HomeMy WebLinkAboutPRE_PREAPPSUMMARY_181217_V1.pdfPREAPPLICATION MEETING FOR
1915 Maple Valley Highway Project — Cedar River Apartments
PRE17-000246
CITY OF RENTON
Department of Community & Economic Development
Planning Division
May 18, 2017
Contact Information:
Planner: Matthew Herrera, 425.430.6593
Public Works Plan Reviewer: Ian Fitz -James, 425.430.7288
Fire Prevention Reviewer: Corey Thomas, 425.430.7024
Building Department Reviewer: Craig Burnell, 425.430.7290
Please retain this packet throughout the course of your project as a reference. Consider
giving copies of it to any engineers, architects, and contractors who work on the
project. You will need to submit a copy of this packet when you apply for land use
and/or environmental permits.
Pre-screening: When you have the project application ready for submittal, call and
schedule an appointment with the project manager to have it pre-screened before
making all of the required copies.
The pre -application meeting is informal and non-binding. The comments provided on
the proposal are based on the codes and policies in effect at the time of review. The
applicant is cautioned that the development regulations are regularly amended and the
proposal will be formally reviewed under the regulations in effect at the time of project
submittal. The information contained in this summary is subject to modification and/or
concurrence by official decision -makers (e.g., Hearing Examiner, Planning Director,
Development Services Director, Department of Community & Economic Development
Administrator, Public Works Administrator and City Council).
FIRE & EMERGENCY SERVICES DEPARTMENT
City of
`tagi--�
r
M E M O R A N D U M _F"..
DATE: May 9, 2017
TO: Matt Herrera, Senior Planner
FROM: Corey Thomas, Plans Review Inspector
SUBJECT: Cedar River Apartments
1. The preliminary fire flow is 2,000 gpm. A minimum of two fire
hydrants are required. One within 150 -feet and one within 300 -feet of
the building. One hydrant is required within 50 -feet of all fire
department connections for standpipes and sprinkler systems.
2. Fire impact Fees are applicable at the rate of $718.56 per multifamily
unit. This fee is paid at time of building permit issuance. No charge
for parking garage areas.
3. Approved fire sprinkler, standpipe and fire alarm systems are required
throughout all the buildings. Dry standpipes are required in all
stairways. Direct outside access is required to the fire sprinkler riser
room. Fire alarm system is required to be fully addressable and full
detection is required. Separate plans and permits required by the fire
department.
4. Fire department apparatus access roadways are required within 150 -
feet of all points on the building. Fire lane signage required for the
on-site roadway. Required turning radius are 25 -feet inside and 45 -
feet outside. Roadways shall be a minimum of 20 -feet wide.
Roadways shall support a minimum of a 30 -ton vehicle and 75 -psi
point loading.
5. Building shall be equipped with an elevator meeting the size
requirements for a bariatric size stretcher. Car size shall tG
accommodate a minimum of a 4Q -inch b 84 -inch stretcher. 7�
6. The building shall comply with the Cityon `>` epi rge�ncy Radio
Coverage ordinance. Testing shall verify both incoming and outgoing
minimum emergency radio signal coverage. If inadequate, the
building shall be enhanced with amplification equipment in order to
meet minimum coverage. Separate plans and permits are required
for any proposed amplification systems.
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
M E M O R A N D U M
DATE: May 18, 2017
TO: Matt Herrera, Senior Planner
FROM: Ian Fitz -James, Civil Plan Reviewer
SUBJECT: Utility and Transportation Comments for Maple Valley Apartments
PRE 17-000246
NOTE: The applicant is cautioned that information contained in this summary is preliminary and non-
binding and may be subject to modification and/or concurrence by official City decision -makers. Review
comments may also need to be revised based on site planning and other design changes required by
City staff or made by the applicant.
I have completed a preliminary review of the application for the proposed Maple Valley Apartments at
1915 Maple Valley Highway. The site is the former Stoneway concrete plant. The proposal is to build
400 apartment units in six buildings and a 26,000 square foot commercial pad.
WATER COMMENTS
A Closure permit required for facilities in Zone 1 of the City's Aquifer Protection Area. The
subject property is within Zone 1 of the City's Aquifer Protection Area (APA). Per Renton
Municipal Code (RMC) 4-9-015F, a Closure Permit is required for existing facilities in Zone 1 of
the APA. Stoneway Concrete has applied for a closure permit and a copy of the closure permit
application dated November 18, 2009 along with permit conditions is attached.
The applicant needs to submit to the City's Water Utility Department, the latest Cleanup Action
Report along with copies of letters, notices, and associated documents between Stoneway and
the Washington State Department of Ecology issued as part of Stoneway's Voluntary Cleanup
Program related to the subject property. The Water Utility Department will review the Cleanup
Action Report and other documentation and will determine if the cleanup is consistent with
RMC 4-9-015F (Closure Permit) and G (Unauthorized Release) and will provide written findings
to Stoneway to indicate whether closure is complete and if not, why not.
K:\Preapps\2017\PRE17000246_1915 Maple Valley Highway Apartments\02.Review Comments\17-0518 PRE17-000246 Civil
Pre -App Comments.docx
Maple Valley Apartments — PRE17-000241
May 18, 2017
2. The applicant shall abandon the existing private well on the subject property in accordance with
Washington State Department of Ecology standards and per Washington Administrative Code
(WAC) 173-160-381. The applicant shall provide a copy of the well decommissioning report to
the City's Water Utility Department.
3. There are two existing City -owned monitoring wells (MW's-40 and 41) within the subject
property. The City will evaluate if the existing monitoring wells can be decommissioned and if
they need to be replaced with new ones.
4. Water service is provided by the City of Renton. It is in the Valley service area in the 196'
hydraulic pressure zone. The approximate static water pressure is 64 psi at a ground elevation
of 46'.
There is an existing 12" water main northeast of the site along the northern frontage of Maple
Valley Highway. Reference Project File WTR2700366 in COR Maps for record drawings. There is
an existing 12" water main that is located northwest of the site that crosses through the Renton
Community Center parking lot adjacent to the City's aquatic center. Reference Project File
WTR2701909 in COR Maps for record drawings. The maximum flowrate from the existing 12"
water mains is 2,500 gallons per minute (gpm).
There is an existing 8" water main that crosses Maple Valley Highway from the existing 12"
water main mentioned above that serves a fire hydrant at the southern corner of the Maple
Valley Highway and Cedar Rider Park Drive intersection. Reference Project File WTR2700366 in
COR Maps for record drawings.
