CITY OF RENTON COUNCIL AGENDA BILL
Subject/Title:
Final Pay Estimate CAG 14-089
South 132nd Street Sewer Extension
Contractor: A Advanced Septic Services, Inc.
Meeting:
REGULAR COUNCIL - 26 Jan 2015
Exhibits:
Issue Paper
Map
Final Pay Estimate
Notice Of Completion of Public Works Contract
Submitting Data: Dept/Div/Board:
Public Works
Staff Contact:
John Hobson, Wastewater, x7279
Recommended Action:
Refer to Utilities Committee
Fiscal Impact:
Expenditure Required: $ $8,732.84 (Final Pay Est.) Transfer Amendment: $NA
Amount Budgeted: $ $10,000 Revenue Generated: $NA
Total Project Budget: $ $400,000 City Share Total Project: $ NA
SUMMARY OF ACTION:
The project was awarded on July 7, 2014; construction began on September 17, 2014 and was
completed on January 14, 2015. The original contract amount was $213,447.44 and the final amount is
$337,647.66, an increase of $124,200.22, or about 58%. The cost increase was due to additional
excavation, shoring and dewatering work that was needed due to extremely poor soils and higher than
expected groundwater within the roadway of South 132nd Street. The final cost was within the amount
budgeted for the project.
The approved 2014/2015 budget for the South 132nd Street Sewer Extension is $400,000. The amount
budgeted for this project is enough to cover City staff, consultant and construction costs of the project.
STAFF RECOMMENDATION:
Accept the project, approve the final pay estimate in the amount of $8,732.84 and release the
retainage in the amount of $15,417.70 after 60 days, subject to the receipt of all required
authorizations.
PUBUCWORKSDEPARTMENTMEMORANDUMDATE:January16,2015TO:EdPrince,CouncilPresidentMembersofRentonCityCouncilVIA:DenisLaw,MayorFROM:GreggZimmerman,PublicWorksAdministratorSTAFFCONTACT:JohnHobson,WastewaterUtilityEngineer,x7279SUBJECT:South132ndStreetSewerExtensionProjectISSUE:ShouldtheCityaccepttheprojectandapprovethefinalpayestimatefortheSouth132ndStreetSewerExtensionProject?Theoriginalcontractamountwas$213,447.44andthefinalamountis$337,647.66,anincreaseof$124,200.22,orabout58%.RECOMMENDATION:Accepttheproject,approvethefinalpayestimateintheamountof$8,732.84andreleasetheretainageintheamountof$15,417.70after60days,subjecttothereceiptofallrequiredauthorizations.BACKGROUNDSUMMARY:TheSouth132ndStreetSewerExtensionProjectinstalled785linearfeetof8-inchsanitarysewermainintheEarlingtonAcresneighborhood.ThisprojectwasconstructedtoprovidesewerservicetoaportionofRenton’ssewerserviceareathathasbeenisolatedfromexistingsewerlinesbyacreek(seeattachedmap).DuringtheportionofconstructionthattookplaceinSouth132Street,thecontractorencounteredgroundwaterquantitiesthatfarexceededthosethathavebeenencounteredbypreviousCityutilityprojectsinthisareaoftheCity.Thegroundwaterflowratewassohighthatitdestabilizedthesoilssurroundingthetrenchcausingconsiderablesloughingwhichleadtoanincreaseinthesewertrenchwidth.Thegroundwateralsocreatedasoftandunstabletrenchbasethatwasunsuitabletosupportthenewsewermain.Duetotheseconditions,thequantityoffoundationrockincreasedfromanoriginalestimateof15tonsto253tons,andimportedtrenchbackfillmaterialfromanoriginalestimateof1,150tonsto2,225tons.Additionaldewateringandtrenchshoringequipmentwasalsorequiredtopermitthesewerinstallation.The
Mr.Prince,CouncilPresidentPage2of2January16,2015trenchsloughingalsoincreasedtheasphaltpatchareafromanestimated425squareyardsto560squareyards.CONCLUSION:TheCityshouldaccepttheproject,approvethefinalpayestimateintheamountof$8,732.84andreleasetheretainageintheamountof$15,417.70after60days,subjecttothereceiptofallrequiredauthorizations.Attachmentcc:LysHornsby,UtilitySystemsDirectorDaveChristensen,Wa5tewaterUtilityEngineeringManagerFileH:\FileSys\WWP.WasteWater\WWP-27-36855132ndStSewerExtension\PayEstimates\lssuePaper-S132ndStSewerProjectClose-out.doc\JDHad
‘FRENTONSTREETSIONPROJECT27-3685LEGENDSHEETNO.SHEETTIRECOVER1teC2CONSTRUCTIONBASEUNEPLAN3SEWERPLANANDPROFILE-4SEWERPLANANDPROFILEBellevueWA98004-5jCIWOFRENTONSTD.DETAILS-
-—8www.stantec.com6JMISC.DETAILS-
-
---—iThSrMLS.BPLANTING&SOILSTABILIZATIONPLANS-.
