HomeMy WebLinkAboutR-405603GENERAL DRAWING INDEX
C6
N
N
DRAWING
SEQ.
O
SHEET
REV
DRAWING TITLE
NUMBER
NO.
J
w
w
w
Lw
>
w
Lw
m
cn
CD
r�
O
cD
CD
m
U
L—
GENERAL
05-APRON-C-GO
GO
GO
C
COVER SHEET
•
05-APRON-C-GI
G1
G1
C
KEY SHEET (SITE CIVIL)
•
05-APRON-C-G2
G2
G2
C
DRAWING INDEX SHEET (SITE)
•
CIVIL
05-APRON-C-C2
C2
Cl
C
CIVIL NOTES
•
05-APRON-C-C3
C3
C2
C
CIVIL NOTES
•
05-APRON-C-C80
C80
C3
C
OVERALL SITE PLAN
•
05-APRON-C-C82
C82
C4
C
CIVIL SITE PLAN
•
05-APRON-C-C223R
C223R
C5
C
TESC PLAN
•
05-APRON-C-C224R
C224R
C6
C
TESC DETAILS
•
05-APRON-C-C221 R
C221 R
C7
C
PAVING REMOVAL PLAN
•
05-APRON-C-C221
C221
C8
C
PAVING PLAN
•
05-APRON-C-C225
C225
C9
C
PAVEMENT MARKING PLAN
•
05-APRON-C-C292R
C292R
C10
C
STORM DRAIN REMOVAL PLAN
•
05-APRON-C-C471 R
C471 R
C1 1
C
FENCING REMOVAL PLAN
•
05-APRON-C-C471
C471
C12
C
FENCING PLAN
•
05-APRON-C-0502
C502
C13
C
TYPICAL SECTION DETAILS
•
05-APRON-C-0511
C511
C14
C
STORM DRAINAGE DETAILS
•
05-APRON-C-0514
C514
C15
C
FENCING DETAILS
•
GENERAL DRAWING INDEX
DRAWING NUMBER
SHEET
SEQ.
NO.
REV
DRAWING TITLE
w
w
�
CD
w
w
�
O
N
�
w
Lw
Q-1
CD
C6
N
O
J
Q
m
cn
U
LANDSCAPE
STRUCTURAL
05-APRON-C-S281
S281
S1
C
CB TYPE 2 - REINFORCED CONCRETE COVER
05-APRON-C-S282
S282
S2
C
CB TYPE 1 L - REINFORCED COVER DETAILS
05-APRON-C-S283
S283
S3
C
TWO CB TYPE 1 L - REINFORCED COVER DETAILS
MECHANICAL
05-APRON-C-M113R
M113R
M1
B
COMPRESSED AIR PIPING PLAN - REMOVAL
•
05-APRON-C-M111 R
M111 R
M2
B
COMPRESSED AIR PIPING PLAN - REMOVAL
•
05-APRON-C-M261 R
M261 R
M3
C
FIRE PROTECTION AND WATER REMOVAL PLAN
•
05-APRON-C-M264R
M264R
M4
B
SAFETY SHOWER TEPID WATER PIPING PLAN - REMOVAL
•
05-APRON-C-M263R
M263R
M5
B
SAFETY SHOWER TEPID WATER PIPING PLAN - REMOVAL
•
05-APRON-C-M45OR
M45OR
M6
B
ENLARGED PLUMBING PLAN - REMOVAL
•
05-APRON-C-CM504R
M504R
M7
B
PIPING DETAILS - REMOVAL
•
ELECTRICAL
05-APRON-C-EO-A
EO-A
E1
A
INDEX
•
05-APRON-C-EO-B
EO-B
E2
A
ELECTRICAL LEGEND AND ABBREVIATIONS
•
05-APRON-C-E4AR
E4AR
E3
A
PARTIAL SITE PLAN -POWER DISTRIBUTION - REMOVAL
•
05-APRON-C-E4-VC-1 R
E4-VC-1 R
E4
A
SUBSTATION VC-1 ONE -LINE - REMOVAL
•
SYM
REVISION
BY
APPROVED
DATE
SYM
REVISION
BY
APPROVED
DATE
—
APRON
C
Cl
PROJECT
— SITE
DCN-04
RT
TWN
03.09.16
—
APRON C
Cl PROJECT —
SITE
DCN-09
RT
TWN
05.11.16
—
APRON
C
Cl
PROJECT
— SITE
DCN-05
RT
TWN
03.28.16
—
APRON C
Cl PROJECT —
SITE
DCN-10
RT
TWN
06.06.16
—
APRON
C
Cl
PROJECT
— SITE
DCN-06
RT
TWN
04.05.16
—
APRON C
Cl PROJECT —
SITE
DCN-11
RT
TWN
07.05.16
—
APRON
C
Cl
PROJECT
— SITE
DCN-07
RT
TWN
04.12.16
—
RECORD
DRAWING — 737
MAX
FLIGHTLINE UTILITIES
RT
TWN
10.17.16
—
APRON
C
Cl
PROJECT
— SITE
DCN-08
RT
TWN
04.22.16
APRON C
PARCEL 820
RT
TWN
02.08.19
Q� BOE/NG°
C'—
NAL
wwv
GENERAL DRAWING INDEX
DRAWING NUMBER
SHEET
SEQ.
