Loading...
HomeMy WebLinkAboutAgenda AGENDA Finance Committee Meeting 3:00 PM - Monday, September 25, 2017 Council Conference Room, 7th Floor, City Hall – 1055 S. Grady Way 1. AIRPORT STAFFING REORGANIZATION a) AB - 1982 Transportation Systems Division recommends approval of the Airport Staffing Reorganization plan, and requests authorization to increase its budget by $148,879 per year to accommodate the addition of three new 1.0 FTE positions and their workstations, effective January 1, 2018. The requested budget adjustment will be included in the mid- biennium budget adjustment ordinance. 2. 2017 SIDEWALK REHAB PROJECT BID AWARD a) AB - 1990 City Clerk reports the results of the September 5, 2017 bid opening for CAG-17- 167, 2017 Sidewalk Rehabilitation & Replacement & Street Overlay Project, and submits the staff recommendation to award the contract to R.W. Scott in the amount of $796,584, and to reallocate funds in order to cover the budget gap. 3. VOUCHERS 4. EMERGING ISSUES IN REVENUE STREAMS AB - 1982 City Council Regular Meeting - 11 Sep 2017 SUBJECT/TITLE: Renton Municipal Airport Staffing Reorganization RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: Transportation Systems Division STAFF CONTACT: Harry Barrett, Jr., Airport Manager EXT.: 7477 FISCAL IMPACT SUMMARY: The Airport reorganization will result in a budget adjustment increase of $148,879 to the 2018 Airport budget. Additional expense will be funded by a combination of costs savings from an unfilled 1.0 FTE Office Assistant I position, a reduction and soft transfer in the Intermittent Salaries line item of $113,928 and anticipated revenue increases from The Boeing Company’s lease adjustments. SUMMARY OF ACTION: The Renton Municipal Airport (Airport) has identified a need to reorganize its staffing to create efficiencies and reduce reliance on temporary part-time Airport Safety Workers. The Airport is requesting an increase of $148,879. This increase will cover the cost of adding three new 1. 0 FTE positions and their workstations with the below estimated pay grades: • Operations and Maintenance Supervisor (a21). • Airport Business Coordinator (a20). • Airport Operations Specialist (a15). The Airport plans to convert the existing unfilled 1.0 FTE Office Assistant I position to partially fund these additions. This position is budgeted at $94,786 for 2018. Additionally, the Airport seeks to reduce the Intermittent Salaries line item by $113,928. This line item currently funds five temporary part-time Airport Safety Workers and one Airport Intern. The remaining impact to the Airport budget is expected to be funded through anticipated building lease rate revenue increases from The Boeing Company, whose building lease rate is currently under negotiation. The adjustment to the Airport budget will be included in the mid-biennium budget adjustment ordinance. EXHIBITS: A. ISSUE PAPER B. EXISTING ORGANIZATIONAL CHART C. PROPOSED ORGANIZATIONAL CHART STAFF RECOMMENDATION: Approve the Renton Municipal Airport staffing reorganization and authorize the Airport to increase its budget by $148,879 to accommodate the addition of the three new requested 1.0 FTE positions and their workstations effective January 1, 2018. AGENDA ITEM #1. a) PUBLIC WORKS DEPARTMENT M E M O R A N D U M DATE:August 22, 2017 TO:Armondo Pavone, Council President Members of the Renton City Council VIA:Denis Law, Mayor FROM:Gregg Zimmerman, Public Works Administrator STAFF CONTACT:Harry Barrett, Jr., ext. 7477 SUBJECT:Renton Municipal Airport Staffing Reorganization ISSUE Should Council: 1. Approve a reorganization of the Renton Municipal Airport staffing? 2. Authorize the conversion of a currently vacant 1.0 FTE Office Assistant I (pay grade a05) position to a newly created 1.0 FTE Airport Business Coordinator (pay grade a20)? 3. Authorize the hiring of a newly created 1.0 FTE Airport Operations and Maintenance Supervisor (pay grade a21)? 4. Authorize the hiring of a newly created 1.0 FTE Operations Specialist position (pay grade a15)? 5. Authorize the reduction of the number of 5 temporary part-time Airport Safety Workers and 1 Airport Intern from 6 staff members to 2 staff members, including the Airport Intern? RECOMMENDATION 1. Approve the recommended reorganization of the Renton Municipal Airport (Airport) staffing. 2. Authorize the conversion of a 1.0 FTE Office Assistant I (pay grade a05) position to a newly created 1.0 FTE Airport Business Coordinator (pay grade a20). 3. Authorize the hiring of a newly created 1.0 FTE Airport Operations and Maintenance Supervisor (pay grade a21). 4. Authorize the hiring of a newly created 1.0 FTE Operations Specialist position (pay grade a15). 