•———--=Hfl—ITONPOJECTrDYWAYLOCATION;T0N98057-INEER(425)430-7279UTILITY(425)430-7212—VICINITYMAP911NTS1-800-424-5555
FROM:PUBLICWORKSADMINISTRATORTO:FINANCEDIRECTORAAdvancedSepticServices,ho.CAG-14-089PO#18/0001921ESTIMATEND.5(FINAL)PROJECT:South132ndStreetSewerExtension1.CONTRACTOREARNINGSTHISESTIMATE$7,975.202.SALESTAX@9.50%$757.643.TOTALCONTRACTAMOUNTTHISESTIMATE$8,732.844.EARNINGSPREVIOUSLYPAIDCONTRACTOR$285,359.895*EARNINGSDUECONTRACTORTHISESTIMATE$7,576.446.SUBTOTAL-CONTRACTORPAYMENTS$292,936.337.RETAINAGEONPREVIOUSEARNINGS$15,018.948.**RETAINAGEONEARNINGSTHISESTIMATE$398.769.SUBTOTAL-RETAINAGE$15,417.7010.SALESTAXPREVIOUSLYPAID$28,535.9911.SALESTAXDUETHISESTIMATE$757.6412.SUBTOTAL-SALESTAX$29,293.63*(95%xLINE1)“(RETAINAGE:5%)GRANDTOTAL:$337,647.66FINANCEDEPARTMENTACTION:PAYMENTTOCONTRACTOR(Lines5and11):ACCOUNT#426.465500.018.594.35.63.000RETAINEDAMOUNT(Line8):ACCOUNTft426.465500.018.594.35.63.000$8,334.08#5(FINAL)$398.76#5(FINAL)$8,334.08$398.76Signed:i14-“.,TOTALTHISESTIMATE:$8,732.84CONTRACTOR:CONTRACTNO.CHARTER116,LAWSOF1965CITYOFRENTONCERTIFICATIONI,THEUNDERSIGNEDDOHERESYCERTIFYUNDERPENALTYOFPERJURY,THATTHEMATERIALSHAVESEENFURNISHED,THESERVICESRENDEREDORTHELABORPERFORMEDASDESCFHEREIN,ANDTHATTHECLAIMISAJUST,DUEANDUNIOBLIGATIONAGAINSTTHECITYOFRENTON.ANDTHAAUTHORIZEDTOAUTHENTICATEANDCERTIFYTOPrintedOn:01/14/2015CityofRentonPublicWorksDepartmentPage1
PrintedOn:01/14/2015CityofRentonPublicWorksDepartmentPage1Project-South122ndStreetSewerExtensionContractNumberCAG-HaagContractorAAdvancedSepticServices,tnc.PayEstimate5(FtNAL)CtosingDate.01/15/2015ternDescriptionUnitEat.UnitPreviousPreviousThisThisTotatTotatNo.QuantityPriceQuantityAmountQuantityAmountQuantityAmountScheduteA001.MobitizationLumpSum153,75000002TrenchEacavationSafetySystemsLumpSum154,667.20003.ConstructionSurveying.Staking,andAs-au/taLumpSum1532t040004TrafficControtLumpSum1516.261.20Gas.TemocraryE’os.ocjSedmentaricnControtsLumpSrn15341549005SiteCear;ngandGrubb.rgLum;Sun159.9150000-7FurnishandtnstattB-incnPVCSawerRpeLinearFcot79553687009Furnishandtnsta’t6-nchPVCSdeSewerPpaLrreaFoot6053427002Furn.star.otn,stal19-tncnSteetCas’r.gw;ThAr.cno’EtcckaLumpSmI$3269000010.Fum,shandtnststt54-nonDiarn.SamrarySewerManroiaEach154.042,60011.Furnrsiand:ns,att48-richDarn.SanitarySewer.Ya,hc:eOath4$4847.65012Furnishandtnstalt48-inchDramSaddleManhoteEachI53.73379AemcvatandReptacen’entatUnsutabteFojndat.on0t3Matera.Ton1556000014BankRunGravetforTrenchBacktittSewerTon1150529500t5AsphasPatchinctudrgCSTC(DELErEDiSquareYard426532630i6RepacePavementWaringsandTnaNc&:tcnsLurroSumI5561003017.CnaLrkFenceLumpSm5392000018LandscaoeReatcrateonLumpSu-m154,70900019CDetAdditionatSideSawerLumpSumISI.35000020CO*IEtectronicReaderBoardsLumpSum154.2145402tCOUIAdditionatDarourSignageLumpSumI$3,95000022.COdLostProductionDueToPoorSoils