Loading...
HomeMy WebLinkAboutRS_Drainage Report_Goldsmith_190607_V1 Dalpay Preliminary Short Plat Level 1 Downstream Analysis and Preliminary Drainage Control Plan June 2019 Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx i TABLE OF CONTENTS 1.0 Project Overview .................................................................................................................. 1 2.0 Offsite Analysis .................................................................................................................... 4 Task 1. Define and Map Study Area Task 2. Information Review Task 3. Field Inspection Task 4. Drainage System Description and Problem Description 3.0 Preliminary Drainage Control Plan ..................................................................................... ..7 4.0 Flow Control and Water Quality Facility Analysis ................................................................. 8 Part A. Existing Site Hydrology Part B. Developed Site Hydrology Part C. Performance Standards Part D. Flow Control System Part E. Water Quality System FIGURES Figure 1 Vicinity Map Figure 2 Existing Site Aerial Photo Figure 3 USGS Soils Map Figure 4 Existing Conditions Map Figure 5 Downstream Map Figure 6 Preliminary Drainage Plan Figure 7 Critical Areas Map APPENDIX A. King County W ater and Land Resources Division Drainage Complaint Investigation Sheets (1/4 Mile and Minimum 1 Mile) B. Geotechnical Report by Associated Earth Sciences, Inc., April 19, 2019 Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 1 1.0 Project Overview Introduction This report provides design data and analysis for the improvements proposed for the Dalpay Short Plat five lot subdivision. The site is approximately 2.46 acres and is located at the northwesterly corner of the intersection of SE Renton-Issaquah Road and 148th Avenue SE in the City of Renton, Washington, also known as Tax Parcel No. 0323059120, situated in the southeast quarter of Section 3, Township 23 North, Range 5 East, W.M. As required by the 2017 City of Renton Surface Water Design Manual (COR SWDM), this report includes a summary of the existing on-site and downstream conditions; proposed developed site conditions; and the proposed stormwater control plan. This report also gives specific details on how the project meets the minimum requirements specified in Section 1.2 of the 2017 COR SWDM. Project Description This project will provide the necessary site improvements required to serve the five single family lots proposed with this short plat. The site is currently undeveloped with a few scattered trees and shrubs/bushes/Himalayan blackberry within the property. The existing Greenes Creek to the west of the site is surrounded by shrubs/bushes as seen in images 1 through 4 of this report. Summary of Proposal This is a request for Preliminary Subdivision approval for five single family residential lots, public roads, public utilities (water, sewer, stormwater), and stormwater/critical area tracts on the existing parcel. Stormwater control facilities will be designed per the 2017 City of Renton Surface Water Design Manual requirements as identified above. The proposed road and permanent cul-de-sac are designed in accordance with the 2016 King County Road Design and Construction Standards. As the future project will disturb one acre or more and has stream buffer on-site, this Preliminary Plat is subject to SEPA. The total project site is approximately 2.46 acres. Currently undeveloped, the site is vegetated with tall grasses, dense blackberry bushes, and scattered trees. The proposed stormwater system proposes to follow similar existing drainage patterns, meeting flow control and water quality requirements set forth by the City of Renton. A downstream analysis of the site up to the quarter mile was prepared in Section 2 of this report. Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 2 CORE REQUIREMENTS The following is a preliminary description of how the Dalpay project will meet the Core Requirements of the 2017 COR SWDM. Core Requirement #1 – Discharge at the Natural Location The proposed conditions will not alter the general downstream path. The proposed drainage improvements will continue to route stormwater to the existing creek west of the property. The proposed flow control structure will discharge stormwater to Greenes Creek. Refer to the Offsite Analysis section (section 2) of this report for a description of the existing discharge point. Core Requirement #2 – Offsite Analysis A downstream drainage analysis has been completed and is included in this report. Core Requirement #3 – Flow Control Flow Control for the project area will be provided by the proposed vault and will be managed by a flow restrictor located on the northwest corner of the property within the proposed stormwater tract. The flow restrictor is designed to meet the flow control duration standard base on the historic forested site conditions. MGS Flood modeling was used to confirm compliance with the 2017 COR SWDM requirements. (Section 4) Core Requirement #4 – Conveyance System The design and analysis of the stormwater conveyance system for this project will comply with the requirements of the 2017 COR SWDM. Detailed design and analysis of the conveyance system will be completed in future engineering plan submittals. Core Requirement #5 – Construction Stormwater Pollution Prevention The design of the construction stormwater pollution prevention (CSPP) plans for the proposed improvements will be per the requirements of the 2017 COR SWDM and included with future engineering plan submittals. Core Requirement #6 – Maintenance and Operation Proposed stormwater facilities will be dedicated to the City of Renton by Dalpay Properties. Core Requirement #7 – Financial Guarantees and Liability This project will comply with all financial guarantees required by the City of Renton. Core Requirement #8 – Water Quality Facilities The project site is located in an area requiring Basic Water Quality Treatment. The Project proposes to treat stormwater runoff from the proposed road and driveways before discharging runoff to the existing Greenes Creek located west of the project. Core Requirement #9 – On-site BMP’s Design and analysis of Flow Control BMP’s will be per requirements of the 2017 COR SWDM. Detailed design and analysis of flow control BMP’s will be included in future submittals. Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 3 SPECIAL REQUIREMENTS Special Requirement #1 – Other Adopted Area-Specific Requirements The site does not fall under any other known adopted area specific requirements. Special Requirement #2 – Flood Hazard Area Delineation This project development is adjacent to a zone X flood hazard area per FEMA Flood Maps. Special Requirement #3 – Flood Protection Facilities This project does not rely on an existing flood protection facility for protection against hazards posed by erosion or inundation or propose to modify or construct a new flood protection facility; therefore, flood protection facilities are not required. Special Requirement #4 – Source Control The proposed development does not require a commercial building or commercial site development permit; Therefore, water quality source control is not required. Special Requirement #5 – Oil Control This project does not have high use site characteristics; therefore, oil control BMP’s are not required. Special Requirement #6 – Aquifer Protection Area This project does not have high use site characteristics; therefore, oil control BMP’s are not required. 2.0 Off-Site Analysis The following is a Level 1 downstream analysis, performed in accordance with the 2017 City of Renton SWDM. A site visit was conducted by Goldsmith Engineering on October 26, 2018 to investigate the onsite drainage systems, confirm downstream drainage paths, and evaluate upstream tributary areas to the project site. The weather during the site visit was cloudy but dry with a temperature of approximately 60 degrees Fahrenheit. Task 1 – Define and Map Study Area The topographical field survey was supplemented by City of Renton GIS drainage information, aerial mapping, and information obtained by field investigation to further define and map the study area in order to prepare the offsite analysis. Task 2 – Information Review As mentioned earlier, the City of Renton drainage maps show the project area within the May Creek Basin. Based on the City of Renton GIS mapping data, there is an existing Class 2 wetland on the west side of the site. The stream / wetland delineation performed by Altmann Oliver Associates has confirmed there is no wetland present on-site, only an off-site wetland as shown on Figure 4. According to the Washington State Department of Ecology Flood Hazard Maps, the project area is not located within a Floodway or 100-year Floodplain. Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 4 Task 3 – Field Inspection The project area slopes north and west with slopes ranging from 8% to 15%. The site is covered with shrubs/bushes near Greenes Creek on the west. Task 4 – Drainage System Description and Problem Descriptions The downstream drainage path was determined based on City of Renton GIS storm drainage maps, site survey, and information gathered during a site visit. Refer to Figure 5 – Downstream Drainage Map. As previously stated, runoff from the site flows north and west towards Greenes Creek. The proposed drainage improvements will discharge stormwater from the detention facility to Greenes Creek on the northwest corner of the property. 1. Runoff is discharged from the site to the existing Greenes Creek near the northwest corner of the property boundary. Greenes Creek slopes north along the edge of the property. No stormwater flow was observed during the time of visit. 2. Runoff is collected from the creek by an existing 24-inch bypass line. 3. Water flows west to existing storm drain man hole within Lyons Ave NE. 4. From this man hole, piping heads north for approximately 190 feet, discharging into Greenes Creek. 5. Stormwater runoff flows north through a heavily vegetated creek, eventually out falling to May Creek. Task 5 – Mitigation of Existing or Potential Problems As indicated previously, there are no existing problems on-site or downstream of the site. The design of a stormwater control plan meeting the City of Renton requirements, including recommended BMPs will mitigate any potential problems related to the development of the subject site. Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 5 Images 1 and 2 – Left image: center of Greenes Creek looking North. Right image: West e dge of Greenes Creek looking East. Imag es 3 and 4 – Left image : 24-inch pipe outfall with trash guard to Greenes Creek . Right image: Greenes Creek looking North . Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 6 OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLE -1 Surface Water Design Manual, Core Requirement #2 Basin: Lake Washington Watershed Sub-basin Name: May Creek Symbol Drainage Component Type, Name, and Size Drainage Component Description Slope (estimated) Distance from site discharge Existing Problems Potential Problems Observations of field inspector, resource reviewer, or resident 1 Site Boundary Property line N/A 0 None None N/A 2 Creek Existing Greenes Creek 0.5 to 30% +/-100ft None Sedimentation, ponding, flooding No signs of major sediment, ponding, or flooding 3 Conveyance System Existing 24-inch bypass pipe 0.5 to 7% +/-500 ft None Under Capacity No capacity problems were observed during site visit 4 Creek Existing Greenes Creek 0.5 to 30% 500-4,150 ft None Sedimentation, ponding, flooding No signs of major sediment, ponding, or flooding 5 Creek Existing May Creek 0.5 to 30% +/-4,150 ft None Sedimentation, ponding, flooding No signs of major sediment, ponding, or flooding Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 7 3.0 Preliminary Drainage Control Plan The stormwater control plan for the site encompasses all available information about the site and its downstream drainage system. This includes site topography, geology, detailed field investigations, and drainage complaints and observations. Flow control and water quality treatment BMPs have been evaluated. Preliminary evaluation of proposed flow control and water quality facilities is provided in Section 4.0. A preliminary drainage plan is shown on Figure 6. FLOW CONTROL STANDARD This section is prepared in conformance with the requirements of the 2017 City of Renton Surface Water Design Manual (COR SWDM) guidelines for drainage review and for downstream analysis of a preliminary subdivision. The following describes the preliminary storm drainage design approach of the stormwater control facilities for the project. In order to comply with Core Requirement #3, this report follows Section 1.2.3. 