Loading...
HomeMy WebLinkAboutECF_SEPA_Checklist_Apron E__190625_v1.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT 1 C:\Users\clementmd\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\IPJI8HF8\SEPA_Checklist_RentonApron E_CLEANDraftBRB_6-25-19.doc Rev: 08/2016 ENV ENVIRONMENTAL CHECKLIST Planning Division 1055 South Grady Way-Renton, WA 98057 Phone: 425-430-7200 | www.rentonwa.gov PURPOSE OF CHECKLIST: Governmental agencies use this checklist to help determine whether the environmental impacts of your proposal are significant. This information is also helpful to determine if available avoidance, minimization or compensatory mitigation measures will address the probable significant impacts or if an environmental impact statement will be prepared to further analyze the proposal. INSTRUCTIONS FOR APPLICANTS: This environmental checklist asks you to describe some basic information about your proposal. Please answer each question accurately and carefully, to the best of your knowledge. You may need to consult with an agency specialist or private consultant for some questions. You may use “not applicable” or "does not apply" only when you can explain why it does not apply and not when the answer is unknown. You may also attach or incorporate by reference additional studies reports. Complete and accurate answers to these questions often avoid delays with the SEPA process as well as later in the decision-making process. The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of time or on different parcels of land. Attach any additional information that will help describe your proposal or its environmental effects. The agency to which you submit this checklist may ask you to explain your answers or provide additional information reasonably related to determining if there may be significant adverse impact. INSTRUCTIONS FOR LEAD AGENCIES: Additional information may be necessary to evaluate the existing environment, all interrelated aspects of the proposal and an analysis of adverse impacts. The checklist is considered the first but not necessarily the only source of information needed to make an adequate threshold determination. Once a threshold determination is made, the lead agency is responsible for the completeness and accuracy of the checklist and other supporting documents. USE OF CHECKLIST FOR NONPROJECT PROPOSALS: [help] For nonproject proposals (such as ordinances, regulations, plans and programs), complete the applicable parts of sections A and B plus the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D). Please completely answer all questions that apply and note that the words "project," "applicant," and "property or site" should be read as "proposal," "proponent," and "affected geographic 2 area," respectively. The lead agency may exclude (for non-projects) questions in Part B - Environmental Elements –that do not contribute meaningfully to the analysis of the proposal. A. BACKGROUND 1. Name of proposed project, if applicable: Boeing Apron E New Aircraft Stalls & 2-Bay Paint Hangar Project 2. Name of applicant: The Boeing Company P.O. Box 3707, MS 66-102 Seattle, WA 98124-2207 3. Address and phone number of applicant and contact person: Mark Clement Permit and Land Use Specialist The Boeing Company, P.O. BOX 3707 MC 66-102 Seattle WA 98124 Ph: 206 617 2944 4. Date checklist prepared: June 2019 5. Agency requesting checklist: City of Renton 6. Proposed timing or schedule (including phasing, if applicable): Jan 2020 to Dec 2021 Commented [BBR1]: is there a need to mention the phasing of stalls followed by paint hangar, as listed in #11, or the Boeing Fire Station move listed in #7 below?) 3 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. No. The existing Boeing Fire Station (5-28 bldg) will be demolished and moved north across Nth 6th St to another Boeing Renton location. Boeing Fire will be fully operational at all times during this project. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. 9. Do you know whether applications are pending for governmental approvals of other proposals directly affecting the property covered by your proposal? If yes, explain. Subsurface geotechnical report, surface water drainage report, lighting impingement study, noise study, archeological study. A SEPA checklist was submitted in 2012 related to the Boeing Renton 737 MAX Airplane Program rate increase that included the planned 2-bay paint hangar portion of this project. The Environmental Review Committee issued Determination of Non-Significance #LUA12-051, ECF, dated 8-30-2012 related to that submittal. 10. List any government approvals or permits that will be needed for your proposal, if known. Federal: NA State of Washington: Washington Department of Ecology (WDOE): Prevention of Significant Deterioration (PSD) permit amendment to PSD # 12-01 NPDES Construction Stormwater General Permit King County: None known at this time. City of Renton/Local: City of Renton construction building permit(s) Puget Sound Clean Air Agency (PSCAA) Notice of Construction/Order of Approval State Environmental Policy Act Review. 