Loading...
HomeMy WebLinkAboutNOA_Project_Acceptance_Dalpay_Short_Plat_1900703 OF APPLICATION AND PROPOSED DETERMINATION OF NON-SIGNIFICANCE  (DNS) A Master Application has been filed and accepted with the Department of Community & Economic Development (CED) – Planning Division of the City of Renton. The following briefly describes the application and the necessary Public Approvals. DATE OF NOTICE OF APPLICATION: July 5, 2019 /  PROJECT NAME/NUMBER: PR19-000289 Dalpay Short Plat / LUA19-000136   PROJECT LOCATION: Northwest corner of NE Sunset Blvd and Nile Ave NE (APN 0323059120)   APPLICANT/PROJECT CONTACT PERSON: Kevin Cleary/Goldsmith Engineering/1215 114th Ave SE, Bellevue, WA 98004   LOCATION WHERE APPLICATION MAY BE REVIEWED: Applicant documents are available online through the City of Renton Document Center website. See also http://bit.ly/2xqZy52  PROJECT DESCRIPTION: The applicant is requesting approval of a Preliminary Short Plat, Environmental (SEPA) Review, and one Street Modification for the proposed subdivision of a property located at the northwest corner of SE Renton Issaquah Rd and Nile Ave NE (parcel number 0323059120). The subject property totals 107,593 square feet (2.46 acres) in area and is currently vacant. The property is located within the Residential-4 (R-4) zone and within the Residential Low Density (LD) land use designation. The proposed residential density is 3.34 dwelling units per net acre. The proposal is to subdivide the project site into five lots, one critical area tract (Tract A), and one drainage facility tract (Tract B). An off site creek is located west of the subject site. The creek buffer is proposed to be located within the critical area tract. Access to the site is proposed via a public road with cul-de-sac extending from Mt Baker Pl NE from the north. The proposed residential lots range in size from 9,534 SF to 13,459 SF. There are three existing trees located on site, of which the applicant is proposing to retain one tree.  DATE OF APPLICATION: June 19, 2019  NOTICE OF COMPLETE APPLICATION: July 5, 2019  OPTIONAL DETERMINATION OF NON-SIGNIFICANCE, MITIGATED (DNS-M): As the Lead Agency, the City of Renton has determined that significant environmental impacts are unlikely to result from the proposed project. Therefore, as permitted under the RCW 43.21C.110, the City of Renton is using the Optional DNS-M process to give notice that a DNS-M is likely to be issued. Comment periods for the project and the proposed DNS-M are integrated into a single comment period. There will be no comment period following the issuance of the Threshold Determination of Non-Significance-Mitigated (DNS-M). This may be the only opportunity to comment on the environmental impacts of the proposal. A 14-day appeal period will follow the issuance of the DNS-M.  PERMITS/REVIEW REQUESTED: Environmental (SEPA) Review, Administrative Short Plat Review, Street Modification  OTHER PERMITS WHICH MAY BE REQUIRED: Building Permit, Construction Permit  REQUESTED STUDIES: Arborist's Report, Geotechnical Report, Stream/Lake Study  PUBLIC HEARING: None  CONSISTENCY OVERVIEW:    Zoning/Land Use: The subject site is designated Residential Low Density (RLD) on the City of Renton Comprehensive Land Use Map and Residential 4 (R-4) on the City’s Zoning Map.   Environmental Documents that Evaluate the Proposed Project: Environmental (SEPA) Checklist   Development Regulations Used For Project Mitigation: The project will be subject to the City’s SEPA ordinance, RMC 4-2-110A Residential Development Standards, RMC 4-4-070 Landscaping, RMC 4-4-130 Tree Retention, RMC 4-6-060 Street Standards, and RMC 4-3-050 Critical Area Regulations and other applicable codes and regulations as appropriate.   Proposed Mitigation Measures: No mitigation measures are proposed at the time of this posting.  Comments on the above application must be submitted in writing to Angelea Weihs, Associate Planner, CED – Planning Division, 1055 South Grady Way, Renton, WA 98057, by 5:00 PM on July 19, 2019. If you have questions about this proposal, or wish to be made a party of record and receive additional notification by mail, contact the Project Manager. Anyone who submits written comments will automatically become a party of record and will be notified of any decision on this project. A copy of the subsequent threshold determination is available upon request.  CONTACT PERSON: Angelea Weihs, ; Tel: (425) 430-7312; Email: aweihs@rentonwa.gov  /