2 Flow Control Facility Implementation requirements. Based on findings in the soils report, full infiltration is not feasible for the proposed development. The 2017 Manual requires use of extended period of record continuous models such as WWHM, HSPF, MGS Flood, or other. The standard requires that post- developed discharges match pre-development continuous flow durations between 50% of the 2- year level through the full 50-year level and match the 2-year and 10-year peak. The facility was sized to provide flow control for the site which included assumed impervious areas for future homes and driveways up to the maximum impervious area allowed per zoning. WATER QUALITY STANDARD The Basic Water Quality treatment for the proposed development is to be provided through the proposed water quality control facility within the proposed stormwater tract. The stormwater system was designed to treat runoff through a cartridge system within a manhole before discharging stormwater to the proposed detention facility. Calculations for WQ include assumed impervious areas for the development of the project at hand. Assumed PGIS areas include the proposed road and driveways for the five proposed lots. Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 8 4.0 Flow Control and Water Quality Facility Analysis The following is the preliminary analysis and design of the proposed stormwater flow control and water quality facility for the Dalpay preliminary plat. These facilities have been designed to ensure that any adverse impacts from the proposed development on downstream systems are prevented. Part A. Existing Site Hydrology The parcel is currently undeveloped and is vegetated with tall grasses, dense blackberry brambles, and scattered stands of young deciduous trees along portions of the perimeter of the parcel. General site topography of the property generally slopes towards the northwest and west. The project site consists of moderate slopes ranging from 8 to 15 percent, draining into the existing creek. Greenes Creek flows to the north and is located west of the property. As mentioned, in task 4 of Section 2 of this report, stormwater runoff flows north through Greenes Creek and a series of existing pipes before discharging into May Creek. Per the Flow Control Applications Map provided by the City of Renton, the project is located within a Flow Control Duration Standard area. The 2017 COR SWDM requires projects located in this area to assume a forested historical site condition for the existing site conditions. These assumptions have been used for calculating allowable release rates and flow durations for the existing stormwater control facilities. Existing site hydrology has been modeled using the approved continuous model (MGS Flood). NCRS soils mapping indicates that the site is underlain by Alderwood gravelly sandy loam (AgD). SCS Group C till soils (See Figure 3). Per the Geotechnical Report, the soils observed in the test pits are considered suitable for foundation support but not favorable for infiltration of site stormwater. See Appendix B for more information. Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 9 Part B. Developed Site Hydrology The stormwater design has been developed to mitigate changes in stormwater runoff from the proposed short plat. Per Section 1.2.3 of the 2017 COR SWDM, the project is required to match developed discharge durations to predeveloped durations for the range of predeveloped discharge rates from 50% of the 2-year peak flow up to the full 50-year peak flow and match peak rates for the 2-year and 10-year return periods. Developed conditions in the MGS Flood model were updated to meet Flow Control Duration Standards, matching Forested Historical site conditions within this project. The total impervious areas for the new project include the proposed road, curb, gutter, sidewalk, driveways, and assumed roof areas per the maximum allowed impervious area per zoning. The maximum allowed impervious area per code is 50% of the proposed lots or 4,000 SF (whichever is less). These assumed areas were used to model the flow control and water quality facilities for the project. To meet Core Requirement #8, a stormwater cartridge system is proposed for treatment of on-site PGIS areas. Pollution-generating impervious surfaces will be treated before discharging runoff to