Loading...
HomeMy WebLinkAboutJ_Modification_Request_Trash_Enclosure_Area_190521_v1April 24, 2019 City of Renton Planning Division 1055 South Grady Way Renton, WA 98057 425.430.7294 425.827.2100 freiheitarch.com 929 108th Avenue NE Suite 210 Bellevue, WA 98004 Chateau Valley Center Expansion Modification Request: Trash Enclosure Area To whom it may concern, Please accept this letter as our justification for a Modification Request to the trash enclosure area requirements. According to the requirements outlined in RMC 4-4-090.D.1.a, we would be required to have 328 total square feet dedicated to the management of trash and recycling, based on the proposed addition of 73 dwelling units, broken down as follows: · 109 minimum square feet for Recyclables. 1.5 SF per Dwelling Unit · 219 minimum square feet for Refuse Deposit. 3 SF per Dwelling Unit We are proposing that if we utilize a compactor, our space requirements for management of trash and recycling can be reduced. For example, the 20-cy compactor installed at our sister location, Chateau Bothell Landing, currently serves 260 dwelling units and 3 commercial kitchens and dining rooms and is serviced twice a month. In addition, the Bothell property has an 8 yard recycle unit that is serviced 2-3 times weekly, and a 1.5 yd compost container, serviced twice monthly. The Chateau Valley Center currently has a 17-cy compactor, serviced every 3-4 months, and it serves the existing dwelling units. While this unit would more than likely handle the extra capacity of the expansion tower, we are proposing to upsize to a 20-yd unit equal to the trash compactor serving the Chateau Bothell Landing building. The existing 16’ x 24’ trash enclosure has adequate space for the larger unit, and currently meets city code requirements for screening wall height, gate height, and will not have any impact or be injurious to any surrounding properties or neighbors. In addition, we propose to build an additional trash enclosure that will house the existing 8yd recycle and 1.5 yd compost container. Please see the attached exhibit on the following page for a diagram of the proposed locations and upsized compactor specs. Sincerely, Dustin Thorlakson Project Manager Freiheit Architecture PROPOSED 20 CY COMPACTORPROPOSED 8' x 16' ENCLOSURE8'-0"16'-0"RC15'-4"24'-8"(E) TRASH ENCLOSURE, OPEN WITH 8' HIGH CEDAR FENCECHATEAU VALLEY CENTER EXPANSION | 4/24/2019A17-569 CODE MODIFICATION: TRASH ENCLOSURENORTH