HomeMy WebLinkAboutAdmin Report �t
CITY OF
EXECUTIVE DEPARTMENT
----�'`Renton �
M E M O R A N D U M
DATE: M a rch 13, 2017
TO: Armondo Pavone, Council President
Members of the Renton City Council
FROM: Denis Law, Mayor
Jay Covington, Chief Administrative Officer
SUBJECT: Administrative Report
• Inclement Weather Response Reminder: The Public Works Department would like to
remind residents to help us prevent local residential street flooding by monitoring catch
basins near your home and keeping them clear of leaves and other debris. Street sweepers
are dispatched daily to clean up debris along major arterials. Also, snow is not far away.
Please remember that during snow and ice events, the department sanders and snow plows
are dispatched to keep major arterials drivable. Visit our website at
http://rentonwa.�ov/livin�/default.aspx?id=21258 to view our snow route maps. It is
imperative that motorists do not park or abandon their vehicles within any portion of the
traffic lanes. Abandoned vehicles impair snow and ice removal and impact response of
emergency vehicles.
• The record rainfall last month caused some landslides in the Kennydale area and in two
places along SR-169. After the devastating Oso mudslide in Snohomish County, the City
conducted a comprehensive LIDAR (Light Detection and Ranging) analysis to identify
potential future slide risks in Renton. Staff will present those findings, along with
information from these latest slides, at the Council's Committee of the Whole meeting on
April 17th.
• Information about preventative street maintenance, traffic impact projects, and road
closures happening this week can be found at http://rentonwa.�ov/trafficimpacts.
Preventative street maintenance, traffic impact projects, and road closures will be at the
following locations:
✓ Monday, March 13th through Friday, March 17th. The following ramp and lane
closures and restrictions are related to the I-405/SR 167 Interchange Direct Connector
Project. More detailed information about upcoming lane and on-ramp restrictions and
closures is available tonight on the back table. The information includes a list of dates
and times of lane and on-ramp restrictions and closures through March 17th.
DAYTIME RESTRICTIONS:
March 13th - March 17th:
✓
��
Armondo Pavone,Council President '
Members of Renton City Council
Page 2
March 13,2017
• Shoulder closure from 9:00 a.m. to 3:00 p.m. along both northbound and
southbound SR 167 between SW 43rd Street and I-405.
• Shoulder closure from 9:00 a.m. to 3:00 p.m. along both northbound and
southbound I-405 between Lind Avenue SW and South 3rd Street.
NIGHTTIME RESTRICTIONS:
March 13th - March 15th:
• Northbound SR 167 left lane closure from 8:00 p.m. to 4:30 a.m. between SW 43�d
Street and I-405.
• Southbound SR 167 left lane closure from 8:00 p.m. to 4:30 a.m. between I-405 and
SW 43�d Street (March 15th only).
• Northbound I-405 left lane closure from 10:00 p.m. to 4:30 a.m. between SR 167 and
Talbot Road South.
March 14th and March 16th:
• Northbound I-405 right lane closure from 1:00 a.m. to 4:30 a.m. between SR 167 and
Talbot Road South.
• Northbound I-405 rolling slowdown from 12:00 a.m. to 4:00 a.m. between SR 167
and Talbot Road South (March 14th only).
March 16th:
• Northbound SR 167 left lane closure from 5:00 p.m. to 1:00 a.m. between SW 43rd
Street and I-405.
• Northbound SR 167 right lane closure from 1:00 a.m. to 4:30 a.m. between SW 43�a
Street and I-405.
• Northbound SR 167 rolling slowdown between 12:00 a.m. and 4:00 a.m.
RAMP CLOSURES:
March 14th - March 16th:
• Southbound SR 167 off-ramp to northbound I-405 closed between 10:00 p.m. and
4:30 a.m. (March 14th only).
• Northbound SR 167 off-ramp to northbound I-405 closed between 10:00 p.m. and
4:30 a.m.
• Talbot Road South on-ramp to northbound I-405 closed between 10:00 p.m. and
4:30 a.m. (March 15th only).
• Northbound I-405 off-ramp to northbound SR 167 closed between 10:00 p.m. and
4:30 a.m. (March 16th only).
