HomeMy WebLinkAboutCM_Construction_Mitigation_Plan_190521_v1Chateau Valley Tower Project
4320 Davis Ave S, Renton, WA
CONSTRUCTION MITIGATION
Proposed Construction Dates (begin and end dates): Start of construction is proposed for the
Spring of 2020 with estimated completion of construction Summer of 2021.
Hours and days of operation: 7:00 am to 5:00 pm, Monday through Friday or as otherwise allowed
by City of Renton.
Proposed Hauling/ Transportation routes: Access for Materials and labor to the site are proposed
from SE 43rd St and Davis Ave S. Transportation access will be from Davis Ave S with on-site parking and
material storage within the existing development parking area on the north side of the property.
Arrangements will be made to provide residents parking on the Valley Medical Center surface parking lot
across Dave Ave S on an interim basis.
The collection and disposal of construction related debris will be handled by a construction materials
recycling contractor. Typically, 100% of the debris is distributed to recycling companies for reuse and
recycling.
Measures to minimize construction activities: The minimal construction activity will be necessary
to provide the required public and private improvements for this project. The Street Modification Request,
if approved will minimize public disturbance and provide adequate public access during and after
development.
Adherence to the erosion control plan will be necessary to control dust and storm water quality during
construction.
Special hours: No special hours are anticipated at this time to complete construction. However,
weekend work may be necessary to complete the project on schedule; this will be determined by owner,
contractor, and City of Renton.
Preliminary Traffic Control Plan: Coordination with the City of Renton staff will be necessary to
minimize disruption to traffic on SE 43rd Street and Davis Ave S. Once a contractor is selected, a traffic
control plan will be submitted and approved prior to the pre-construction meeting with the City of
Renton. This plan will be implemented prior to any construction activities.