HomeMy WebLinkAboutR-4056280)
3
Ld
w
I
U
Z
0
a
I
uJ
0
.3
0
0
I
O
E
0
0
N
00
U
O
CL
U
0
a
Q
a�
O
m
J
0
0
N
O
I
U
N
O
CL
U)
w
.:
E
U
O
N
0
0
u_
N
Lq
rn
0
rn
N
v �,
---
-
- w i6'L1
__ SS
- - - S"FlR 1
- I
_ — — RAIN I ER AVE__-N- -- TMH
-
DENSE BRUSH
� Ia•MAP
— I6•Mgp ® � � � S1S S0
l�w- S1S
j —ummur
DENSE BRUSH S 1S
ww °"""uE PANr srm >
s
—sue- — � G
w _
AI ®I
No
I � o
I RPORT PROPERTY � :.
LINE
X,
TES o W W .,- - — —
W J E
cq
esx = car »7 SUBSTATION VC —1 `� N
} = S gar
Key
M —�-- o Pad e 9 y NNN / I m
M - /� — w DISTRIBUTION
aed ° I 0 4ALE5d2 of I I_ I 4A E5 OR RACK C7 2
Row o
MH— 8 6"`
— — — M rc�F-r ew cnle P-� Md I ® n
o o M H —C9 -
DIRT 8 0 1 '
£ c sc -Y
® $ Tr X
W I= 11
_ r _ W
LL
C ET ENCASED BA K
b 2) OM - S
�. 4 I If ;., 4A E5 R
. o ' E 0 0
P^ _
w
= I n (0
cr�l
Ll
w —
LLJ ,
cn121=3=
— — — — — — — — � — — — � — — — — — — —
C)
�I
z TAXIWAY —
~ 65.5'
z
�ROUk_il_�FA TIN
n-I
of
I
65 5'
W
z M TOFA (EXISTING) M
I
=I
U
Q I SIGN
'E4A LE5dl
I
MH—C4
m
HH—C4 (COMM)
TO MH—B4
(VIA—C3,C2,C1)
TAXIWAY A
0
—M M v/
CONCRETE ENCASED DUCTBANK
—CIS ► ,� (1)4"C, 3#600, #2G (VC-1 /9)-480V
(1)4"C—SPARE
(1)4"C—FIBER
(1)4"C—COMM SPARE
5
ol 2 HH—05
4ALE5d1(COMM)
CONCRETE ENCASED DUCTBANK
(1)5"C-3#4/0 MV-105, #2G (PSE #24)
(1)5"C—SPARE
(1)4"C—FIBER
(1)4"C—COMM SPARE
/5' RUNWAY SAFT \r ;
/�' RUNWAY SAFETY ARFA (RSA)
(1) 4"C — FIBRE (TYP )
(1) 4"C — SPARE
CONCRETE ENCASED DUCT BANK
(1)5"C-3#4/0 MV-105, #2G (PSE #24)
(1)5"C—SPARE
(1)4"C—FIBER
(1)4"C—COMM SPARE
RUNWAY 16-34
GENERAL NOTES
1. ALL NEW STRUCTURES AND FACILITIES ARE PARALLEL AND
PERPENDICULAR TO EAST BOEING LEASE LINE AT BEARING
N4.48'53"W.
2. PER IFC 2009, CHAPTER 11, AVIATION FACILITIES:
AIRCRAFT BEING FUELED SHALL BE POSITIONED SUCH
THAT ANY FUEL SYSTEM VENTS AND OTHER FUEL TANK
--
OPENINGS ARE A MINIMUM OF IWENIY—FIVE FEEI (/620
MM) FROM BUILDINGS OR STRUCTURE OTHER THAN JET
BRIDGES; AND FIFTY FEET (15,240 MM) FROM AIR INTAKE
VENTS FOR BOILER, HEATER OR INCINERATOR ROOMS.
II I 3.