-LumpSum155.940000230041AdditionatShoringLumpSum152,89200023CCCIDownrimeforUnmarkedAbandonedGasLineLumpSum153.980,02025C0*2AddirionalTrenchEacavationCoatLumpSum1534,20000026CO42AsphaltOverlayLumpSum1523.653,76080$3000000205750001CO53750.0010054597.205000ICO54.6872005051,6052005051.6052010053,210401.00515.25t.20sooa1.00516,261.201.0053.2194050001.0053.41940lCD59.9150050001,0050,915007950052892295500078500529922.95600052056205000600052055201.0053266000$000‘00532.68000lCD54.04260509010054042.60400519.390505000400519.390601.0053.7337650001.0053.73378253175151902050C0253.17515190.20222502565635095000222502565538.090.005000500000050000005000cO$562000too$5620001005392000SOCO1.0050620001CO54,708005000I005470800I0051.3500050001.005t35000100$4214545000100$42145410053.9500050001DO53.950001,00569400050001.0056540001,00529920050001.0052.992001.00$39990250001.0053,989.02100534,2000050001.00534,200001.00523,9537650001.0052385375
PrintedOn:01/14/2015CityofTRentonPublicWorksDepartmentPage2Project:South132ndStreetSewerExtentianContractNumberCAG-14089ContractorAAdvancedSepticServices.tncPayEstimate5(FtNAIJCtcsingDate01115/2015ternDescriptionUnitEatUnitPreviousPreviousThisThisTotalTotalNo.QuantityPriceQuantityAmountQuantityAmountQuantityAmount533037R83S79752353053540295uSatesTax$2253599$757.62529,29363Totat532a912S258732835337,647.669a*l,jaqI
NOTICEOFCOMPLETIONOFPUBLICWORKSCONTRACTContractor’sUBINumber:Date:60260340901/26/2015Noticeisherebygive,?relativetothecompletionofcontractorprojectdescribedbelowProjectNameContractNumberJobOrderContractingSouth132ndStreetSewerExtensionCAG-14-089DYesIZNoDescriptionofWorkDone/include,JobsiteAddress(es)Installationof785linearfeetof8”PVCsewermain,6manholesandassociatedroadrestoration.Federallyfundedroadtransportationproject?EYesENoContractor’sNameTelephoneNumberAffidavitLD*AAdvancedSepticServices,Inc.253-435-9999ContractorAddressI1603CanyonRdE,Puyallup,WA98373IfRetainageisBonded,ListSurety’sName(orattachacopy)N/ASuretyAgent’sAddressDateContractAwardedDateWorkCommencedDateWorkCompletedDateWorkAcceptedJuly7,2014September17,2014January14,20)5January26,2015ContractAmount$194,929.17Additions(+)$113,424.86LiquidatedDamages$Reductions(-)$AmountDisbursed$322,229.96Sub-Total$308,354.03AmountRetained$15,417.70AmountofSalesTaxPaidat9.500%(Ifvariousriflesapply,pleasesendabreakdown)$29,293.63TOTAL$337,647.66TOTAL$337,647.66NOTE:ThesetwototalssizustbeequalPleaseListallSubcontractorsandSub-tiersBelow:Subcontractor’sName:UBINumber:(Required)AffidavitLW’AspenLandSurveying,LLC602266387537406MulierConstructionLLC603391521NorthwestAsphaltinc601556048C&PFencing603210811MilesSand&GravelCompany171004760F215-038-00007-2012REV310020e(07/06/12)Name&AddressofPublicAgççy_CityofRenton1055SouthGradyWayRenton,WA98057UBINumber:177000094DepartmentUseOnlyAssignedto:DateAssigned:Continuedonpage2
