HomeMy WebLinkAboutR-405635...................
..................................................
N
4" COMM SPARE
/ 4 Q
a 4
4 d a
ad 4a
I d 4 I
5"C. SPARE a ° 4„d NON—METALLIC
SPACER (TYP)
d
I ii 4 C
FIBER REBAR 18" SPACING 5 c
( ) 4 4"C. FIBER
5 C. MV
NONMETALLIC LEVELING BAR / 30"
#4/0 BARE CU GROUND
REINFORCED DUCT BANK —MEDIAN
SCALE: 1-1 /2"=1 ' —O"
#6 REBAR (TYP)
E4A,E4Bj E500
a a a
a a
a a a
a a
CL
z
. 4 d
a a a d a 5" C. SPARE
a d.
I 4 4"C. COMM SPARE
I 4 4 d
4"C, SPARE a 4>> 4>> dl
4 II
I� W ll
FIBER REBAR 18 NG) 4" �a o 4" 4"C, FIBER
ada �
4"C, 4
/ I'
NONMETALLIC LEVELING BAR
36"
5"C. MV
#4/0 BARE CU GROUND ---/
REINFORCED DUCT BANK —APRON
SCALE: 1-1 /2"=1 ' —0"
4A1 E50OR
a a
--------------------------
dffl
OC
Cl
7
z
o
0
LO
w
I
U
Z
O
4" SPARF
LEGEND
a
a
_W7(
N
GENERAL NOTES
1. ALL 5" CONDUITS ARE FOR MEDIUM VOLTAGE
CIRCUITS.
�, • d Q a 4" COMM SPARE
2. USE SCHEDULE 40 PVC CONDUIT FOR CONCRETE
a 4 d O a 4 d l
Id a a a I ENCASED DUCT BANKS.
d 4 4 Q 1
Od G d d
3. PROVIDE PULL CORDS IN ALL CONDUITS.
SPACE FOR SMALL CONDUIT 4„
d
I� a d d NON—METALLIC 4. SEE CIVIL AND STRUCTURAL PLANS FOR DETAILED
I d SPACER (TYP) CONSTRUCTION REQUIREMENTS.
4 v 4
O I
FIBER REBAR (18" SPACIN 4" 4" 4"
Ida 4"C, FIBER
• REFERENCE DRAWINGS:
05—APRON—C—E4A PARTIAL SITE PLANS
NONMETALLIC LEVELING BAR 05—APRON—C—E4B PARTIAL SITE PLAN
36" 05—APRON—C—SXXX STRUCTURAL DETAILS
#4/0 BARE CU GROUND __z \— #6 REBAR (TYP)
RE NFORCED DUCT BANK —MAN NORTH —SOUTH AREA E
SCALE: 1-1 /2"=1 '-0" 1 1 1 LE5do
LO
Q d / r r r r r r r r r r r r r r r r r r r
*4V�
3 d a a 4 a 4 Q Q CONSTRUCTION NOTES
(2) 4„ COMM
I a d a I a °a4 a I REMOVE THE 480V CONDUCTORS BETWEEN SUBSTATION
4I >> I a 5 ° a I VC-1/BREAKER 9 AND DISTRIBUTION RACK C7.
5 C. SPARE a 4 a I °I 4» 4>> L PROVIDE PULL STRING IN THE CONDUITS.
a I° 5 C. SPARE a d d
I d >> d NON—METALLIC d e ° d �d NON—METALLIC
IL 5 (TYP) I SPACER (TYP)
FIBER REBAR (18" SPACING) a a � 4" � SPACER TYP 5» °
#4 REBAR (18 SPACING) 1 I „
4 4 C. FIBER
„ � a
5 C. MV a D D
L 5"C. MV .�
o �
0
NONMETALLIC LEVELING BAR
0 30 NONMETALLIC LEVELING BAR 36„ EBAR (TYP)
I ...... ...... '' IL\
#4/0 BARE CU GROUND #6 REBAR (TYP) 4"C. 48 /�
#4/0 BARE CU GROUND
O
IL
V)
REINFORCED DUCT BANK C7 TO SUB VC-1 c REINFORCED DUCT BANK —TO C6 C7
w
4A E5 OR „ „ 4A[E5dOR
c SCALE: 1-1 /2 =1 —0 SCALE: 1-1 /2 =1 —0
V
O
a
R-405635
0
ISSUE FOR CONSTRUCTION CASNEEngineering
CE REM VAL 3545 FACTORIA BOULEVARD SE., SUITE 200
FE B R UARY 08 2019 BELLEVUE, WA 98006
7 (425) 522-1000 WWW. CASNE. COM JOB NO. 191-027
DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL p DATE 02 08.19
� SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE was�llr� ACCEPTABILITY CASNE 08.20.15 //�\
- APRON C Cl PROJECT W3441886 CASNE CEC 12.14.15 �� � THIS DESIGN AND/OR CHECKED ELECTRICAL DETAILS -DUCT BANKS
SPECIFICATION IS APPROVED CEC 08.20.15 SHEET
12 ® _ ENGINEER TITLE APRON C PARCEL 820 E50OR E10
- RECORD DRAWING-737 MAX FLIGHTLINE UTILITIES W3441886 CASNE DAT 12.19.16 P VED BY DEPT. DATE JEA 08.20.15
A APRON C PARCEL 820 CASNE CEC 02.08.19 1 CHECKED
°� 35276 w� APPROVED APRON C JOB NO. COMP NO.
�SSis T � II W3441886 jONAL �1 �I APPROVED ELECTRICAL MASTER YARD RENTON, WA DWG NO. 05—APRON—C—E50OR
N