HomeMy WebLinkAbout32_Site Plan Review - Traffic Study TENW Transportation Engineering NorthWest Transportation Planning | Design | Traffic Impact & Operations 11400 SE 8th Street, Suite 200, Bellevue, WA 98004 | Office (425) 889-6747 MEMORANDUM DATE: August 21, 2015 TO: Vicki Grover City of Renton Public Works FROM: Chris Forster, P.E. TENW SUBJECT: Longacres Business Center Phase 2 Traffic Impact Analysis TENW Project No. 5093 This memorandum documents the traffic impact analysis completed for the proposed Longacres Business Center Phase 2 project. The project is located west of Oakesdale Ave SW on the north side of SW 27th Street across from the proposed Longacres Business Center (Phase 1) project in Renton, WA (see Figure 1). Executive Summary Project Description. The proposed project would include up to 320,000 square feet of office space on a currently vacant site. Vehicular access to the site would be provided at 2 separate access driveways, one on SW 27th St and one on Oakesdale Ave SW. The site access driveway on SW 27th St will form the north leg of the existing Naches Ave SW/SW 27th St all-way stop controlled intersection and will provide full access to all turning movements. The new driveway on Oakesdale Ave SW will provide full access to all turning movements. For the analysis in this report, a 2017 horizon year was used. This project is located within Phase IV of the Boeing Longacres Office Park and is subject to the 2003 Development Agreement and Strander Agreement. Trip Generation. The proposed project is estimated to generate a total of 3,178 new weekday daily trips with 485 new trips occurring during the weekday AM peak hour (427 entering, 58 exiting), and 437 new trips occurring during the weekday PM peak hour (74 entering, 363 exiting). Traffic Operations at Study Intersections. Based on the results of a traffic operations analysis at the off- site study intersections, the study intersections currently operate at LOS A and B, and are expected to continue to operate at LOS B in 2017 with the proposed project. Access Analysis. With the proposed site access via the north leg at Naches Ave SW/SW 27th Street, the intersection is proposed to remain as an all-way stop with only minor revisions associated with creating the new north leg of the intersection for site access. It is assumed that the intersection will be modified to its ultimate configuration in the future when SW 27th is extended to the west to connect with Strander Blvd. The results of the site access LOS analysis show that the movements at both access locations are expected to operate at LOS C or better in 2017 with the proposed project. These results show that no major improvements such as signalization are needed at the site access locations. Mitigation. No significant adverse transportation impacts are anticipated with the proposed Longacres Business Center Phase 2 development. Transportation impact fees are anticipated to be required and will be determined prior to building permit issuance based on discussions with the City of Renton and Boeing. Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 2 Insert Figure 1 (Vicinity Map) Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 3 Introduction Based on correspondence with the City, the following items are addressed in this traffic impact analysis:  Project description  Trip generation  Trip distribution and assignment  Traffic volume forecasts  Traffic operations at 2 study intersections  Site access operations  Mitigation Project Description The proposed project would include up to 320,000 square feet of office space on a currently vacant site. Vehicular access to the site would be provided at 2 separate access driveways, one on SW 27th St and one on Oakesdale Ave SW. The site access driveway on SW 27th St will form the north leg of the existing Naches Ave SW/SW 27th St all-way stop controlled intersection and will provide full access to all turning movements. The new driveway on Oakesdale Ave SW will provide full access to all turning movements. For the analysis in this report, a 2017 horizon year was used. A preliminary site plan is provided in Figure 2. This project is located within Phase IV of the Boeing Longacres Office Park and is subject to the 2003 