the proposed stormwater detention vault. The location of the proposed facilities is shown on Figure 6. Part C. Performance Standards Flow Control BMPs The proposed project is required to meet the flow control duration standard matching forested historical site conditions per the 2017 COR SWDM. The proposed flow control facilities were evaluated per current code requirements using an approved continuous model. Water Quality Standard Proposed water quality facilities were designed to mitigate for future development of this site. The basic water quality facilities were examined using the current City of Renton Surface Water Design Manual to meet basic water quality treatment. SF AC 18,900 0.434 20,000 0.459 38,900 0.893 68,693 1.577 107,593 2.470 Developed Conditions Road Lot (4,000sf per lot) Total Impervious Total Pervious Total Site Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 10 Part D. Flow Control System The following provides information related to the proposed flow control facility designed for the development of this site. As previously mentioned, per the requirements set forth by the 2017 COR SWDM, the project will meet flow control duration standards matching historic forested conditions. The vault and flow control structure were designed using MGS Flood, meeting peak rates described in Section 1.2.3 of the surface water design manual. Calculations for the facilities has been included at the end of this report. Post developed runoff will continue to discharge runoff to the existing Greenes Creek via a dispersion trench as shown in Figure 6. Part E. Water Quality System As noted above, basic water quality treatment for the site is provided by the proposed drainage facilities within the proposed stormwater tract. The facilities were evaluated using the 2017 COR SWDM and the approved continuous model. As previously mentioned, the facilities were designed to include assumed impervious areas for future development of the site. The MGS Flood calculations show that the proposed stormwater cartridges meet the requirements for water quality treatment. Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 11 ———————————————————————————————— MGS FLOOD DALPAY FLOW CONTROL & WQ PROJECT REPORT Program Version: MGSFlood 4.46 Program License Number: 201810008 Project Simulation Performed on: 05/02/2019 3:44 PM Report Generation Date: 05/02/2019 3:44 PM ————————————————————————————————— Input File Name: Flow Control & WQ.fld Project Name: Dalpay Short Plat Analysis Title: Flow Control Matching Forested Historic Conditions Comments: Lot size = 2.47ac Impervious = 0.893 ac ———————————————— PRECIPITATION INPUT ———————————————— Computational Time Step (Minutes): 15 Extended Precipitation Time Series Selected Climatic Region Number: 16 Full Period of Record Available used for Routing Precipitation Station : 96004405 Puget East 44 in_5min 10/01/1939-10/01/2097 Evaporation Station : 961044 Puget East 44 in MAP Evaporation Scale Factor : 0.750 HSPF Parameter Region Number: 1 HSPF Parameter Region Name : USGS Default ********** Default HSPF Parameters Used (Not Modified by User) *************** ********************** WATERSHED DEFINITION *********************** Predevelopment/Post Development Tributary Area Summary Predeveloped Post Developed Total Subbasin Area (acres) 2.470 2.470 Area of Links that Include Precip/Evap (acres) 0.000 0.000 Total (acres) 2.470 2.470 ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 2.384 Impervious 0.086 ---------------------------------------------- Subbasin Total 2.470 Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 12 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 ---------- Subbasin : Subbasin 1 ---------- -------Area (Acres) -------- Till Forest 1.577 Impervious 0.893 ---------------------------------------------- Subbasin Total 2.470 ************************* LINK DATA ******************************* ----------------------SCENARIO: PREDEVELOPED Number of Links: 0 ************************* LINK DATA ******************************* ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ------------------------------------------ Link Name: New Structure Lnk1 Link Type: Structure Downstream Link: None Prismatic Pond Option Used Pond Floor Elevation (ft) : 100.00 Riser Crest Elevation (ft) : 105.00 