Loading...
HomeMy WebLinkAboutR-4056292 i U > I w 1 U Z 0 Q - I 0 1-1 v 0 I 0 E 0 0 0 N co N 0 U 0 Q 0 0 m J 0 0 N O 0 V 0 UNIT SUB VC-1- CIRCUIT BREAKER TRIP SETTINGS EATON MAGNUM DS WITH 1150 TRIP UNIT BREAKER NO. SENSOR RATING PLUG RATING LONG TIME SHORT TIME INST. PICKUP GROUND FAULT MAINTENANCE PICKUP DELAY PICKUP DELAY PICKUP DELAY MODE 1 3200A 3200A 0.75 6 4 0.15 (I2T IN) - 0.25 0.25 (12T OUT) 2.5 2 3200A 3200A 0.4 4.5 4 0.2 (I2T IN) 3 0.25 0.25 (12T OUT) 2.5 3 800A 800A 4 800A 800A 0.5 10 6 0.4 (I2T IN) 6 0.25 0.1 (I2T OUT) 2.5 5 800A 800A 0.5 10 6 0.4 (I2T IN) 6 0.25 0.1 (I2T OUT) 2.5 6 AISLE HEATER 7 PROVISION - 8 800A 800A 9 800A 800A 0.5 10 6 0.4 (I2T IN) 6 0.25 0.1 (I2T OUT) 2.5 10 800A 800A 0.5 10 6 0.4 (I2T IN) 6 0.25 0.1 (I2T OUT) 2.5 WALK-IN LOW VOLTAGE SECTI W✓w�,-�� 3200 AMP, 30, 4 SKAIC 9 800AF � LSI 800AT TR GF N NS� �Q! 3,649 SOLID STATE TRIP UNIT W/GROUND FAULT TRIP (TYP) DUCTBANK FROM MH-B4 PSE CKT 24 5"C, 3#4/0 MV-105 15 KV CABLE + #2G 10 8 7 6 5 n 800AF LSI 800AT C� GF R C v N INS DOUBLE LUGS - A 800AF LSI 800AT TR \� GF T �E 800AF /V TRI 800AT GF (2D) N �STATION INS HEATER MANHOLE MH-C8 2500' / LOAD BREAK SWITCH ARRESTERS ® NEMA 3R N SUBSTATION �C 1 (EENCLOSUR) 125E AT APRON C ( XFMR �° 10' 0 12,470V - 480V/277V, 1500/2000KVA ""r7 Z=5.81 %, DRY TYPE, NEMA 3R � 3200AF TR 3200AT LSI 0-3000A 4 CT'S Al Tg AS A 3000:5A 3 PT'S 0-600V EATON POWER MONITOR XPERT 6000 W/ ETHERNET 4 3 65,000 2 800AF � LSI 800AT TR GF N NS 800AF V LSI 800AT rGIFG N NS� 15 480V-120/240V 5 KVA STATION POWER 3200AF � LSI 3200AT �TR GF � N NS� 4� INTO MH-C8 - 4"C TO MH-C8 � 3 5 C',4"C INTO MH-C8� 2 345' 1200' 285' MH-C8 SPARE MH-C8 SPARE 3/4°C PORTABLE GENSET I]]CONNECTION MH-C7 50� MH-C8 BOX MH-C9 500 KW MH-C6 8� 70A CB 11 10 45 KVA- 18,000 C9 3,619 10,000 2,574 TO 120/21 LOADS SYM REVISION F7 APRON C Cl PROJECT - RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES °' A APRON C PARCEL 820 N IIPA 110' 12 MH-C10 10,000 2,057 3 60' 17,955 LEGEND: 1600AF DRAWOUT INSULATED CASE CIRCUIT BREAKER 1200AT WITH FRAME AND TRIP RATING NOTED: LETTERS DENOTE TRIPS: L = LONG TIME S = SHORT TIME = INSTANTANEOUS GF = GROUND FAULT NS NEUTRAL SENSOR/CT PT POTENTIAL TRANSFORMER TR TRIP UNIT/RELAY QA AMMETER AS AMP/PHASE SELECTOR SWITCH V0 VOLTMETER VS VOLT/PHASE SELECTOR SWITCH XXXXXX > AVAILABLE FAULT CURRENT SHOWN XXX AIC RATING OF EQUIPMENT XXX FEEDER LENGTH IN FEET ❑• MANHOLE • TAP BOX K1 KIRK KEY INTERLOCK GENERAL NOTES: 1. TRIP MECHANISM FOR BREAKERS 2000AF AND ABOVE SHALL BE ELECTRICALLY OPERATED. 2. TRANSFORMERS DELTA-WYE UNLESS OTHERWISE NOTED. REFERENCE DRAWINGS: 05-APRONC-E4-1 SUBSTATION VC-1 ELEVATION AND LAYOUT CONSTRUCTION NOTES: A 1 TURN OFF BREAKER 9 IN SUBSTATION VC-1. REMOVE THE ABOVE -GROUND EQUIPMENT AT POSITIONS 6 & 7, INCLUDING POWER STANDS, PANELBOARDS, TRANSFORMERS, CREW SHELTERS. SALVAGE ALL EQUIPMENT TO BOEING. COORDINATE WITH THE BOEING CONSTRUCTION MANAGER. REMOVE THE CONDUCTORS FROM THE CONDUITS POWER DISTRIBUTION E4-VC-1 E521 BETWEEN SUBSTATION VC-1 AND THE C6 TAP BOX. STAND DSC2 PROVIDE PULL STRING IN