11. Give brief, complete description of your proposal, including the proposed uses and the size of the project and site. There are several questions later in this checklist that ask you to describe certain aspects of your proposal. You do not need to repeat those answers on this Commented [BBR2]: Should this be yes? Or is the BFD station move a totally separate submittal? Commented [BBR3]: Combine #’s 9&10 (as we did in 2012 for the MAX SEPA). Commented [BBR4]: Is a WA L&I elevator permit needed? If so, add here 4 page. (Lead agencies may modify this form to include additional specific information on project description.) Project Narrative: The Boeing Company is planning to convert the existing S1 parking lot into three production stalls for aircraft, a two-bay paint hangar, and a new utility building. This will require demolition of the existing fire station, which will be relocated to Boeing’s existing S2 parking lot. The relocated fire station will be under a separate permit. The new two-bay paint hangar is a 180’ x 290’ x 85’ high bay structure attached to a two-story 35’ x 290’ x 33’ high building for support functions. A new one story 35’ x 175’ utility building will be located east of the hangar building. The paint hangar will include: two aircraft paint bays to accommodate all current 737 MAX models, including the largest variant, the MAX 10; three mechanical chase blocks located at the center and both ends of the building (running north-south direction); and a two-story facility support function area to the south of the hangar building. A stand-alone accessory utility building approximately 35’ x 155’ will house various paint hangar-supported utility equipment including but not limited to boilers, waste tanks, electrical substations, emergency electrical generator and all associated mechanical support systems. Landscaping, a sound wall, and a blast fence are anticipated to be included in the design. Approximately 1,000 parking stalls will be displaced by this project, however Boeing currently has approximately 1,500 available stalls located in Lot E7, 10-20 Garage, Lot E1 and 10-18 Garage. Refer to last page for locations. The project is divided into two phases, whereby the construction of aircraft parking stalls will be Phase I and the construction of the paint hangar will be Phase II. See the appended Vicinity Map and Site Map for location information. 12. Location of the proposal. Give sufficient information for a person to understand the precise location of your proposed project, including a street address, if any, and section, township, and range, if known. If a proposal would occur over a range of area, provide the range or boundaries of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if reasonably available. While you should submit any plans required by the agency, you are not required to duplicate maps or detailed plans submitted with any permit applications related to this checklist. 737 Logan Avenue North, Renton, WA 98055. See site map, vicinity map and legal description included with this application. 1. EARTH 5 a. General description of the site (Check or circle one): Flat, rolling, hilly, steep slopes, mountainous, other _____________ b. What is the steepest slope on the site (approximate percent slope)? 3% for most of the site, 10% in some landscaping areas. c. What general types of soils are found on the site (for example, clay, sand, gravel, peat, muck)? If you know the classification of agricultural soils, specify them and note any agricultural land of long-term commercial significance and whether the proposal results in removing any of these soils. Sandy silt loam d. Are there surface indications or history of unstable soils in the immediate vicinity? If so, describe. Yes, liquefaction zone e. Describe the purpose, type, total area, and approximate quantities and total affected area of any filling, excavation, and grading proposed. Indicate source of fill. Total area grading on the project site will be approximately 10.1 acres Types of fill and excavation will include: General site grading required to adjust the existing parking lot slopes as needed to accommodate the grading requirements of a commercial aircraft manufacturing facility, as well as to implement best management practices for stormwater drainage. Site excavation will be required for the installation of buildings, utilities and pavement sections. Total earthwork quantities for the project are estimated to be approximately 30,800 cubic yards of excavation and 19,300 cubic yards of clean native fill. f. Could erosion occur as a result of clearing, construction, or use? If so, generally describe. 