Development Agreement and Strander Agreement. Trip Generation The trip generation estimates for the proposed uses were based on methodology documented in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 9th Edition for Land Use Code (LUC) 710 General Office Building. The new weekday daily, AM and PM peak hour trip generation from the Longacres Business Center Phase 2 development are summarized in Table 1. Detailed trip generation calculations are included in Attachment A. Table 1 Longacres Business Center Phase 2 Trip Generation Summary New Trips Generated Weekday Time Period In Out Total Daily 1,589 1,589 3,178 AM Peak Hour 427 58 485 PM Peak Hour 74 363 437 As shown in Table 1, the proposed Longacres Business Center Phase 2 project is estimated to generate a total of 3,178 new weekday daily trips with 485 new trips occurring during the weekday AM peak hour (427 entering, 58 exiting), and 437 new trips occurring during the weekday PM peak hour (74 entering, 363 exiting). Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 4 INSERT FIGURE 2 (Site Plan) Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 5 Trip Distribution and Assignment The distribution of PM peak hour project trips in the study area was based on the assumptions used in traffic studies supporting the Master Plan, EIS, and Development Agreement for the Boeing Longacres Office Park. The assignment of trips at the site driveways was estimated based on the allocation of parking within the site as well as logical assumptions based on the origins/destinations. The PM peak hour project trip distribution and assignment at the study intersections and site driveways are shown in Figure 3. Traffic Volumes Forecasts Existing weekday PM peak hour traffic counts were collected by All Traffic Data, Inc. at the following two study intersections (study intersections were selected based on discussions with the City): 1. Naches Ave SW/SW 27th Street (all-way stop) 2. Oakesdale Ave SW/SW 27th Street (traffic signal) The existing PM peak hour traffic counts are summarized in Figure 4. Year 2017 without-project baseline traffic volumes were estimated based on the assumption of a 2 percent annual growth rate, consistent with other studies conducted in the area. In addition, traffic from the Longacres Business Center (Phase 1) project were added to the background volumes as a pipeline project. The year 2017 baseline volumes are shown in Figure 5. Future 2017 with-project traffic volumes were estimated by adding the trip assignment from the proposed project (Figure 3) to the year 2017 without-project volumes (Figure 5). The resulting 2017 with-project PM peak hour traffic volumes at the study intersections and site driveways are shown in Figure 6. Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 6 Fig 3: Trip Distribution/Assignment Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 7 Fig 4: 2015 Existing PM Volumes Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 8 Fig 5 2017 Without Project Volumes Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 9 Fig 6: 2017 With-Project Volumes Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 10 Traffic Operations at Study Intersections An existing 2015, 2017 without project, and 2017 with project level of service (LOS) analysis was conducted at the two study intersections. LOS generally refers to the degree of congestion on a roadway or intersection. It is a measure of vehicle operating speed, travel time, travel delays, and driving comfort. A letter scale from A to F generally describes intersection LOS. At signalized intersections, LOS A represents free-flow conditions (motorists experience little or no delays), and LOS F represents forced-flow conditions where motorists experience an average delay in excess of 80 seconds per vehicle. The LOS reported for signalized intersections represents the average control delay (sec/veh) and can be reported for the overall intersection, for each approach, and for each lane group (additional v/c ratio criteria apply to lane group LOS only). The LOS reported at stop-controlled intersections is based on the average control delay and can be reported for each controlled minor approach, controlled minor lane group, and controlled major-street movement (and for