COMMITTEE REPORT
3 C��1.`�.
March 13, 2017
Main Avenue South and South 2nd Street Intersection
Partial Closure
The Committee of the Whole recommends concurrence in the staff recommendation to
direct the Administration to prepare a Resolution authorizing the closure of all but one
westbound traffic lane of the intersection of Main Avenue South and South 2"d Street for
the duration of 37 working days, plus any unworkable days not to exceed two months.
Armondo Pavone, Council President
cc: Chip Vincent,Community& Economic Development Administrator
Jim Seitz,Transportation Systems Director
Mike Stenhouse, Maintenance Services Director
Cliff Long, Economic Development Director
Chris Barnes,Transportation Operations Manager
Eric Cutshall,Sign&Signal Shop Manager
John Collum,Community Development Project Manager
��
1055 South Grady Way,Renton,WA 98057 • rentonwa.gov
V
FINANCE COMMITTEE �"���'�'��'' \y"`�� � �
COMMITTEE REPORT ���� �-�''4``�'�����
� ����.�-�-�--
March 13, 2017
Maplewood Golf Course Fee Waiver for Senior Pro-Am Golf Tournament
(March 6, 2017)
The Finance Committee recommends concurrence in the staff recommendation to approve the
waiver of green fees at Maplewood Golf Course for the participants in the Senior Pro-Am Golf
Tournament scheduled for Monday, June 12, 2017. The waiver is equivalent to $2,980.00 in
green fees.
Not in Attendance
D P sson, Chair
Ed Prince, Vice Chair
�
�-/' '1� ,� ,,
t �L�% �1.;C %z
Carol Ann Witschi, Member
cc: Kelly Beymer, Community Services Administrator
Jan Hawn,ASD Administrator
��
1055 South Grady Way,Renton,WA 98057 • rentonwa.gov
J
� �
FINANCE COMMITTEE REPORT APPF�'�'''��� ��
CITY ����CtL
March 13, 2017 ��'kc,� � �� r�
APPROVAL OF CLAIMS AND PAYROLL VOUCHERS
The Finance Committee approves for payment on March 13, 2017 claims vouchers 354491,
354500-354516, 354536-354748, 5305-5316 and 5 wire transfers and 2 payroil runs with
benefit withholding payments totaling $4,907,014.31 and payroll vouchers including 603 direct
deposits and 38 payroll vouchers totaling$1,210,939.32.
�d� �v► 7���EV1�GW1�,��
Don P so , Chair
Ed Prince, Vice-Chair
jf �
/ J
/,
� �
Carol Ann Witschi, Member
i�PPR�'�'�� ��
UTILITIES COMMITTEE C�"(�( GQI,J�C�L
COMMITTEE REPORT
�a$� � �
March 13, 2017
Falcon Ridge Lift Station Replacement and Force Main Improvements Project
Agreement with RH2 Engineering, Inc.
(March 6, 2017)
The Utilities Committee recommends concurrence in the staff recommendation to execute
the agreement for the Falcon Ridge Lift Station Replacement and Force Main Improvements
project with RH2 Engineering, Inc. in the amount of $134,880 for design engineering
services and services during construction.
�
an clrvin, Chair
�
Ruth Pere , Vice- air
� 1. C- �
f�andy Corman, ber
cc: Lys Hornsby, Utility Systems Director
Dave Christensen,Wastewater Utility Engineering Manager
Hai Nguyen,Senior Finance Analyst
Teresa Phelan, Utility Systems Administrative Secretary
��
1055 South Grady Way,Renton,WA 98057 • rentonwa.gov
v�
RPPRO��� ��
UTILITIES COMMITTEE �'��� ���� ��� �c,�'�
COMMITTEE REPORT ����., LL 7I�`ll ► /
"'t'�T
March 13, 2017
Agreement for the Lift Station and Force Main Rehabilitation Group 1 Facilities
Predesign Project with RH2 Engineering, Inc.
(March 6, 2017)
The Utilities Committee recommends concurrence in the staff recommendation to execute
the agreement for the lift Station and Force Main Rehabilitation Group 1 Facilities -
Predesign project with RH2 Engineering, Inc. in the amount of$176,379.
