CITY OF RENTON COUNCIL AGENDA BILL
Subject/Title:
Amend the 2015-2020 Six-Year Transportation
Improvement Plan
Meeting:
REGULAR COUNCIL - 09 Feb 2015
Exhibits:
TIP 36
TIP 37
TIP 38
Draft Amended 2015-2020 Six-Year TIP Document Resolution
Submitting Data: Dept/Div/Board:
Public Works
Staff Contact:
Juliana Fries, Program Development
Coordinator, extension 7232
Recommended Action:
Refer to Transportation/Aviation Committee and Set the
Public Hearing Date of February 23, 2015
Fiscal Impact:
Expenditure Required: $ Transfer Amendment: $
Amount Budgeted: $ Revenue Generated: $
Total Project Budget: $ City Share Total Project: $
SUMMARY OF ACTION:
The City is required by law to annually review the Six-Year Transportation Improvement Plan (TIP) and
adopt any updates by City Council Resolution. The 2015-2020 TIP was approved by Council on August 4,
2014 via Resolution 4222.
In December 2014, the City was awarded 2 grants from the Bridge Replacement Advisory Committee
(BRAC). Grants are for the North 27th Place Bridge, in the amount of $481,474, and the NE 31st Street
Bridge, in the amount of $1,222,095. As a requirement of the grants, the two projects need to be
included in the current TIP as a complete programmed project. In addition, it is proposed that the Sunset
Lane project is added to the TIP; $320,000 will be transferred from the General Fund and incorporated
into the upcoming Carry Forward Ordinance. This project was not included when the TIP was adopted in
July 2014. This amendment to the 2015-2020 TIP will comply with the requirement set for federally
funded projects.
STAFF RECOMMENDATION:
1. Approve the amendment to the 2015-2020 Six-Year Transportation Improvement Plan.
2. Set February 23, 2015 as the public hearing to amend the 2015-2020 TIP.
3. Present the Resolution regarding this matter for reading and adoption.
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2015 -2020 TRANSPORTATION IMPROVEMENT PROGRAM -AMENDED
Sunset Lane/NE 10th St Roadway Improvements Functional Classification:N/A Fund:317
Proj.Length:Proj:122122
Community Planning Area:Highlands TIP No.36 CONTACT:Keith Woolley 425.430.7318
DESCRIPTION:STATUS:
This project will reconstruct Sunset Lane to accomodate a 2 lane roadway with on-street parallel and This project was one of the multi-modal improvements identified in the Sunset Area Green
angle parking.The project will also extend NE 10th St (Harrington Ave NE to Glenwood Ave NE).Connection (TIP #13).This project was separated from the Sunset Area Green
Includes roadway pavement,curbs,sidewalks,landscape buffer,ADA improvements,drainage,lighting,Connection as funded for 30%design has been indetified.Funding for final design and
signing and channelization.construction of the project is undetermined.
JUSTIFICATION:CHANGES:
The improvements are key to support the redevelopment of the Sunset Area Community in the Highlands
area.The City is in partnership with the Renton Housing Authority to redevelop the Sunset Terrace public
housing community.The goal is to encourage private development and support the new public library
and the Sunset Neighborhood Park as proposed in the Planned Action Study area.
