SURFACE STANDARD PLAN NOTES:
1 . THESE NOTES SHALL APPEAR ON PROJECTS FOR THE SURFACE WATER UTILITY.
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A
PRE -CONSTRUCTION MEETING MUST BE HELD BETWEEN THE CITY OF RENTON PLAN
REVIEW SECTION AND THE APPLICANT.
3. ALL DESIGN AND CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE RENTON
MUNICIPAL CODE (RMC), THE LATEST EDITION OF THE STANDARD SPECIFICATIONS
FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION PREPARED BY WSDOT AND THE
AMERICAN PUBLIC WORKS ASSOCIATION (APWA), AS AMENDED BY THE CITY OF
RENTON PUBLIC WORKS DEPARTMENT. IT SHALL BE THE SOLE RESPONSIBILITY OF THE
APPLICANT AND THE PROFESSIONAL CIVIL ENGINEER TO CORRECT ANY ERROR,
OMISSION OR VARIATION FROM THE ABOVE REQUIREMENTS FOUND IN THIS PLANS.
ALL CORRECTIONS SHALL BE AT NO ADDITIONAL COST TO THE CITY.
4. APPROVAL OF THIS ROAD, GRADING, PARKING AND DRAINAGE PLAN DOES NOT
CONSTITUTE AN APPROVAL OF ANY OTHER CONSTRUCTION (E.G. DOMESTIC WATER
CONVEYANCE, SEWER CONVEYANCE, GAS, ELECTRICAL. ETC.)THE SURFACE WATER
DRAINAGE SYSTEM SHALL BE CONSTRUCTED ACCORDING TO THE APPROVED PLANS,
WHICH ARE ON FILE IN WITH THE CITY. ANY DEVIATION FROM THE APPROVED PLANS
WILL REQUIRE WRITTEN APPROVAL FROM THE CITY OF RENTON PUBLIC WORKS
DEPARTMENT, SURFACE WATER UTILITY SECTION.
5. A COPY OF THESE APPROVED PLANS MUST BE ON THE JOB SITE WHENEVER
CONSTRUCTION IS IN PROGRESS.
6. GRADING ACTIVITIES (SITE ALTERATION) ARE LIMITED TO THE HOURS OF 7 A.M. TO 7
P.M. MONDAY THROUGH SATURDAY AND NO WORK ON SUNDAY IS ALLOWED,
UNLESS OTHERWISE APPROVED WITH A WRITTEN DECISION BY THE CITY OF RENTON.
7. IT SHALL BE THE APPLICANT'S/CONTRACTOR'S RESPONSIBILITY TO OBTAIN ALL
CONSTRUCTION EASEMENTS NECESSARY BEFORE INITIATING OFF -SITE WORK.
EASEMENTS REQUIRE CITY REVIEW AND APPROVAL PRIOR TO CONSTRUCTION.
8. FRANCHISED UTILITIES OR OTHER INSTALLATIONS THAT ARE NOT SHOWN ON THESE
APPROVED PLANS SHALL NOT BE CONSTRUCTED UNLESS AN APPROVED SET OF
PLANS THAT MEET ALL REQUIREMENTS OF CHAPTER 4 OF THE SURFACE WATER
DESIGN MANUAL ARE SUBMITTED TO THE CITY OF RENTON.
9. DATUM SHALL BE NAVD 88 UNLESS OTHERWISE APPROVED BY THE CITY OF RENTON
REFERENCE BENCHMARK AND ELEVATIONS ARE NOTED ON THE PLANS.
10. ANY DEWATERING SYSTEM NECESSARY FOR THE CONSTRUCTION OF STORMWATER
FACILITIES MUST BE SUBMITTED TO THE CITY FOR REVIEW AND APPROVAL.
1 1 . ALL UTILITY TRENCHES AND ROADWAY SUBGRADE SHALL BE BACKFILLED AND
COMPACTED TO 95 PERCENT DENSITY, STANDARD PROCTOR.
