HomeMy WebLinkAboutR-4056303
v
Q
rn
Ld
I
U
Z
0
Of
a_
Q
I
Lo
0
v
rn
c_
3
v
I
/
0
E
N
0
0
CV
00
L
O
U
c
O
a
a
a�
O
m
J
0
0
CV
0
I
i
rn
/
Q
U
a�
0
L
0-
U)
w
/
E
U
O
N
v
v
/
0
0)
cV
PARTIAL LEGEND
O SG STATIC GROUND WELL
GROUND ROD, 30' COPPER STEEL
II UNDERGROUND COPPER GROUND CABLE
5 Stalls
5 Stalls I
— — CADWELD CONNECTION
�� 5 Stalls
Q I 30 Stalls + 2 ADA GROUNDING ELECTRODE PIGTAIL
O
_ M,, I
TOTAL: 32 Stalls El
I
T1J s Z96 4 Stalls 5 Stalls 1 Stch II
co
NO
BLDG 790 O
OCDT iA OS 90909 ElZZ NOTES
I� � I I
O 1. ALL NEW STRUCTURES AND FACILITIES ARE PARALLEL
AND PERPENDICULAR TO EAST BOEING LEASE LINE AT
I BEARING N4°48'53"W.
a 3 2. PER IFC 2009, CHAPTER 11, AVIATION FACILITIES:
® �' (NP') AIRCRAFT BEING FUELED SHALL BE POSITIONED SUCH
9A E5 4 I
THAT ANY FUEL SYSTEM VENTS AND OTHER FUEL TANK
OPENINGS ARE A MINIMUM OF TWENTY—FIVE FEET (7620
POWER DISTRIBUTION MM) FROM BUILDINGS OR STRUCTURE OTHER THAN JET
RACK C7 2 \ BRIDGES; AND FIFTY FEET (15,240 MM) FROM AIR
m� INTAKE VENTS FOR BOILER, HEATER OR INCINERATOR
0 I ROOMS.
w I I 3. REPAIR OR REPLACE ANY AND ALL PAVEMENT DISTURBED
w DURING CONSTRUCTION IN ACCORDANCE WITH C501 AND
C ' I RSTRMRSTRM
THE SPECIFICATIONS.
1
I
wlz
4
65.5'
GROUP II TOFA (EXISTING)
SYM REVISION BY APPROVED DATE SYM
- APRON C CI PROJECT W3441886 CASNE CEC 12.14.15
- RECORD DRAWING - 737 MAX FLIGHTLINE UTILITIES W3441886 CASNE DAT 12.19.16
A APRON C PARCEL 820 CASNE CEC 02.08.19
APRON C PLAN
20 10 0 10 20 40 SCALE: 1 " = 20'
TAXIWAY A
SCALE: 1:20
REVISION BY APPROVED DATE
L-Aff"AiSFAV"
rr-
�4� of waste ltr�j
16 35276is
w4
ONAL�����Q
ACCEPTABILITY
THIS DESIGN AND/OR
SPECIFICATION IS APPROVED
'kROVED BY I DEPT. I DATE
UNAWN UAIt I SUBTITLE
C. ALLISON 07.15.15
11111112
.CONSTRUCTION NOTES
AT EACH EXISTING AIRPLANE STATIC GROUND
CONNECTION, FILL THE CAVITY WITH EPDXY AND PUT
THE BRASS CAP BACK ON, ABANDON THE ASSOCIATED
UNDERGROUND CONDUCTORS. SEE DETAIL 2 ON
SHEET E526R.
AT EACH EXISTING GROUND ROD, CUT THE ROD
FLUSH AT GRADE LEVEL. ABANDON THE ASSOCIATED
UNDERGROUND CONDUCTORS.
AT GROUNDED EQUIPMENT, REMOVE THE GROUND
CONNECTION BACK TO THE FIRST LOCATION AT WHICH
IT GOES UNDERGROUND, THEN CUT IT FLUSH WITH
THE SURFACE.
O m m Il- co u") � r) N O m m I— co U") -�d- r7 N O
N N N N N N
U U U U U U U U U U U U U U U U U U U U U
--
APRON
„
CIPA
AIR
ORT
TON MUN
lk
�
RE
�
I—
0
RUNWAY
APRON„„.
—
o
RAN
I
�o
D_
-
RO
"D"
5
20/
1
a
'0
AN
vp
cn
81 /E
12
H 9
Mmpi
F
PI
1 -80
_YLI
El
I
�
COMPLE
PAR
ING
L01
6
�_405
Z
_T_
KEY PLAN z
SCALE: NONE
ISSUE FOR CONSTRUCTION CE CASNEEngineering
3545 FACTORIA BOULEVARD SE., SUITE 200
FE B R U A RY 08 2019 BELLEVUE, WA 98006
f (425) 522-1000 WWW.CASNE.COM JOB NO. 191-027
GROUNDING PLAN - C6 & C7 CURRENT REVISION SYMBOL A DATE 02.08.19
SHEET
APRON C PARCEL 820 E9AR E5_
APRON C JOB NO. COMP NO.
W3441886
RENTON, WA DWG NO. 05—APRON—C—E9AR
A
B
C
D
E
F
G
H
J
K
L
ELECTRICAL MASTER