the overall intersection at all-way stop controlled intersections. Additional v/c ratio criteria apply to lane group or movement LOS only). Table 2 outlines the current HCM 2010 LOS criteria for signalized and stop-controlled intersections based on these methodologies. Table 2 LOS Criteria for Signalized and Stop-Controlled Intersections1 SIGNALIZED INTERSECTIONS STOP-CONTROLLED INTERSECTIONS LOS by Volume-to Capacity (V/C) Ratio2 LOS by Volume-to Capacity (V/C) Ratio3 Control Delay (sec/veh)  1.0 > 1.0 Control Delay (sec/veh)  1.0 > 1.0  10 A F  10 A F > 10 to  20 B F > 10 to  15 B F > 20 to  35 C F > 15 to  25 C F > 35 to  55 D F > 25 to  35 D F > 55 to  80 E F > 35 to  50 E F > 80 F F > 50 F F 1 Source: HCM2010 Highway Capacity Manual, Transportation Research Board, 2010. 2 For approach-based and intersection-wide assessments at signals, LOS is defined solely by control delay. 3 For two-way stop controlled intersections, the LOS criteria apply to each lane on a given approach and to each approach on the minor street. LOS is not calculated for major-street approaches or for the intersection as a whole at two -way stop controlled intersections. For approach-based and intersection-wide assessments at all-way stop controlled intersections, LOS is solely defined by control delay. Level of service calculations for intersections were based on methodology and procedures outlined in the 2010 update of the Highway Capacity Manual, Transportation Research Board (HCM 2010) using Synchro 8.0 traffic analysis software. Existing signal timing used in the analysis was provided by the City of Renton. For the 2017 with-project analysis at the study intersection of Naches Ave SW/SW 27th Street, the proposed site access will form a new north leg to the existing all-way stop controlled intersection. For our analysis, we Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 11 are proposing that the intersection remain as an all-way stop with only minor revisions associated with creating the new north leg of the intersection for site access. It is assumed that the intersection will be modified to its ultimate configuration in the future when SW 27th is extended to the west to connect with Strander Blvd. The PM peak hour LOS analysis results are summarized in Table 3. The LOS worksheets are included in Attachment B. Table 3 PM Peak Hour LOS Summary at Study Intersections 2015 Existing 2017 Baseline 2017 With-Project Study Intersection LOS Delay (sec) LOS Delay (sec) LOS Delay (sec) All-Way Stop Intersection #1 Naches Ave SW/SW 27th St A 7.9 A 9.9 B 13.0 Signalized Intersection #2 Oakesdale Ave SW/SW 27th St B 11.3 B 14.5 B 16.8 As shown in Table 3, the study intersections currently operate at LOS A and B. The Naches Ave SW / SW 27th St intersection is expected to operate at LOS A in 2017 without the project and LOS B with the proposed project. The Oakesdale Ave SW / SW 27th St intersection is expected to operate at LOS B in 2017 without or with the proposed project. Site Access Analysis A level of service (LOS) analysis was conducted at the site access driveways using the methodology and procedures outlined in the HCM 2010. The Synchro software package was used to determine the reported LOS. The proposed site access on SW 27th Street will form a new north leg to the existing all-way stop controlled intersection at Naches Ave SW/SW 27th Street. For our analysis, we are proposing that the intersection remain as an all-way stop with only minor revisions associated with creating the new north leg of the intersection for site access. It is assumed that the intersection will be modified to its ultimate configuration in the future when SW 27th is extended to the west to connect with Strander Blvd The driveway on Oakesdale Ave SW was assumed to allow all turn movements (full access) and be configured with separate outbound left and right turn lanes. A center two-way left turn lane exists on Oakesdale Ave SW which will provide a left-turn lane for traffic entering the site and a center refuge lane for traffic exiting the site. Table 4 summarizes the results of the LOS analysis for future 2017 with project conditions for the site access locations. The LOS and queue calculation sheets are included in Attachment B. Traffic Impact