Max Pond Elevation (ft) : 105.50 Storage Depth (ft) : 5.00 Pond Bottom Length (ft) : 80.0 Pond Bottom Width (ft) : 40.0 Pond Side Slopes (ft/ft) : L1= 0.00 L2= 0.00 W1= 0.00 W2= 0.00 Bottom Area (sq-ft) : 3200. Area at Riser Crest El (sq-ft) : 3,200. (acres) : 0.073 Volume at Riser Crest (cu-ft) : 16,000. (ac-ft) : 0.367 Area at Max Elevation (sq-ft) : 3200. (acres) : 0.073 Vol at Max Elevation (cu-ft) : 17,600. (ac-ft) : 0.404 Massmann Infiltration Option Used Hydraulic Conductivity (in/hr) : 0.00 Depth to Water Table (ft) : 100.00 Bio-Fouling Potential : Low Maintenance : Average or Better Riser Geometry Riser Structure Type : Circular Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 13 Riser Diameter (in) : 18.00 Common Length (ft) : 0.010 Riser Crest Elevation : 105.00 ft Hydraulic Structure Geometry Number of Devices: 2 ---Device Number 1 --- Device Type : Circular Orifice Control Elevation (ft) : 100.00 Diameter (in) : 1.00 Orientation : Horizontal Elbow : No --- Device Number 2 --- Device Type : Vertical Rectangular Orifice Control Elevation (ft) : 102.30 Length (in) : 0.13 Height (in) : 32.00 Orientation : Vertical Elbow : No **********************FLOOD FREQUENCY AND DURATION STATISTICS******************* ----------------------SCENARIO: PREDEVELOPED Number of Subbasins: 1 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Subbasins: 1 Number of Links: 1 ********** Link: New Structure Lnk1 ********** Link WSEL Stats WSEL Frequency Data(ft) (Recurrence Interval Computed Using Gringorten Plotting Position) Tr (yrs) WSEL Peak (ft) ====================================== 1.05-Year 101.145 1.11-Year 101.309 1.25-Year 101.615 2.00-Year 102.353 3.33-Year 102.719 5-Year 103.093 10-Year 103.808 25-Year 104.414 50-Year 104.506 100-Year 104.778 ***********Water Quality Facility Data ************* ----------------------SCENARIO: PREDEVELOPED Dalpay Preliminary Short Plat June 2019 Level 1 Downstream Analysis and Preliminary Drainage Control Plan r18067 Dalpay Technical Information Report 2019-06.docx 14 Number of Links: 0 ----------------------SCENARIO: POSTDEVELOPED Number of Links: 1 ********** Link: New Structure Lnk1 ********** Basic Wet Pond Volume (91% Exceedance): 5692. cu-ft Computed Large Wet Pond Volume, 1.5*Basic Volume: 8538. cu-ft Infiltration/Filtration Statistics-------------------- Inflow Volume (ac-ft): 640.21 Inflow Volume Including PPT-Evap (ac-ft): 640.21 Total Runoff Infiltrated (ac-ft): 0.00, 0.00% Total Runoff Filtered (ac-ft): 0.00, 0.00% Primary Outflow To Downstream System (ac-ft): 640.19 Secondary Outflow To Downstream System (ac-ft): 0.00 Percent Treated (Infiltrated+Filtered)/Total Volume: 0.00% ***********Compliance Point Results ************* Scenario Predeveloped Compliance Subbasin: Subbasin 1 Scenario Postdeveloped Compliance Link: New Structure Lnk1 *** Point of Compliance Flow Frequency Data *** Recurrence Interval Computed Using Gringorten Plotting Position Predevelopment Runoff Postdevelopment Runoff Tr (Years) Discharge (cfs) Tr (Years) Discharge (cfs) ---------------------------------------------------------------------------------------------------------------------- 2-Year 7.969E-02 2-Year 4.128E-02 5-Year 0.130 5-Year 6.653E-02 10-Year 0.163 10-Year 0.103 25-Year 0.214 25-Year 0.141 50-Year 0.273 50-Year 0.148 100-Year 0.295 100-Year 0.167 200-Year 0.441 200-Year 0.170 ** Record too Short to Compute Peak Discharge for These Recurrence Intervals **** Flow Duration Performance **** Excursion at Predeveloped 50%Q2 (Must be Less Than or Equal to 0%): -30.9% PASS Maximum Excursion from 50%Q2 to Q2 (Must be Less Than or Equal to 0%): -26.8% PASS Maximum Excursion from Q2 to Q50 (Must be less than 10%): -10.0% PASS Percent Excursion from Q2 to Q50 (Must be less than 50%): 0.0% PASS ------------------------------------------------------------------------------------------------- MEETS ALL FLOW DURATION DESIGN CRITERIA: PASS Figures Vicinity Map No Address Assigned Tax Parcel 0323059120 FIGURE 1 North Not to Scale Site Pictom etr y, Ki ng C ou n ty, K ing C ou nty Date : 11 /1 2/2 018 Notes: ±The informati on included on this map has been compi led by King County staff from a variety of sour ces and issubject to change wi thout notice. King County makes no r epresentati ons or w ar ranties, expr ess or