6 No erosion is expected as a result of this project. During construction, best management practices (via a WDOE-issued Construction Stormwater General Permit) will be used to ensure compliance with erosion and other surface water- related requirements. g. About what percent of the site will be covered with impervious surfaces after project construction (for example, asphalt or buildings)? Approximately 90% of the site is currently covered with impervious surface. With the completion of this project the site will be approximately 91% covered with impervious surface. h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any: Potential erosion impacts will be mitigated using best management practices, a temporary erosion and sediment control plan, and continuous compliance with a planned WDOE-issued construction stormwater permit. AIR a. What types of emissions to the air would result from the proposal during construction, operation, and maintenance when the project is completed? If any, generally describe and give approximate quantities if known. Dust and smoke from construction equipment during normal construction activities. When project is complete, volatile organic compounds and particulate matter from spray coating operations; products of combustion from boilers and aircraft engine operations. b. Are there any off-site sources of emissions or odor that may affect your proposal? If so, generally describe. Various sources of emissions from industrial and commercial entities exist in the local vicinity. Renton Municipal Airport is on adjacent property to the west. PACCAR Kenworth Truck manufacturing plant is located to the east down Nth 6th St. King County wastewater sewage treatment plant is located within a few miles to the southwest. Also within a mile of the project are a few coffee roasters, and a cement mixing plant. c. Proposed measures to reduce or control emissions or other impacts to air, if any: Commented [BBR5]: (From 2012: “No. Best management practices and temporary erosion and sedimentation control (TESC) plan will be in place to prevent erosion.”) 7 Mitigation measures will be implemented as required to meet or exceed all applicable emission control standards as required by the PSCAA, including meeting Best Available Control Technology (BACT) requirements. Mitigation for these air impacts includes filtration of particulate matter and hazardous air pollutants from paint exhaust, and formulation limitations on the concentration of volatile organic compounds and organic hazardous air pollutants in the paint coatings (as required by the Aerospace National Emission Standards for Hazardous Air Pollutants). New natural gas-fired boilers will be installed with low-NOx burners and operated with good combustion practices and no back -up liquid fuel used. Addition potential mitigation measure to reduce emissions includes ensuring that machines and equipment used during and after construction are well maintained and properly operated. 3. WATER a. Surface Water: 1) Is there any surface water body on or in the immediate vicinity of the site (including year-round and seasonal streams, saltwater, lakes, ponds, wetlands)? If yes, describe type and provide names. If appropriate, state what stream or river it flows into. Cedar River to the west which flows into Lake Washington to the north. 2) Will the project require any work over, in, or adjacent to (within 200 feet) the described waters? If yes, please describe and attach available plans. No 3) Estimate the amount of fill and dredge material that would be placed in or removed from surface water or wetlands and indicate the area of the site that would be affected. Indicate the source of fill material. None 4) Will the proposal require surface water withdrawals or diversions? Give general description, purpose, and approximate quantities if known. No Commented [BBR6]: This paragraph was modified from and based on the 2012 737 MAX SEPA response for this item. 8 5) Does the proposal lie within a 100-year floodplain? If so, note location on the site plan. No 6) Does the proposal involve any discharges of waste materials to surface waters? If so, describe the type of waste and anticipated volume of discharge. No. All project activities will be in compliance with the project specific Construction Stormwater General Permit issued by the Washington Department of Ecology and the currently in affect Industrial Stormwater General Permit issued by the Washington Department of Ecology. b. Ground Water: 1) Will groundwater be withdrawn from a well for drinking water or other purposes? If so, give a general description of the well, proposed uses and approximate quantities withdrawn from the well. Will water be discharged to groundwater? Give general description, purpose, and approximate quantities if known. Groundwater will not be withdrawn for drinking water or other purposes, however dewatering will be necessary for the construction of utilities and buildings onsite. Bore sample testing has been conducted across the site to confirm groundwater elevations. See geotechnical report for information on groundwater levels. Approximate quantities are not known. Discharge to groundwater is not anticipated for this project. 