There is an another existing 8" water main that crosses Maple Valley Highway from the existing
12" water main that serves two fire hydrants along the southern Maple Valley Highway frontage
near the site's northeast corner. Reference Project File WTR2700366 in COR Maps for record
drawings.
Below is a summary of the existing fire hydrants in the vicinity of the site. Installation of
additional fire hydrants or retrofit of existing fire hydrants may be required by the Renton
Regional Fire Authority based on final fire flow demand and final site plan.
a. At the southern corner of the Maple Valley Highway and Cedar River Park Drive
intersection (COR Facility ID HYD -SE -00017).
b. Northwest of the site's northeast corner along the southern frontage of Maple Valley
Highway (COR Facility ID HYD -SE -00018).
c. Southeast of the site's southeast corner along the southern frontage of Maple Valley
Highway (COR Facility ID HYD -SE -00139).
d. South of an existing drive aisle in the Renton Community Center site near the sites
northeastern corner (COR Facility ID HYD -SE -00015).
7. Based on the review of the information submitted for the pre -application, the Renton Regional
Fire Authority has determined that the preliminary fire demand for the development is 2,000
K:\Preapps\2017\PRE17000246-1915 Maple Valley Highway Apartments\02.Review Comments\17-0518 PRE17-000246 Civil
Pre -App Comments.docx
6
Maple Valley Apartments — PRE17-000241
F
May 18, 2017
gpm including the using of an automatic fire sprinkler system. Per City Codes, a looped water
main around the buildings is required when the required fire flow exceeds 2,500 gpm.
8. Extension of water mains (minimum 8" to 12") within the interior roads connecting to the
existing 12" main along the northern frontage of Maple Valley Highway and also to the existing
12" main within the Community Center parking lot is required. The final sizing of the water
mains will be determined based on the final fire flow demand for the proposed development.
An easement from the City will be required for the portion of the new water main within the
City -owned (Parks) property. A 15' utility easement will be required for the new water mains,
hydrants, and water meters within the property.
9. A fire sprinkler stub with a double detector check valve assembly (DDCVA) in an exterior
underground vault within private property per COR Standard Plan 360.2 shall be installed for
backflow prevention for each building. The DDCVA may be installed in the building if it meets
the conditions as shown on COR Standard Plan 360.5 for the installation of DDCVA inside a
building. The location of the DDCVA inside the building shall be approved by the City Plan
Reviewer and Water Utility Department. The fire department connection (FDC) shall be within
50' of a fire hydrant or in a location approved by the Renton Regional Fire Authority. A post
indicator valve (PIV) per City standards is required on the fire line. The fire sprinkler stub and
appurtenance shall be sized by a registered fire sprinkler designer / contractor.
10. A separate domestic water meter is required for each residential building. Each domestic water
meter shall be sized in accordance with the most recent edition of the Uniform Plumbing Code.
DCVA's with a size of 2" or smaller shall be installed in a meter box. Domestic water meters 3"
or larger shall be installed in an exterior vault in accordance with COR Standard Plan 320.4.
Meters and meter vaults shall be located within public right of way or within an easement on
private property. Installation of a double check valve assembly (DCVA) per City standards is
required behind the domestic meter within private property for each residential building. The
DCVA may be installed inside the building provided the location is approved by the City Plan
Reviewer and Water Utility Department.
11. A separate domestic water meter is required for the commercial pad. This domestic water
meter shall have a reduced pressure backflow assembly (RBPA) installed behind the meter
within private property. The RBPA shall be installed inside an above ground heated enclosure
per COR Standard Plan 350.2. The RPBA may be located inside the building if a drainage outlet
for the relief valve is provided and the location is approved by the City Plan Reviewer and City
Water Utility Department.
12. A separate meter is required for landscape irrigation per COR Standard Plan 320.1. A double
check valve assembly (DCVA) on private property is required behind the meter per COR
Standard Plan 340.8.
13. Water system improvements shall be designed in accordance with Appendix 1 of the City's 2012
Water System Plan. Adequate horizontal and vertical separation between new water mains and
other existing and proposed utilities (sewer lines, storm drains, gas lines, power and
communication ducts) shall be provided for the operation and maintenance of the water main.
Retaining walls, rockeries, or similar structures cannot be installed over the water main unless
the water main is installed inside of a steel casing.
K:\Preapps\2017\PRE17000246-1915 Maple Valley Highway Apartments\02.Review Comments\17-0518 PRE17-000246 Civil
Pre -App Comments.dou
7
Maple Valley Apartments — PRE17-000241
May 18, 2017
14. The development is subject to system development charges (SDCs) for water service and fire
sprinkler use. Water SDCs that are current will be collected at the time of construction permit
issuance. Fees for work done by City crews will also be collected at the time of construction
permit issuance. Work done by City crews includes connections of the new mains to the existing
system and chlorination of the new lines. Below is a list of various water SDCs that may be
applicable to this application. Please see the 2017 Development Fees Document on the City's
website for a complete list of fees.
• The 2017 SDC for a 3" water service is $53,776.00. The applicant pays for the meter and
installs it. A $220.00 processing fee is due at the time of meter application.
• The 2017 SDC for a 2" water service is $27,888.00. A 2" drop-in meter is $950.00 and is
installed by City crews.
• The 2017 SDC for a 1-1/2" water service is $17,430.00. A 11/2" drop-in meter is
$750.00 and is installed by City crews.
• The 2017 SDC for a 1" water service is $3,486.00. A 1" drop in meter is $460.00 and is
installed by City crews.
• The 2017 SDC for a 4" fire service is $11,236.00.
• The 2017 SDC for a 6" fire service is $22,476.00.
SEWER COMMENTS
1. Sewer service is provided by the City of Renton.
There is an existing 12" HDPE sewer in a casing flowing from east to west north of the site in
Cedar River Park Drive. The sewer continues west between the Renton Community Center and
Cedar River and then west across Interstate 405. Reference Project File WWP2700710 in COR
Maps for record drawings.
There is also an existing 42" King County gravity transmission sewer east of the site in Maple
Valley Highway that flows from southeast to northwest. Contact King County Wastewater
Treatment Division for record drawings.
2. An extension of sewer main into the site is required to serve each building. The City would
prefer that new sewer main from the site connect to the 12" City sewer main north of the site
described above. If a gravity connection of the entire site or a portion of the site is not possible
to the existing City sewer main, the new sewer main can connect to the existing King County
transmission main in Maple Valley Highway.