IFunded:320,000 lUnfunded:__J4,445,000
Project Totals Programmed Pre-2015 Six-Year Program
ITEM Programmed Spent Pre-2014 2014 Total 2015 2016 2017 2018 2019 2020
EXPENSES:I
Planning 10,000 10,000 10,000 -
Preliminary Engineering 790000 790,000 310,000 480,000
R-O-W (includes Admin)---—
Construction 3,165,000 I 3,165,000 3,165,000 —
Construction Services 800,000 800,000 800,000
Post Construction Services
TOTAL EXPENSES 4,765,000 4,765,000 320,000 480,000 3,965,000
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee -—
ProposedFundBalance -I ----
Grantsln-Hand(1)-
-I -----
Grants In-Hand (2)-—---—-
--Mitigation In-Hand
Other In Hand (General Fund tran 320000 —320 000 320 000
Other In-Hand (2)
Undetermined 4,445,000 4,445,000 480,000 3,965,000
TOTAL SOURCES 4,765,000 4,765,000 320,000 480,000 3,965,000
01/2812015 1222 P1.1Uod
5-36 AMENDED -DRAFT
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2015 -2020 TRANSPORTATION IMPROVEMENT PROGRAM -AMENDED
NE 31st St Bridge Replacement Functional Classification:N/A Fund:317
Proj.Length:Proj:
Community Planning Area:Kennydale TIP No.37 CONTACT:Derek Akesson 425.430.7337
DESCRIPTION:STATUS:
The NE 31st Street Bridge (aka May Creek Bridge)was built by King County in 1950.The area was A grant in the amount of $1,222,095 from the 2014 Bridge Federal Funding was awarded
annexed into the City in 1960.This project will replace the existing substandard bridge.The sufficiency for this project in 2014.A 20%match is required for preliminary engineering and right-of-
rating of the existing structure is 27 SD.Per WSDOT standards,bridges with sufficiency rating below 40 way.Projects that obtain construction authorization by September2018 are eligible for a
SD are recommended replacement.lower local match of 13.5%for the construction phase (otherwise,the local match is 20%
for the construction phase).
JUSTIFICATION:CHANGES:
The NE 31st St serves as the only public access to several homes.The existing bridge is built on timber New project.
piles.Two of the piles have been red tagged due to advance rot near the groundline.Temporary shoring
has been installed at the central pier to support the load capacity of the bridge (without the temporary
supports the bridge may require closure).However the temporary supports are not scour resistant (with
high creek flows they could wash out).
Funded:1,436,900 Unfunded:__I
Project Totals Programmed Pre-2015 Six-Year Program
ITEM Programmed Spent Pre-2014 2014 Total 2015 2016 2017 2018 2019 2020
EXPENSES:
Planning
-—-Preliminary Engineering 280,000 280,000 —-252,000 28,000
R-O-W (includes Admin)40,000 1 40,000 36,000 4,000 -
Construction 915,000 915,000 --—823,500 91,500 --
Construction Services 201,900 201,900 181,800 20,100 -
Post Construction Services
TOTAL EXPENSES 1,436,900 1,436,900 288,000 1,037,300 111,600
SOURCE OF FUNDS:
‘Jehicle Fuel Tax -
Business License Fee
-
Proposed Fund Balance -----VGrantsIn-Hand (Bridge)1,222,095 1,222,095 -230,400,895,185 96,510 —
Grantsln-Hand(2)
•--Mitigation In-Hand
--
Otherln Hand (CityFunds)214805 214805 57600 142115 15090
Other In-Hand (2)——-
Undetermined
TOTAL SOURCES 1,436,900 1,436,900 288,000 1,037,300 111,600
5 -37 AMENDED -DRAFT
Ol’2W2015 2.22 PMUnd
CITY OF RENTON
PUBLIC WORKS
TRANSPORTATION SYSTEMS DIVISION
2015 -2020 TRANSPORTATION IMPROVEMENT PROGRAM -AMENDED
N 27th P1 Culvert Scour Repair Functional Classification:N/A Fund:317
Proj.Length:Proj:
Community Planning Area:Kennydale TIP No.38 CONTACT:Derek Akesson 425.430.7337
DESCRIPTION:STATUS:
As part of the Clover Creek development,a new street was constructed over Kennydale Creek.This A grant in the amount of $481,474 from the 2014 Bridge Federal Funding was awarded for
project will provide scour mitigation for the N 27th P1 Culvert.This bridge is 20-foot long and is located on this project.A 10%match is required for preliminary engineering and right-of-way.No
a residential street.The mitigation consists of placement of concrete under the exposed footing,match is required for construction if authorization is obtained by Sep 2018.
placement of streambed sediment and cobbles to armor the channel.