Analysis – Longacres Business Center Phase 2 TENW August 21, 2015 Page 12 Table 4 Future 2017 PM Peak Hour Site Access LOS Summary 2017 With-Project Site Driveway LOS Delay (sec) 1. SW 27th St Access Turning Movements (All-Way Stop) EB Shared Left-Th-Right (entering) B 15.0 SB Left-through (exiting) B 13.5 SB Right (exiting) A 8.7 WB Shared Through-Right (entering) B 10.5 3. Site Driveway on Oakesdale Avenue SW EB Left (exiting) C 19.5 EB Right (exiting) B 11.3 NB Left (entering) A 9.0 The results of the site access LOS analysis in Table 4 show that the movements at both access locations are expected to operate at LOS C or better in 2017 with the proposed project. The results show that no major improvements such as signalization are needed at the site access locations. Mitigation No significant adverse transportation impacts are anticipated with the proposed Longacres Business Center Phase 2 development. Transportation impact fees are anticipated to be required and will be determined prior to building permit issuance based on discussions with the City of Renton and Boeing. If you have any questions regarding the information presented in this analysis, please call me at 206-498- 5897 or email at forster@tenw.com. cc: Molly Carson, Ryan Companies US, Inc. Jeff Haynie, P.E., Principal, TENW Attachments Traffic Impact Analysis – Longacres Business Center Phase 2 ATTACHMENT A Trip Generation DAILY ITE Land Use Size Units 1 LUC 2 In Out In Out Total General Office 320,000 GFA 710 equation 50%50%1,589 1,589 3,178 NEW DAILY TRIP GENERATION = 1,589 1,589 3,178 AM PEAK HOUR ITE Land Use Size 1 LUC 2 In Out In Out Total General Office 320,000 GFA 710 equation 88%12%427 58 485 NEW AM PEAK HOUR TRIP GENERATION = 427 58 485 PM PEAK HOUR ITE Land Use Size 1 LUC 2 In Out In Out Total General Office 320,000 GFA 710 equation 17%83%74 363 437 NEW PM PEAK HOUR TRIP GENERATION = 74 363 437 Notes: 1. GFA = Gross Floor Area. 2. Institute of Transportation Engineers (ITE) Trip Generation manual 9th edition land use code. Trip Rate Directional Split Trips Generated Longacres Business Center Phase 2 Trip Generation Trip Rate Directional Split Trips Generated Trip Rate Directional Split Trips Generated TENW 8/17/2015 Traffic Impact Analysis – Longacres Business Center Phase 2 ATTACHMENT B Level of Service Calculations Traffic Impact Analysis – Longacres Business Center Phase 2 2015 Existing Lanes, Volumes, Timings 1: Naches Ave SW & SW 27th St 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2015 Existing - PM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph) 91 4 4 49 9 15 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 150 0 0 Storage Lanes 0 1 1 0 Taper Length (ft) 25 25 Link Speed (mph) 25 35 25 Link Distance (ft) 652 366 557 Travel Time (s) 17.8 7.1 15.2 Confl. Peds. (#/hr) 3 5 3 5 Peak Hour Factor 0.84 0.84 0.84 0.84 0.84 0.84 Heavy Vehicles (%) 7% 7% 15% 15% 17% 17% Shared Lane Traffic (%) Sign Control Stop Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 2010 AWSC 1: Naches Ave SW & SW 27th St 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2015 Existing - PM Peak Hour Intersection Intersection Delay, s/veh 7.9 Intersection LOS A Movement EBU EBT EBR WBU WBL WBT NBU NBL NBR Vol, veh/h 0 91 4 0 4 49 0 9 15 Peak Hour Factor 0.92 0.84 0.84 0.92 0.84 0.84 0.92 0.84 0.84 Heavy Vehicles, % 2 7 7 2 15 15 2 17 17 Mvmt Flow 0 108 5 0 5 58 0 11 18 Number of Lanes 0 10011 01 0 Approach EB WB NB Opposing Approach WB EB Opposing Lanes 2 1 0 Conflicting Approach Left NB EB Conflicting Lanes Left 0 1 1 Conflicting Approach Right NB WB Conflicting Lanes Right 1 0 2 HCM Control Delay 7.9 8 7.5 HCM LOS A A A Lane NBLn1 EBLn1 WBLn1 WBLn2 Vol Left, % 38% 0% 100% 0% Vol Thru, % 0% 96% 0% 100% Vol Right, % 62% 4% 0% 0% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 24 95 4 49 LT Vol 9040 Through Vol 0 91 0 49 RT Vol 15 4 0 0 Lane Flow Rate 29 113 5 58 Geometry Grp 2577 Degree of Util (X) 0.034 0.132 0.007 0.079 Departure Headway (Hd) 4.301 4.19 5.362 4.861 Convergence, Y/N Yes Yes Yes Yes Cap 837 852 667 736 Service Time 2.301 2.233 3.098 2.597 HCM Lane V/C Ratio 0.035 0.133 0.007 0.079 HCM Control Delay 7.5 7.9 8.1 8 HCM Lane LOS AAAA HCM 95th-tile Q 0.1 0.5 0 0.3 Lanes, Volumes, Timings 2: Oakesdale