All new sewer main shall have a minimum diameter of 8". Sewer mains and manholes shall be
designed and installed in accordance with City and Department of Ecology standards. Based on
the pre -application submittal, new sewer main would be privately owned and maintained.
K:\Preapps\2017\PRE 17000246_1915 Maple Valley Highway Apartments\02.Review Comments\17-0518 PRE17-000246 Civil
Pre -App Comments.docx
8
Maple Valley Apartments — PRE17-000241
May 18, 2017
4. All building side sewers shall be a minimum of 6" and shall run at a slope of at least 2%.
5. All wastewater from proposed garage areas shall be routed through a City approved oil/water
separator prior to discharge into the sewer main.
6. If a commercial kitchen is proposed as part of the commercial pad, a grease interceptor will be
required. The grease interceptor shall be sized based on drainage fixture units in accordance
with standards found in the latest edition of the Uniform Plumbing Code (UPC). The grease
interceptor shall drain by gravity to the sewer main. The grease interceptor shall be located on
site so that it is accessible for routine maintenance.
15. The development is subject to system development charges (SDCs) for sewer service. The SDCs
for sewer service are based on the size of the domestic water services. Fees that are current will
be charged at the time of construction permit issuance. Below is a list of various sewer SDCs that
may be applicable to this application. Please see the 2017 Development Fees Document on the
City's website for a complete list of fees.
• The 2017 SDC with a 3" water service is $40,640.00.
a The 2017 SDC with a 2" water service is $20,320.00.
a The 2017 SDC with a 1-1/2" water service is $12,700.00.
• The 2017 SDC with a 1" water service $2,540.00.
STORM DRAINAGE COMMENTS
The project site is currently vacant and consists of large areas of compacted gravel and dirt. The
majority of the site is relatively flat. There are a few portions of the site with slopes exceeding
15%. The site slopes away from Maple Valley Highway towards the Cedar River. There is no
existing on-site conveyance system. There is an existing 12" public storm drain that flows from
northwest to southeast along the southern frontage of Maple Valley Highway that collects
drainage in the public right of way. Reference Project File TED4003295 in COR Maps for record
drawings. There is also a 12" pubic storm drain that flows from east to west that collects
drainage from the Cedar River Park Drive public right of way. Reference Project File
TED4003268 in COR Maps for record drawings. Storm drainage from this system is conveyed
through the Renton Community Center site and into the Cedar River.
2. Drainage plans and a drainage report complying with the adopted 2017 Renton Surface Water
Design Manual (RSWDM) will be required.
Refer to Figure 1.1.2.A— Flow Chart in the RSWDM to determine what type of drainage review is
required for this site. The site falls within the City's Flow Control Duration Standard (Forested
Conditions). The site falls within the Lower Cedar River drainage basin. The project site is within
a half mile of a Major Receiving Water, the Cedar River.
4. On-site BMPs satisfying Core Requirement #9 in the RSWDM will be required for the site.
K:\Preapps\2017\PRE17000246_1915 Maple Valley Highway Apartments\02.Review Comments\17-0518 PRE17-000246 Civil
Pre -App Comments.docx
9
V A- , >�v
Maple Valley Apartments — PRE17-000241
May 18, 2017
5. Enhanced basic water quality treatment is required for this site.
6. The following are prohibited in Zone 1 of the Aquifer Protection Area:
a. Open facilities such as flow control and water quality treatment ponds, stormwater
wetlands and infiltration facilities.
b. On-site BMPs that rely on infiltration. (On-site BMPs that rely on dispersion are allowed
for non-PGIS)
c. Open conveyance systems such as ditches and channels.
7. New storm drain shall be designed and sized in accordance with the standards found in Chapter
4 of the 2017 RSWDM.
8. Storm drainage improvements along public street frontages are required to conform to the
City's street standards.
9. New storm drain shall be designed and sized in accordance with the standards found in Chapter
4 of the 2017 Renton Surface Water Design Manual.
10. The project site contains areas that are designated as the FEMA 100 -year floodplain based upon
the approved 2006 Flood Insurance Mapping Study of the Cedar River and as shown in the
November 2010 FEMA preliminary DFIRM map. The Zone AE Base Flood Elevations for the 100 -
year floodplain on the site rages between an elevation of 43' to 44' (NAVD datum). The City's
adopted Flood Hazard Critical Area Ordinance will apply for work within the FEMA established
100 -year floodplain on the site. Buildings constructed within the 100 -year floodplain must have
their finished floors elevated 1' above the 100 -year floodplain Based Flood Elevation. Elevation
certificates are required for any building constructed in the 100 -year floodplain.
11. Any fill placed in the 100 -year floodplain will need to provide compensatory storage per the
requirements in the RSWDM.
12. The October 2015 Lower Cedar River Chinook Salmon Habitat Assessment Study, which was
funded by a grant from the Puget Sound Partnership's Puget Sound Acquisition and Restoration
Fund (PSAR) program, was completed to study potential Chinook salmon habitat restoration
sites in the Lower Cedar River within Renton and its floodplain. The study developed conceptual
designs for several sites that are deemed the best opportunities for habitat restoration. The
project was selected for the grant recommended by the Lake Washington / Cedar / Sammamish
Watershed Resource Inventory Area (WRIA 8) perspective. The Study identified the Cedar River
shoreline area adjacent to the project site as a potential habitat restoration site to remove
armoring and concrete walls along the shoreline to create habitat for Chinook salmon and other
salmonids. This shoreline habitat restoration could be incorporated into the project to meet
project mitigation needs. At a minimum, the project should not preclude the ability for the
habitat restoration project on the site from being able to be implemented in the future.
K:\Preapps\2017\PRE17000246_1915 Maple Valley Highway Apartments\02.Review Comments\17-0518 PRE17-000246 Civil
Pre -App Comments.dou
10
Maple Valley Apartments — PRE17-000241
May 18, 2017
13. A geotechnical report for the site is required. The site is located with Zone 1 of the City Aquifer
Protection Area (APA). On-site BMPs that involve infiltration are not allowed in Zone 1 of the
APA, so infiltration testing on the site to determine feasibility of on-site infiltration BMP's is not
required.
14. A Construction Stormwater General Permit from the Washington Department of Ecology is
required as site clearing is equal to or exceeds one acre.