,�'
L
n Mclrvin, Chair
�
Ruth Perez, Vice-Chair
�
��
. ��,����
andy Corman, Member
cc: Lys Hornsby, Utility Systems Oirector
Dave Christensen,Wastewater Utility Engineering Manager
Hai Nguyen,Senior Finance Analyst
Teresa Phelan, Utility Systems Administrative Secretary
��
1055 South Grady Way,Renton,WA 98057 • rentonwa.gov �
FINANCE COMMITTEE ���,t;:��}����� `�`�
COMMITTEE REPORT ��-�--� ���g,���Il.
March 13, 2017 ������ ..:`�-����
Fire Station#15 Architect Contract
(March 6, 2017)
The Finance Committee recommends concurrence with the staff recommendation to
approve the contract with Schreiber Starling Whitehead Architects in the amount of
$763,486.00 for architectural services for Fire Station #15 and to authorize the Mayor and
City Clerk to execute the contract.
Not in Attendance
Don P , Chair
Ed Prince, Vice-Chair
n
���/�� � •
r G' �G
Carol Ann Witschi, Member
cc: Michael Kirk, Facilities Director
, Robert Ebert,Capital Project Coordinator
Jessi Merriman,Administrative Secretary I
��
1055 South Grady Way,Renton,WA 98057 • rentonwa.gov �
PLANNING AND DEVELOPMENT COMMITTEE #��`�y���'``�'''�4 �"� ?�#�
COMMITTEE REPORT ���� ���`��"�����
.`=, �?. ,(�-�,�7-,._.
March 13 2017 �
City Center Community Plan Advisory Board Recommendations
Referred February 27, 2017
The City Center Community Plan contains goals and strategies to accomplish those goals
over a twenty year horizon. The City Center Community Plan Advisory Board is tasked with
making recommendations to the Council regarding which strategies should be prioritized
and implemented through departmental work programs. The City Center Community Plan
Advisory Board has made recommendations in 2013 and 2016. One of the implementation
strategies in the plan is to "Create a greenway/promenade between the Cedar River and N
1st Street" (Goal 8.3). Residents of that area have expressed concerns about how this
strategy might be implemented. In response to this concern, the Board has made two
recommendations regarding this goal/priority. The Planning and Development Committee
has reviewed the recommendations and directs staff--beginning in 2017--to develop a
work program that engages the public so the community can participate in an actionable
plan for this policy. The work plan will take into account the likely redevelopment of 200
Mill and the potentially significant changes within the Civic Node, and its potential impact
on the surrounding neighborhood. The Committee further directs staff to hold a public
hearing to consider adoption of a revision to the strategy 8.3.1: "Complete a detailed
implementation strategy for the greenway/promenade based on the conceptual design" to
add the statement: "The City shall not utilize Eminent Domain in furtherance of this
strategy".
,
Ed Prince, Chair
��.
`�////��- •` � ! ,
y"�"V
R�andy Corman, Vice Chair
�
n clrvin, Member
��
cc:Chip Vincent,CED Administrator
1055 South Grady Way,Renton,WA 98057 • rentonwa.gov �
; _✓ - � �a,k;
�'���.: ��.�.s� ,
PLANNING AND DEVELOPMENT COMMITTEE �-�� � � #�°��;���.
`� r,
..1� a . ,.. -
COMMITTEE REPORT
�� �.�I.l_�..__
!
March 13, 2017
Benson Hill Community Plan Advisory Board Recommendations
Referred on February 27, 2017
In order to ensure the Benson Hill Community Plan is implemented and successful, the City
created the Benson Hill Community Plan Advisory Board. The Board is tasked with making
recommendations regarding which strategies of the Plan should be prioritized for inclusion
in departmental work programs. The Planning and Development Committee has reviewed
the recommendations of the Board and directs staff to initiate work for the following
strategies:
• Improve 116th Avenue SE to provide a walkable, bikable, and environmentally-friendly
way to connect to destinations.
• Provide skills training and support for immigrants at schools or a community center to
welcome new residents and foster a sense of community across diverse neighbors.
• Comptete missing links in sidewalks and add pedestrian-scaled street lighting and calm
traffic on routes to schools, parks, and commercial areas.
• Continue improving the pedestrian environment around the Benson Shopping Center.
i
rince, Chair
����//�'� �
� "� — ����
Randy Corman, Vice Chair
�
n Mclrvin, Member
cc:Chip Vincent,CED Administrator
��
1055 South Grady Way, Renton,WA 98057 • rentonwa.gov
J