Ave SW & SW 27th St 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2015 Existing - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 19 35 35 46 19 15 9 350 21 27 489 24 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 250 0 200 0 215 0 150 0 Storage Lanes 1 0 1 1 1 0 1 0 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 35 35 35 35 Link Distance (ft) 992 730 726 325 Travel Time (s) 19.3 14.2 14.1 6.3 Confl. Peds. (#/hr) 2 3 3 4 5 2 2 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 9% 9% 9% 8% 8% 8% 4% 4% 4% 7% 7% 7% Shared Lane Traffic (%) Turn Type pm+pt NA pm+pt NA Perm pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 8 2 6 Detector Phase 7 4 38852 16 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 5.0 Minimum Split (s) 9.0 26.0 9.0 26.0 26.0 9.0 26.0 9.0 26.0 Total Split (s) 15.0 30.0 15.0 30.0 30.0 15.0 35.0 15.0 35.0 Total Split (%) 15.8% 31.6% 15.8% 31.6% 31.6% 15.8% 36.8% 15.8% 36.8% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None None None None None Intersection Summary Area Type: Other Cycle Length: 95 Actuated Cycle Length: 37 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Splits and Phases: 2: Oakesdale Ave SW & SW 27th St HCM 2010 Signalized Intersection Summary 2: Oakesdale Ave SW & SW 27th St 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2015 Existing - PM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 19 35 35 46 19 15 9 350 21 27 489 24 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 0.99 0.99 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1743 1743 1900 1759 1759 1759 1827 1827 1900 1776 1776 1900 Adj Flow Rate, veh/h 20 37 37 48 20 16 9 368 22 28 515 25 Adj No. of Lanes 120111120120 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %999888444777 Cap, veh/h 326 155 135 330 200 169 404 1171 70 476 1209 59 Arrive On Green 0.02 0.09 0.09 0.04 0.11 0.11 0.01 0.35 0.35 0.03 0.37 0.37 Sat Flow, veh/h 1660 1674 1453 1675 1759 1480 1740 3328 198 1691 3275 159 Grp Volume(v), veh/h 20 37 37 48 20 16 9 191 199 28 265 275 Grp Sat Flow(s),veh/h/ln 1660 1656 1471 1675 1759 1480 1740 1736 1791 1691 1687 1747 Q Serve(g_s), s 0.4 0.8 1.0 1.0 0.4 0.4 0.1 3.3 3.3 0.4 4.8 4.8 Cycle Q Clear(g_c), s 0.4 0.8 1.0 1.0 0.4 0.4 0.1 3.3 3.3 0.4 4.8 4.8 Prop In Lane 1.00 0.99 1.00 1.00 1.00 0.11 1.00 0.09 Lane Grp Cap(c), veh/h 326 154 136 330 200 169 404 611 630 476 623 645 V/C Ratio(X) 0.06 0.24 0.27 0.15 0.10 0.09 0.02 0.31 0.32 0.06 0.43 0.43 Avail Cap(c_a), veh/h 697 1009 897 670 1072 902 812 1269 1310 843 1234 1278 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 16.3 17.3 17.3 15.9 16.3 16.3 8.6 9.7 9.7 8.2 9.7 9.7 Incr Delay (d2), s/veh 0.1 1.1 1.5 0.2 0.3 0.3 0.0 0.4 0.4 0.1 0.7 0.6 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.2 0.4 0.5 0.5 0.2 0.2 0.1 1.6 1.7 0.2 2.3 2.4 LnGrp Delay(d),s/veh 16.4 18.4 18.9 16.1 16.6 16.6 8.6 10.1 10.1 8.2 10.3 10.3 LnGrp LOS BBBBBBABBABB Approach Vol, veh/h 94 84 399 568 Approach Delay, s/veh 18.2 16.3 10.1 10.2 Approach LOS BBBB Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 6.1 19.4 6.7 8.8 5.4 20.1 5.8 9.7 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 30.0 10.0 25.0 10.0 30.0 10.0 25.0 Max Q Clear Time (g_c+I1), s 2.4 5.3 3.0 3.0 2.1 6.8 2.4 2.4 Green Ext Time (p_c), s 0.0 8.3 0.0 0.7 0.0 8.1 0.0 0.7 Intersection Summary HCM 2010 Ctrl Delay 11.3 HCM 2010 LOS B Traffic Impact Analysis – Longacres Business Center Phase 2 2017 Baseline (Without Project) Lanes, Volumes, Timings 1: Naches Ave SW & SW 27th St 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 Baseline - PM Peak Hour Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Volume (vph) 220 6 55 51 37 139 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 150 0 0 Storage Lanes 0 1 1 0 Taper Length (ft) 25 25 Link Speed (mph) 25 35 25 Link Distance (ft) 652 366 557 Travel Time (s) 17.8 7.1 15.2 Confl. Peds. (#/hr) 3 5 3 5 Peak Hour Factor 0.84 0.84 0.84 0.84 0.84 0.84 Heavy Vehicles (%) 7% 7% 15% 15% 17% 17% Shared Lane Traffic (%) Sign Control Stop Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 2010 AWSC 1: Naches Ave SW & SW 27th St 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 Baseline - PM Peak Hour Intersection Intersection Delay, s/veh 9.9 Intersection LOS A Movement EBU EBT EBR