impl ied,as to accurac y, completenes s, timeli ness , or ri ghts to the use of such infor mation. This document is not intendedfor use as a s urvey pr oduct. King County shall not be liable for any gener al, s pecial, i ndir ect, incidental , orconsequential damages incl uding, but not li mited to, lost revenues or lost pr ofits resulting fr om the use or misuseof the information contained on this map. Any sale of this map or infor mati on on this map is pr ohibited except bywritten per mi ssi on of Ki ng County. FIGU RE 2 SITE AER IAL 9 Custom Soil Resource Report Soil Map 526161052616305261650526167052616905261710526173052617505261770526179052618105261830526161052616305261650526167052616905261710526173052617505261770526179052618105261830564360 564380 564400 564420 564440 564460 564480 564500 564520 564360 564380 564400 564420 564440 564460 564480 564500 564520 47° 30' 24'' N 122° 8' 43'' W47° 30' 24'' N122° 8' 35'' W47° 30' 16'' N 122° 8' 43'' W47° 30' 16'' N 122° 8' 35'' WN Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84 0 50 100 200 300 Feet 0 15 30 60 90 Meters Map Scale: 1:1,120 if printed on A portrait (8.5" x 11") sheet. Soil Map may not be valid at this scale. MAP LEGEND MAP INFORMATION Area of Interest (AOI) Area of Interest (AOI) Soils Soil Map Unit Polygons Soil Map Unit Lines Soil Map Unit Points Special Point Features Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip Sodic Spot Spoil Area Stony Spot Very Stony Spot Wet Spot Other Special Line Features Water Features Streams and Canals Transportation Rails Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography The soil surveys that comprise your AOI were mapped at 1:24,000. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: King County Area, Washington Survey Area Data: Version 14, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Jul 8, 2014—Jul 15, 2014 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. Custom Soil Resource Report 10 Map Unit Legend Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI AgC Alderwood gravelly sandy loam, 8 to 15 percent slopes 3.6 100.0% Totals for Area of Interest 3.6 100.0% Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit. A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class. Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils. Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas. Custom Soil Resource Report 11 9,0281505 City of Renton Print map Template This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATIONWGS_1984_Web_Mercator_Auxiliary_Sphere Notes Downstream Analysis 06/05/2019 Legend 1023 0 512 1023 Feet Information Technology - GIS RentonMapSupport@Rentonwa.gov Environment Designations Natural Shoreline High Intensity Shoreline Isolated High Intensity Shoreline Residential Urban Conservancy Jurisdictions Streams (Classified) <all other values> Type S Shoreline Type F Fish Type Np Non-Fish Type Ns Non-Fish Seasonal Unclassified Not Visited Wetlands Pump Stations Discharge Points Stormwater Mains Culverts Open Drains Facility Outlines Private Pump Stations Private Discharge Points Private Pipes Private Culverts Private Open Drains Private Facility Outlines Streets Parks Waterbodies Map Extent2010 N87°49'06"W 380.03N16°29'59"W 433.63N56°37 '22 "E 300 .25 S1°25'23"W 236.20 WWWWWWWWSD SD SD SD SDGGGGGGGGGGGGGGGGGGGGGGGGEEEEEEEE E E E E E E E E E ETTT TTTT TTTT T T T T T T T T T T T T T T T T T SSSSSSSSSSSSSSSSSSSSSSSSSSXXXXXXXXXXXXXXXXXXXXXXW W W W WSSSSSSSSGGGGG G WWGG G GGGGG WWWSSTTSS615 5 . 0 '542110,348 SF9,534 SF13,459 SF13,160 SF15,012 SFTRACT A(CRITICAL AREA)TRACT BRIGHT -OF -WAY DED ICAT ION AREA = 9 ,117 SF21'21'7,879 SFTRACT B(STORM DETENTION)42' R.O.W.SECTION A-AMOUNT BAKER PL. NEN.T.S.15.5'DRIVINGLANE5' SIDEWALKVERTICAL CONCRETECURB AND GUTTER, TYP.2%±2%0.5' CURB2%±2%15.5'DRIVINGLANE5' SIDEWALK0.5' CURBDRAWN:APPROVED:PLOTTED:DESIGNED:L:\2018\18067\3 DEVELOPMENT\CAD\HOST DRAWINGS\PRELIM SHORT PLAT\18067P01.DWG2019/06/03 09:15ClatorreSHEETSE 1/4, SE 1/4 SECTION 3, TOWNSHIP 23 N, RANGE 5 E, W.M.CITY OF RENTON, KING COUNTY, WASHINGTONCLTCLTKJGDALPAY PROPERTIESJOB NO. 18067CITY OF RENTONKING COUNTYWASHINGTONHGGEXH5H.dwt BGOLDS 10/21/14 08:42S:\DWTs\Shared Printers\TitleBlocks\HGG Standard\HGGEXH5H.dwt FORDALPAY PRELIMINARY SHORT PLATPRELIMINARY GRADING, UTILITIES, AND DRAINAGE