HomeMy WebLinkAboutR-405620� f f
t f f f f
f . �
I
I
ROFA (U) ROFA (U)
I
I
ROFA (U) ROFA (U)
12" DI
ROFA (U) ROFA (U) ROFA (U)
PM
ROFA
(U) ROFA (U)
u
GENERAL NOTES
1. THERE SHALL BE NO EXPOSED GALVANIZED
MATERIALS, COATINGS OR ZINC APPLIED
SURFACE TREATMENTS ON ANY EXTERIOR OR
UNDERGROUND MATERIALS OR SURFACES. ALL
GALVANIZED OR ZINC APPLIED MATERIALS OR
COATINGS SHALL BE PERMANENTLY PAINTED OR
COATED TO PREVENT EXPOSURE OF THE
GALVANIZED/ZINC MATERIALS PRIOR TO
INSTALLATION OR COMPLETION OF
CONSTRUCTION.
03AVd
REMOVAL NOTES
SALVAGE ALL EQUIPMENT TO BOEING.
COORDINATE WITH BOEING. DEMO COMPRESSED
AIR PIPING AND ISOLATION VALVE TO 6" BELOW
BASE OF CONCRETE. PROVIDE CAP AND LABEL
ABANDONED PIPE.
B
Gdd-1NI0f N3dO.Z l
aS--- —
119
O m 00 r- CO LO � rO N CD� 00 r- CO CCU t N") N O
� N N N N N N N N N N
U U U U U U U U U U U U U U U U U U U U U
R-405620
MATCH LINE - FOR CONTINUATION SEE SHEET M 113
20 10 0 10 20 40 ISSUE FOR CONSTRUCTION FSi consulting engineers
APRON C P LAN PROFESSIONAL STAMP & SIGNATUREREMOVAL Seattle, Washington
SCALE: 1" — 20' Z APPLIES TO WORK WITHIN THE CLOUDED FEBRUARY 8, 2019
SCALE: 1:20 REVISION AREAS ONLY AS INDICATED Solutions & Service
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION DATE
— APRON C CI PROJECT W3441886 FSi AWL 12.14.15 <� q tiACCEPTABILITY ADR 02.08.19 W568371dSYMBOL
� oWwny, c THIS DESIGN AND/OR CHECKED COMPRESSED AIR PIPING PLAN
SPECIFICATION IS APPROVED AWL 02.08.19 SHEET
® ENGINEER TITLE
A SITE DCN 02 W3341886 FSi AWL 01.26.16 APPROVED BY DEPT. DATE AWL 02.08.19 APRON C PARCEL 820 M111R M 2
D,n �FG�STEAPPROVED - JOB N0.
B APRON C PARCEL 820 W5683710 FSi AWL 02.08.19
FS 4STE NG CHECKED SITE 05-YD APRON C 13726-01
�COMP NO.
S/ONAL E
02.0 APPROVED MECHANICAL MASTER RENTON, WA °wc No.
s��D 05—APRON—C—M111 R
A
B
C
D
E
F
G
H
J
K
L