Loading...
HomeMy WebLinkAboutR-405609RED FLASHING HAZARD WARNING LIGHT (REQUIRED) TOP RAIL MIN. 2" O.D. GALV. STEEL (TYP) CHAIN LINK FABRIC HT. FENCE POST INSERTS (TYP) — EXISTING GROUND CHAIN LINK FABRIC, FULL HEIGHT (TYP) BOTTOM RAIL MIN. 2" O.D. GALV. STEEL (TYP) ANCHOR FENCE TO PAVEMENT FOD FENCE DETAIL NTS #6 GAGE COATED STEEL FABRIC BANDS, 14" MAX. SPACING 10' MAX. (TYP) GEOTEXTILE FABRIC, 4' MIN. HEIGHT SECURED TO CHAINLINK FENCE (TYP) LINE POST MIN. 2-3/8" O.D. GALV. STEEL (TYP) X Q CV 7' MIN. 4' MIN. FENCE HT. FABRIC HT. C223RIC224R 5" MAX. _ DRAINAGE GRATE TRIM GRATEFRAME a d D SEDIMENT AND DEBRIS a OVERFLOW BYPASS 0 D v BELOW INLET GRATE DEVICE FILTERED WATER .o .o SECTION VIEW DRAINAGE GRATE RECTANGULAR GRATE SHOWN RETRIEVAL SYSTEM (TYP.) 0 BELOW INLET GRATE DEVICE OVERFLOW BYPASS (TYP.) ISOMETRIC VIEW NOTES 1. Size the Below Inlet Grate Device (BIGD) for the storm water structure it will service. 2. The BIGD shall have a bulltan high -flow relief system (overflow bypass). 3. The retrieval system must allow removal of the BIGD without spilling the collected material. 4. Perform maintenance In accordance with Standard Specification 8-01.3(15). + e� PUBLIC WORKS CATCH BASIN FILTER STD. PLAN — 218.30 DEPARTMENT P�+N tp MARCH 2O08 CATCH BASIN FILTER NTS 1.50' NOTES:- 1 . ASPHALT BERMS SHALL BE CONTINUOUS FOR THE AREA SHOWN. 2. INSPECTION SHALL BE MADE WEEKLY OR AFTER EACH RAINFALL 0.50' EVENT AND REPAIR OR REPLACEMENT SHALL BE MADE PROMPTLY AS REQUIRED. 3. ACCUMULATED SILT SHALL BE REMOVED WHEN IT REACHES A DEPTH OF 4" AND DISPOSED OF IN A MANNER WHICH WILL NOT IING ASPHAET/CONCRETE CAUSE ADDITIONAL SILTATION. FULL IASPHAET/CONCRETE �PAVEMENT 4. AFTER THE DEVELOPMENT SITE IS COMPLETELY STABILIZED, THE CONTACT PROPOSED COMPACTED BERMS AND ANY REMAINING SILT SHALL BE REMOVED. SILT SHALL HMA BERM BE DISPOSED OF AS CONTAMINATED EXCAVATION MATERIAL. ASPHALT SEDIMENT DAM NTS C223RIC224R C223RIC224R IN QO MPLIAN [�E VVITH OTY OF RENTON STANDARDS E PMENT ENGINEERING ir 04/26/2019 ' IFIC SUBMITTAL FEBRUARY 8,2019 SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE s w f "�,� ACCEPTABILITY UKAWN J. CLOUD UAIL 02.08.19 SUBTITLE TESC DETAILS CECKED — APRON C CI PROJECT — SITE DCN-04 RT TWN 03.09.16 — APRON C CI PROJECT — SITE DCN-09 RT TWN 05.11.16 �� of 'it �, THIS DESIGN AND/OR TH BURTON G � ° SPECIFICATION IS APPROVED 02.08.19 ENGINEER — APRON C CI PROJECT —SITE DCN-05 RT TWN 03.28.16 — APRON C CI PROJECT —SITE DCN-10 RT TWN 06.06.16 ,�� ® __ c'4 �o �� �ISTER� �SSIONAL E�G� �I V T. NEU 02.08.19 TITLE BOEING APRON C PARCEL 820 PROJECT SITE 05- I�/ D CIVIL MASTER APPROVED BY DEPT. DATE — APRON C CI PROJECT — SITE DCN-06 RT TWN 04.05.16 — APRON C CI PROJECT — SITE DCN-11 RT TWN 07.05.16 CHECKED D. 02.08.19 — APRON C CI PROJECT — SITE DCN-07 RT TWN 04.12.16 — RECORD DRAWING — 737 MAX FLIGHTLINE UTILITIES RT TWN 10.17.16 ROVED APPROVED — APRON C CI PROJECT — SITE DCN-08 RT TWN 04.22.16 APRON C PARCEL 820 RT TWN 02.08.19 APPROVED R-405609 BOWL CURRENT REVISION SYMBOL DATE W3441886 SHEET C224R C6. JOB NO. COMP NO. W3441886 RENTON, WA °wc No. 05—APRON —C—C224R