PLAN090601530SCALE: 1" = 30'SE REN TON - ISSAQUAH ROAD 148TH AVENUE SE MOUNT BAKER PL. NE Know what'sbelow.before you dig.CallR8" SS45 LF72 LF 12" SDAASANITARY SEWERCONNECTION, TYP.WATER METER, TYP.STORMWATER WQTREATMENT CARTRIDGESYSTEM 72" MHTYPE I CB, TYP.ROOF/YARD DRAINCONNECTION, TYP.STORMWATER DETENTION FACILITYREQUIRED VOLUME = 16,000 CU.FT.TOP OF LID ELEV. = 428.0INSIDE OF LID ELEV. = 427.0OUTLET IE = ±422.0CONNECT TO EXISTINGSANITARY SEWERIE = XXX.XX8" WMPROPOSED MAJOR 10' CONTOUR430SDSSWPROPOSED SANITARY SEWER PIPELEGENDSPROPOSED WATER MAINDWPROPOSED SIDEWALKPROPOSED ASPHALT PAVEMENTPROPOSED CB TYPE IIPROPOSED SANITARY SEWER MHPROPOSED CB TYPE IPROPOSED STORM PIPEPROPOSED MINOR 2' CONTOUR42820'3 0 '20'FLOW CONTROLFACILITYDISPERSION TRENCHGROUND ELEV. = ±422.018067P01.dwg clator 06/03/19 09:15L:\2018\18067\3 DEVELOPMENT\CAD\HOST DRAWINGS\Prelim Short Plat\18067P01.dwg PROPOSED BSBL3 0 '20'3 0 '20'30'20'5'15.4 '5'BSBL BSBLBSBLBSBL R30.5 'PROP. FIRE HYDRANT 4,514752 City of Renton Print map Template This map is a user generated static output from an Internet mapping site and is for reference only. Data layers that appear on this map may or may not be accurate, current, or otherwise reliable. THIS MAP IS NOT TO BE USED FOR NAVIGATIONWGS_1984_Web_Mercator_Auxiliary_Sphere Notes None 06/06/2019 Legend 512 0 256 512 Feet Information Technology - GIS RentonMapSupport@Rentonwa.gov Erosion Hazard - High Landslide Very High High Moderate Unclassified Slope City of Renton >15% & <=25% >25% & <=40% (Sensitive) >40% & <=90% (Protected) >90% (Protected) Environment Designations Natural Shoreline High Intensity Shoreline Isolated High Intensity Shoreline Residential Urban Conservancy Jurisdictions Streams (Classified) <all other values> Type S Shoreline Type F Fish Type Np Non-Fish Type Ns Non-Fish Seasonal Unclassified Not Visited Wetlands Seismic Hazard Areas Faults Streets Points of Interest Parks Waterbodies Map Extent2010 Appendix A King County Water & Land Resources Division Drainage Complaint Investigation Sheets King County Water and Land Resources Division - Drainage Services Section Complaint Search Printed : 5/9/2019 1:24:00 PM Number Type Type of Problem Address of Problem Comments Tbros Page Complaint Type Code Type of Problem Address of Problem Comments 2009-0008 R RFD 10415 147TH AVE SE INQUIRY FROM MS. DONNELLY ABOUT 626J5 2009-0250 NDA- RFD 10269 147TH AVE SE SURCHARGING CB ERODES DRIVEWAY. 626J5 2009-0250 R RFD 10269 147TH AVE SE SURCHARGING CB ERODES DRIVEWAY. 626J5 2010-0374 C DDM 148TH AVE SE - SE May Valley flooding? Inv did not find any 626J5 2010-0714 C RFD 10269 14TH AVE SE Yard/house flooding from storm? Inv found 626J5 2010-0714 R RFD 10269 14TH AVE SE Yard/house flooding from storm? Inv found 626J5 2011-0722 X INQ 5625 NE 26TH ST EMAIL CONCERNING ROADSIDE DITCH 626J5 2012-0676 WQC DES LYONS AVE NE Dirt from new development on road? Project 626J6 2013-0760 WQC WQDR 2701 Nile Ave NE Tires in wetlands 626J5 2014-0152 I INQ 10415 147TH AVE SE EMAIL INQUIRY ABOUT POTENTIAL 626J5 2014-0245 X DDM 10415 147th AVE SE INQUIRY ABOUT A PROJECT IN THE CITY 626J5 2014-0500 C MFD 10217 148th Ave SE Dumping in ditch? 626J5 2015-0293 NDA- DES 10415 147th Ave SE ACTUALLY TURNED TO NDA-Q ON 3/23/15. 626J5 2015-0293 R DES 10415 147th Ave SE 626J5 2015-0321 WQC WQO 10274 147TH AVE SE Collapsing railroad ties near stormwater ditch. 626J5 2015-0631 C DES 10415 147th Ave SE Concern about roadside ditch maintenance. 626J5 2015-0863 C RFD 10202 148TH AVE SE Ditch water is crossing the driveway and 626J5 2015-0863 R RFD 10202 148TH AVE SE Ditch water is crossing the driveway and 626J5 2016-0556 C INQ 9846 148TH AVE SE Unpermitted septic and earth moving 626J5 2017-0621 WQC WQDR 10217 148TH AVE SE Litter in the culvert draining into Greens Creek 626J5 2017-0725 X INQ 10415 147th Ave SE Several emails received by several staff 626J5 2018-0003 WQC WQO 10201 148th Ave SE water coming over the side of the bank into 626J5 2018-0282 R DES 10202 148th Ave SE Erosion in R-O-W due to runoff from private 626J5 2019-0075 C RFD 10415 147th Ave SE Concern about Greenes Stream. Complaint 626J5 2019-0078 R SKH 10218 148th Ave SE Sinkhole 37' x 14' x "a couple" feet deep. 626J5 Appendix B Geotechnical Report by Associated Earth Sciences, Inc. – April 19, 2019