WBU WBL WBT NBU NBL NBR Vol, veh/h 0 220 6 0 55 51 0 37 139 Peak Hour Factor 0.92 0.84 0.84 0.92 0.84 0.84 0.92 0.84 0.84 Heavy Vehicles, % 2 7 7 2 15 15 2 17 17 Mvmt Flow 0 262 7 0 65 61 0 44 165 Number of Lanes 0 10011 01 0 Approach EB WB NB Opposing Approach WB EB Opposing Lanes 2 1 0 Conflicting Approach Left NB EB Conflicting Lanes Left 0 1 1 Conflicting Approach Right NB WB Conflicting Lanes Right 1 0 2 HCM Control Delay 10.5 9.2 9.6 HCM LOS B A A Lane NBLn1 EBLn1 WBLn1 WBLn2 Vol Left, % 21% 0% 100% 0% Vol Thru, % 0% 97% 0% 100% Vol Right, % 79% 3% 0% 0% Sign Control Stop Stop Stop Stop Traffic Vol by Lane 176 226 55 51 LT Vol 37 0 55 0 Through Vol 0 220 0 51 RT Vol 139 6 0 0 Lane Flow Rate 210 269 65 61 Geometry Grp 2577 Degree of Util (X) 0.275 0.358 0.109 0.093 Departure Headway (Hd) 4.732 4.787 6.019 5.515 Convergence, Y/N Yes Yes Yes Yes Cap 756 748 594 648 Service Time 2.773 2.831 3.772 3.267 HCM Lane V/C Ratio 0.278 0.36 0.109 0.094 HCM Control Delay 9.6 10.5 9.5 8.8 HCM Lane LOS ABAA HCM 95th-tile Q 1.1 1.6 0.4 0.3 Lanes, Volumes, Timings 2: Oakesdale Ave SW & SW 27th St 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 Baseline - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 158 78 105 48 29 16 23 364 22 28 509 53 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 250 0 200 0 215 0 150 0 Storage Lanes 1 0 1 1 1 0 1 0 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 35 35 35 35 Link Distance (ft) 992 730 726 325 Travel Time (s) 19.3 14.2 14.1 6.3 Confl. Peds. (#/hr) 2 3 3 4 5 2 2 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 9% 9% 9% 8% 8% 8% 4% 4% 4% 7% 7% 7% Shared Lane Traffic (%) Turn Type pm+pt NA pm+pt NA Perm pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 8 2 6 Detector Phase 7 4 38852 16 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 5.0 Minimum Split (s) 9.0 26.0 9.0 26.0 26.0 9.0 26.0 9.0 26.0 Total Split (s) 15.0 30.0 15.0 30.0 30.0 15.0 35.0 15.0 35.0 Total Split (%) 15.8% 31.6% 15.8% 31.6% 31.6% 15.8% 36.8% 15.8% 36.8% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None None None None None Intersection Summary Area Type: Other Cycle Length: 95 Actuated Cycle Length: 48.5 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Splits and Phases: 2: Oakesdale Ave SW & SW 27th St HCM 2010 Signalized Intersection Summary 2: Oakesdale Ave SW & SW 27th St 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 Baseline - PM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 158 78 105 48 29 16 23 364 22 28 509 53 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 1.00 0.99 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1743 1743 1900 1759 1759 1759 1827 1827 1900 1776 1776 1900 Adj Flow Rate, veh/h 166 82 111 51 31 17 24 383 23 29 536 56 Adj No. of Lanes 120111120120 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %999888444777 Cap, veh/h 451 300 268 333 188 158 357 1155 69 433 1082 113 Arrive On Green 0.12 0.18 0.18 0.04 0.11 0.11 0.02 0.35 0.35 0.03 0.35 0.35 Sat Flow, veh/h 1660 1656 1474 1675 1759 1479 1740 3327 199 1691 3084 321 Grp Volume(v), veh/h 166 82 111 51 31 17 24 199 207 29 293 299 Grp Sat Flow(s),veh/h/ln 1660 1656 1474 1675 1759 1479 1740 1736 1791 1691 1687 1718 Q Serve(g_s), s 4.2 2.1 3.3 1.3 0.8 0.5 0.4 4.2 4.2 0.5 6.7 6.8 Cycle Q Clear(g_c), s 4.2 2.1 3.3 1.3 0.8 0.5 0.4 4.2 4.2 0.5 6.7 6.8 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.11 1.00 0.19 Lane Grp Cap(c), veh/h 451 300 268 333 188 158 357 602 622 433 592 603 V/C Ratio(X) 0.37 0.27 0.41 0.15 0.16 0.11 0.07 0.33 0.33 0.07 0.49 0.50 Avail Cap(c_a), veh/h 595 837 745 603 889 747 669 1052 1086 730 1023 1041 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 16.1 17.4 17.9 18.5 20.1 20.0 10.4 11.9 11.9 10.1 12.6 12.6 Incr Delay (d2), s/veh 0.5 0.7 1.5 0.2 0.6 0.4 0.1 0.5 0.4 0.1 0.9 0.9 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 1.9 1.0 1.4 0.6 0.4 0.2 0.2 2.1 2.1 0.2 3.2 3.3 LnGrp Delay(d),s/veh 16.6 18.1 19.4 18.7 20.7 20.4 10.5 12.4 12.4 10.1 13.5 13.5 LnGrp LOS BBBBCCBBBBBB Approach Vol, veh/h 359 99 430 621 Approach Delay, s/veh 17.8 19.6 12.3 13.4 Approach LOS BBBB Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 6.3 22.2 7.0 14.0 6.1 22.4 10.7 10.3 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 30.0 10.0 