Proposed Project Name: Chateau Valley Tower
Project Location: 4320 Davis Avenue South
Parcel Number(s): 639180-0010 / 639180-0125
Zoning Designation: Commercial Office (CO)
Proposed Project Size: 74,000 gsf (excluding parking garage)
Proposed # of Stories: 2 Levels of structured parking + 7 Levels of Units
Preliminary Estimated Project Cost: $15,000,000
Preliminary Estimated Fair Market Value: $16,500,000
Project Overview
The subject project is an expansion to the Chateau at Valley Center Assisted Living
Facility located on the campus of the Valley Medical Center. In 2005 the property was
leased from the Valley Medical Center and Phase I of the development was constructed.
The address of the property is 4320 Davis Ave. S. Renton WA, 98055. Phase I, which was
completed in April 2005 consists of 126 studio, 1 bedroom and 2 bedroom apartment
units. The units are licensed under the Washington State Boarding Home regulations for
Assisted Living. At the time Phase I was applied to Renton for permitting, Phase II was
shown on the site plan which was approved by the City of Renton. We now wish to
construct phase II.
We are proposing to have 2 levels of structured parking under the building with 66 parking
stalls and then 73 residential units in 7 stories above the parking. The top level of the
project is below the 75’ threshold for a high-rise project. This would all be licensed as
assisted living. The units would be a mix of 1 bedroom, 1 bedroom plus den, and 2
bedroom. On the top floor, in addition to some residential units we will have a dining room,
a lounge/activity room and an outside garden with walking paths landscaped with shrubs,
small trees and flowers.
The proposed structure is four levels of Type III-A construction over five levels of Type I-A
construction. The new floors will connect to the existing facility on levels one through four,
however, the building will be structurally independent.
Access to the site will consist of three driveways off of Davis Ave S. These driveways
include the existing drive serving the existing building, a new driveway to access the upper
parking level, and a new driveway to access the lower parking level. The proposed
building drop-off area will be a two-lane one-way accessed from the existing driveway.
This will eliminate any potential for queuing of vehicles on Davis Ave S. During
construction, there will be one construction office trailer located on-site adjacent to Davis
Ave S. The construction will be fenced and protected from the existing facility.
Chateau Valley Tower
Page 2/ 2
Exterior lighting will match the existing facility. Wall pack lights shielded from up-light will
be used along the west façade to illuminate the entrance and walking paths. The existing
pole lights illuminating the parking area will be maintained. No new parking area lights are
proposed under this application.
There are no critical areas on or adjacent to the site. The North East corner contains
regulated slopes of approximately 25%. Soils on the site are Silty Sand and Sandy Silt in a
loose to medium dense condition. This should provide a good drainage condition. Building
excavation will be approximately 5,300 cubic yards with 950 yards of imported backfill.
This will be WSDOT type 17 gravel barrow for backfill and 1 ¼” crushed rock for capillary
break below the building. Construction of the building will require removal of 10-12 small
alder, vine maple, and cottonwoods as well as two 11” diameter cottonwoods and one 24’
tall maple tree along the north end of the project site.
We attended a pre-application conference on June 14 with Senior Planner Clark Close.
Per this meeting the following permits are required for this project: Hearing Examiner Site
Plan Review, SEPA Review, Civil Construction Permit, Street Modification Request, and
Commercial/Multifamily Permit. In addition, we are requesting elimination of the required
street dedication. We understand that Assisted Living Facilities are not required to adhere
to the requirements of Design District ‘D’, however, this exception may be waived prior to
vesting of this project. As a proactive measure, we have included an outline demonstrating
the buildings compliance with the Design District standards.
This application includes three Administrative Modification Requests including a reduction
of the required number of bicycle parking stalls, reduction in the required capacities of the
trash enclosure due to the use of a trash compactor, and request to alter the typically
required street improvements to Davis Ave S.
Please find attached application materials based on the above outlined items. We look
forward to working together with the City of Renton on this exciting project.