JUSTIFICATION:CHANGES:
The stream has scoured down to below one of the spread footings.A load rating and scour plan of action New project.
have recently been done for this structure.
IFunded:1492,474 Unfunded:__I
Project Totals Programmed Pre-2015 Six-Year Program
ITEM Programmed Spent Pre-2014 2014 Total 2015 2016 2017 J 2018 2019 2020
EXPENSES:
Planning ---—---Preliminary Engineering 85,000 85,000 76,500 8,500 --
R-O-W (includes Admin)-—25,000 25,000 22,500 2,500
Construction 270,000 --270,000 243,000 27,000 -
Construction Services -112,474 -112,474 -101,220 11,254
Post Construction Services
TOTAL EXPENSES 492,474 492,474 99,000 355,220 38,254
SOURCE OF FUNDS:
Vehicle Fuel Tax
Business License Fee
Proposed Fund Balance -----—---
Grants In-Hand (Bridge)481,474 -----—-481,474 89,100 354,120 38,254
Grantsln-Hand(2)--
Mitigation In-Hand --
Other In Hand (City Funds)11 000 11 000 9900 1 100 -—
Other In-Hand (2)-——-
Undetermined
TOTAL SOURCES 492,474 492,474 99,000 355,220 38,254
Und
5-38 AMENDED-DRAFT
Q282OTh 12,22 PM
CITYOFRENTON,WASHINGTONRESOLUTIONNO.__
__
__
_ARESOLUTIONOFTHECITYOFRENTON,WASHINGTON,AMENDINGTHECITY’SSIX-YEARTRANSPORTATIONIMPROVEMENTPROGRAM2015-2020.WHEREAS,theCityofRentonhasheretoforeadopteda“Six-YearTransportationImprovementProgram”pursuanttoRCW35.77.010,andtheplanandprogramhavingbeenamendedandmodifiedfromtimetotimeasauthorizedbylaw;andWHEREAS,theCityCouncil,afterrecommendationofthePublicWorksDepartment,heldapublichearingonFebruary23,2015,afternoticetothepublicasprovidedbylawforthepurposeofconsideringadoption,modification,andamendmentsoftheplanandprogram;andWHEREAS,atthepublichearingheldonFebruary23,2015,dueconsiderationwasgiventotheproposedchangesandamendmentsforthepurposeofupdatingtheplanandprogram;NOW,THEREFORE,THECITYCOUNCILOFTHECITYOFRENTON,WASHINGTON,DOESRESOLVEASFOLLOWS:SECTIONI.Theabovefindingsaretrueandcorrectinallrespects.SECTIONII.TheCity’s“Six-YearTransportationImprovementProgram”isherebyamendedandmodified,asmoreparticularlyshownontheattachedExhibits“A”and“B”,incorporatedhereinasiffullysetforth.SECTIONIII.Theprogram,asevidencedbysaidExhibits,shallbeandconstitutetheCity’s“Six-YearTransportationImprovementProgram”,andshallremaininfullforceandeffectuntilfurtherrevised,amended,andmodifiedasprovidedbylaw.1
RESOLUTIONNO.SECTIONIV.TheAdministratorofthePublicWorksDepartmentandtheCityClerkareherebyauthorizedanddirectedtofilethisResolution,togetherwiththeExhibits,withtheDirectorofHighwaysfortheStateofWashingtonandasotherwiseprovidedbylaw.PASSEDBYTHECITYCOUNCILthisdayof___
_
__
_
__
_
___
_
__
_
,2015.JasonA.Seth,CityClerkAPPROVEDBYTHEMAYORthisdayof__
___
_
__
_
__
_
___
_
__
_
,2015.DenisLaw,MayorApprovedastoform:LawrenceJ.Warren,CityAttorneyRES.1660:1/16/15:scr2