12. OPEN CUTTING OF EXISTING ROADWAYS FOR NON -FRANCHISED UTILITY OR STORM
DRAINAGE WORK IS NOT ALLOWED UNLESS SPECIFICALLY APPROVED BY THE CITY OF
RENTON AND NOTED ON THESE APPROVED PLANS. ANY OPEN CUT SHALL BE
RESTORED IN ACCORDANCE WITH THE CITY OF RENTON TRENCH RESTORATION
STANDARDS.
13. ALL SEDIMENTATION/EROSION FACILITIES MUST BE IN OPERATION PRIOR TO
CLEARING AND BUILDING CONSTRUCTION, AND THEY MUST BE SATISFACTORILY
MAINTAINED UNTIL CONSTRUCTION IS COMPLETED AND THE POTENTIAL FOR
ON -SITE EROSION HAS PASSED.
14. ALL RETENTION/DETENTION FACILITIES MUST BE INSTALLED AND IN OPERATION
PRIOR TO OR IN CONJUNCTION WITH ALL CONSTRUCTION ACTIVITY UNLESS
OTHERWISE APPROVED BY THE PUBLIC WORKS DEPARTMENT, SURFACE WATER
UTILITY SECTION.
15. ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED
FOUNDATION IN ACCORDANCE WITH THE CURRENT STATE OF WASHINGTON
STANDARD SPECIFICATION FOR ROAD AND BRIDGE CONSTRUCTION. THIS SHALL
INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE
FOUNDATION MATERIAL, AS WELL AS PLACEMENT AND COMPACTION OF REQUIRED
BEDDING MATERIAL, TO UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE
WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE. ALL PIPE BEDDING
SHALL BE APWA CLASS "C", WITH THE EXCEPTION OF PVC PIPE.
16. STEEL PIPE SHALL BE ALUMINIZED, OR GALVANIZED WITH ASPHALT TREATMENT #1
OR BETTER INSIDE AND OUTSIDE.
17. ALL DRAINAGE STRUCTURES, SUCH AS CATCH BASINS AND MANHOLES SHALL HAVE
SOLID LOCKING LIDS. ALL DRAINAGE STRUCTURES ASSOCIATED WITH A PERMANENT
RETENTION/DETENTION FACILITY SHALL HAVE SOLID LOCKING LIDS.
18. BUILDING AND OTHER STRUCTURES SHALL BE PLACED IN ACCORDANCE WITH TABLE
4.1 EASEMENT WIDTHS AND BUILDING SETBACKS LINES.
19. ALL CATCH BASIN GRATES SHALL BE DEPRESSED 0.10 FEET BELOW PAVEMENT LEVEL.
20. ALL DRIVEWAY CULVERTS LOCATED WITHIN CITY OF RENTON RIGHT-OF-WAY SHALL
BE OF SUFFICIENT LENGTH TO PROVIDE A MINIMUM 3:1 SLOPE FROM THE EDGE OF
THE DRIVEWAY TO THE BOTTOM OF THE DITCH. ROCK FOR EROSION PROTECTION
OF ROADSIDE DITCHES, WHERE REQUIRED, SHALL BE OF SOUND QUARRY ROCK
PLACED TO A DEPTH OF ONE (1) FOOT AND MUST MEET THE FOLLOWING
SPECIFICATIONS:
4 - 8 INCH ROCK / 40 - 70% PASSING;
2 - 4 INCH ROCK / 30 - 40% PASSING; AND
LESS THAN 2 INCH ROCK / 10 - 20% PASSING.
21. ALL BUILDING DOWNSPOUTS AND FOOTING DRAINS SHALL BE CONNECTED TO THE
STORM DRAINAGE SYSTEM, UNLESS APPROVED BY THE CITY PLAN REVIEWER OR
SURFACE WATER UTILITY SECTION. AN ACCURATELY DIMENSIONED, CERTIFIED
AS -BUILT DRAWING OF THIS DRAINAGE SYSTEM WILL BE SUBMITTED TO THE CITY
UPON COMPLETION.
SE 1 /4, SE 1 /4 SECTION 29, TOWNSHIP 24 N, RANGE 5 E, W.M.