REPAIR OR REPLACE ANY AND ALL PAVEMENT DISTURBED
DURING CONSTRUCTION IN ACCORDANCE WITH C501 AND
THE SPECIFICATIONS.
4.
ALL DIRECT BURIED CONDUIT SHALL BE SCHEDULE 80
C
CONDUIT. SWEEPS WHICH ENTER THE EARTH SHALL BE
PVC COATED RIGID STEEL.
5.
ABOVE GRADE EXPOSED CONDUIT SHALL BE EITHER RIGID
ALUMINUM OR PAINTED RIGID GALVANIZED STEEL. PER
THE SPECIFICATIONS LOW VOLTAGE.
6.
CONTRACTOR SHALL PROVIDE DETAILED LOCATE SERVICE
FOR ALL AREAS IN BORE OR TRENCH PATH.
7.
PROVIDE NYLON PULL CORDS IN ALL SPARE CONDUITS.
8.
CONCRETE ENCASED DUCTS SHALL BE SCHEDULE 40 PVC
REFERENCE DRAWINGS
A
/� I
F-1—\ nr,-OPPnNI-r-P_1 1 n
I/ - '" , " -, '-
05—APRON—C—E360
REMOVAL NOTES
BETWEEN SUBSTATION VC-1 AND DISTRIBUTION RACK C6,
REMOVE THE EXISTING POWER CONDUCTORS AND FIBER
OPTIC CABLES THAT SERVE PARCEL 820. PROVIDE PULL
STRINGS IN THE CONDUITS. TERMINATE THE CONDUIT STUB
UPS AS SHOWN IN DETAIL 3 ON DRAWING E526R.
REMOVE EXISTING DISTRIBUTION RACKS C6 AND C7 AND
ASSOCIATED HARDWARE. SALVAGE ALL EQUIPMENT TO
BOEING. COORDINATE WITH THE BOEING CONSTRUCTION
MANAGER.
BETWEEN DISTRIBUTION RACK C6 AND DISTRIBUTION RACK
C7, REMOVE THE EXISTING POWER CONDUCTORS AND FIBER
OPTIC CABLES. PROVIDE PULL STRINGS IN THE CONDUITS.
TERMINATE THE CONDUIT STUB UPS AS SHOWN IN DETAIL 3
ON DRAWING E526R.
I��
•
�O
x
Ad
-..Md
imp
w
OR
fop
ME
I
Sm
I
I
Lo,
N
offilftlamOrm
IPN
l
0i
r
r
lI
M.
0-
110
MIKE
!I
LJ�I�■MENEM
mmom
R-40562§ KEY PLAN a 5K
2
SCALE: NONE z �'40 L
50 25 0 25 50 10o ISSUE FOR CONSTRUCTION CASNEEngineering
APR 0 N C P LANREM VALCE
J545 FACTORIA BOULEVARD SE., SUITE 200
SCALE: 1:50 SCALE: 1" = 50' z FEBRUARY 08 2019 BELLEVUE, WA 98006
f (425) 522-1000 WWW. CASNE. COM JOB NO. 191-027
SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE i DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL A DATE 02.08.19
4 of WAS lr ACCEPTABILITY C. ALLISON 07.15.15
- APRON C Cl PROJECT W3441886 CASNE CEC 12.14.15 ���� ��� THIS DESIGN AND/OR CHECKED PARTIAL SITE PLAN - POWER DISTRIBUTION
SPECIFICATION IS APPROVED r-NIINEER SHEET
RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES W3441886 CASNE DAT 12.19.16 P OVED BY DEPT. DATE JEA07.16.15 TITLE APRON C PARCEL 820 E4AR E3
A APRON C PARCEL 820 CASNE CEC 02.08.19 CHECKED
°3527. 4 APPROVED APRON C JOB NO. COMP NO.
•� ISTER� II W3441886
jONAL 2 `�I APPROVED DWGNO.
ELECTRICAL MASTER DAT 05—APRON—C—E4AR