NO.
REV
DRAWING TITLE
I
w
Lw
CD
I
w
w
CD
N
C*"]
w
w
O
C6
N
o
J
Q
m
cn
U
05-APRON-C-E9AR
E9AR
E5
A
GROUNDING PLAN-C6 & C7 - REMOVAL
•
05-APRON-C-E10R
E10R
E6
A
LIGHTING PLAN -NORTH PARCEL - REMOVAL
•
05-APRON-C-E60R
E60R
E7
A
208Y/120V POWER PLAN-056 & C7 - REMOVAL
•
05-APRON-C-El1OR
E11OR
E8
A
480/277V POWER PLAN-056 & C7 - REMOVAL
•
05-APRON-C-E36OR
E360R
E9
A
PARTIAL DATA AND SECURITY PLAN - REMOVAL
•
05-APRON-C-E50OR
E50OR
E10
A
ELECTRICAL DETAILS -DUCT BANKS - REMOVAL
•
05-APRON-C-E501 R
E501 R
E1 1
A
ELECTRICAL DETAILS -MANHOLE BUTTERFLIES - REMOVAL
•
05-APRON-C-E502R
E502R
E12
A
ELECTRICAL DETAILS -MANHOLE BUTTERFLIES - REMOVAL
•
05-APRON-C-E508R
E508R
E13
A
ELECTRICAL DETAILS -POWER DISTRIBUTION STANDS - REMOVAL
•
05-APRON-C-E508-C6R
E508-C6R
E14
A
POWER STAND PSC6 DETAILS - REMOVAL
•
05-APRON-C-E508-C7R
E508-C7R
E15
A
POWER STAND PSC7 DETAILS - REMOVAL
•
05-APRON-C-E51OR
E51OR
E16
A
ELECTRICAL DETAILS-AMS AND SLIDING GATE - REMOVAL
•
05-APRON-C-E526R
E526R
E17
A
REMOVAL DETAILS
•
05-APRON-C-E4A
E4A
E18
A
PARTIAL SITE PLAN - POWER DISTRIBUTION
•
05-APRON-C-E4-VC-1
E4-VC-1
El
A
SUBSTATION VC-1 ONE -LINE
•
05-APRON-C-E9A
E9A
E20
A
GROUNDING PLAN-C6 & C7
•
05-APRON-C-E10
E10
E21
A
LIGHTING PLAN - NORTH PARCEL
•
05-APRON-C-E60
E60
E22
A
208Y/120V POWER PLAN-C6 & C7
•
05-APRON-C-El10
E110
E23
A
480Y/277V POWER PLAN-C6 & C7
•
05-APRON-C-E360
E360
E24
A
PARTIAL DATA AND SECURITY PLAN
•
05-APRON-C-E500
E500
E25
A
ELECTRICAL DETAILS -DUCT BANKS
•
05-APRON-C-E501
E501
E26
A
ELECTRICAL DETAILS -MANHOLE BUTTERFLIES
•
05-APRON-C-E502
E502
E27
A
ELECTRICAL DETAILS -MANHOLE BUTTERFLIES
•
05-APRON-C-E505
E505
E28
A
LIGHTING DETAILS
•
05-APRON-C-E506
E506
E29
A
LIGHTING DETAILS
•
05-APRON-C-E508
E508
E30
A
ELECTRICAL DETAILS -POWER DISTRIBUTION STANDS
•
05-APRON -C-E508-C6
E508-C6
E31
A
POWER STAND PSC6 DETAILS
•
05-APRON -C-E508-C7
E508-C7
E32
A
POWER STAND PSC7 DETAILS
•
05-APRON-C-E510
E510
E33
A
ELECTRICAL DETAILS - AMS AND SLIDING GATE
•
05-APRON-C-E511
E511
E34
A
ELECTRICAL DETAILS
•
05-APRON-C-E513
E513
E35
A
ELECTRICAL DETAILS
•
ACCEPTABILITY
R. TEMPLADO
THIS DESIGN AND/OR
CHECKED
oG
y
SPECIFICATION IS APPROVED
T. NEU
ENGINEER
T. NEU
APPROVED BY
DEPT.
DATE
CHECKED
D. MURATA
4
APPROVED
IN C IPLiAW: E WITH CITY OF RENTON STANDARDS
DEVELOPMENT ENGINEERING o%
rnair 04/26/2019 Is
IFIC SUBMITTAL
FEBRUARY 8 2019
4TE SUBTITLE CURRENT
02.08.19 DRAWING INDEX SHEET
02.08.19 SHEET
02.08.19 TITLE BOEING APRON C PARCEL 820 PROJECT
02.08.19 SITE 05-YD
JOB N0.
--]CIVIL MASTER RENTON, WA DWG N0.
LEGEND
0
0
w
cn
• —DOT INDICATES DRAWING IS
INCLUDED IN SUBMITTAL
NO DOT INDICATES DRAWING
IS NOT INCLUDED IN
SUBMITTAL
I1[41mKolION oil]160111001411If] II
FOR REFERENCE ONLY
DRAWING REVISION - SEE SPECIFIC
DRAWING FOR NATURE OF REVISION
R-405603
4fLrD_0WL
REVISION SYMBOL DATE
W3441886
G2 G2
COMP NO.
W3441886
05-APRON-C-G2