HomeMy WebLinkAboutR-405607E— I I
L — _ _ _ —-------- E --_— — — PSE EASEMENT
E — — —_ o AFN 2010092100I966
S1 �— T _ T — E T —T= — — — --- -- 10
_ — — — — — — T
Sls — n� — --— —= o €E — �— — I
_ --
G --- G---- —— G 6 0 o E __ _
G--- G --- G---- — — — �2—co c
_ I I
PSE EASEMENT ❑ �
E AFN 2010092100966 o U ❑ -n ❑ ❑ ❑ I
ri o cn CD ❑ n
— — E O STS ❑ ❑ ° a I
0 0 o Li D I
1 0 0 �, I
N 6 = II I I
PSE EASEMENT RAMPALT
AFN 2010092100966 u cn 1 — — — T _- II I T — — T I
c w�� ❑ ❑ ❑ El El El El ElI ElI
BLDG 790
A D , I
AIRPORT MAINTENANCE w
— BLDG 800 X3 I
RAINIER FLIGHT SERVICE , X ❑ I _SS
TEMP TEMP _��
_ SS - -I
RSTRMRSTRM C ❑ — _
E 1 w � _ —Ss I
o D
7 7
I� ❑ I I I
/c/� 5 OR 6 BLOCKS 6 X I
1 f GAP cn n0 I I
o l $ �' II I I
,Z*z' cf) T� Ll
x x x
LL — STS I c�, 6'CLF GATE
cn w
W w
W � 12' C
(n --- S— -- S— SS-- — S---- SS---- SS---- 6 C w J' S r STS STS STS— STS 2—ROWS W 6� SS-�-- SS---- SS---- SS---- SS w S -- SS s --- STS—SS -- SS-- — SS-- - SS---- S I
zo I m� � w o I B ,5 BLOCKS m o
Q I 3 A A 2 OR 3 GAP
D 00
z n , 's , D o- E Os,�p 6 iii D N
z � / I E �C E E E r o
O 12" DI I 12' DI �� ��/ < RAMP
i
O
E�
Lw
�o
0
-
o Z
�o
z
-x D 1 2 N 8 s
x x x
E AF —€�N— EWE — — — RW --- A FW -- A--- A — A — w E — A --- --- A — — A — — — -- A 1 I w I
w — — — EW FW Ev"v
— E---- E --- E---- E — — E -- E---- E---- E---- E -- — — -- E _
— — ---- T --- T -- — T --- E—I 4 — 0 E�
I
D
<
D
I
I
I
CDD
I �
D
-91 1II I o
D I
m
�TS- STS i m
I '�
I II
D I z 80' f GAF'
8
'� EQUAL SPACING D o II I
I I —
�° I
II2 BLOCK 1
EQUAL
.ci PAv 1
DI I
m 6
I I
II I 1 -
IIF-
FT6
II �
2 BLOCKS
CONSTRUCTION NOTES
R>-REMOVE
TURNSTILE &CARD READERS. PROVIDE VINYL COATED FENCING.
2�REMOVE
TOOL CABANA.
D>-DISCONNECT
ALL UTILITIES AND BUILDING ANCHORS TO ALLOW FOR THE
REMOVAL OF THE CREW SHELTERS BY BOEING.
4�COVERED
WORK AREA TO BE REMOVED.
DEMOLISH TANK WATER HEATER BUILDING, INCLUDING FOUNDATION.
B>-REMOVE
BARRIERS.
7�
TEMPORARY RESTROOM (SANI-CAN) TO BE REMOVED (BY OTHERS).
R>-REMOVE
POWER STAND.
R>-REMOVE
SAFETY SHOWERS &EYE WASH STATION.
1�REMOVE
LIGHT POLE ASSEMBLY.
P>-REMOVE
AIR &WATER SERVICE STANDS.
A P>-REMOVE
STAINLESS STEEL SKYDROL INSERT.
1
REMOVE BOLLARDS.
P>-REMOVE
FIRE HYDRANT ASSEMBLY AND BOLLARDS. DELIVER FIRE HYDRANT
ASSEMBLY TO THE CITY OF RENTON MAINTENANCE SHOP.
1�REMOVE
EXISTING POWER OUTLETS.