2) Describe waste material that will be discharged into the ground from septic tanks or other sources, if any (for example: Domestic sewage; industrial, containing the following chemicals; agricultural; etc.). Describe the general size of the system, the number of such systems, the number of houses to be served (if applicable), or the number of animals or humans the system(s) are expected to serve. There will be no waste material discharged to ground. All potential waste material generated from the site will be removed according to local, state or federal law, or treated onsite and discharged in compliance with an existing King County industrial wastewater treatment permit. 9 c. Water runoff (including stormwater): 1) Describe the source of runoff (including storm water) and method of collection and disposal, if any (include quantities, if known). Where will this water flow? Will this water flow into other waters? If so, describe. The only source of runoff from the project site during and after construction will be stormwater. During construction, it will be managed in accordance with the planned NPDES construction stormwater general permit. After project completion, all stormwater will continue to flow into the Boeing Renton site stormwater conveyance system, which drains into Lake Washington. 2) Could waste materials enter ground or surface waters? If so, generally describe. No 3) Does the proposal alter or otherwise affect drainage patterns in the vicinity of the site? If so, describe. No. Existing stormwater drainage patterns for the site will be retained. Drainage from the project will continue to be conveyed to existing stormwater outfalls that discharge to Lake Washington. d. Proposed measures to reduce or control surface, ground, and runoff water, and drainage pattern impacts, if any: The contractor is required to have all temporary sediment and erosion control best management practices (TESC BMP) implemented prior to the commencement of construction activities, and throughout construction. They will be required to continually update, maintain and implement new BMP’s as work changes and progresses onsite, in compliance with a planned WDOE- issued construction stormwater permit. 10 4. PLANTS ] a. Check the types of vegetation found on the site: __x__deciduous tree: alder, maple, aspen, other __x__evergreen tree: fir, cedar, pine, other _x___shrubs _x___grass ____pasture ____crop or grain ____orchards, vineyards or other permanent crops. ____wet soil plants: cattail, buttercup, bullrushbulrush, skunk cabbage, other ____water plants: water lily, eelgrass, milfoil, other ____other types of vegetation b. What kind and amount of vegetation will be removed or altered? Trees and Plants c. List threatened and endangered species known to be on or near the site. None known d. Proposed landscaping, use of native plants, or other measures to preserve or enhance vegetation on the site, if any: A net gain of 45 new trees and numerous native plants. e. List all noxious weeds and invasive species known to be on or near the site. Himalayan Blackberry, Milfoil 5. ANIMALS Commented [BBR7]: in 2012 for 737 MAX SEPA, we said “Migratory salmon, steelhead in Cedar River” Formatted: Font: Bold, Font color: Custom Color(RGB(83,129,53)) 11 a. List any birds and other animals which have been observed on or near the site or are known to be on or near the site. Examples include: Birds: hawk, heron, eagle, songbirds, other: seagulls Mammals: deer, bear, elk, beaver, other: Fish: bass, salmon, trout, herring, shellfish, other [perch?] b. List any threatened and endangered species known to be on or near the site. Puget Sound steelhead and Chinook salmon, Coastal /Puget Sound Bull trout. c. Is the site part of a migration route? If so, explain Yes, Pacific Flyway, Puget Sound Chinook & Coho salmon, Puget Sound Steelhead trout, Sockeye salmon, Coastal Cutthroat trout, non-anadromous Rainbow trout in adjacent Cedar river. d. Proposed measures to preserve or enhance wildlife, if any: None e. List any invasive animal species known to be on or near the site. Smallmouth bass and largemouth bass are present in Lake Washington 6. ENERGY AND NATURAL RESOURCES a. What kinds of energy (electric, natural gas, oil, wood stove, solar) will be used to meet the completed project's energy needs? Describe whether it will be used for heating, manufacturing, etc. Electricity, natural gas will be used for comfort and process heating. Commented [BBR8]: Add bass here (since we reference them in 5e below). 12 b. Would your project affect the potential use of solar energy by adjacent properties? If so, generally describe. No c. What kinds of energy conservation features are included in the plans of this proposal? List other proposed measures to reduce or control energy impacts, if any: Energy efficient lighting, high efficiency chiller and variable speed fan wall(?) Natural gas boilers operated with low-NOx burners and operated with good combustion practices. 7. ENVIRONMENTAL HEALTH a. Are there any environmental health hazards, including exposure to toxic chemicals, risk of fire and explosion, spill, or hazardous waste that could occur as a result of this proposal? If so, describe. Yes, see Air section. 