The following ramp and lane closures
and restrictions are related to the I-405/SR 167 Interchange Direct Connector Project.
More detaited information about upcoming lane and on-ramp restrictions and closures
is available tonight on the back table. The information includes a list of dates and times
of lane and on ramp restrictions and closures through March 17th.
NIGHTTIME RESTRICTIONS:
March 6th - March 10th:
• The northbound I-405 on-ramp at Talbot Road South will be closed between
10:00 p.m. and 4:30 a.m.
• One lane of northbound I-405 from SR 167 to South 4th Street will be closed
nightly between 10:00 p.m. and 4:30 a.m.
• One lane of southbound I-405 between Talbot Road South and SR 167 will be
closed nightly between 9:00 p.m. and 4:30 a.m.
✓ Monday, March 6th through Friday, March 10th, 8:30 a.m. to 3:30 p.m. Intermittent
lane closures at Lake Washington Boulevard just north of Houser Way North/Gene
Coulon Park due to utility installation and possible road restoration. Questions may be
directed to Brad Stocco at 425-282-2373.
✓ Monday, March 6th through Friday, March 10th, 8:30 a.m. to 3:30 p.m. Intermittent
lane closures with alternating traffic due to the installation of sidewalk for the 116th
Avenue SE Sidewalk project. Questions can be directed to Flora Lee at 425-430-7303 or
Todd Freih at 206-999-1832.
✓ Monday, March 6th through Friday, March 10th, and Monday, March 13th through
Tuesday, March 14th. Intermittent lane closures in both directions on Sunset Blvd NE
between Harrington Avenue NE and Edmonds Avenue NE will occur to accommodate
utility work related to the Sunset Lane NE Improvements Project. Flaggers will be on
hand to control traffic flow. Questions may be directed to Keith Woolley at 425-430-
7318 or on his cell phone at 206-999-1829.
✓ Monday, March 6th through Friday, March 10th, 8:30 a.m.to 3:30 p.m. Intermittent
lane closures due to road construction for the 2nd and Main Capital Improvement
Project. Questions can be directed to Keith Wooley at 425-430-7318 or Mark
Wetherbee at 206-999-1829.
Armondo Pavone,Council President
Members of Renton City Council
Page 3
March 6, 2017
✓ Monday, March 6th through Sunday, March 12th. Road closure will take place on
South 14th Street between Smithers Avenue South through Davis Avenue South for
utility construction. Open to local access only. Questions may be directed to Patrick
DeCaro at 425-207-6013.
✓ Monday, March 6th through Sunday, March 12th. The two west lanes on Main Avenue
between 2nd and 3rd will be closed for project improvements while the east lanes will
be open for traffic flow. The on-site inspector is Pat Miller, 206-794-6162.
✓ Monday, March 6th through approximately Friday, March 17th. Expect northbound I-
405 on-ramp restrictions and closures at NE 30th Street and NE 44th Street while the
WSDOT contractor reconfigures these on-ramps to improve safety and traffic flow that
will minimize backup on Renton neighborhood streets. Questions may be directed to
WSDOT Project Manager Mike Askarian at 206-768-5861 or the 24-hour project hotline
at 206-440-4368 or visit the project website at
http://www.wsdot.wa.�ov/news/2016/11/02/north bound-i-405-ra m p-widen in�-
proiect-renton-will-brin�-relief-citv-streets. More detailed information about these on-
ramp restrictions and closures is available tonight on the back table. The information
includes a list of dates and times for the on ramp closures and/or lane reductions.
✓ Monday, March 6th through approximately Friday, March 31st. Full road closure on
Harrington between Sunset Lane NE and Harrington Avenue NE as well as a full road
closure on Harrington Avenue NE between NE 10th Street and Sunset Lane NE will be in
place as part of the Sunset Lane Capital Improvement Project. Approved traffic control
plans have been issued for all work and will be followed. Questions can be directed to
Keith Wooley, 425-430-7318 or Mark Wetherbee, 206-999-1829.
✓ Monday, March 6th through approximately Friday, July 28th. Complete road closure
of Harrington Avenue NE, Sunset Lane NE, and Glenwood Avenue NE will take place for
approximately one year to accommodate the Sunset Lane NE Roadway Improvements
Project. Detours are in place. Questions may be directed to Keith Woolley at 425-430-
7318.