Loading...
HomeMy WebLinkAboutzW-4056SetE— I I L — _ _ _ —-------- E --_— — — PSE EASEMENT E — — —_ o AFN 2010092100I966 S1 �— T _ T — E T —T= — — — --- -- 10 _ — — — — — — T Sls — n� — --— —= o €E — �— — I _ -- G --- G---- —— G 6 0 o E __ _ G--- G --- G---- — — — �2—co c _ I I PSE EASEMENT ❑ � E AFN 2010092100966 o U ❑ -n ❑ ❑ ❑ I ri o cn CD ❑ n — — E O STS ❑ ❑ ° a I 0 0 o Li D I 1 0 0 �, I N 6 = II I I PSE EASEMENT RAMPALT AFN 2010092100966 u cn 1 — — — T _- II I T — — T I c w�� ❑ ❑ ❑ El El El El ElI ElI BLDG 790 A D , I AIRPORT MAINTENANCE w — BLDG 800 X3 I RAINIER FLIGHT SERVICE , X ❑ I _SS TEMP TEMP _�� _ SS - -I RSTRMRSTRM C ❑ — _ E 1 w � _ —Ss I o D 7 7 I� ❑ I I I /c/� 5 OR 6 BLOCKS 6 X I 1 f GAP cn n0 I I o l $ �' II I I ,Z*z' cf) T� Ll x x x LL — STS I c�, 6'CLF GATE cn w W w W � 12' C (n --- S— -- S— SS-- — S---- SS---- SS---- 6 C w J' S r STS STS STS— STS 2—ROWS W 6� SS-�-- SS---- SS---- SS---- SS w S -- SS s --- STS—SS -- SS-- — SS-- - SS---- S I zo I m� � w o I B ,5 BLOCKS m o Q I 3 A A 2 OR 3 GAP D 00 z n , 's , D o- E Os,�p 6 iii D N z � / I E �C E E E r o O 12" DI I 12' DI �� ��/ < RAMP i O E� Lw �o 0 - o Z �o z -x D 1 2 N 8 s x x x E AF —€�N— EWE — — — RW --- A FW -- A--- A — A — w E — A --- --- A — — A — — — -- A 1 I w I w — — — EW FW Ev"v — E---- E --- E---- E — — E -- E---- E---- E---- E -- — — -- E _ — — ---- T --- T -- — T --- E—I 4 — 0 E� I D < D I I I CDD I � D -91 1II I o D I m �TS- STS i m I '� I II D I z 80' f GAF' 8 '� EQUAL SPACING D o II I I I — �° I II2 BLOCK 1 EQUAL .ci PAv 1 DI I m 6 I I II I 1 - IIF- FT6 II � 2 BLOCKS CONSTRUCTION NOTES R>-REMOVE TURNSTILE &CARD READERS. PROVIDE VINYL COATED FENCING. 2�REMOVE TOOL CABANA. D>-DISCONNECT ALL UTILITIES AND BUILDING ANCHORS TO ALLOW FOR THE REMOVAL OF THE CREW SHELTERS BY BOEING. 4�COVERED WORK AREA TO BE REMOVED. DEMOLISH TANK WATER HEATER BUILDING, INCLUDING FOUNDATION. B>-REMOVE BARRIERS. 7� TEMPORARY RESTROOM (SANI-CAN) TO BE REMOVED (BY OTHERS). R>-REMOVE POWER STAND. R>-REMOVE SAFETY SHOWERS &EYE WASH STATION. 1�REMOVE LIGHT POLE ASSEMBLY. P>-REMOVE AIR &WATER SERVICE STANDS. A P>-REMOVE STAINLESS STEEL SKYDROL INSERT. 1 REMOVE BOLLARDS. P>-REMOVE FIRE HYDRANT ASSEMBLY AND BOLLARDS. DELIVER FIRE HYDRANT ASSEMBLY TO THE CITY OF RENTON MAINTENANCE SHOP. 1�REMOVE EXISTING POWER OUTLETS. R>-REMOVE 6" GATE VALVE AT 12" TEE PROVIDE 6" MJ PLUG TO BE INSTALLED BY CITY OF RENTON FORCES THE CONTRACTOR SHALL PROVIDE ALL MATERIALS AND RESTORE FINAL SURFACE PAVING. GENERAL NOTES: 1. ALL ITEMS TO BE REMOVED SHALL BE DELIVERED TO BOEING TO A LOCATION AS DIRECTED BY BOEING CONSTRUCTION MANAGER. 