HomeMy WebLinkAboutAdmin Report CITY OF
EXECUTIVE DEPARTMENT .r.--�Renton �
--____.�.....•
M E M O R A N D U M
DATE: March 27, 2017
TO: Armondo Pavone, Council President
Members of the Renton City Council
FROM: Denis Law, Mayor
Jay Covington, Chief Administrative Officer
SUBJECT: Administrative Report
• Inclement Weather Response Reminder: The Public Works Department would like to
remind residents to help us prevent local residential street flooding by monitoring catch
basins near your home and keeping them clear of leaves and other debris. Street sweepers
are dispatched daily to clean up debris along major arterials. Also, snow is not far away.
Please remember that during snow and ice events, the department sanders and snow plows
are dispatched to keep major arterials drivable. Visit our website at
http://rentonwa.�ov/livin�/default.aspx?id=21258 to view our snow route maps. It is
imperative that motorists do not park or abandon their vehicles within any portion of the
traffic lanes. Abandoned vehicles impair snow and ice removal and impact response of
emergency vehicles.
• Information about preventative street maintenance, traffic impact projects, and road
closures happening this week can be found at http://rentonwa.�ov/trafficimpacts.
Preventative street maintenance, traffic impact projects, and road closures will be at the
following locations:
✓ Monday, March 27th through Friday, March 31st. Frequent ramp and lane closures
and restrictions related to the I-405/SR 167 Interchange Direct Connector Project are in
effect. More detailed information about upcoming lane and on-ramp restrictions and
closures is available tonight on the back table.
✓ Monday, March 27th through approximately Friday, March 31st. The northbound
I-405 on-ramp improvements at NE 30th Street and NE 44th Street project is not yet
complete. Repaving of the construction site will take place once the weather improves
this spring, at which time further on-ramp closures and lane restrictions will take place.
The city is continuing to monitor this project and will provide additional updates when
they are received from WSDOT. Questions may be directed to WSDOT Project Manager
Mike Askarian at 206-768-5861 or the 24-hour project hotline at 206-440-4368 or visit
the project website at http://www.wsdot.wa.govJnews/2016/111Q2/norfihbound-i-4Q5-
ramp-widenin�-project-renton-will-brin�-relief-city-streets.
Armondo Pavone,Council President
Members of Renton City Council
Page 2
March 27,2017
✓ Monday, March 27th through Friday, March 31st, 8:30 a.m. to 3:30 p.m. Intermittent
lane closure south of SE Petrovitsky Road along the west side of 116th Avenue SE due to
construction. Questions may be directed to Tom Main at 206-999-1833.
✓ Monday, March 27th through Friday, March 31st, 8:30 a.m. to 3:30 p.m. Intermittent
lane closures at Lake Washington Blvd just north of Houser Way North/Gene Coulon
Park due to utility installation and possible road restoration. Questions may be directed
to Brad Stocco at 425-282-2373.
✓ Monday, March 27th through Friday, March 31st, 8:30 a.m. to 3:30 p.m. Single lane
closure on East Valley Highway at the 3900 block due to utility construction. Questions
may be directed to Tom Main at 206-999-1833.
✓ Monday, March 27th through Friday, March 31st, 8:30 a.m. to 3:30 p.m. Potential lane
closure on East Valley Highway at SW 41st Street due to utility construction. Questions
may be directed to Tom Main at 206-999-1833.
✓ Monday, March 27th through Friday, March 31st, 8:30 a.m. to 3:30 p.m. Single lane
closure on Lind Avenue SE between SW 41st Street and SW 43rd Street due to utility
construction. Questions may be directed to Tom Main at 206-999-1833.
✓ Monday, March 27th through Friday, March 31st, 8:30 a.m. to 3:30 p.m. Intermittent
lane closures due to road construction for the 2nd and Main Capital Improvement
Project. Questions can be directed to Keith Wooley at 425-430-7318 or Mark
Wetherbee at 206-999-1829.
✓ Monday, March 27th through Friday, March 31st, 8:00 a.m.to 3:00 p.m. City
maintenance crews will be performing routine sewer line maintenance in both
directions along Taylor Place NW and Taylor Avenue NW between Stevens Avenue NW
and Renton Avenue South. Flaggers will be on hand to direct traffic. Questions may be
directed to Utility Maintenance Lead Rocky Sittner at 425-902-2004 or Utility
Maintenance Supervisor Stan Job at 425-766-9737.
✓ Monday, March 27th through Sunday, April 2nd. Road Closure on South 14th Street
between Smithers Avenue South through Davis Avenue South for utility construction.
Open to local access only. Questions may be directed to Patrick DeCaro at 425-207-
6013.
✓ Monday, March 27th through Sunday,April 2nd. The two west lanes on Main Street
between 2nd and 3rd will be closed for project improvements while the east lanes will
be open for traffic flow. The on-site inspector is Todd Freih, 206-999-1832.
✓ Monday, April 3rd through approximately Friday,June 30th. South 2nd Street, east of
and adjacent to the intersection of Main Avenue South and South 2nd Street, is
tentatively scheduled to close beginning Monday, April 3rd for a period not to exceed
two months. A map showing alternative routes through this area is available tonight on
the back table.
Armondo Pavone, Council President
Members of Renton City Council
Page 3
March 27, 2017
✓ Monday, March 27th through approximately Friday,July 28th. Complete road closure
of Harrington Avenue NE, Sunset Lane NE, and Glennwood Avenue NE for approximately
one year to accommodate the Sunset Lane NE Roadway Improvements Project. Detours
are in place. Questions may be directed to Keith Woolley at 425-430-7318.
✓ Monday, March 27th through Friday, September 29th. Full road closure on Harrington
between Sunset Lane NE and Harrington Avenue NE as well as a ful) road closure on
Harrington Avenue NE between NE 10th Street and Sunset Lane NE will be in place as
part of the Sunset Lane Capital Improvement Project. Questions can be directed to
Keith Wooley at 425-430-7318 or Mark Wetherbee at 206-999-1829.