Loading...
HomeMy WebLinkAboutR-405635................... .................................................. N 4" COMM SPARE / 4 Q a 4 4 d a ad 4a I d 4 I 5"C. SPARE a ° 4„d NON—METALLIC SPACER (TYP) d I ii 4 C FIBER REBAR 18" SPACING 5 c ( ) 4 4"C. FIBER 5 C. MV NONMETALLIC LEVELING BAR / 30" #4/0 BARE CU GROUND REINFORCED DUCT BANK —MEDIAN SCALE: 1-1 /2"=1 ' —O" #6 REBAR (TYP) E4A,E4Bj E500 a a a a a a a a a a CL z . 4 d a a a d a 5" C. SPARE a d. I 4 4"C. COMM SPARE I 4 4 d 4"C, SPARE a 4>> 4>> dl 4 II I� W ll FIBER REBAR 18 NG) 4" �a o 4" 4"C, FIBER ada � 4"C, 4 / I' NONMETALLIC LEVELING BAR 36" 5"C. MV #4/0 BARE CU GROUND ---/ REINFORCED DUCT BANK —APRON SCALE: 1-1 /2"=1 ' —0" 4A1 E50OR a a -------------------------- dffl OC Cl 7 z o 0 LO w I U Z O 4" SPARF LEGEND a a _W7( N GENERAL NOTES 1. ALL 5" CONDUITS ARE FOR MEDIUM VOLTAGE CIRCUITS. �, • d Q a 4" COMM SPARE 2. USE SCHEDULE 40 PVC CONDUIT FOR CONCRETE a 4 d O a 4 d l Id a a a I ENCASED DUCT BANKS. d 4 4 Q 1 Od G d d 3. PROVIDE PULL CORDS IN ALL CONDUITS. SPACE FOR SMALL CONDUIT 4„ d I� a d d NON—METALLIC 4. SEE CIVIL AND STRUCTURAL PLANS FOR DETAILED I d SPACER (TYP) CONSTRUCTION REQUIREMENTS. 4 v 4 O I FIBER REBAR (18" SPACIN 4" 4" 4" Ida 4"C, FIBER • REFERENCE DRAWINGS: 05—APRON—C—E4A PARTIAL SITE PLANS NONMETALLIC LEVELING BAR 05—APRON—C—E4B PARTIAL SITE PLAN 36" 05—APRON—C—SXXX STRUCTURAL DETAILS #4/0 BARE CU GROUND __z \— #6 REBAR (TYP) RE NFORCED DUCT BANK —MAN NORTH —SOUTH AREA E SCALE: 1-1 /2"=1 '-0" 1 1 1 LE5do LO Q d / r r r r r r r r r r r r r r r r r r r *4V� 3 d a a 4 a 4 Q Q CONSTRUCTION NOTES (2) 4„ COMM I a d a I a °a4 a I REMOVE THE 480V CONDUCTORS BETWEEN SUBSTATION 4I >> I a 5 ° a I VC-1/BREAKER 9 AND DISTRIBUTION RACK C7. 5 C. SPARE a 4 a I °I 4» 4>> L PROVIDE PULL STRING IN THE CONDUITS. a I° 5 C. SPARE a d d I d >> d NON—METALLIC d e ° d �d NON—METALLIC IL 5 (TYP) I SPACER (TYP) FIBER REBAR (18" SPACING) a a � 4" � SPACER TYP 5» ° #4 REBAR (18 SPACING) 1 I „ 4 4 C. FIBER „ � a 5 C. MV a D D L 5"C. MV .� o � 0 NONMETALLIC LEVELING BAR 0 30 NONMETALLIC LEVELING BAR 36„ EBAR (TYP) I ...... ...... '' IL\ #4/0 BARE CU GROUND #6 REBAR (TYP) 4"C. 48 /� #4/0 BARE CU GROUND O IL V) REINFORCED DUCT BANK C7 TO SUB VC-1 c REINFORCED DUCT BANK —TO C6 C7 w 4A E5 OR „ „ 4A[E5dOR c SCALE: 1-1 /2 =1 —0 SCALE: 1-1 /2 =1 —0 V O a R-405635 0 ISSUE FOR CONSTRUCTION CASNEEngineering CE REM VAL 3545 FACTORIA BOULEVARD SE., SUITE 200 FE B R UARY 08 2019 BELLEVUE, WA 98006 7 (425) 522-1000 WWW. CASNE. COM JOB NO. 191-027 DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL p DATE 02 08.19 � SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE was�llr� ACCEPTABILITY CASNE 08.20.15 //�\ - APRON C Cl PROJECT W3441886 CASNE CEC 12.14.15 �� � THIS DESIGN AND/OR CHECKED ELECTRICAL DETAILS -DUCT BANKS SPECIFICATION IS APPROVED CEC 08.20.15 SHEET 12 ® _ ENGINEER TITLE APRON C PARCEL 820 E50OR E10 - RECORD DRAWING-737 MAX FLIGHTLINE UTILITIES W3441886 CASNE DAT 12.19.16 P VED BY DEPT. DATE JEA 08.20.15 A APRON C PARCEL 820 CASNE CEC 02.08.19 1 CHECKED °� 35276 w� APPROVED APRON C JOB NO. COMP NO. �SSis T � II W3441886 jONAL �1 �I APPROVED ELECTRICAL MASTER YARD RENTON, WA DWG NO. 05—APRON—C—E50OR N