HomeMy WebLinkAboutRE 1504 Kirkland Ave Renton - Fire Hydrant modification per City of Renton request.msgMinor mark-ups on thrust blocks and shackle rods are shown on the attachment.
Abdoul
From: Scott Warlick
Sent: Tuesday, June 25, 2019 8:49 AM
To: Abdoul Gafour <Agafour@Rentonwa.gov>
Subject: FW: 1504 Kirkland Ave Renton - Fire Hydrant modification per City of Renton request
Hey Abdoul,
I received this revision to my water plans for the install of a fire hydrant. Pat Miller was out on site last week and shut them down because they did not have adequate cover for the
water line so to get the fire hydrant down to the proper depth they had to add some bends.
This is the first time I have taken in a field revision like this Abdoul so let me know if you need anything more from me!
Thanks Abdoul,
Scott Warlick
Engineering specialist II | CED
SWarlick@Rentonwa.gov <mailto:SWarlick@Rentonwa.gov> | Phone: (425) 430-7216
P Please consider the environment before printing this email
EFFECTIVE JANUARY 1, 2018 THE COMMUNITY AND ECONOMIC DEVELOPMENT
DEPARTMENT PERMIT COUNTER WILL CLOSE AT 4:00 P.M. DAILY
Permit Counter 8:00 a.m. to 4:00 p.m.
Financial Transactions 8:00 a.m. to 4:30 p.m.
From: Callidus [mailto:callidusland@comcast.net]
Sent: Monday, June 24, 2019 6:40 PM
To: Scott Warlick <SWarlick@Rentonwa.gov>
Cc: callidusland@comcast.net
Subject: FW: 1504 Kirkland Ave Renton - Fire Hydrant modification per City of Renton request
Scott –
We found/were informed the other day that the City of Renton Water line was not as deep as thought so to get Fire Hydrant to proper depth needed to have bend’s in it. Inspector wanted
us to do a drawing for this which is attached. Please let me know what to do to get approved as it is holding up project.
Thanks,
Troy Schmeil
Callidus Development, Inc
Sapphire Homes, Inc
Office: 425-818-8829
Cell: 206-954-4945
Email: Callidusland@comcast.net
Web: www.sapphirehomesnw.com <https://urldefense.proofpoint.com/v2/url?u=http-3A__www.sapphirehomesnw.com_&d=CwMFAg&c=DGYIV7x3cSzfJxnLcx-BeqhepWcu1bx4JZ4-8hMr-34&r=L6k5RkYzwtaCdLTxSnBcog&m=OZCaog2jv
HNEdotVFd5dogeeMq7r6VcQ4fF8XXa0eNc&s=j80H3ppM_SGmknioHuNPdxFR2zEuwAKS7Lhwwsfq0Dw&e=>
From: Han Phan <pbg.engr@yahoo.com>
Sent: Monday, June 24, 2019 11:42 AM
To: Todd Emry <todd.kvhconstruction@gmail.com>; Callidus Development <callidusland@comcast.net>
Subject: Re: 1504 Kirkland Ave Renton
Todd and Troy,
Attached is the revised sheet C4 showing the detail of the vertical bends for the fire hydrant on NE 15th Street. Please note that 45 degree bend wouldn't work here because of the difference
from 2.5' to 3' min. pipe cover. It needs to be 22.5 degree bend.
Thanks
Han Phan, P.E.
PBG
5130 S. 166th Lane
SeaTac, WA 98188
Cell: 206-229-6422 <file:///C:\Users\TSchmeil\AppData\Local\Microsoft\Windows\INetCache\Content.MSO\31CFED90.tmp>
Office: 206-446-1292 <file:///C:\Users\TSchmeil\AppData\Local\Microsoft\Windows\INetCache\Content.MSO\833CFA1E.tmp>
Email: PBG.ENGR@yahoo.com
On Thursday, June 20, 2019, 12:07:34 PM MST, Todd Emry <todd.kvhconstruction@gmail.com> wrote:
Todd Emry
Vanhoof Construction
Cell 253-257-9302
On Thu, Jun 20, 2019, 11:52 AM Han Phan <pbg.engr@yahoo.com> wrote:
Todd,
No redline or sketch attached to the email?
Thanks
Han Phan, P.E.
PBG
5130 S. 166th Lane
SeaTac, WA 98188
Cell: 206-229-6422
Office: 206-446-1292
Email: PBG.ENGR@yahoo.com
On Thursday, June 20, 2019, 11:30:11 AM MST, Todd Emry <todd.kvhconstruction@gmail.com> wrote:
On Thu, Jun 20, 2019, 11:28 AM Todd Emry <todd.kvhconstruction@gmail.com> wrote:
Need this drawn up and submitted to the city asap. Thanks
Todd Emry
Vanhoof Construction