25.0 10.0 30.0 10.0 25.0 Max Q Clear Time (g_c+I1), s 2.5 6.2 3.3 5.3 2.4 8.8 6.2 2.8 Green Ext Time (p_c), s 0.0 8.9 0.0 1.7 0.0 8.4 0.1 1.8 Intersection Summary HCM 2010 Ctrl Delay 14.5 HCM 2010 LOS B Traffic Impact Analysis – Longacres Business Center Phase 2 2017 With-Project Lanes, Volumes, Timings 1: Naches Ave SW & SW 27th St 8/20/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 With-Project - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 7 220 6 55 51 33 37 0 139 163 0 36 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 150 0 0 0 0 0 Storage Lanes 0 0 1 0 0 0 0 1 Taper Length (ft) 25 25 25 25 Link Speed (mph) 25 35 25 25 Link Distance (ft) 652 366 557 298 Travel Time (s) 17.8 7.1 15.2 8.1 Confl. Peds. (#/hr) 3 5 3 5 Peak Hour Factor 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 0.84 Heavy Vehicles (%) 2% 7% 7% 15% 15% 2% 17% 2% 17% 2% 2% 2% Shared Lane Traffic (%) Sign Control Stop Stop Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized HCM 2010 AWSC 1: Naches Ave SW & SW 27th St 8/20/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 With-Project - PM Peak Hour Intersection Intersection Delay, s/veh 13 Intersection LOS B Movement EBU EBL EBT EBR WBU WBL WBT WBR NBU NBL NBT NBR Vol, veh/h 0 7 220 6 0 55 51 33 0 37 0 139 Peak Hour Factor 0.92 0.84 0.84 0.84 0.92 0.84 0.84 0.84 0.92 0.84 0.84 0.84 Heavy Vehicles, %2277215152217217 Mvmt Flow 0 8 262 7 0 65 61 39 0 44 0 165 Number of Lanes 001001100010 Approach EB WB NB Opposing Approach WB EB SB Opposing Lanes 2 1 2 Conflicting Approach Left SB NB EB Conflicting Lanes Left 2 1 1 Conflicting Approach Right NB SB WB Conflicting Lanes Right 1 2 2 HCM Control Delay 15 10.7 12.8 HCM LOS B B B Lane NBLn1 EBLn1 WBLn1 WBLn2 SBLn1 SBLn2 Vol Left, % 21% 3% 100% 0% 100% 0% Vol Thru, % 0% 94% 0% 61% 0% 0% Vol Right, % 79% 3% 0% 39% 0% 100% Sign Control Stop Stop Stop Stop Stop Stop Traffic Vol by Lane 176 233 55 84 163 36 LT Vol 37 7 55 0 163 0 Through Vol 0 220 0 51 0 0 RT Vol 139 6 0 33 0 36 Lane Flow Rate 210 277 65 100 194 43 Geometry Grp 667777 Degree of Util (X) 0.363 0.482 0.13 0.177 0.367 0.066 Departure Headway (Hd) 6.237 6.258 7.167 6.379 6.804 5.585 Convergence, Y/N Yes Yes Yes Yes Yes Yes Cap 574 574 499 560 528 639 Service Time 4.3 4.314 4.934 4.145 4.565 3.345 HCM Lane V/C Ratio 0.366 0.483 0.13 0.179 0.367 0.067 HCM Control Delay 12.8 15 11 10.5 13.5 8.7 HCM Lane LOS BBBBBA HCM 95th-tile Q 1.6 2.6 0.4 0.6 1.7 0.2 HCM 2010 AWSC 1: Naches Ave SW & SW 27th St 8/20/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 With-Project - PM Peak Hour Intersection Intersection Delay, s/veh Intersection LOS Movement SBU SBL SBT SBR Vol, veh/h 0 163 0 36 Peak Hour Factor 0.92 0.84 0.84 0.84 Heavy Vehicles, %2222 Mvmt Flow 0 194 0 43 Number of Lanes 0011 Approach SB Opposing Approach NB Opposing Lanes 1 Conflicting Approach Left WB Conflicting Lanes Left 2 Conflicting Approach Right EB Conflicting Lanes Right 1 HCM Control Delay 12.6 HCM LOS B Lane Lanes, Volumes, Timings 2: Oakesdale Ave SW & SW 27th St 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 With-Project - PM Peak Hour Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (vph) 249 105 150 48 35 21 32 374 22 55 555 71 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 250 0 200 0 215 0 150 0 Storage Lanes 1 0 1 1 1 0 1 0 Taper Length (ft) 25 25 25 25 Right Turn on Red Yes Yes Yes Yes Link Speed (mph) 35 35 35 35 Link Distance (ft) 992 730 726 650 Travel Time (s) 19.3 14.2 14.1 12.7 Confl. Peds. (#/hr) 2 3 3 4 5 2 2 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Heavy Vehicles (%) 9% 9% 9% 8% 8% 8% 4% 4% 4% 7% 7% 7% Shared Lane Traffic (%) Turn Type pm+pt NA pm+pt NA Perm pm+pt NA pm+pt NA Protected Phases 7 4 3 8 5 2 1 6 Permitted Phases 4 8 8 2 6 Detector Phase 7 4 38852 16 Switch Phase Minimum Initial (s) 4.0 4.0 4.0 4.0 4.0 4.0 5.0 4.0 5.0 Minimum Split (s) 9.0 26.0 9.0 26.0 26.0 9.0 26.0 9.0 26.0 Total Split (s) 15.0 30.0 15.0 30.0 30.0 15.0 35.0 15.0 35.0 Total Split (%) 15.8% 31.6% 15.8% 31.6% 31.6% 15.8% 36.8% 15.8% 36.8% Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Lead/Lag Lead Lag Lead Lag Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Recall Mode None None None None None None None None None Intersection Summary Area Type: Other Cycle Length: 95 Actuated Cycle Length: 55.4 Natural Cycle: 70 Control Type: Actuated-Uncoordinated Splits and Phases: 2: Oakesdale Ave SW & SW 27th St HCM 2010 Signalized Intersection Summary 2: Oakesdale Ave SW & SW 27th St 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 With-Project - PM Peak Hour Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Volume (veh/h) 249 105 150 48 35 21 32 374 22 55 555 71 Number 7 4 14 3 8 18 5 2 12 1 6 16 Initial Q (Qb), veh 000000000000 Ped-Bike Adj(A_pbT) 0.99 1.00 0.99 0.99 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Adj Sat Flow, veh/h/ln 1743 1743 1900 1759 1759 1759 1827 1827 1900 1776 1776 1900 Adj Flow Rate, veh/h 262 111 158 51 37 22 34 394 23 58 584 75 Adj No. of Lanes 120111120120 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, %999888444777 Cap, veh/h 513 392 350 309 199 168 318 1108 64 420 1039 133 Arrive On Green 0.16 0.24 0.24 0.04 0.11 0.11 0.03 0.33 0.33 0.04 0.35 0.35 Sat Flow, veh/h 1660 1656 1476 1675 1759 1480 1740 3333 194 1691 3008 385 Grp Volume(v), veh/h 262 111 158 51 37 22 34 205 212 58 327 332 Grp Sat Flow(s),veh/h/ln 1660 1656 1476 1675 1759 1480 1740 1736 1792 1691 1687 1707 Q Serve(g_s), s 7.4 3.1 5.2 1.5 1.1 0.8 0.7 5.1 5.1 1.3 9.0 9.0 Cycle Q Clear(g_c), s 7.4 3.1 5.2 1.5 1.1 0.8 0.7 5.1 5.1 1.3 9.0 9.0 Prop In Lane 1.00 1.00 1.00 1.00 1.00 0.11 1.00 0.23 Lane Grp Cap(c), veh/h 513 392 350 309 199 168 318 577 595 420 582 589 V/C Ratio(X) 0.51 0.28 0.45 0.17 0.19 0.13 0.11 0.35 0.36 0.14 0.56 0.56 Avail Cap(c_a), veh/h 534 724 645 537 769 647 572 911 940 644 885 896 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Uniform Delay (d), s/veh 16.2 17.8 18.6 21.2 23.0 22.8 12.5 14.4 14.5 11.8 15.2 15.2 Incr Delay (d2), s/veh 0.8 0.6 1.3 0.2 0.6 0.5 0.1 0.5 0.5 0.1 1.2 1.2 Initial Q Delay(d3),s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.5 1.5 2.2 0.7 0.6 0.3 0.4 2.5 2.6 0.6 4.4 4.4 LnGrp Delay(d),s/veh 17.0 18.4 19.9 21.4 23.6 23.3 12.7 15.0 15.0 12.0 16.4 16.4 LnGrp LOS B B B C C C BBBBBB Approach Vol, veh/h 531 110 451 717 Approach Delay, s/veh 18.2 22.5 14.8 16.1 Approach LOS B C B B Timer 12345678 Assigned Phs 12345678 Phs Duration (G+Y+Rc), s 7.4 24.0 7.2 18.6 6.7 24.7 14.3 11.5 Change Period (Y+Rc), s 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 Max Green Setting (Gmax), s 10.0 30.0 10.0 25.0 10.0 30.0 10.0 25.0 Max Q Clear Time (g_c+I1), s 3.3 7.1 3.5 7.2 2.7 11.0 9.4 3.1 Green Ext Time (p_c), s 0.0 9.5 0.0 2.4 0.0 8.6 0.1 2.6 Intersection Summary HCM 2010 Ctrl Delay 16.8 HCM 2010 LOS B Lanes, Volumes, Timings 3: Oakesdale Ave SW & Site Access 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 With-Project - PM Peak Hour Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Volume (vph) 91 73 15 629 608 19 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 50 0 Storage Lanes 1 1 1 0 Taper Length (ft) 25 25 Link Speed (mph) 25 35 35 Link Distance (ft) 244 650 325 Travel Time (s) 6.7 12.7 6.3 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 Shared Lane Traffic (%) Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized HCM 2010 TWSC 3: Oakesdale Ave SW & Site Access 8/17/2015 Longacres Business Center Phase 2 Synchro 8 Report 2017 With-Project - PM Peak Hour Intersection Int Delay, s/veh 1.9 Movement EBL EBR NBL NBT SBT SBR Vol, veh/h 91 73 15 629 608 19 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 0 50 - - - Veh in Median Storage, # 1 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 99 79 16 684 661 21 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 1045 341 682 0 - 0 Stage 1 671 - - - - - Stage 2 374 - - - - - Critical Hdwy 6.84 6.94 4.14 - - - Critical Hdwy Stg 1 5.84 - - - - - Critical Hdwy Stg 2 5.84 - - - - - Follow-up Hdwy 3.52 3.32 2.22 - - - Pot Cap-1 Maneuver 224 655 907 - - - Stage 1 470 - - - - - Stage 2 666 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 220 655 907 - - - Mov Cap-2 Maneuver 346 - - - - - Stage 1 470 - - - - - Stage 2 654 - - - - - Approach EB NB SB HCM Control Delay, s 15.9 0.2 0 HCM LOS C Minor Lane/Major Mvmt NBL NBTEBLn1EBLn2 SBT SBR Capacity (veh/h) 907 - 346 655 - - HCM Lane V/C Ratio 0.018 - 0.286 0.121 - - HCM Control Delay (s) 9 - 19.5 11.3 - - HCM Lane LOS A - C B - - HCM 95th %tile Q(veh) 0.1 - 1.2 0.4 - -