1) Describe any known or possible contamination at the site from present or past uses. 2) Describe existing hazardous chemicals/conditions that might affect project development and design. This includes underground hazardous liquid and gas transmission pipelines located within the project area and in the vicinity. NA(?) 3) Describe any toxic or hazardous chemicals that might be stored, used, or produced during the project's development or construction, or at any time during the operating life of the project. During construction any and all hazardous material will be stored, used and managed per the construction stormwater general permit. After project completion, materials planned for storage and use at the project site will include paints, primers, water-based and solvent-based cleaning materials and other materials that are typically used in an industrial decorative painting operations. These materials will be used and stored in compliance with all applicable Uniform Fire Code and other applicable regulations. Commented [BBR9]: Exhaust fan? Commented [BBR10]: Will the fire station or the hangar have any efficiency certification? Commented [BBR12]: Do we need to mention the planned work on, for example, the natural gas conveyance system here? Formatted: Font: (Default) Arial, Font color: Custom Color(RGB(83,129,53)) Commented [BBR13]: Input per Ray Power and Blake Boling 13 4) Describe special emergency services that might be required. None anticipated Boeing Renton Fire Department will be fully operational at all times throughout the project. 5) Proposed measures to reduce or control environmental health hazards, i f any: During construction all project activities will be operated in compliance with a planned WDOE-issued construction stormwater permit to protect local waterways from potential releases from the project site. After completion, all Boeing manufacturing activities will be conducted in compliance with various environmental pollution prevention permits and practices, including a WDOE industrial stormwater permit, PSCAA-issued air operating permit (per Title V of the Clean Air Act), and other industrial best management practices. b. Noise 1) What types of noise exist in the area which may affect your project (for example: traffic, equipment, operation, other)? Renton airport adjacent to project, traffic along Logan Ave Nth. 2) What types and levels of noise would be created by or associated with the project on a short-term or a long-term basis (for example: traffic, construction, operation, other)? Indicate what hours noise would come from the site. Short term temporary noise can be expected from construction activities. Pile driving activity will not occur during evening hours. Long term production stall activity will include similar work currently being done at the airport and in existing Boeing production stalls, and entails readying 737 aircraft for first flight. Boeing would avoid any production stall engine run activity during early mornings, at night, and after dusk. 3) Proposed measures to reduce or control noise impacts, if any: To reduce noise from construction during, the contractor will implement the use of alternate backup alarms, dump truck bed liners and dump gate closers Formatted: Font: (Default) Arial, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Font color: Custom Color(RGB(83,129,53)) Commented [BBR14]: Is this a true statement or worth stating? Seems to me that this questions is asking us point blank about expected noise generation. Formatted: Font: (Default) Arial, Bold 14 An engineered sound-mitigating perimeter wall is planned for construction between aircraft stalls and public streets - see attached noise study. 8. LAND AND SHORELINE USE a. What is the current use of the site and adjacent properties? Will the proposal affect current land uses on nearby or adjacent properties? If so, describe. The site is fully developed as an aircraft manufacturing and final assembly facility. No known or expected impact to the uses of adjacent properties. b. Has the project site been used as working farmlands or working forest lands? If so, describe. How much agricultural or forest land of long-term commercial significance will be converted to other uses as a result of the proposal, if any? If resource lands have not been designated, how many acres in farmland or forest land tax status will be converted to nonfarm or non-forest use? NA 1) Will the proposal affect or be affected by surrounding working farm or forest land normal business operations, such as oversize equipment access, the application of pesticides, tilling, and harvesting? If so, how: NA c. Describe any structures on the site. The Renton Plant is a large airplane manufacturing and final assembly facility, consisting of many buildings, storage, staging, and parking areas, and ancillary use property. The City of Renton boathouse is adjacent to the site. d. Will any structures be demolished? If so, what? Yes, the existing Boeing fire station e. What is the current zoning classification of the site? Urban Center north 2 15 f. What is the current comprehensive plan designation of the site? UCN g. If applicable, what is the current shoreline master program designation of the site? Shoreline High-Intensity Overlay District h. Has any part of the site been classified as a critical area by the city or county? If so, specify. DNR shoreline habitat, Cedar River i. Approximately how many people would reside or work in the completed project? Approx. 