PleaseListallSubcontractorsandSub-tiersBelow:SubcontractorsName:UBINumber:(Required)AffidavitID*Comments:HContactName:NatalieWissbrodTitle.AccountingAssistantEmailAddress:nwissbrod@rentonwa.govPhoneNumber:425-430-6919£LJLt.IIIOiMIUIiIWL)IIiLIIlIUMULIIiIItUiILUlIJILLLUOUULiiIiII&UIdWL)UIWia9)LdIlUILII•‘.tJikUUIiUIIUILIiItUIIUdL.NOPAYMENTSHALLBEMADEFROMRETAINEDFUNDSuntilreceiptofallreleasecertificates.AffidavitID*-Provideknownonesatthistime.NoLNIreleasewillhegranteduntilallaffidavitsarecompleted.SubmittingForm:Pleasesubmitthecompletedformtoallthreeagenciesbelow.Forafasterresponse,pleasesubmitbye-mail.WashingtonStatewashingtonState—“IashlngtonStater&epanmentofRevenueiepartmentofLaborandIndustriesamploymentSecurityDepartmentublicWorksSection:ontractRelease‘IP”’egistratin,Inquiry,Standards&‘0Box47474‘0Box44274,.,oordlnatianunitOlympiaWA98504-7474Olympia,WA98504-4272P0Box9046(360)725-7588(360)902-5772OlympiaWA98507-9046FAX(360)664-4159FAX(360)902-6897t360)902-9450pWc@dorwagovContractflelease@lni.wa.govFax(360)902-9287pubtcworks@esd.wa.govFortaxassistanceortorequestthisdocumentinanalternateformat,visithttp://dor.wa.govorcall1-800-647-7706.Teletype(TTY)usersmaycall(360)705-6718.P215-038-00007-2012REV310020e(07106112)
CITY OF RENTON COUNCIL AGENDA BILL
Subject/Title:
Request to Establish New Wastewater CIP Project
SE 165th Street Sanitary Sewer Main Extension
Meeting:
REGULAR COUNCIL - 02 Feb 2015
Exhibits:
Issue Paper
Map
Submitting Data: Dept/Div/Board:
Public Works
Staff Contact:
Dave Christensen, x7212
Recommended Action:
Refer to Utilities Committee
Fiscal Impact:
Expenditure Required: $ $150,000 Transfer Amendment: $$150,000
Amount Budgeted: $ 0 Revenue Generated: $NA
Total Project Budget: $ $150,000 City Share Total Project: $ NA
SUMMARY OF ACTION:
The Wastewater Utility is requesting to establish the SE 165th Street Sanitary Sewer Main Extension
Project to install sanitary sewer in a portion of SE 165th Street between 108th Avenue SE and the
existing alley to the west.
The project would be funded through the transfer of $150,000 from the existing 2015 Sewer Repair
Replacement Project (426/465507) and a special assessment district would be established to ensure
that each property that benefits from the sewer main extension will pay their fair share of the cost of
the installation as they make connection to the City sewer system.
The area is currently within Soos Creek Water and Sewer District’s service area, however the District
has agreed to transfer the service area to the City upon our request.
STAFF RECOMMENDATION:
Approve the establishment of the SE 165th Street Sanitary Sewer Main Extension project and approve
the request to transfer $150,000 from the 2015 Sewer Repair Replacement Project (426/465507) to fund
this new project.