THE CONDUITS. REFER TO C3 TAP BOX DETAIL 3 ON DRAWING E526R. C2 TAP BOX J - 25,974 POWER STAND C DI STAND DSCS 21,625 11.913 POWERDISTRIBUTION 1� 387 STAND DS SA � CB �100A CB OBOXIT n �� i3 MANREMOVE HOLETHE C6 TAOPDBOXORS ANDFROE CH TAP PROVIDE (1 C5 TAP BOX I 1 PULL STRING IN THE CONDUIT. REFER TO DETAIL 3 ON 10' 70A CB 12 11 10' 45KVA 9 g° C5 CREW ` 35,000 SHELTER 225A 17,165 480V PSCS 208/120V 208/120V PANEL PANEL 10,000 PSC5-1 05-435 3,347 40, 10,000 2,205 TO 120/208V LOADS 10 T95' TAP BOX 14,415 3,910 POWER DISTRIBUTION ( POWER STAND l;4 ICI STAND DSC4 � LJ gO' 125A CB ( C 70A CB 12' 10' 12 225A 480V PSC4 35,000 13,428 10,000 30 10 13,983 3,308 35,000 TO 120/208V LOADS 7,744 18,483 C4 TAP BOX 11 45KVA 10,000 BY APPROVED DATE SYM W3441886 CASNE CEC 12.14.15 W3441886 CASNE DAT 12.19.16 CASNE CEC 02.08.19 6 O 9 SHELTER 2,399 g' 400HZ CONVTR. 208/120V 208/120V 11 90 KVA PANEL PANEL 225A PSC4-1 05-434 480V PSC2-C3 ( 70A CB ( 100A CB 270' 20 75KVA DRAWING E526R. 12 1 p> 0 6 10' 16 40' 13 C2 CREW FEEDER SCHEDULE 9 J 5 45KVA 75KVA 10' C3 CREW 16 SHELTER 20' 208/120V 208/120V PANEL PANEL SHELTER 400HZ 208 120V 208 120V 208/120V CONVTR. / / 90KVA PANEL PANEL PANEL PSC2-1 05-432 05-430 10,000 145' 10,000 10,000 TYPE TYP. RATING VOLTS CONDUIT CONDUCTORS PER CONDUIT QTY SIZE PHASE NEUTRAL GND IG 10 200A 12,470 1 5" 3-4/0 (MV) #2 20 800A 480 2 4" 3-#600 #250 30 380A 480 1 3" 3-#500 #3 PSC3-1 05-433 1,279 3,450 3 ® 400A 480 1 4" 3-#600 #2 3 10,000 100' 10,000 75 5,073 10 60' 15 50 475 480 1 4" 3-#750 #2 260 5,071 10 1,683 0 7 179 - 3- 1 6 TO 120/208V LOADS 11 © 125 480 1 1 1/2 # # POWER DISTRIBUTION • POWER STAND 225A 35,000 70 175 480 1 2" 3-#2/0 #6 10,000 208/120V STAND DSC 1 Cl g7,068 ® 150 480 1 1-1 2" 3-# 1 /0 #6 2,925 PANEL 7,871 0 480V / ( ( ( PSC1 REVISION BY APPROVED DATE 05-438 Cl TAP BOX 70A CB 125A CB 7 90 150 208 1 1-1 /2" 3-# 1 /0 # 1 /0 #6 40' 10 60 208 1 1 " 3-#6 #6 #8 40' 6 14 112.5KVA 11 225 480 1 2" 3-#4/0 #4 10 12 10 10,0 00 12 70 480 1 1 " 3-#4 #8 VA ( 350A CB 0 7 882 Cl CREW 1 p, 9 175A CB 400HZ 4,802 2"C, 4#3/0, #6GND 13 100 480 1 1-1 /4" 3-#2 #8 SHELTER CONVTR. 14 30 BY MODULAR BLDG MFR. 90KVA 10,000 14 350 480 1 3" 3-#500 #500 #3 POWER STAND 10,000 12' 0 C2-C3 208/120V 2 999 208/120V 6,975 10,000 208/120V 0 208/120V 4,333 15 100 208 1 1-1 /2" PANEL PANEL PANEL PANEL 0 10,000 05-431 PSC1-1 4,503 > 05-lC4 05-2C4 R-405629 16 225 208 1 2-1/2" 3-#4/0 #4/0 #4 2,063 40 IN BLDG 05-429 IN BLDG 05-429 10 TO LOADS 8V ISSUE FOR CONSTRUCTION CE CASNEEngineering REM VAL 3545 FACTORIA BOULEVARD SE., SUITE 200 FE B R U A RY 08 2019 BELLEVUE, WA 98006 f (425) 522-1000 WWW.CASNE.COM JOB NO. 191-027 DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE WA LU?, ACCEPTABILITY C08.18.15 SUBSTATION VC-1 ONE -LINE THIS DESIGN AND/OR CHECKED SPECIFICATION IS APPROVED RJJ 08.18.15 SHEET ® ENGINEER TITLE VED BY DEPT. DATE JEA 08.18.15 APRON C PARCEL 820 E4-VC-1 R E4�"tiCHECKED �� 35276 w� APPROVED APRON C JOB No. COMP NO. °� �SISTER� I W3441886 `SIONAL�� II APPROVED ELECTRICAL MASTER RENTON, WA DwG No. 05-APRONC-E4R 2