�
Armondo Pavone,Council President
Members of Renton City Council
Page 3
March 13,2017
✓ Monday, March 13th through Tuesday, March 14th. Intermittent lane closures in both
directions on Sunset Boulevard NE between Harrington Avenue NE and Edmonds
Avenue NE will occur to accommodate utility work related to the Sunset Lane NE
Improvements Project. Flaggers will be on hand to control traffic flow. Questions may
be directed to Keith Woolley at 425-430-7318 or on his cell phone at 206-999-1829.
✓ Monday, March 13th through Friday, March 17th, 8:30 a.m.to 3:30 p.m. Intermittent
lane closures at Lake Washington Boulevard just north of Houser Way North/Gene
Coulon Park due to utility installation and possible road restoration. Questions may be
directed to Brad Stocco at 425-282-2373.
✓ Monday, March 13th through Friday, March 17th, 8:30 a.m.to 3:30 p.m. Intermittent
lane closures with alternating traffic due to the installation of sidewalk for the 116th
Avenue SE Sidewalk project. Questions can be directed to Flora Lee at 425-430-7303 or
Todd Freih at 206-999-1832.
✓ Monday, March 13th through Friday, March 17th, 3:00 p.m.to 9:00 p.m. Intermittent
lane closures at the intersection of Talbot Road South and South Grady Way due to
utility installation. Questions may be directed to Pat Miller at 206-794-6162.
✓ Monday, March 13th through Friday, March 17th, 8:30 a.m.to 3:30 p.m. Intermittent
lane closures due to road construction for the 2nd and Main Capital Improvement
Project. Questions can be directed to Keith Wooley at 425-430-7318 or Mark
Wetherbee at 206-999-1829.
✓ Monday, March 13th through Friday, March 17th, 9:00 a.m.to 2:30 p.m. City
maintenance crews will be performing routine Filtera system cleaning along Rainier
Avenue South in both directions between South Grady Way and South 3rd Place. Please
expect intermittent lane closures. Questions may be directed to Utility Maintenance
Lead Jayson Gallaway at 425-207-6491 or Utility Maintenance Supervisor Stan 1ob at
425-766-9737.
✓ Monday, March 13th through Sunday, March 19th. Road closure will take place on
South 14th Street between Smithers Avenue South through Davis Avenue South for
utility construction. Open to local access only. Questions may be directed to Patrick
DeCaro at 425-207-6013.
✓ Monday, March 13th through Sunday, March 19th. The two west lanes on Main
Avenue between 2nd and 3rd will be closed for project improvements while the east
lanes will be open for traffic flow. The on-site inspector is Pat Miller, 206-794-6162.
✓ Monday, March 13th through approximately Friday, March 17th. Expect northbound I-
405 on-ramp restrictions and closures at NE 30th Street and NE 44th Street while the
WSDOT contractor reconfigures these on-ramps to improve safety and traffic flow that
will minimize backup on Renton neighborhood streets. Questions may be directed to
WSDOT Project Manager Mike Askarian at 206-768-5861 or the 24-hour project hotline
�
Armondo Pavone,Council President
Members of Renton City Council
Page 4
March 13, 2017
at 206-440-4368 or visit the project website at
http://www.wsdot.wa.�ov/news/2016/11/02/northbound-i-405-ramp-widenin�-
proiect-renton-will-bring-relief-city-streets. More detailed information about these on-
ramp restrictions and closures is available tonight on the back table. The information
includes a list of dates and times for the on-ramp closures and/or lane reductions.
✓ Monday, March 13th through approximately Friday, March 31st. Full road closure on
Harrington between Sunset Lane NE and Harrington Avenue NE as well as a full road
closure on Harrington Avenue NE between NE 10th Street and Sunset Lane NE will be in
place as part of the Sunset Lane Capital Improvement Project. Approved traffic control
plans have been issued for all work and will be followed. Questions can be directed to
Keith Wooley, 425-430-7318 or Mark Wetherbee, 206-999-1829.
✓ Monday, March 13th through approximately Friday,July 28th. Complete road closure
of Harrington Avenue NE, Sunset Lane NE, and Glenwood Avenue NE will take place for
approximately one year to accommodate the Sunset Lane NE Roadway Improvements
Project. Detours are in place. Questions may be directed to Keith Woolley at 425-430-
7318.