15. The development is subject to stormwater system development charges (SDCs). The 2017 SDC
for stormwater is $0.641 per square foot of new impervious surface area, but not less than
$1,608.00. Stormwater SDCs that are current will be collected at the time of construction
permit issuance.
TRANSPORTATION/STREET COMMENTS
1. The 2017 transportation impact fee is $3,358.55 per apartment dwelling unit, $13.29 per square
foot of commercial space, $30.48 per square foot of sit-down restaurant space, and $69.89 per
square foot of fast food with no -drive up space. A full list of traffic impact fees can be found on
the City's 2017 Development Fees Document on the City's website. The transportation impact
fees that are current are due at the time of building permit issuance for each building.
2. Maple Valley Highway (State Route 169) is classified as a principal arterial. Maple Valley
Highway is owned and maintained by WSDOT. The existing right of way width for Maple Valley
Highway adjacent to the site varies from approximately 95' to approximately 127' per the King
County Assessor's Map. The paved roadway width adjacent to the site is approximately 82'
consisting of three travel lanes in each direction and a center turn lane. There is a concrete curb
and sidewalk directly behind the curb along each side of the roadway. The sidewalk along the
project frontage is approximately 6.5' in width.
Per RMC 4-6-060, the minimum right of way width for a principal arterial with seven lanes is
125'. The paved roadway width is 88' consisting of 6 —11' travel lanes, 1-12' left turn lane, and
2 — 5' bike lanes. A 0.5' curb, 8' planter, 8' sidewalk, and 2' clear behind sidewalk are required
along each side of the pavement.
Maple Valley Highway is owned and maintained by WSDOT. WSDOT will be reviewing street
frontage improvements along the Maple Valley frontage. Pending the findings of the Traffic
Impact Analysis (TIA), WSDOT may require further roadway improvements than what is
mentioned above. The proposed access to Maple Valley Highway from the site is subject to
WSDOT review and approval.
Any modification of the curb to curb pavement width will be at the discretion of WSDOT. An 8'
planter, 8' sidewalk, and 2' clear at back of sidewalk would be required behind the curb line.
The new right of way line would be established at the back of the 2' clearance. A street
modification will need to be submitted to use this modified street section.
4. Cedar River Park Drive is classified as a commercial access street. The current right of way width
for Cedar River Park Drive varies from approximately 60' to approximately 98' near the
intersection with Maple Valley Highway per the King County Assessor's Map. The paved
K:\Preapps\2017\PRE17000246_1915 Maple Valley Highway Apa rtments\02. Review Comments\17-0518 PRE17-000246 Civil
Pre -App Comments.docx
m
Maple Valley Apartments — PRE17-000241
May 18, 2017
roadway width adjacent to the site is approximately 40' consisting of one travel lane from Maple
Valley Highway and two travel lanes to Maple Valley Highway. There is a concrete curb and
sidewalk directly behind the curb along each side of the roadway. The sidewalk along the
project frontage is approximately 7' in width. Cedar River Park Drive transitions to a private
roadway (Park's property) approximately 235' west of the intersection with Maple Valley
Highway.
Per RMC 4-6-060, the minimum right of way width for a commercial access street with three
lanes is 80'. The paved roadway width is 47' consisting of 2 —10' travel lanes, 1-11' turn lane,
and 8' parking lanes on each side of the roadway. A 0.5' curb, 8' planter, 6' sidewalk, and 2'
clear behind sidewalk are required along each side of the pavement.
The City's Transportation Department has looked at this portion of Cedar River Park Drive and
recommends keeping the curb line in the established location pending the findings of the TIA.
The curb line along the project frontage may move after review of the TIA. An 8' planter, 6'
sidewalk, and 2' clear at back of sidewalk would be required behind the curb line. The new right
of way line would be established at the back of the 2' clearance. A street modification will need
to be submitted to use this modified street section.
5. Any proposed access from the City of Renton Community Center site is subject to review from
the City's Parks Department.
6. A Traffic Impact Analysis (TIA) per City of Renton standards is required for this development as it
will generate new vehicular traffic exceeding 20 vehicles per hour in both the AM and PM peak
periods. The TIA should analyze the following intersections:
a. Maple Valley Highway and Cedar River Park Drive.
b. Maple Valley Highway and new eastern site access road.
c. Maple Valley Highway and the Interstate 405 interchange
d. Maple Valley Highway and Bronson Way N. and Sunset Boulevard N.
The evaluation at each intersection shall include the following at a minimum and follow the
Traffic Impact Analysis Guidelines for New Development published on the City's website.
a. Evaluation of existing signal and intersection under existing conditions.
a. Traffic engineer can use recently completed traffic studies from the City for this
information upon request.
Explain how the signal will operate with the additional traffic from the proposed
development.
c. Provide recommendations as necessary for mitigation of traffic impacts caused by this
project at this intersection.
K:\Preapps\2017\PRE17000246_1915 Maple Valley Highway Apartments\02.Review Comments\17-0518 PRE17-000246 Civil
Pre -App Comments.docx
12
Maple Valley Apartments — PRE17-000241
May 18, 2017
7. Street lighting per City standards is required along both the Maple Valley Highway and Cedar
River Park Drive frontages. A street lighting analysis and plan shall be submitted with the
construction permit.
8. Paving and trench restoration within the City of Renton right of way shall comply with the City's
Street Restoration and Overlay requirements.
GENERAL COMMENTS
1. The fees listed are for 2017. The fees that are current at the time of the respective permit
issuance will be levied. Please see the City of Renton website for the current fee schedule.
2. All new utility lines (i.e. electrical, phone, and cable services, etc.) within the site must be
underground. The construction of franchise utilities must be inspected and approved by the City
of Renton franchise inspector.
3. Retaining walls that are 4' or taller from bottom of footing and stormwater detention vaults will
require a separate building permit. Structural calculations and plans prepared by a licensed
engineer will be required as part of the building permit review.
4. All civil plans shall conform to the current City of Renton survey and drafting standards. Current
drafting standards can be found on the City of Renton website.
5. A separate plan submittal will be required for a construction permit for utility work and street
improvements. All plans shall be prepared by a licensed Civil Engineer in the State of
Washington.
6. Please see the City of Renton Development Engineering website for the Construction Permit
Application and Construction Permit Process and Submittal Requirements. Please contact the
City to schedule a construction permit intake meeting.
7. All plan review for the City is now paperless. Please see http://rentonwa.gov/paperless/ for
more information.
K:\Preapps\2017\PRE17000246_1915 Maple Valley Highway Apartments\02.Review Comments\17-0518 PRE17-000246 Civil
Pre -App Comments.docx
13
DEPARTMENT OF COMMUNITYC'TY°F
AND ECONOMIC DEVELOPMENT Renton :
Cedar River Apartments
Preapplication Meeting
May 18, 2017
Special Flood Hazard Area. The site is also located within a Zone 1 Wellhead Protection Area and
Seismic Hazard Area
Current Use: Temporary storage for construction machinery, equipment, and supplies.
Zoning: The subject property is within the Commercial -Office -Residential (COR) land use
designation and zoning classification. Please refer to Zoning Use Table RMC 4-2-060 for a
complete listing of permitted uses in the COR zone.
• Attached residential is a permitted use.
• General Office and Medical/Dental Office is a permitted use.
• Retail sales are permitted with the following RMC 4-2-080A.21 condition: the use shall be
housed in a structure containing one or more of the following uses: offices, residences,
hotels, convention centers, and/or research and development facilities.
• Eating and drinking establishments are permitted with the following RMC 4-2-080A.82
condition: All development shall be architecturally and functionally integrated into the
overall shopping center or mixed use development. Buildings shall be mixed use except for
retail buildings with more than 75,000 square feet, structured parking, and a maximum
building footprint of 65,000 square feet, or structures smaller than 5,000 square feet. Single -
use retail buildings are not allowed east of Lake Washington Boulevard North.
If the proposed commercial pad will contain retail sales and/or eating and drinking
establishments, the building will also need to add another use component as identified above.
Development Standards: The project would be subject to RMC 4-2-120B, "Development
Standards for Commercial Zoning Designations" and District 'C' overlay area "RMC 4-3-100
"Urban Design Regulations" effective at the time of complete application. The project is also
subject to Shoreline Master Program Regulations as portions of the site are within the 200 -foot
Shoreline High -Intensity Overlay.
Density — The minimum density permitted is 30 units/net acre and the maximum density is 50
units/net acre. Gross density of the proposal is approximately 32 units per acre. A density
worksheet verifying net density with any public street, access easement, or critical area
deductions will be required with the land use application.
Minimum Lot Size, Width and Depth — There are no minimum requirements for lot size, lot
width or depth.
Lot Coverage —A maximum building coverage of 65 percent, or 75 percent if parking is provided
within a building or within an on-site parking garage. As surface parking is proposed for a
portion of development, the 65 -percent maximum will apply to this proposal, however this
standard is eligible for modification with an approved master plan.
Setbacks — Setbacks are the minimum required distance between the building footprint and the
property line and any private access easement or tract. All setbacks, except for Clear Vision
Area, are determined through site plan review.
Height — Maximum building height is 10 stories and/or 125 -feet. However, in no case shall
building height exceed the maximum allowed by the Airport Compatible Land Use Restrictions,
for uses located within the Federal Aviation Administration Airport Zones designated under RMC
4-3-020. Buildings or portions of buildings that exceed 50 -feet in height shall include upper story
16
Cedar River Apartments
Preapplication Meeting
May 18, 2017
setbacks as follows: The minimum setback for a fifth story and succeeding stories shall be ten
10 -feet minimum from the preceding story, applicable to each story or an equivalent standard
that adds interest and quality to the building. Buildings shall provide vertical and horizontal
modulation of roof lines and facades of not less than two -feet at a minimum interval of 40 -feet
per building face, or an equivalent standard that adds interest and quality to the building. No
building elevations were provided however the narrative stated residential buildings would be
5 -stories therefore the Sth story setback would apply. 4P--rje5 WCo_ Dt-4-r ;: j IQ_ .Ckx, 4 i .
Screening - Screening must be provided for all surface -mounted and roof top utility and
mechanical equipment. The site plan application will need to include elevations and details for
the proposed methods of screening.
Refuse and Rec cy lin_Areas - Refuse and recycling areas need to meet the requirements of RMC
4-4-090, "Refuse and Recyclables Standards." For multi -family development, a minimum of 1-%
square feet per dwelling unit shall be provided for recyclable deposit areas, and a minimum of 3
square feet per dwelling unit shall be provided for refuse deposit areas with a combined total
minimum area of 80 square feet. Please refer to RMC 4-4-090 for separate Office and Retail
deposit and collection requirements. The applicant would be required to submit a site plan
depicting a refuse and recyclable area compliant with RMC 4-4-090 with the land use
application.
Landscaping: Except for critical areas, all portions of the development area not covered by
structures, required parking, access, circulation or service areas, must be landscaped with
native, drought -resistant vegetative cover. The minimum on-site landscape width required
along street frontages is 10 feet and shall contain trees, shrubs, and landscaping. Street trees in
the ROW planter will also be required.
Surface parking lots with 15 to 50 stalls shall provide 15 square feet of internal lot landscaping
for each parking stall. There shall also be no more than 50 feet between parking stalls and an
interior parking lot landscape area and the interior lot landscaping area shall be a minimum of 5 -
feet in width (not including curb). Perimeter landscaping may not substitute for interior
landscaping.
Surface parking lots shall contain a perimeter landscaping screen at least 10 -feet in width
measured from the ROW. Within this perimeter screen trees shall be planted at a minimum of 2 -
inch caliper at an average rate of 30 lineal feet of street frontage, shrubs at the minimum rate of
one per 20 square feet, and groundcover in quantities that will provide at least 90 -percent
coverage within 3 -years.
Please refer to landscape regulations (RMC 4-4-070) for additional general and specific
landscape requirements. A conceptual landscape plan shall be submitted at the time of land
use application.
Tree Preservation: If significant trees (greater than 6 -inch caliper or 8 -caliper inches for alders
and cottonwoods) are proposed to be removed, a tree inventory, tree retention plan, arborist
report, and tree retention worksheet shall be provided with the formal land use application as
defined in RMC 4-8-120. The tree retention plan must show preservation of at least 10% of
significant trees, and indicate how proposed building footprints would be sited to accommodate
preservation of significant trees that would be retained (RMC 4-4-130H1.a). When the required
number of protected trees cannot be retained, replacement trees, with at least a two-inch (2")
caliper or an evergreen at least six feet (6') tall, shall be planted at a rate of twelve (12) caliper
17
Cedar River Apartments
Preapplication Meeting
May 18, 2017
inches of new trees to replace each protected tree removed. The Administrator may authorize
the planting of replacement trees on the site if it can be demonstrated to the Administrator's
satisfaction that an insufficient number of trees can be retained.
Significant trees shall be retained in the following priority order:
Priority One: Landmark trees; significant trees that form a continuous canopy; significant trees
on slopes greater than 20%; significant trees adjacent to critical areas and their associated
buffers; and significant trees over 60' in height or greater than 18" caliper.
Priority Two: Healthy tree groupings whose associated undergrowth can be preserved; other
significant native evergreen or deciduous trees; and other significant non-native trees.
Priority Three: Alders and cottonwoods shall be retained when all other trees have been
evaluated for retention and are not able to be retained, unless the alders and/ or cottonwoods
are used as part of an approved enhancement project within a critical area or its buffer.
The Administrator may require an independent review of any land use application that involves
tree removal and land clearing at the City's discretion. A formal tree retention plan and arborist
report would be required with the land use application.
Parking: Parking for residential units shall be enclosed within the same building as the unit it
serves.
Use Ratio
Attached Dwellings 1 per dwelling unit is required. Maximum of 1.75 per dwelling
unit is allowed.
General Office Min: 2 spaces per 1,000 SF
Max: 4.5 spaces / 1,000 SF
Retail SalesI Minimum and maximum of 2.5 per 1,000 square feet of net
floor area.
Eating/Drinking Establishments Minimum and maximum of 10 per 1,000 square feet of dining
area.
A twenty five percent (25%) reduction or increase from the minimum or maximum number of
parking spaces may be granted for nonresidential uses through site plan review if the applicant
can justify the modification to the satisfaction of the Administrator. Justification might include,
but is not limited to, quantitative information such as sales receipts, documentation of customer
frequency, and parking standards of nearby cities.
The applicant will be required at the time of formal land use application to provide detailed
parking information (i.e. stall and drive aisle dimensions) and calculations of the subject site.
Please refer to RMC 4-4-080F for stall, aisle, and accessible space dimensional requirements.
18
Cedar River Apartments
Preapplication Meeting
May 18, 2017
The proposal would be required to provide bicycle parking based on 10 96 of the required
number of parking stalls for commercial uses and one-half (0.5) bicycle parking space per one
dwelling unit.
The bicycle parking shall provide for secure extended use and shall protect the entire bicycle and
its components and accessories from theft and weather. Acceptable examples include bike
lockers, bike check-in systems, in -building parking, and limited access fenced areas with weather
protection. Spaces within the dwelling units or on balconies do not count toward the bicycle
parking requirement.
Please review RMC 4-4-080F.10 and RMC 4-4-080F.1 for further general and specific bicycle
parking requirements.
Access: Per COR zoning designation development regulations, direct arterial access to individual
structures shall occur only when alternative access to local or collector streets or consolidated
access with adjacent uses is not feasible.
Driveway widths and quantity are limited by the driveway standards, in RMC 4-40801.
Driveways shall not be closer than 5 -feet to any property line and not exceed 40 percent of the
street frontage. The width of any driveway shall not exceed 30 -feet. The number of driveways
and other vehicular access points is limited by the Urban Design Regulations for District C. See
comments below. Access may also be limited by WSDOT as Maple Valley Highway is a State
Highway.
Urban Design Regulations: Compliance with Urban Design Regulations, District 'C', is required.
See RMC 4-3-100 for a menu of options and requirements. The land use application shall
identify how the project meets each of the applicable urban design regulations. The following
bullets are some, but not all, of the guidelines and standards applicable to your project.
• Residential and mixed-use buildings containing street -level residential uses and single -
purpose residential buildings shall be:
• Set back from the sidewalk a minimum of ten feet (10') and feature substantial
landscaping between the sidewalk and the building; or
• Have the ground floor residents I uses raised above street level for residents'
privacy. -
p y' �/�� t-,A-A'V1N(Cj'
• Building entries from a street shall be prominent and clearly marked with canopies,
architectural elements, ornamental lighting, or landscaping and include weather protection
at least four and one-half feet (4-1/2') wide along at least seventy five percent (75%) of the
length of the building facade facing the street, a maximum height of fifteen feet (15') above
the ground elevation, and no lower than eight feet (8') above ground level. Additionally, as
several of the residential only buildings will be located along the river and public access
areas, the southern elevations of these buildings shall not "turn their back" on these
spaces. Architectural features that complement the building along the river frontage will
also be required.
• Multiple buildings on the same site shall direct views to building entries by providing a
continuous network of pedestrian paths and open spaces that incorporate landscaping.
• Parking shall be at the side and/or rear of a building and may not occur between the
building and the street. However, if due to the constraints of the site, parking cannot be
CN) 19
Cedar River Apartments
Preapplication Meeting
May 18, 2017
provided at the side or rear of the building, the Administrator may allow parking to occur
between the building and the street. If parking is allowed to occur between the building and
the street, no more than sixty feet (60') of the street frontage measured parallel to the curb
shall be occupied by off-street parking and vehicular access.
• Parking shall be located so that it is screened from surrounding streets by buildings,
landscaping, and/or gateway features as dictated by location. The surface parking area is
relatively large in scale with the development and should be relocated from the
intersection of Cedar River Park Drive and Maple Valley Highway. The proposed
commercial pad and residential only buildings should be reconfigured to better screen the
parking.
• Surface parking lots shall be designed to facilitate future structured parking and/or other
infill development. For example, provision of a parking lot with a minimum dimension on
one side of 200 -feet and 1,500 -feet maximum perimeter area. Exception: If there are size
constraints inherent in the original parcel.
• Parking lot entrances, driveways, and other vehicular access points shall be restricted to one
entrance and exit lane per 500 linear feet as measured horizontally along the street.
• A pedestrian circulation system of pathways that are clearly delineated and connect
buildings, open space, and parking areas with the sidewalk system and abutting properties
shall be provided.
• Architectural elements that incorporate plants, particularly at building entrances, in publicly
accessible spaces and at facades along streets, shall be provided.
• Amenities such as outdoor group seating, benches, transit shelters, fountains, and public art
shall be provided.
• All mixed use residential and attached housing developments of ten (10) or more dwelling
units shall provide common open space and/or recreation areas. At minimum, 50 square
feet per unit shall be provided. Please refer to RMC 4-3-100E.4 Recreation Areas and
Common Open Space for a menu options on how to meet the open space requirements.
• All buildings and developments with over 30,000 square feet of nonresidential uses
(excludes parking garage floorplate areas) shall provide pedestrian -oriented space. The
pedestrian -oriented space shall be provided according to the following formula: 1% of the
site area + 1% of the gross building area, at minimum. Please refer to RMC 4-3-100E.4
Recreation Areas and Common Open Space for a menu options on how to meet the
pedestrian oriented space requirements.
• All building facades shall include measures to reduce the apparent scale of the building and
add visual interest. Examples include modulation, articulation, defined entrances, and
display windows.
• All buildings shall be articulated with one or more of the following: Defined entry features;
Bay windows and/or balconies; Roof line features; or other features as approved by the
Administrator.
• Single purpose residential buildings shall feature building modulation as follows:
20
Cedar River Apartments
Preapplication Meeting
May 18, 2017
• The maximum width (as measured horizontally along the building's exterior)
without building modulation shall be forty feet (40').
• The minimum width of modulation shall be fifteen feet (15').
• The minimum depth of modulation shall be greater than six feet (6).
• All buildings greater than one hundred sixty feet (160') in length shall provide a variety of
modulations and articulations to reduce the apparent bulk and scale of the facade or
provide an additional special design feature such as a clock tower, courtyard, fountain, or
public gathering area.
• Varied and interesting roof profiles are required. At least one of the elements are required;
extended parapets; feature elements projecting above parapets; projected cornices; or
pitched/sloped roofs.
• Building materials shall be durable, high quality, and consistent with more traditional urban
development, such as brick, integrally colored concrete masonry, pre -finished metal, stone,
steel, glass and cast -in-place concrete.
• Any facade visible to the public shall be comprised of at least fifty percent (50%) transparent
windows and/or doors for at least the portion of the ground floor facade that is between
four feet (4') and eight feet (8') above ground (as measured on the true elevation).
Shoreline Master Program: Portions of the site (areas within 200 -feet of the OHWM) are
located within the Shoreline High Intensity — Cedar River Reach C designation. This overlay
contains additional requirements related to setbacks, public access, and permits. Shoreline use
and development shall be carried out in a manner that prevents or mitigates adverse impacts to
ensure no net loss of ecological functions and processes. When there are conflicts between the
Shoreline Master Program regulations and the City -Wide Property Development Standards, the
master program shall prevail. Below are some of the Shoreline Master Program regulations that
apply to your proposal. Please refer to RMC 4-3-090 for master program regulations in their
entirety.
Allowed Use — Attached dwellings and commercial uses permitted in the COR zone are also
permitted in the Shoreline High Intensity designation.
Setbacks —100 -feet from Ordinary High Water Mark (OHWM). Buildings F, D, C and paved areas
near Building B are located within the 100 foot setback. The site plan will need to be re-
designed to accommodate the setback to implement the required buffer noted below.
Vegetation Conservation Buffer — Within the 100 -foot setback, the applicant will be required to
provide a vegetation buffer to the river. The master program has identified the following buffer
standards for the subject property's Cedar River Reach C designation: "Enhancement of native
riparian vegetation within the standard or modified buffers shall be provided upon
redevelopment of the north shore, except in areas where public/community access is provided.
The vegetation conservation buffer may be designed to incorporate floodplain management
features including floodplain compensatory storage." The site's required mitigation plan (noted
in the Critical Areas section of the memo) shall provide a buffer restoration plan and any
compensatory flood storage needed to offset the impacts of any new improvements within the
flood plain.
21
Cedar River Apartments
Preapplication Meeting
May 18, 2017
Building Height — 35 feet for buildings landward of 100 -feet from the OHWM or one-half of the
maximum height allowed in the underlying zone, whichever is greater; and have an upward,
landward transition at a slope of one vertical to one horizontal from the beginning height either
(a) until the line at which the maximum height allowed in the underlying zoning is reached (from
which line the height envelope shall extend landward at the maximum height allowed in the
underlying zoning), or (b) to the end of shoreline jurisdiction, whichever comes first. The
proposed residential buildings would be limited to 62.5 feet or 5 stories beginning at the 100 -
foot setback.
View Corridors - Where commercial, industrial, multiple use, multi -family and/or multi -lot
developments are proposed, primary structures shall provide for view corridors between
buildings where views of the shoreline are available from public right-of-way or trails. The
application shall identify whether any view corridors currently exist and if they do, how they
will be maintained post development.
Coverage — Up to five percent (5%) impervious surface is allowed in vegetation conservation
buffers/setbacks for access to the shoreline, or a pathway up to six feet (6') wide, whichever is
greater. In addition, for projects that provide public access and the opportunity for substantial
numbers of people to enjoy the shoreline, up to twenty five percent (25%) impervious surface is
allowed; provided, that no more than five percent (5%) impervious surface is allowed closer
than twenty five feet (25') from OHWM.
Public Access — New multi -family development is required to provide public access and/or
ecological restoration along the water's edge. The master program has identified the following
public access requirements for the subject property's Cedar River Reach C designation:
"Public/community access along the waterfront should be provided as private lands on the
north side of the river redevelop, considered along with the goal of restoration of ecological
functions. Public or community access shall be provided when residential development occurs
consistent with standards of the Shoreline Master Program." The development will require a
trail component along the subject property's shoreline providing a connection to the abutting
Cedar River Park trail.
Critical Areas: The City's COR mapping system indicates portions of the property are within the
Cedar River Floodway and Special Flood Hazard Area. The elevation of the Floodway can change
the SMP jurisdiction with regard to buffers, setbacks, and the extent of the overlay. The
Floodway must be accurately delineated on all plans submitted with the land use application.
Pursuant to the FEMA Flood Insurance Rate Maps, the subject property contains a Special Flood
Zone AE which is classified as a 100 -year flood plain. Flood Hazard Data shall be submitted with
the land use application pursuant to RMC 4-8-120D. Development shall not reduce the effective
base flood storage volume of the floodplain. If grading would reduce the effective storage
volume, compensatory storage shall be created on the site or off the site if legal arrangements
can be made to assure that the effective compensatory storage volume will be preserved over
time. Compensatory storage shall be configured so as not to trap or strand salmonids after flood
waters recede and may be configured to provide salmonid habitat or high flow refuge whenever
suitable site conditions exist and the configuration does not adversely affect bank stability or
existing habitat.
The site is also located within a Zone 1 Wellhead Protection Area. The overall purpose of the
Wellhead protection regulations is to protect aquifers used as potable water supply sources by
the City from contamination by hazardous materials. Some uses are restricted that store,
22
Cedar River Apartments
Preapplication Meeting
May 18, 2017
handle, treat, use, or produce substances that pose a hazard to groundwater quality. If fill is
used, then a fill source statement is needed.
The site is also located in a Seismic Hazard Area. The seismic hazard is related to potential
liquefaction of soils during an earthquake event. A geotechnical analysis for the site is required.
The analysis needs to assess soil conditions and detail construction measures to assure building
stability.
Please refer to RMC 4-8-120 Submittal Requirements for detailed information regarding the
items that must be included in each of the following reports/studies that will be required with
the land use application:.
• Geotechnical Report — The report shall demonstrate the proposed development can be
safely accommodated on the site.
• Habitat Data Report — The assessment shall determine the extent, function and value of the
critical habitat and potential for impacts and mitigation consistent with report submittal
requirements.
• Biological Assessment/Critical Area Study — A biological assessment/critical area study is a
written study that evaluates the proposal, all probable impacts and risks related to the
critical area, and recommends appropriate mitigation measures to adequately protect the
functions and values of the critical area, and preserve anadromous fish and their habitat.
• Standard Stream Study and Mitigation Plan — Delineation and classification of the water
body along with topography, drainage patterns, floodplain boundary, and location of
existing and proposed structures in relation to the river and its buffer. The mitigation plan
provide for the vegetative buffer plantings, discussion of how the project meets or exceeds
the standard of no net loss of ecological functions, and a maintenance and monitoring plan.
• Flood Hazard Data — Plans that identify proposed improvements and their corresponding
elevations in relation to mean sea level of the lowest floor of all structures; Certification by a
Professional Engineer or Architect the flood proofing methods criteria in RMC 4-3-050G.4.c
have been met; and Description of the extent to which a watercourse will be altered or
relocated as a result of proposed development.
It is the applicant's responsibility to ascertain whether any additional critical areas or
environmental concerns are present an the site during site development or building
construction.
Environmental Review: The proposal exceeds several State Environmental Policy Act (SEPA)
WAC 197-11-800 categorical exemptions and the presence of critical areas on the property will
subject the application to Environmental Review. An environmental checklist must be
submitted with the land use application.
Permit Requirements —A Master Plan application, Shoreline Substantial Development Permit,
and SEPA Threshold Determination would be required. The project would also require a public
hearing and Hearing Examiner's decision. The purpose of the master plan process is to evaluate
projects at a broad level and provide guidance for development projects with multiple buildings
on a single large site. Where a master plan is approved, subsequent site plans submitted for
future phases may be submitted and approved administratively without a public hearing. Also,
23
Cedar River Apartments
Preapplication Meeting
May 18, 2017
the applicant may submit a Site Plan Review application for the initial phase of the project to be
reviewed concurrently with the master plan application.
The Master Plan application, initial Site Plan Review, Shoreline Substantial Development Permit,
and SEPA review can be processed concurrently in an estimated time frame of 12 weeks once a
complete application is accepted. The 2017 Hearing Examiner Master Plan Review application
fee is $3,500.00, Hearing Examiner Site Plan Review $3,500.00 Shoreline Substantial
Development Permit fee is $2,500.00, and the SEPA checklist fee is $1,500.00. There is currently
an additional 3% technology fee at the time of land use application. Be advised the technology
fee will be increased later this year. Detailed information regarding the land use application
submittal is provided on the City's website. Search "Land Use Forms" in the search bar for
handouts and checklists. The City now requires all plans to be submitted electronically per the
Electronic Review Standards, which can also be reviewed on the City's website.
In addition to the required land use permits, separate construction, building and sign permits
would be required. Applications may be submitted after the issuance of the above -referenced
land use permits.
Public Information Sign: The applicant is required to install a proposed land use action sign on
the subject property per the specifications provided in the accompanied public information sign
handout. The applicant is solely responsible for the construction, installation, maintenance,
removal, and any costs associated with the sign.
Neighborhood Meeting Requirement: Projects estimated by the City to have a monetary value
equal to or greater than $10,000,000 requires the applicant to conduct a neighborhood
meeting. The meeting shall be held at a location open to the public within Renton city limits, at a
location no further than two (2) miles from the project site. The applicant is required to mail a
written notice announcing the neighborhood meeting to property owners within 300 -feet of the
subject property. The neighborhood meeting is intended to be a developer -neighborhood
interaction. City staff members are not required to attend and/or participate in neighborhood
meetings. Please see the attached RMC 4-8-090A for the complete neighborhood meeting
requirements.
Public Outreach Sign: Projects estimated by the City to have a monetary value equal to or
greater than $10,000,000 requires the applicant to install a public outreach sign. Public outreach
signs are intended to supplement information provided by public information signs by allowing
an applicant to develop a personalized promotional message for the proposed development.
The sign is also intended to provide the public with a better sense of proposed development by
displaying a colored rendering of the project and other required or discretionary information
that lends greater understanding of the project.
Impact Fees: In addition to the applicable building and construction fees, the following 2017
impact fees would be required prior to the issuance of building permits.
• A Fire Mitigation fee currently assessed at $718.56 per new dwelling unit and $0.21 per
square foot of general office.
• A Transportation Mitigation Fee assessed at $3,358.55 per new apartment unit; $7.29
per square foot for general office.
• A Renton School District Impact Fee currently assessed at $1,448.00 per new multi-
family unit.
24
Cedar River Apartments
Preapplication Meeting
May 18, 2017
• A Parks Impact Fee currently assessed at $1,858.95 per new dwelling unit.
Next Steps: When the formal application materials are complete, the applicant is strongly
encouraged to have one copy of the application materials pre-screened at the 6th floor front
counter prior to submitting the complete application package. Please contact Matthew Herrera,
Senior Planner at 425-430-6593 or mherrera@rentonwa.gov to schedule an appointment.
Expiration: For non -phased plans, The Hearing Examiner shall determine, and document in
writing, an appropriate expiration date for the master plan, granting up to five (5) years. An
applicant shall submit a complete site plan application for the development within the specified
time frame if a site plan was not combined with the master plan application. The Administrator
may grant a one year extension for good cause. For phased plans, The Hearing Examiner may
grant master plan approval for large projects planned to be developed or redeveloped in phases
over a period of years exceeding the five (5) year time limit for non -phased plans. Such approval
shall include clearly defined phases and specific time limits for each phase and a determination
of eligibility for any extensions of the time limits.
25