R>-REMOVE
6" GATE VALVE AT 12" TEE PROVIDE 6" MJ PLUG TO BE
INSTALLED BY CITY OF RENTON FORCES THE CONTRACTOR SHALL PROVIDE
ALL MATERIALS AND RESTORE FINAL SURFACE PAVING.
GENERAL NOTES:
1. ALL ITEMS TO BE REMOVED SHALL BE DELIVERED TO
BOEING TO A LOCATION AS DIRECTED BY BOEING
CONSTRUCTION MANAGER.
2. AIRCRAFT WILL BE PARKED AT POSITION C-6 AND
C-7 UNTIL 3-8-2019. BOEING MAY ADJUST THAT
DATE AS NEEDED.
3. THE CONTRACTOR SHALL DISCONNECT THE
ELECTRICAL AND DATA LINES FROM CREW SHELTERS.
SEE ELECTRICAL AND DATA PLANS.
4. THE CONTRACTOR SHALL REMOVE ALL CREW
SHELTER GROUT PADS ONCE BUILDING IS REMOVED.
ALL REMAINING ANCHOR BOLTS SHALL BE CUT
FLUSH WITH THE PAVEMENT.
I z DI
5 II-,
FTI
= r, oNC
I � � I
I I E E cf)
I
II m 11 i m I
Fr 1,
3 $ I 3 I AIR
RTON CIPA B6
--- _
j l N I 2' OR 3' GAP o Ru P ,° I o C
AX
z RAM P o SG I �_ - - Z
1 0
FT-Q 2 `� o m I �� RO "p° Q o 77
20/ 1 a D
T I I I - E
rf:�oqAyN �
D 1 u FT, I I 81/ 2 F
1
4 I IN CONIPLIAN aE 1NITN CI -I Y of RENTON $TAN❑)ARD� .F
1 -80 0-5 G
I
FTI9 I Fai 7-
I DEVELOPMENT ENGINEERING 1 74
❑ H
I rnair 04/26/2019 I -
m COMPLE �
� I �
AIRP RT LEASE LINE AIRPORT LEASE LINE I PAR I
.. 1 LQ K
I I
z 1_405
I w
W-405601 I KEY PLAN
FA (E) TO FA (E) TOFA (E) TO FA (E) TOFA (E) TOFA (E) -TO FA TO FA (E) OFA �E) TO FA (E) — �rH TOFA (E) 7
� I I SCALE: NONE L
` 20 10 0 10 20 40MEMO I I IFC SUBMITTAL
w APRON C PLAN R-405607
I
o TAXIWAY A SCALE: 1:20 SCALE: 1" = 20' z I DRAIN PIPE
EASEME M A RCH 2 2 2019
1 3 oOWL
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE
S W ACCEPTABILITY R. TEMPLADO 03.22.19 CIVIL SITE PLAN W3441886
- APRON C Cl PROJECT - SITE DCN-05 RT TWN 03.28.16 - APRON C Cl PROJECT - SITE DCN-10 RT TWN 06.06.16 �A� OF WASkI �THIS DESIGN AND/OR CHECKED
coo G SPECIFICATION IS APPROVED T. NEU 03.22.19 SHEET ENGINEER TITLE C82
APRON C CI PROJECT - SITE DCN-06 RT TWN 04.05.16 - APRON C CI PROJECT - SITE DCN-11 RT TWN 07.05.16 ® APPROVED BY DEPT. DATE T. NEU 03.22.19 BOEING APRON C PARCEL 820 PROJECT C4
APRON C Cl PROJECT SITE DCN-07 RT TWN 04.12.16 RECORD DRAWING CHECKED 737 MAX FLIGHTLINE UTILITIES RT TWN 10.17.16 D. MURATA 03.22.19 SITE 05I D
45379 APPROVED JOB NO. COMP NO.
cr
- APRON C Cl PROJECT - SITE DCN-08 RT TWN 04.22.16 - APRON C PARCEL 820 RT TWN 02.08.19 �o Eo �� - - W3441886
�'sT� �ti�
- APRON C Cl PROJECT - SITE DCN-09 RT TWN 05.11.16 A APRON C PARCEL 820 PERMIT COMMENT REVISION RT TWN 03.29.19 S70NAL E� 3/29/19 APPROVED CIVIL MASTER RENTON, WA DWG NO. 05-APRON-C-C82