80 j. Approximately how many people would the completed project displace? None k. Proposed measures to avoid or reduce displacement impacts, if any: NA l. Proposed measures to ensure the proposal is compatible with existing and projected land uses and plans, if any: Existing No change of useManufacturing use. m. Proposed measures to reduce or control impacts to agricultural and forest lands of long- term commercial significance, if any: NA 9. HOUSING Formatted: Font: Arial, Bold Formatted: Font: Arial, Bold Formatted: Font: Arial, Bold Formatted: Font: Arial, Bold Formatted: Font color: Custom Color(RGB(83,129,53)) 16 a. Approximately how many units would be provided, if any? Indicate whether high, middle, or low-income housing. NA b. Approximately how many units, if any, would be eliminated? Indicate whether high, middle, or low-income housing. NA c. Proposed measures to reduce or control housing impacts, if any: 10. AESTHETICS a. What is the tallest height of any proposed structure(s), not including antennas; what is the principal exterior building material(s) proposed? No proposed structures85 feet high b. What views in the immediate vicinity would be altered or obstructed? Some Noneresidential views of Boeing Apron D and Airport auxiliary buildings will be obstructed c. Proposed measures to reduce or control aesthetic impacts, if any: NAAesthetically pleasing sound wall in front of new aircraft stalls 11. LIGHT AND GLARE a. What type of light or glare will the proposal produce? What time of day would it mainly occur? NoneExterior building lighting. After dusk b. Could light or glare from the finished project be a safety hazard or interfere with views? NoA Formatted: Font: (Default) Arial, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font color: Custom Color(RGB(83,129,53)) Formatted: Font: Bold Formatted: Font: Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold Formatted: Font: Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Indent: Left: 1.23" Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font: Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font color: Custom Color(RGB(83,129,53)) Formatted: Font: Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font: Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(56,86,35)) 17 c. What existing off-site sources of light or glare may affect your proposal? None d. Proposed measures to reduce or control light and glare impacts, if any: NAFully cutoff lights, to reduce light throw. See attached Cedar River impingement study for mitigation of light spread into existing river. 12. RECREATION a. What designated and informal recreational opportunities are in the immediate vicinity? City of Renton Cedar River Park. Renton rowing center. b. Would the proposed project displace any existing recreational uses? If so, describe. [help] No c. Proposed measures to reduce or control impacts on recreation, including recreation opportunities to be provided by the project or applicant, if any: [help] NA 13. HISTORIC AND CULTURAL PRESERVATION [help] a. Are there any buildings, structures, or sites, located on or near the site that are over 45 years old listed in or eligible for listing in national, state, or local preservation registers ? If so, specifically describe. [help] b. Are there any landmarks, features, or other evidence of Indian or historic use or occupation? This may include human burials or old cemeteries. Are there any material Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold, Italic, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold Commented [BBR15]: Will the biking path me maintained along Logan? Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold Formatted: Indent: Hanging: 0.5" Formatted: Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: HRt-1, Numbered + Level: 1 + Numbering Style: a, b, c, … + Start at: 1 + Alignment: Left + Aligned at: 0.25" + Indent at: 0.5" 18 evidence, artifacts, or areas of cultural importance on or near the site? Please list any professional studies conducted at the site to identify such resources. ] None known. See attached archaeological studyNone known adjacent to the site c. Describe the methods used to assess the potential impacts to cultural and historic resources on or near the project site. Examples include consultation with tribes and the department of archeology and historic preservation, archaeological surveys, historic maps, GIS data, etc. Boeing historical archivist on staff. Outside consultations with professional