Loading...
HomeMy WebLinkAboutPN_4th _Dim_PROJECT NARR_190709_v1 CONCEPT ARCHITECTURE, LLC 1712 Pacific Avenue Suite 107, Everett, WA 98201 1005 Terminal Way Suite 245 Reno, NV 89502 ConceptArchitecture.com PROJECT NARRATIVE VARIANCE Project: 4th Dimension Building Site Location: 4502 NE 4th Street, Renton, WA APN 1023059068 Site Area: 23,170 SF The proposed project is to be constructed at 4502 NE 4th Street in Renton. The project will require a Site Plan Review as well as building permits. The site is zoned CA and all adjacent parcels are also CA zoned. The existing site has one vacant home which is accessed from NE 4th Street. The site elevations descend to the north forming a bowl. There are no wetlands identified on or near the site. A 24” storm water pipe conveys upstream flow through this low area. The flow is considered by the City a piped stream and the low area is subject to ponding of storm water during severe events according to previous drainage studies provided by the City. The soils consist of ablation till overlying lodgment till. The proposed use of the property will be a mixed use building which will include ground level commercial uses with residential uses above. The basement level and a portion of the main level will be parking. Pedestrian access to the project will be from NE 4th Street and Bremerton Avenue. Vehicle access will be from Bremerton Ave. Offsite improvements will include roadway frontage improvements. The estimated cost of the project will be between $6 mil. and $7 mil. The market value is unknown, but will exceed the costs. The building is designed to utilize the site topography as much as possible. Estimated quantity of excavation is 1,500 cy cut and 3,500 cy fill. There are not significant trees on site. Some trees within the right of way will be removed in order to widen the road as required. The City has required a land dedication in order to widen both NE 4th Street and Bremerton Ave. Please see the site plan for additional information. During the construction phase, a job site trailer is anticipated. This will be determined in more detail when the project moves nearer construction. As mentioned above, a 24” diameter drainage pipe is located under the proposed building location. The system is considered a piped stream. The upstream drainage basin is large, fully developed, and during large storm events; directs enough water through the storm drainage line that storm water overflows the culvert inlet and ponds in the lower area of the site. This has been determined by previous studies provided by the City. The proposal removes the pipe under the building while providing a new open channel. It also provides open space under the building for the storage of ponded storm waters to prevent impacts to neighboring properties. The open channel will be less likely to plug or get blocked by debris compared to the existing 24” culvert. In addition, a new 30” culvert will be extended to the site from the existing storm system in Bremerton Avenue. The area below the building will have access for maintenance and cleanout and pumping access per City specification. The impact will be to improve the flow of drainage water across the site. 1712 Pacific Avenue Suite 107, Everett, WA 98201 1005 Terminal Way Suite 245 Reno, NV 89502 ConceptArchitecture.com Page 2 | 2