Loading...
HomeMy WebLinkAboutR-405620� f f t f f f f f . � I I ROFA (U) ROFA (U) I I ROFA (U) ROFA (U) 12" DI ROFA (U) ROFA (U) ROFA (U) PM ROFA (U) ROFA (U) u GENERAL NOTES 1. THERE SHALL BE NO EXPOSED GALVANIZED MATERIALS, COATINGS OR ZINC APPLIED SURFACE TREATMENTS ON ANY EXTERIOR OR UNDERGROUND MATERIALS OR SURFACES. ALL GALVANIZED OR ZINC APPLIED MATERIALS OR COATINGS SHALL BE PERMANENTLY PAINTED OR COATED TO PREVENT EXPOSURE OF THE GALVANIZED/ZINC MATERIALS PRIOR TO INSTALLATION OR COMPLETION OF CONSTRUCTION. 03AVd REMOVAL NOTES SALVAGE ALL EQUIPMENT TO BOEING. COORDINATE WITH BOEING. DEMO COMPRESSED AIR PIPING AND ISOLATION VALVE TO 6" BELOW BASE OF CONCRETE. PROVIDE CAP AND LABEL ABANDONED PIPE. B Gdd-1NI0f N3dO.Z l aS--- — 119 O m 00 r- CO LO � rO N CD� 00 r- CO CCU t N") N O � N N N N N N N N N N U U U U U U U U U U U U U U U U U U U U U R-405620 MATCH LINE - FOR CONTINUATION SEE SHEET M 113 20 10 0 10 20 40 ISSUE FOR CONSTRUCTION FSi consulting engineers APRON C P LAN PROFESSIONAL STAMP & SIGNATUREREMOVAL Seattle, Washington SCALE: 1" — 20' Z APPLIES TO WORK WITHIN THE CLOUDED FEBRUARY 8, 2019 SCALE: 1:20 REVISION AREAS ONLY AS INDICATED Solutions & Service SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION DATE — APRON C CI PROJECT W3441886 FSi AWL 12.14.15 <� q tiACCEPTABILITY ADR 02.08.19 W568371dSYMBOL � oWwny, c THIS DESIGN AND/OR CHECKED COMPRESSED AIR PIPING PLAN SPECIFICATION IS APPROVED AWL 02.08.19 SHEET ® ENGINEER TITLE A SITE DCN 02 W3341886 FSi AWL 01.26.16 APPROVED BY DEPT. DATE AWL 02.08.19 APRON C PARCEL 820 M111R M 2 D,n �FG�STEAPPROVED - JOB N0. B APRON C PARCEL 820 W5683710 FSi AWL 02.08.19 FS 4STE NG CHECKED SITE 05-YD APRON C 13726-01 �COMP NO. S/ONAL E 02.0 APPROVED MECHANICAL MASTER RENTON, WA °wc No. s��D 05—APRON—C—M111 R A B C D E F G H J K L