Loading...
HomeMy WebLinkAboutR-405611Lo 0 I C) I r W >� ( r i ° o O O 0 O 0o O ASPHAL RAMP I BLDG 790 AIRPORT MAINTENANCE I I BLDG 800 RAINIER FLIGHT SERVICE 0 O O o — —mum--- — — 0 0 0 0 0 0 0 C* (C# °I°1❑1❑ 0 1 El 1 0 1 1 w IN I I I x x x .......x x x x � ❑ I 1 X 1 I 2 TEMP TEMP RSTR RSTR X ❑ i 1 X� ° I ❑ I cN Lo CD X I � 2 El C502 0 1 x x x Da U GATE 6'CLF I m� ©0tillm rwM • 91 im 0 0 m D N m r z m 0 z 0 D r r CONSTRUCTION NOTES 2 R>- CONSTRUCT ASPHALT PAVEMENT SECTION PER C5�2 2� CONSTRUCT TYPE I CEMENT CONCRETE PAVEMENT SECTION PER C502 TRANSFER DOWEL AT ALL CONSTRUCTION AND CONTRACTION JOINTS (lYP). >- RESTORE PAVEMENT AT WATER HEATER BUILDING PER C502 GENERAL NOTES 1. UNLESS OTHERWISE SHOWN ALL CONCRETE JOINTS ARE CONTRACTION JOINTS. 2. UPON COMPLETION OF UNDERGROUND CONSTRUCTION, BOEING ENGINEER AND AIRPORT ENGINEER (CITY) SHALL PAINT THE LIMITS OF CONCRETE PANEL REPLACEMENT, IN ACCORDANCE WITH FAA ADVISORY CIRCULAR 150/5380-6C, PRIOR TO CONCRETE PANEL CONSTRUCTION. 3. THE CONTRACTOR SHALL HAVE A GEOTECHNICAL TESTING COMPANY TO PROVIDE COMPACTION, SUBGRADE, AND PAVEMENT TESTING PER CONTRACT SPECIFICATIONS. LEGEND ^ ASPHALT PAVEMENT C502 TYPE I CEMENT ^ CONCRETE PAVEMENT C502 IN COP LIAICS VITH CITY Or RENTON STANDARDS DEVELOPMENT ENGINEERING o� rnair 04/26/2019 i co Lo � ro cV o m co I— co Ln � r7 cV o 0� • C14 c`V.� CN C14 C14 m II Ln _ ❑® R N A C502 2 l ° 2 3J RE TON MUN CIPA AIR g • RU s G\ 0- D C° RO „D" co 2JQ 20 1 I g g g oo � E 2 ►� 21 N IF�v ~ — 81/ 2 0 1 —80 0-5 G I H I � COMPLE AIRPORT LEASE LINE AIRPORT LEASE LINE PAR I K Z k-405 I KEY PLAN SCALE: NONE Z FA (E) TOFA (E) TOFA (E) - TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) --TC FA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) TOFA (E) 65.5TAXIWAY A R-405 6 1 1 GROUP II TOFA (EXISTING) 20 10 0 10 20 40 APRON C PLAN IFC SUBMITTAL / 00 SCALE: 1:20 SCALE: 1 " = 20' Z FEBRUAR 8 2019 DOWL SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE i s w ACCEPTABILITY R. TEMPLADO 02.08.19 PAVING PLAN W3441886 - APRON C Cl PROJECT - SITE DCN-04 RT TWIN 03.09.16 - APRON C Cl PROJECT - SITE DCN-09 RT TWIN 05.11.16 �4� pF WASl�rl�l1t� THIS DESIGN AND/OR CHECKED G SPECIFICATION IS APPROVED T. NEU 02.08.19 SHEET ENGINEER TITLE C221 APRON C Cl PROJECT - SITE DCN-05 RT TWIN03.28.16 = APRON C Cl PROJECT = SITE DCN-10 RT TWIN06.06.16 ""z ,�� ® APPROVED BY DEPT. DATE T. NEU 02.08.19 BOEING APRON C PARCEL 820 PROJECT Q APRON C Cl PROJECT SITE DCN-06 RT TWIN04.05.16 APRON C Cl PROJECT SITE DCN-11 RT TWIN07.05.16 CHECKED o APPROVEDROVED (�4-14 D. 02.08.19 SITE 05-YD JOB NO. COMP NO. - APRON C Cl PROJECT - SITE DCN-07 RT TWIN04.12.16 - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES RT TWIN10.17.16 W3441886 O��,S EGI STERti���J - APRON C Cl PROJECT - SITE DCN-08 RT TWIN 04.22.16 APRON C PARCEL 820 RT TWIN 02.08.19 SIONAL V, �I APPROVED CIVIL MASTER RENTON, WA DWG NO. 05—APRON—C—C221 &I 0 N