2. AIRCRAFT WILL BE PARKED AT POSITION C-6 AND C-7 UNTIL 3-8-2019. BOEING MAY ADJUST THAT DATE AS NEEDED. 3. THE CONTRACTOR SHALL DISCONNECT THE ELECTRICAL AND DATA LINES FROM CREW SHELTERS. SEE ELECTRICAL AND DATA PLANS. 4. THE CONTRACTOR SHALL REMOVE ALL CREW SHELTER GROUT PADS ONCE BUILDING IS REMOVED. ALL REMAINING ANCHOR BOLTS SHALL BE CUT FLUSH WITH THE PAVEMENT. I z DI 5 II-, FTI = r, oNC I � � I I I E E cf) I II m 11 i m I Fr 1, 3 $ I 3 I AIR RTON CIPA B6 --- _ j l N I 2' OR 3' GAP o Ru P ,° I o C AX z RAM P o SG I �_ - - Z 1 0 FT-Q 2 `� o m I �� RO "p° Q o 77 20/ 1 a D T I I I - E rf:�oqAyN � D 1 u FT, I I 81/ 2 F 1 4 I IN CONIPLIAN aE 1NITN CI -I Y of RENTON $TAN❑)ARD� .F 1 -80 0-5 G I FTI9 I Fai 7- I DEVELOPMENT ENGINEERING 1 74 ❑ H I rnair 04/26/2019 I - m COMPLE � � I � AIRP RT LEASE LINE AIRPORT LEASE LINE I PAR I .. 1 LQ K I I z 1_405 I w W-405601 I KEY PLAN FA (E) TO FA (E) TOFA (E) TO FA (E) TOFA (E) TOFA (E) -TO FA TO FA (E) OFA �E) TO FA (E) — �rH TOFA (E) 7 � I I SCALE: NONE L ` 20 10 0 10 20 40MEMO I I IFC SUBMITTAL w APRON C PLAN R-405607 I o TAXIWAY A SCALE: 1:20 SCALE: 1" = 20' z I DRAIN PIPE EASEME M A RCH 2 2 2019 1 3 oOWL SYM REVISION BY APPROVED DATE SYM REVISION BY APPROVED DATE DRAWN DATE SUBTITLE CURRENT REVISION SYMBOL DATE S W ACCEPTABILITY R. TEMPLADO 03.22.19 CIVIL SITE PLAN W3441886 - APRON C Cl PROJECT - SITE DCN-05 RT TWN 03.28.16 - APRON C Cl PROJECT - SITE DCN-10 RT TWN 06.06.16 �A� OF WASkI �THIS DESIGN AND/OR CHECKED coo G SPECIFICATION IS APPROVED T. NEU 03.22.19 SHEET ENGINEER TITLE C82 APRON C CI PROJECT - SITE DCN-06 RT TWN 04.05.16 - APRON C CI PROJECT - SITE DCN-11 RT TWN 07.05.16 ® APPROVED BY DEPT. DATE T. NEU 03.22.19 BOEING APRON C PARCEL 820 PROJECT C4 APRON C Cl PROJECT SITE DCN-07 RT TWN 04.12.16 RECORD DRAWING CHECKED 737 MAX FLIGHTLINE UTILITIES RT TWN 10.17.16 D. MURATA 03.22.19 SITE 05I D 45379 APPROVED JOB NO. COMP NO. cr - APRON C Cl PROJECT - SITE DCN-08 RT TWN 04.22.16 - APRON C PARCEL 820 RT TWN 02.08.19 �o Eo �� - - W3441886 �'sT� �ti� - APRON C Cl PROJECT - SITE DCN-09 RT TWN 05.11.16 A APRON C PARCEL 820 PERMIT COMMENT REVISION RT TWN 03.29.19 S70NAL E� 3/29/19 APPROVED CIVIL MASTER RENTON, WA DWG NO. 05-APRON-C-C82