PUBLICWORKSDEPARTMENTMEMORANDUMDATE:January15,2015TO:EdPrince,CouncilPresidentMembersofRentonCityCouncilVIA:DenisLaw,MayorFROM:GreggZimmermPcWorksAdministratorSTAFFCONTACT:DaveChristensen,WastewaterUtilityManager,x7212SUBJECT:RequesttoEstablishNewWastewaterCIPProjectSE165thStreetSanitarySewerMainExtensionISSUE:ShouldtheCity’sWastewaterUtilityestablishanewcapitalimprovementprojecttoextendsewerservicein165thStreetfrom103thAvenueSEtotheexistingalleyandtoestablishaprojectbudgetof$150,000tocompletetheprojectwork?RECOMMENDATION:ApprovetheestablishmentoftheSE165thStreetSanitarySewerMainExtensionProjectandapprovetherequesttotransfer$150,000fromthe2015SewerRepairReplacementproject(426/465507)tofundthisnewproject.BACKGROUNDSUMMARY:InNovemberof2014theCitywasapproachedbypropertyownersrepresentingnineexistinglotsthatfrontonSE165thStreet,between108thAvenueSEandtheexistingalleytothewest.TheneighborhoodhadbeenworkingwithSoosCreekWaterandSewerDistrict(District)toextendasanitarysewermaintoservetheblockofninehomes,buttheywereunabletocomeupwithasatisfactorymethod/pricefortheproject.TheDistrictatthattimeagreedtoallowtheneighborhoodtoapproachtheCitytoprovidetheserviceandtotransferthesewerserviceareafromtheDistricttotheCity.WastewaterstaffdevelopedapreliminaryplanofhowtheCitycouldprovideserviceandwhattheestimatedtotalprojectcostwouldbe.Forthepurposesofdeterminingapotentialfrontagecostperlot,weestimatedthetotalprojectcosttobeabout$120,000,orapproximately$13,000perlot.Thisinformationwaspresentedtotheresidentsofthisareawhowerecomfortablewiththeestimatedcostperlotandwith
Mr.Prince,CouncilPresidentPage2of2January15,2015theCityutilizingaSpecialAssessmentDistricttocollectthatfrontagecostatsuchtimeastheyconnecttothefacility.Aspartofour2015WastewaterCapitalImprovementFund,theWastewaterUtilityhasaprojectknownasthe2015SanitarySewerReplacement/Rehabilitation.Ithasaninitialbudgetof$1,300,000.TheWastewaterUtilitycanstillperformtheworkithadintendedwiththe2015projectevenwiththetransferof$150,000tocompletethissmallsanitarysewerextension.TheWastewaterUtilityalsohasstaffavailabilitytomanagethissmalladditionalprojectwithouthavingtosignificantlydelayorpostponeanyofitsotherplannedactivitiesforthisyeartocompletethisadditionalwork.CONCLUSION:TheadditionofthisminorcapitalprojecttotheWastewaterUtilityCapitalImprovementProgramwillnotresultinanyimpacttoeitherthefundingortimingofanyothercurrentcapitalprojectinourprogram.Inaddition,theWastewaterUtilityhassufficientstaffresourcestocompletethisminorprojectwithoutdelayingorpostponinganyofourexistingprojectsorprograms.Assuch,werecommendthattheCouncilauthorizethenewcapitalproject,SE165thStreetSanitarySewerMainExtension,andapproveatransferof$150,000fromthe2015SanitarySewerReplacement/Rehabilitationproject(426/465507)tocovertheanticipatedtotalprojectcosts.cc:LysHornsby,UtilitySystemsDirectorHaiNguyen,FinanceAnalystH:\FileSys\WWP-WasteWater\WWP-03-0000Correspondence-Wastewater\DaveC\2015Correspondence\SE165thStreetSewerMainExtlssue.doc\DMCad
Legend
City and County Boundary
Other
!City of Renton
Addresses
Parcels
O 1st Floor
Q 1st Floor
Q 2nd Floor
O 1st FlooroOtherBuildings
Buildings
LJ Lift Station
Clean Outs
6t Manholes
S Casings
—Pressurized Mains
Gravity Mains
—KC Pressurized Mains
KC Gravity Mains
SE 165th Street Sewer Main Extension -Vicinity Map
Notes
None
I Information Technology -GIS This map is a user generated static output from an Internet mapping site and
256 0 128 256 Feet iS for reference only.Data layers that appear on this map may or may not be City of J —ff1OJ)..RentonMapSupportRentonwa.gov accurate,current,or otherwise reliable.—
WGS 1984 Web Mercator Auxiliary Sphere o im r
01/15/2015 THIS MAP IS NOT TO BE USED FOR NAVIGATION i inance ii iW1StOfl
0