archaeologists as needed. Boeing provides professional archaeological produced training video to all contractors before starting excavation. d. Proposed measures to avoid, minimize, or compensate for loss, changes to, and disturbance to resources. Please include plans for the above and any permits that may be required. Should any unknown archaeological resources be encountered during project activities, ground-disturbing activities will be halted in the area of the find in accordance with RCW 27.53.060 (Archaeological Sites and Resources) and RCW 27.44.020 (Indian Graves and Records). A professional archaeologist will be called in to assess the significance of the find, and the Department of Archaeology and Historic Preservation in Olympia will be notified so that a course of action can be implemented. 14. TRANSPORTATION a. Identify public streets and highways serving the site or affected geographic area and describe proposed access to the existing street system. Show on site plans, if any. The site has access to North 6th street and Logan Ave. North b. Is the site or affected geographic area currently served by public transit? If so, generally describe. If not, what is the approximate distance to the nearest transit stop? Yes Metro 150 25 yards Field Code Changed Formatted: Font color: Auto Formatted: Font color: Auto Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font: Bold, Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial Formatted: Font: (Default) Arial, Font color: Custom Color(RGB(56,86,35)) Formatted: Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold Formatted: Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font: Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold 19 c. How many additional parking spaces would the completed project or non-project proposal have? How many would the project or proposal eliminate? c. The existing project area is an approximately 1,000 stall Boeing parking lot. At the completion of the project there will be 89 total Boeing parking spaces remaining. The project will eliminate approximate 911 Boeing parking spaces.Xxxxxxxxx Travis Neu- Dowl Existing Private Parking will be relocate and reduced as part of the project. -see traffic plans No vehicle parking will be eliminated d. Will the proposal require any new or improvements to existing roads, streets, pedestrian, bicycle or state transportation facilities, not including driveways? If so, generally describe (indicate whether public or private). Private Aircraft transportationvehicle road will be created. Existing driveways will be blocked at S1parking lot corridor will be improved e. Will the project or proposal use (or occur in the immediate vicinity of) water, rail, or air transportation? If so, generally describe. City of Renton municipal airport is adjacent to project f. How many vehicular trips per day would be generated by the completed project or proposal? If known, indicate when peak volumes would occur and what percentage of the volume would be trucks (such as commercial and non-passenger vehicles). What data or transportation models were used to make these estimates? No change in vehicular tripsPlease see attached traffic study g. Will the proposal interfere with, affect or be affected by the movement of agricultural and forest products on roads or streets in the area? If so, generally describe. No h. Proposed measures to reduce or control transportation impacts, if any: Formatted: Indent: Left: 0.5", No bullets or numbering Formatted: Font: Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font color: Custom Color(RGB(56,86,35)) Formatted: Font: Arial, Bold Formatted: Font: Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold 20 None 15. PUBLIC SERVICES a. Would the project result in an increased need for public services (for example: fire protection, police protection, public transit, health care, schools, other)? If so, generally describe. None anticipated b. Proposed measures to reduce or control direct impacts on public services, if any. No Impacts 16. UTILITIES a. Circle utilities currently available at the site: [ Electricity, Natural gas, Water, Refuse service, Telephone, Sanitary sewer, Septic system, Other Steam b. Describe the utilities that are proposed for the project, the utility providing the service, and the general construction activities on the site or in the immediate vicinity which might be needed. Electrical PSE, Water domestic, fire C. SIGNATURE The above answers are true and complete to the best of my knowledge. I understand that the lead agency is relying on them to make its decision. Proponent Signature: Formatted: Font: (Default) Arial, Bold Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) Formatted: Font: (Default) Arial, Bold Formatted: Font color: Custom Color(RGB(56,86,35)) Formatted: Font color: Custom Color(RGB(56,86,35)) Formatted: Font: (Default) Arial, Bold, Font color: Custom Color(RGB(83,129,53)) 21 Name of Signee (printed): Mark Clement Position and Agency/Organization: Permit specialist Date Submitted: