HomeMy WebLinkAboutP_Color_Renderings_Plans_190118_V2.pdfFUTURE COMMERICAL BUILDING PAD
PHASE III
FIRE LANE.SEE CIVIL DRAWING.PHASE I PHASE II
82'-3 3/4"382'-11 1/4"176'-0 1/2"73'-2 3/8"2 5 1 '-1 1 1 /2 "31'-5 3/8"194'-0 3/8"19'-10 1/8"20'-0"354'-2 1/8"
97'-6 3/4"
289'-2 1/8"134'-7 1/2"3
1'-1
1 1/4"
57'-5 7/8"
58'-5 1/8"1 0 5 '-2 3 /4 "5 4 '-3 1 /2 "154'-11 7/8"311'-2 1/2"200'-8 1/4"
161'-6 1/2"
161'-2 1/2"
120'-10"
3 0 '-2 1 /2 "50'-0 7/8"CEDAR RIVER
ADJACENT
COMMUNITY CENTER
PARKING
PROPOSED PARKING
PROPOSED PARKING
R.O.W CENTER90'-3"100' OFFSET1% CHANCE ANNUAL FLOOD BOUNDARY
EXISTING CONC WALL W/3'CLF
LIGHT POLE
WITH LANE
TRANSITION
SIGN
BUS STOP
SIGN
TRAFFIC SIGNAL
POLE WITH SIGN
RENTON
COMMUNITY
CENTER
EXISTING TRUCK WASH AREA
ACCESS RISER
FOR VAULT
SIGN, "NO
JAKE BRAKE"
SIGN,
"BURIED FIBER
OPTICS"
SIGN, "40
MPH"
SIGN, "MILE 25"
EXISTING CONC WALL W/3'CLF
48" CMP DRYWELLS
SLOPE EASEMENT REC. NO.
20070716001844
EXISTING FENCE.
SEE SURVEY.
OVERHEAD POWER LINES
OVERHEAD POWER LINES
EXISTING LIGHTS
EXISTING FENCE.
SEE SURVEY
WEST COURTYARD
EAST COURTYARD
CENTRAL COURTYARD
ACCESS MANHOLE
M
A
P
L
E
V
A
L
L
E
Y
H
W
Y
CEDAR RIVER PARK
FUTURE COMMERICAL BUILDING PAD
PHASE III
25,000 S.F.
N85°40’33”W
298.77’
SCALE:
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY HWY
RENTON, WA 98055
CEDAR RIVER APARTMENTS
SITE PLAN
FUTURE COMMERICAL BUILDING PAD
PHASE III
FIRE LANE.SEE CIVIL DRAWING.PHASE I PHASE II
82'-3 3/4"382'-11 1/4"176'-0 1/2"73'-2 3/8"2 5 1 '-1 1 1 /2 "31'-5 3/8"194'-0 3/8"19'-10 1/8"20'-0"354'-2 1/8"
97'-6 3/4"
289'-2 1/8"134'-7 1/2"3
1'-1
1 1/4"
57'-5 7/8"
58'-5 1/8"1 0 5 '-2 3 /4 "5 4 '-3 1 /2 "154'-11 7/8"311'-2 1/2"200'-8 1/4"
161'-6 1/2"
161'-2 1/2"
120'-10"
3 0 '-2 1 /2 "50'-0 7/8"CEDAR RIVER
ADJACENT
COMMUNITY CENTER
PARKING
PROPOSED PARKING
PROPOSED PARKING
R.O.W CENTER90'-3"100' OFFSET1% CHANCE ANNUAL FLOOD BOUNDARY
EXISTING CONC WALL W/3'CLF
LIGHT POLE
WITH LANE
TRANSITION
SIGN
BUS STOP
SIGN
TRAFFIC SIGNAL
POLE WITH SIGN
RENTON
COMMUNITY
CENTER
EXISTING TRUCK WASH AREA
ACCESS RISER
FOR VAULT
SIGN, "NO
JAKE BRAKE"
SIGN,
"BURIED FIBER
OPTICS"
SIGN, "40
MPH"
SIGN, "MILE 25"
EXISTING CONC WALL W/3'CLF
48" CMP DRYWELLS
SLOPE EASEMENT REC. NO.
20070716001844
EXISTING FENCE.
SEE SURVEY.
OVERHEAD POWER LINES
OVERHEAD POWER LINES
EXISTING LIGHTS
EXISTING FENCE.
SEE SURVEY
WEST COURTYARD
EAST COURTYARD
CENTRAL COURTYARD
ACCESS MANHOLE
M
A
P
L
E
V
A
L
L
E
Y
H
W
Y
CEDAR RIVER PARK
N85°40’33”W
298.77’
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY HWY
RENTON, WA 98055
CEDAR RIVER APARTMENTS
NEIGHBORHOOD DETAIL MAP
SCALE: 1” =50’-0”
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC3GV1FC1GV1GV1GV2FC3RA2M2
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.10.31
2018.10.31
MASTER SITE PLAN APPROVAL
As indicated
2018.10.19
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING A -
(NORTH) FACADE
A3.1
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.1
1 BUILDING A - NORTH ELEVATION
KEY PLAN
A
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC3 GV1 COL1
M5
RA2
GV1GV1FC2M1M3 FC1
AC2
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.10.31
2018.10.31
MASTER SITE PLAN APPROVAL
As indicated
2018.10.19
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING A -
(EAST) FACADE
A3.2
KEY PLAN
A
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.2
1 BUILDING A - EAST FACADE
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
GV1RA1GV1GV1M2FC2
10'-6"10'-6"10'-6"10'-6"10'-6"AC2
RA2
FC3
GV1GV1FC3RA1
M5
COL1
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.10.31
2018.10.31
MASTER SITE PLAN APPROVAL
As indicated
2018.10.19
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING A -
(SOUTH) FACADE
A3.3
KEY PLAN
A
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.3
1 BUILDING A - SOUTH ELEVATION
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
M1GV1FC2GV1FC3GV1
GS1
M3
M5
RA2
GV2
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
RA3GS1ED1FC3
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.10.31
2018.10.31
MASTER SITE PLAN APPROVAL
As indicated
2018.10.19
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING A -
CENTRAL
COURTYARD (EAST
& SOUTH) FACADE
A3.4
KEY PLAN
A
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.4
1 BUILDING A - CENTRAL COURTYARD (EAST) FACADE
SCALE:1/16" = 1'-0"A3.4
2 BUILDING A - CENTRAL COURTYARD (SOUTH) FACADE
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
M3 M1FC2GV1 GV1FC3COL1
FC1
GV1FC3
M5
RA2
AC2
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC2 GV1M3GV2M1GV2
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
M1 GV2 M3 FC2 GV1 FC3GV1
FC1
RA2
M5
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.10.31
2018.10.31
MASTER SITE PLAN APPROVAL
As indicated
2018.10.19
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING A - WEST
COURTYARD (WEST,
SOUTH, & EAST)
FACADE
A3.5
KEY PLAN
A
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.5
1 BUILDING A - WEST COURTYARD (WEST) FACADE
SCALE:1/16" = 1'-0"A3.5
2 BUILDING A - WEST COURTYARD (SOUTH) FACADE
SCALE:1/16" = 1'-0"A3.5
3 BUILDING A - WEST COURTYARD (EAST) FACADE
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC1 FC1
GS1
FC1
FC2GV1M3GV2M1GV1
GS1
FC3M2
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.10.31
2018.10.31
MASTER SITE PLAN APPROVAL
As indicated
2018.10.19
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING B -
(NORTH) FACADE
A3.6
KEY PLAN
B
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.6
1 BUILDING B - MAPLE VALLEY HWY - NORTH FACADE
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC3FC1FC2M1
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.10.31
2018.10.31
MASTER SITE PLAN APPROVAL
As indicated
2018.10.19
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING B -
CENTRAL
COURTYARD (WEST)
FACADE
A3.8
KEY PLAN
B
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.8
1 BUILDING B - CENTRAL COURTYARD (WEST) FACADE
REVISIONS
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
FC1 GV1 GV1RA1
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.10.31
2018.10.31
MASTER SITE PLAN APPROVAL
As indicated
2018.10.19
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING B -
(SOUTH) FACADE
A3.9
KEY PLAN
B
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
SCALE:1/16" = 1'-0"A3.9
1 BUILDING B - (SOUTH) FACADE
REVISIONS
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.10.31
2018.10.31
MASTER SITE PLAN APPROVAL
As indicated
2018.10.19
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING B - EAST
COURTYARD (WEST,
SOUTH, & EAST)
FACADE
A3.10
SCALE:1/16" = 1'-0"A3.10
1 BUILDING B - EAST COURTYARD (WEST) FACADE
SCALE:1/16" = 1'-0"A3.10
2 BUILDING B - EAST COURTYARD (SOUTH) FACADE
SCALE:1/16" = 1'-0"A3.10
3 BUILDING B - EAST COURTYARD (EAST) FACADE
KEY PLAN
B
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
REVISIONS
LEVEL 1
EL. 52' - 0"
LEVEL 2
EL. 62' - 6"
LEVEL 3
EL. 73' - 0"
LEVEL 4
EL. 83' - 6"
LEVEL 5
EL. 94' - 0"
ROOF LEVEL
EL. 104' - 6"
1. REFER TO T SERIES FOR PROJECT AND ZONING ANALYSIS, ZONING DIAGRAMS, DEPARTURE
REQUESTS, AND HEIGHT DIAGRAMS
2. FLOOR LEVEL ELEVATIONS INDICATED ARE TO TOP OF CONCRETE AT CONCRETE FLOOR
ASSEMBLIES AND TOP OF GYPCRETE AT WOOD FLOOR ASSEMBLIES
3. ALL EXTERIOR LIGHTING TO BE SHIELDED AND DIRECTED AWAY FROM ADJACENT USES
EXTERIOR ELEVATION NOTES:
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.10.31
2018.10.31
MASTER SITE PLAN APPROVAL
As indicated
2018.10.19
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
BUILDING
ELEVATIONS -
BUILDING B - EAST
COURTYARD (WEST)
FACADE
A3.11
SCALE:1/16" = 1'-0"A3.11
1 BUILDING B - (EAST) FACADE
KEY PLAN
B
ELEVATION KEY NOTE LEGEND
# DESCRIPTION
AC2 ARCHITECTURAL CONCRETE - BOARD FORMED
COL1 WOOD COLUMN
ED1 MULTI-SLIDING DOOR
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: WHITE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(COLOR: LIGHT BLUE)
FC3 PAINTED FIBER CEMENT PANEL (WOOD TONE)
GS1 STOREFRONT SYSTEM - DARK BRONZE ANODIZED
GV1 VINYL WINDOWS (WHITE)
GV2 VINYL WINDOWS (BLACK)
M1 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M2 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M3 METAL PANEL (AEP SPAN PRESTIGE PLUS)
M5 METAL STANDING SEAM ROOF
RA1 STEEL RAILING W/ PREFORATED METAL PANEL INSETS
RA2 STEEL RAILING W/ METAL PANEL
RA3 STEEL RAILING W/ GLASS INSETS
REVISIONS
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
REVISIONS
A3.12
BLDG ELEVATIONS -
OFFICE BLDG - NORTH
PC1 FC2 GS1 FC1 BR1GS1GS1
±0.00'
LEVEL 1
+10.50'
LEVEL 2
+21.00'
ROOF
# DESCRIPTION
BR1 BRICK (TAN AGED )
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(SW 6127 IVOIRE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(SW 7004 SNOWBOUND)
GS1 STOREFRONT SYSTEM
PC1 PARAPET CAP (SW 6104 KAFFEE)
SC1 STEEL CANOPY W/ TIEBACKS
ELEVATION KEY NOTE LEGEND
SCALE: 1/8" = 1'-0"1 NORTH BUILDING ELEVATION
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
REVISIONS
A3.13
BLDG ELEVATIONS -
OFFICE BLDG - WEST
BR1PC1FC2GS1FC1GS1GS1
±0.00'
LEVEL 1
+10.50'
LEVEL 2
+21.00'
ROOF
# DESCRIPTION
BR1 BRICK (TAN AGED )
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(SW 6127 IVOIRE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(SW 7004 SNOWBOUND)
GS1 STOREFRONT SYSTEM
PC1 PARAPET CAP (SW 6104 KAFFEE)
SC1 STEEL CANOPY W/ TIEBACKS
ELEVATION KEY NOTE LEGEND
SCALE: 1/8" = 1'-0"1 WEST BUILDING ELEVATION
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
REVISIONS
A3.14
BLDG ELEVATIONS -
OFFICE BLDG - SOUTH
BR1 PC1 FC1GS1
±0.00'
LEVEL 1
+10.50'
LEVEL 2
+21.00'
ROOF
# DESCRIPTION
BR1 BRICK (TAN AGED )
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(SW 6127 IVOIRE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(SW 7004 SNOWBOUND)
GS1 STOREFRONT SYSTEM
PC1 PARAPET CAP (SW 6104 KAFFEE)
SC1 STEEL CANOPY W/ TIEBACKS
ELEVATION KEY NOTE LEGEND
SCALE: 1/8" = 1'-0"1 SOUTH BUILDING ELEVATION
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
REVISIONS
A3.15
BLDG ELEVATIONS -
OFFICE BLDG - SOUTHEAST
BR1 PC1 FC2 GS1 FC1GS1GS1 SC1
±0.00'
LEVEL 1
+10.50'
LEVEL 2
+21.00'
ROOF
# DESCRIPTION
BR1 BRICK (TAN AGED )
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(SW 6127 IVOIRE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(SW 7004 SNOWBOUND)
GS1 STOREFRONT SYSTEM
PC1 PARAPET CAP (SW 6104 KAFFEE)
SC1 STEEL CANOPY W/ TIEBACKS
ELEVATION KEY NOTE LEGEND
SCALE: 1/8" = 1'-0"1 SOUTHEAST BUILDING ELEVATION
SHEET
DRAWN:
SCALE:
JOB # :
DATE:SUBMITTALS
SHORELINE SUBSTANTIAL
DEVELOPMENT PERMIT
2018.11.08
2018.11.08
MASTER SITE PLAN APPROVAL
As indicated
2018.11.01
18-119
CEDAR RIVER
APARTMENTS
1915 MAPLE VALLEY
HWY, RENTON, WA
98055
REVISIONS
A3.16
BLDG ELEVATIONS -
OFFICE BLDG - EAST
PC1 FC1GS1BR1
±0.00'
LEVEL 1
+10.50'
LEVEL 2
+21.00'
ROOF
# DESCRIPTION
BR1 BRICK (TAN AGED )
FC1 FIBER CEMENT PANEL (HARDIE REVEAL 2)(SW 6127 IVOIRE)
FC2 FIBER CEMENT PANEL (HARDIE REVEAL 2)(SW 7004 SNOWBOUND)
GS1 STOREFRONT SYSTEM
PC1 PARAPET CAP (SW 6104 KAFFEE)
SC1 STEEL CANOPY W/ TIEBACKS
ELEVATION KEY NOTE LEGEND
SCALE: 1/8" = 1'-0"1 EAST BUILDING ELEVATION