August 20, 2015
Mr. Clark Close
City of Renton Planning Division
1055 South Grady Way
Renton, WA 98057
RE: Longacres Business Center – Phase II
Construction Mitigation Description
Dear Mr. Close:
For Application Item 10, Construction Mitigation Description, Ryan Companies is providing the
following items:
1. Anticipated construction start date is December, 2015 with completion in June, 2017.
2. Allowable working hours will be from 6:00 am to 10:00 pm Monday-Friday and from 6:00 am to
6:00 pm on Saturday. It is not anticipated that work will occur overnight and on Sundays,
however as conditions present themselves we reserve the ability to work off-hours and Sundays
as necessary to maintain the construction schedule.
3. The primary transportation route anticipated to site via 405 will be 167 to Grady Way, Lind Ave,
to our primary entrance off of 27th. A secondary entrance will be provided off Oakesdale but will
be primarily used for exiting. A Haul Route plan is attached.
4. A dedicated traffic control is not anticipated, however as required this will be developed in
conjunction with the City of Renton.
5. The attached site logistic plan addresses the location of the contractor trailer complex, parking,
site security and silt fencing, and wash out and track out stations.
6. Dust control will be controlled on site with water as required. A Storm Water Pollution
Protection Plan will be provided as part of the final civil design package.
Please do not hesitate to contact Ryan Companies if you have any questions or need further information.
Sincerely,
Ryan Companies U.S., Inc.
Cory Handfelt
Project Manager
Cc: Molly Carson, Ryan Companies U.S., Inc.
Dave Williams, Ryan Companies U.S., Inc.
LONGACRES BUSINESS PARK: PHASE 2
SITE LOGISTICS PLAN
ACCESS ROAD CRANE PATH
ACCESS ROADCRANE PATH
CRANE PATH ACCESS ROAD
CRANE PATH
CRANE PATH
ACCESS ROAD
TRAILER /
LAY DOWN AREA
FENCING
FENCING
FENCING
FENCING
FE
N
C
I
N
G
FENCING FENCING FENCINGFENCINGFENCING
FENCINGFENCINGENTRANCE
EXITACCESS ROADGROUP HEALTH - PHASE 2
SITE LOGISTICS
8/13/2015
WASHOUT/TRACKOUT
STATION
HAUL ROUTE
SITE LOGISTICS