CITY OF NEWCASTLE, KING COUNTY, WASHINGTON
22. DRAINAGE OUTLETS (STUB -OUTS) SHALL BE PROVIDED FOR EACH INDIVIDUAL LOT,
EXCEPT FOR THOSE LOTS APPROVED FOR INFILTRATION BY THE CITY. STUB -OUTS
SHALL CONFORM TO THE FOLLOWING:
A. EACH OUTLET SHALL BE SUITABLY LOCATED AT THE LOWEST ELEVATION ON THE
LOT, SO AS TO SERVICE ALL FUTURE ROOF DOWNSPOUTS AND FOOTING DRAINS,
DRIVEWAYS, YARD DRAINS, AND ANY OTHER SURFACE OR SUBSURFACE DRAINS
NECESSARY TO RENDER THE LOTS SUITABLE FOR THEIR INTENDED USE. EACH
OUTLET SHALL HAVE FREE -FLOWING, POSITIVE DRAINAGE TO AN APPROVED
STORMWATER CONVEYANCE SYSTEM OR TO AN APPROVED OUTFALL LOCATION.
B. OUTLETS ON EACH LOT SHALL BE LOCATED WITH A FIVE -FOOT -HIGH, 2" X 4"
STAKE MARKED
C. "STORM" OR "DRAIN". THE STUB -OUT SHALL EXTEND ABOVE SURFACE LEVEL, BE
VISIBLE, AND BE SECURED TO THE STAKE.
D. PIPE MATERIAL SHALL CONFORM TO UNDERDRAIN SPECIFICATIONS DESCRIBED IN
CHAPTER 4 OF THE SURFACE WATER DESIGN MANUAL AND, IF NON-METALLIC,
THE PIPE SHALL BE PLACED IN
E. A TRENCH WITH A TRACING WIRE ABOVE OR OTHER ACCEPTABLE DETECTION.
F. PRIVATE DRAINAGE EASEMENTS ARE REQUIRED FOR DRAINAGE SYSTEMS DESIGNED
TO CONVEY FLOWS THROUGH INDIVIDUAL LOTS.
G. THE APPLICANT/CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE
LOCATIONS OF ALL STUB -OUT
H. CONVEYANCE LINES WITH RESPECT TO OTHER UTILITIES (E.G. POWER, GAS,
TELEPHONE, TELEVISION).
I. ALL INDIVIDUAL STUB -OUTS SHALL BE PRIVATELY OWNED AND MAINTAINED BY
THE LOT HOME OWNER.
J. STORM DRAINAGE PIPE SYSTEMS SHALL NOT PENETRATE BUILDING FOUNDATIONS,
EXCEPT FOR SUMP PUMP DISCHARGE LINES USED TO DRAIN CRAWL SPACES,
PROVIDED THE SUMP PUMP SYSTEM INCLUDES BACKFLOW PREVENTION OR A
CHECK VALVE.
23. ALL DISTURBED PERVIOUS AREAS (COMPACTED, GRADED, LANDSCAPED, ETC.) OF
THE DEVELOPMENT SITE MUST DEMONSTRATE ONE OF THE FOLLOWING: THE
EXISTING DUFF LAYER SHALL BE STAGED AND REDISTRIBUTED TO MAINTAIN THE
MOISTURE CAPACITY OF THE SOIL, OR; AMENDED SOIL SHALL BE ADDED TO
MAINTAIN THE MOISTURE CAPACITY.
24. PROOF OF LIABILITY INSURANCE SHALL BE SUBMITTED TO THE CITY PRIOR TO
CONSTRUCTION PERMIT ISSUANCE.
25. ISSUANCE OF THE BUILDING OR CONSTRUCTION PERMITS BY THE CITY OF RENTON
DOES NOT RELIEVE THE OWNER OF THE CONTINUING LEGAL OBLIGATION AND/OR
LIABILITY CONNECTED WITH STORM SURFACE WATER DISPOSITION. FURTHER, THE
CITY OF RENTON DOES NOT ACCEPT ANY OBLIGATION FOR THE PROPER
FUNCTIONING AND MAINTENANCE OF THE SYSTEM PROVIDED DURING
CONSTRUCTION.
26. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ADEQUATE SAFEGUARD,
SAFETY DEVICES, PROTECTIVE EQUIPMENT, FLAGGERS, AND ANY OTHER NEEDED
ACTIONS TO PROTECT THE LIFE, HEALTH, AND SAFETY OF THE PUBLIC, AND TO
PROTECT PROPERTY IN CONNECTION WITH THE PERFORMANCE OF WORK. ANY
WORK WITHIN THE TRAVELED RIGHT-OF-WAY THAT MAY INTERRUPT NORMAL
TRAFFIC FLOW SHALL REQUIRE A TRAFFIC CONTROL PLAN APPROVE BY THE PUBLIC
WORKS EPARTMENT, TRANSPORTATION SYSTEMS DIVISION. ALL SECTIONS OF THE
WSDOT STANDARD SPECIFICATIONS 1-07-23 TRAFFIC CONTROL SHALL APPLY.
27. PROJECT LOCATED WITHIN THE AQUIFER PROTECTION AREA (APA) SHALL COMPLY
WITH SPECIAL REQUIREMENT #6 OF THE SURFACE WATER DESIGN MANUAL AND
AQUIFER PROTECTION REGULATIONS (RMC 4-3-050).
EROSION CONTROL NOTES:
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER UTILITY, WATER UTILITY, AND
TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD WITH THE CITY OF RENTON,
PUBLIC WORKS DESIGN ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF VEGETATION PRESERVATION AS PRESCRIBED ON THE PLAN(S) SHALL BE CLEARLY
FLAGGED BY SURVEY TAPE OR FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER
DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION. DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE BEYOND THE CLEARING
LIMITS SHALL BE PERMITTED. THE CLEARING LIMITS SHALL BE MAINTAINED BY THE APPLICANT/ESC SUPERVISOR FOR THE DURATION OF
CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF
THE PROJECT. ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO ENSURE THAT ALL
PAVED AREAS ARE KEPT CLEAN AND TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL FACILITIES MUST BE CONSTRUCTED AND IN OPERATION PRIOR TO LAND CLEARING AND/OR
CONSTRUCTION TO PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES. ALL
EROSION AND SEDIMENT FACILITIES SHALL BE MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH TIME THAT CLEARING AND/OR
CONSTRUCTION IS COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS PASSED. THE IMPLEMENTATION, MAINTENANCE, REPLACEMENT AND
ADDITIONS TO EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE THE RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS DEPICTED ON THIS DRAWING ARE INTENDED TO BE MINIMUM REQUIREMENTS TO MEET
ANTICIPATED SITE CONDITIONS. AS CONSTRUCTION PROGRESSES AND UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE PERMITEE SHALL
ANTICIPATE THAT MORE EROSION AND SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY TO ENSURE COMPLETE SILTATION CONTROL
ON THE PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION, IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE PERMITEE TO
ADDRESS ANY NEW CONDITIONS THAT MAY BE CREATED BY THE ACTIVITIES AND TO PROVIDE ADDITIONAL FACILITIES, OVER AND ABOVE
MINIMUM REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT ADJACENT PROPERTIES AND WATER QUALITY OF THE RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL OF STORM DRAINAGE
DESIGN, SIZE NOR LOCATION OF PIPES, RESTRICTORS, CHANNELS, OR RETENTION FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO DAYS DURING THE WET SEASON
(OCTOBER 1 ST TROUGH MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON (APRIL 1 ST TOUGH SEPTEMBER 30) SHALL BE IMMEDIATELY
STABILIZED WITH THE APPROVED ESC COVER METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING, ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION SITES CLEARING BETWEEN OCTOBER 1
AND MARCH 30 INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY THROUGH AN ADJUSTMENT PROCESS. 10. COVER MEASURES WILL BE
APPLIED IN CONFORMANCE WITH APPENDIX D OF THE SURFACE WATER DESIGN MANUAL.
1 1 .ANY AREA NEEDING ESC MEASURES, NOT REQUIRING IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN SEVEN (7) DAYS. 12. THE ESC
FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN 24 HOURS FOLLOWING A
STORM EVENT.
1 3.AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL CATCH BASINS AND
CONVEYANCE LINES SHALL BE CLEANED PRIOR TO PAVING. THE CLEANING OPERATION SHALL NOT FLUSH SEDIMENT -LADEN WATER INTO THE
DOWNSTREAM SYSTEM.
14.DURING THE TIME PERIOD OF OCTOBER 1 ST THROUGH MARCH 30
TH, ALL PROJECT DISTRIBUTED SOIL AREAS GREATER, THAT ARE TO BE LEFT UN -WORKED FOR MORE THAN 12 HOURS, SHALL BE COVERED BY MULCH,
SODDING OR PLASTIC COVERING.
1 5.ANY PERMANENT RETENTION/DETENTION FACILITY USED AS A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH THE NECESSARY
EROSION CONTROL MEASURES AND SHALL PROVIDE ADEQUATE STORAGE CAPACITY. IF THE PERMANENT FACILITY IS TO FUNCTION ULTIMATELY
AS AN INFILTRATION SYSTEM, THE TEMPORARY FACILITY MUST BE ROUGH GRADED SO THAT THE BOTTOM AND SIDES ARE AT LEAST THREE FEET
ABOVE THE FINAL GRADE OF THE PERMANENT FACILITY.
1 6.PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1), ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY WHICH ONES CAN BE SEEDED
IN PREPARATION FOR THE WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED WITHIN ONE WEEK OF THE BEGINNING OF THE WET SEASON. A
SKETCH MAP OF THOSE AREAS TO BE SEEDED AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE SUBMITTED TO THE CITY OF RENTON FOR
REVIEW.
1 7.ALL ESC MEASURES MUST BE REMOVED AFTER CONSTRUCTION ACTIVITY IS COMPLETE.
r S Gold
of WAS
LW�' �� i � � SURVEYEDLN
z rm O L D SMITH z x DESIGNED:
BPF, SP
z LAND DEVELOPMENT SERVICES 424597 DRAWN:
+P 9 w� S P
Lai 1215 1 14th Ave SE, Bellevue, WA 98004 1 PO Box 3565, Bellevue, WA 98009 �o� �G1sTEg� �`v CHECKED:
a T 425 462 1080 F 425 462 7719 www.goldsmi hengineering.com ssIONAL E��1 BPF, KJG
JOB NO. 14134 iCAP RHODY RIDGE, LLC NO. REVISION BY DATE APPR rAIM.VEDKJG
SCALE:
NTS
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SC ALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL: NAD 1983/1991
DATUM
Know what's below.
Call before you dig.
•
CITY OF
RENTON
Planning/Building/Public Works Dept
BY: DATE:
CITY OF NEWCASTLE
THESE DRAWINGS ARE APPROVED FOR CONSTRUCTION FOR A PERIOD OF 12
MONTHS FROM THE DATE SHOWN HEREON. THE CITY RESERVES THE RIGHT
TO MAKE REVISIONS, ADDITIONS, DELETIONS, OR MODIFICATIONS SHOULD
CONSTRUCTION BE DELAYED BEYOND THIS TIME LIMITATION. THE CITY, BY
APPROVING THESE DRAWINGS, ASSUMES NO LIABILITY IN REGARDS TO
THEIR ACCURACY OR OMISSIONS.
R-396604
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING � SURFACE WATER UTILITYAr% IL
Justin Johnson 02/11 /2019 rstraka 02/11 /2019
RHODODENDRON RIDGE
ERP PLAN SET
SURFACE AND EROSION CONTROL STANDARD NOTES
DATE:
11/1/18
FIELDBOOK: 1977
PAGE: 27
DRAWING NO:
D-6
SHEET: OF:
2 6