M E M O R A N D U M
DATE: April 3, 2017
TO: Armondo Pavone, Council President
Members of the Renton City Council
FROM: Denis Law, Mayor
Jay Covington, Chief Administrative Officer
SUBJECT: Administrative Report
• Information about preventative street maintenance, traffic impact projects, and road
closures happening this week can be found at http://rentonwa.�ov/trafficimpacts.
Preventative street maintenance, traffic impact projects, and road closures will be at the
following locations:
✓ Monday,April 3rd through Friday,April 7th. Frequent ramp and lane closures and
restrictions related to the I-405/SR 167 Interchange Direct Connector Project are in
effect. More detailed information about upcoming lane and on-ramp restrictions and
closures is available tonight on the back table.
✓ Monday, April 3rd through approximately Tuesday, April 25th. The northbound
I-405 on-ramp improvements at NE 30th Street and NE 44th Street project is not yet
complete. Construction crews will be on site conducting work in preparation of
repaving the affected lanes. More detailed information about upcoming lane closures
and restrictions is available tonight on the back table. Questions may be directed to
WSDOT Project Manager Mike Askarian at 206-768-5861 or the 24-hour project hotline
at 206-440-4368 or visit the project website at
http://www.wsdot.wa.�ov/news/2016/11/02/northbound-i-405-ramp-widenin�-
proiect-renton-will-brin�-relief-city-streets.
✓ Monday,April 3rd through Friday, April 7th,8:30 a.m.to 3:30 p.m. Intermittent lane
closures at Lake Washington Blvd just north of Houser Way North/Gene Coulon Park
due to utility installation and possible road restoration. Questions may be directed to
Brad Stocco at 425-282-2373.
✓ Monday, April 3rd through Friday,April 7th, 8:30 a.m. to 3:30 p.m. Impacts to
intersection at South 43rd Street and Talbot Road South due to hauling activity from the
Valley Medical Center Improvements. Questions may be directed to Tom Main at 206-
999-1833.
✓ Monday,April 3rd through Friday, April 7th,8:30 a.m.to 3:30 p.m. Single lane closures
along with alternating traffic due to grinding and asphalt overlay of the roadway for the
116th Avenue SE Sidewalk project. Questions can be directed to Flora Lee at 425-430-
7303 or Todd Freih at 206-999-1832.
Armondo Pavone, Council President
Members of Renton City Council
Page 2
April 3, 2017
✓ Monday, April 3rd through Friday,April 7th, 8:30 a.m. to 3:30 p.m. Intermittent lane
closures due to road construction for the 2nd and Main Capital Improvement Project.
Questions can be directed to Keith Wooley at 425-430-7318 or Mark Wetherbee at 206-
999-1829.
✓ Monday, April 3rd through Sunday, April 9th. Road Closure on South 14th Street
between Smithers Avenue South through Davis Avenue South for utility construction.
Open to local access only. Questions may be directed to Patrick DeCaro at 425-207-
6013.
✓ Monday, April 3rd through Sunday, April 9th. The two west lanes on Main Street
between 2nd and 3rd will be closed for project improvements while the east lanes will
be open for traffic flow. The on-site inspector is Todd Freih, 206-999-1832.
✓ Monday, April 3rd through approximately Friday, June 30th. South 2nd Street, east of
and adjacent to the intersection of Main Avenue South and South 2nd Street, is
tentatively scheduled to close beginning Monday, April 3rd for a period not to exceed
two months. A map showing alternative routes through this area is available tonight on
the back table.
✓ Monday, April 10th through approximately Friday, July 14th. The intersection of NE
10th Street and Harrington Avenue NE will be closed to accommodate construction of
the Sunset Neighborhood Park and surrounding area. A map showing alternative routes
through this area is available tonight on the back table.
✓ Monday, April 3rd through approximately Friday,July 28th. Complete road closure of
Harrington Avenue NE, Sunset Lane NE, and Glennwood Avenue NE for approximately
one year to accommodate the Sunset Lane NE Roadway Improvements Project. Detours
are in place. Questions may be directed to Keith Woolley at 425-430-7318.
✓ Monday, April 3rd through Friday, September 29th. Full road closure on Harrington
between Sunset Lane NE and Harrington Avenue NE as well as a full road closure on
Harrington Avenue NE between NE 10th Street and Sunset Lane NE will be in place as
part of the Sunset Lane Capital Improvement Project. Questions can be directed to
Keith Wooley at 425-430-7318 or Mark Wetherbee at 206-999-1829.