Loading...
HomeMy WebLinkAboutM_Color_Elevations_190620_v1Second Floor 126'-0" First Floor 115'-0" Seventh Floor 174'-1" Third Floor 135'-2" Fourth Floor 144'-8 1/2" Entry Level 105'-10" Fifth Floor 154'-6" Sixth Floor 164'-3 1/2" Bottom of Roof 183'-9" Top of Roof 189'-9" Grade Plane 106'-10 13/16" S L O P E 4 :1 2 SLOPE 4:12SLOPE 4 :1 2 76'-10 3/16" GRADE PLANE TO TOP OF WALL PLATEEXTERIOR WALL PACK LIGHT FIXTURES STOREFRONT WINDOW SYSTEMALUMINUM FRAMED WINDOWASPHALT SHINGLE ROOFING SYSTEM TO MATCH EXISTING BUILDING VINYL LAP SIDING (COLOR A) VINYL LAP SIDING (COLOR B) HARDIE PANEL SYSTEM W/ REVEALS GLASS GUARDRAIL STOREFRONT ENTRY SYSTEM OVERHEAD COILING PARKING ENTRY DOORBRICK/STONE VENEER WALL SYSTEM HARDIE SIDING SYSTEM GLASS PORTE COCHERE CANOPY CHATEAU VALLEY TOWER | RENTON, WA | 6.20.2019A17-569WEST ELEVATION Second Floor 126'-0" First Floor 115'-0" Seventh Floor 174'-1" Third Floor 135'-2" Fourth Floor 144'-8 1/2" Entry Level 105'-10" Fifth Floor 154'-6" Sixth Floor 164'-3 1/2" Bottom of Roof 183'-9" Top of Roof 189'-9" Grade Plane 106'-10 13/16" S L O P E 4 :1 2 S L O P E 4 :1 2 S L O P E 4 :1 2SLOPE 4:12 SLOPE 4:12 SLOPE 4:12SLOPE 4 :1 2 SLOPE 4:12 S L O P E 4 :1 2 SLOPE 4:12 76'-10 3/16" GRADE PLANE TO TOP OF WALL PLATESTOREFRONT WINDOW SYSTEM ALUMINUM FRAMED WINDOWASPHALT SHINGLE ROOFING SYSTEM TO MATCH EXISTING BUILDING VINYL LAP SIDING (COLOR A) VINYL LAP SIDING (COLOR B) HARDIE PANEL SYSTEM W/ REVEALS GLASS GUARDRAIL BRICK/STONE VENEER WALL SYSTEM HARDIE SIDING SYSTEM CHATEAU VALLEY TOWER | RENTON, WA | 6.20.2019A17-569EAST ELEVATION Second Floor 126'-0" First Floor 115'-0" Seventh Floor 174'-1" Third Floor 135'-2" Fourth Floor 144'-8 1/2" Entry Level 105'-10" Fifth Floor 154'-6" Sixth Floor 164'-3 1/2" Bottom of Roof 183'-9" Top of Roof 189'-9" Grade Plane 106'-10 13/16" SLOPE 4:12 76'-10 3/16" GRADE PLANE TO TOP OF WALL PLATEALUMINUM FRAMED WINDOW ASPHALT SHINGLE ROOFING SYSTEM TO MATCH EXISTING BUILDING VINYL LAP SIDING (COLOR A) VINYL LAP SIDING (COLOR B) HARDIE PANEL SYSTEM W/ REVEALS GLASS GUARDRAIL BRICK/STONE VENEER WALL SYSTEM HARDIE SIDING SYSTEM Second Floor 126'-0" First Floor 115'-0" Seventh Floor 174'-1" Third Floor 135'-2" Fourth Floor 144'-8 1/2" Entry Level 105'-10" Fifth Floor 154'-6" Sixth Floor 164'-3 1/2" Bottom of Roof 183'-9" Top of Roof 189'-9" Grade Plane 106'-10 13/16" EXISTING BUILDING 76'-10 3/16" GRADE PLANE TO TOP OF WALL PLATES L O P E 4 :1 2 SLOPE 4:12 STOREFRONT WINDOW SYSTEM ASPHALT SHINGLE ROOFING SYSTEM TO MATCH EXISTING BUILDING VINYL LAP SIDING (COLOR B) GLASS GUARDRAIL BRICK/STONE VENEER WALL SYSTEM CHATEAU VALLEY TOWER | RENTON, WA | 6.20.2019A17-569SOUTH/NORTH ELEVATION