5. Authorize the reduction of the number of five temporary part-time Airport Safety Workers and one Airport Intern from 6 staff members to 2 staff members, including the Airport Intern. AGENDA ITEM #1. a) Armondo Pavone, Council President Members of the Renton City Council Page 2 of 10 August 22, 2017 The newly proposed positions of the Airport Business Coordinator, Operations and Maintenance Supervisor and Airport Operations Specialist are subject to job description, classifications review and approval by the AFSCME Union Local 2170. This may result in changes to the proposed pay grades. BACKGROUND As part of the 2017-2018 biennium budget, Council approved the addition of a 1.0 FTE Office Assistant I position. Following the departure of the previous Airport Manager and both Airport Maintenance Workers in late 2016/early 2017 (a combined loss of over 30 years of institutional knowledge), Airport operations have been impacted while new staff members transition through a learning curve phase. As a result of the staffing changes, the Airport Manager opted to hold the Office Assistant I position vacant until further work load and efficiency analysis could be conducted. The new management team has determined that in order to improve the effectiveness, efficiency and professionalism of the services provided at the Airport, additional permanent staff members with specialized skills are required. At the same time, the number of five temporary part-time Airport Safety Workers and one Airport Intern could be reduced from 6 staff members to 2 staff members, including the Airport Intern. The proposed reorganization plan includes the creation of the following three 1.0 FTE positions with estimated pay grades: Operations and Maintenance Supervisor (pay grade a21) reports to the Assistant Airport Manager and would function as a “working supervisor.” Airport Business Coordinator (pay grade a20), reports to the Airport Manager. Airport Operations Specialist (pay grade a15), will report to the Airport Operations and Maintenance Supervisor. In order to minimize the number of positions that would need to be created, the Airport would convert the existing unfilled 1.0 FTE Office Assistant I position to a 1.0 FTE Airport Business Coordinator, to provide the Airport with needed expertise in handling property and grant management. The increase in operations at the Airport has resulted in a corresponding administrative burden due to a need to better enforce federal and state regulations and address customer matters. To use examples, the Airport currently does not have the ability to strictly monitor or enforce the Federal Aviation Administration’s (FAA) hangar use policy, maintain and update based aircraft data or conduct fueling inspections for fixed based operators, all of which should be standard practice for an airport. The Airport also does not have staffing resources to proactively monitor or engage in preventative maintenance for Airport buildings, which in some cases has resulted in accelerated deterioration. Hangar 608, which is leased by NW Seaplanes, LLC is in need of a roof replacement due to lack of preventative maintenance and the Cedar River Hangars had AGENDA ITEM #1. a) Armondo Pavone, Council President Members of the Renton City Council Page 3 of 10 August 22, 2017 gone years without being monitored for drywall repair. These are examples of structure deterioration due to such maintenance shortfalls. As an indicator, below is a non-comprehensive list of duties and programs that the Airport Manager has determined are either not being effectively executed, or are not being executed at all due to staffing shortfalls, or to the need for staff resources with specialized backgrounds and skill sets. Many of these duties require a redundant system or multiple people coordinating the work to guarantee full compliance with aviation regulations: Duty Status Frequency Required Position Responsible Hangar Inspections Not being completed Quarterly Airport Business Coordinator Fueling Inspections Not being completed Quarterly Airport Operations Specialist Environmental Monitoring Not being completed Continuous Assistant Airport Manager Recurring Building Maintenance Management Not being completed Continuous Airport Business Coordinator Minimum Standards Enforcement Inadequate support, need ability to monitor continuously Continuous Airport Business Coordinator (facilities), Airport Operations Specialist (airfield) Part 139 Airfield Inspections Inadequate; requires specialized training Daily Airport Operations Specialist Part 77 Airspace Inspections Inadequate; requires specialized training Daily Airport Operations Specialist TSR 1540 Perimeter Security Inspections Inadequate support Daily/Continuous Airport Operations Specialist Airfield Drivers Training Inadequate support Weekly Airport Operations Specialist Safety Management System Program Not being completed Continuous Assistant Airport Manager Based Aircraft Reporting and Transient Tie Down Inadequate support, not within the job description of the Administrative Secretary I Continuous Airport Business Coordinator Invoicing Inadequate support, Administrative Secretary currently performing invoicing and accepting cash receipts Monthly Airport Business Coordinator Form 7460 reviews Not being completed Continuous Assistant Airport Manager Cert Manual, Advisory Circular updates Inadequate support Continuous Assistant Airport Manager Under the current organizational structure there is the potential for problems to occur due to duties not being completed. There is a need to create a more resilient organization to assure that there are sufficient qualified staff resources at the Airport to AGENDA ITEM #1. a) Armondo Pavone, Council President Members of the Renton City Council Page 4 of 10 August 22, 2017 handle the workload, much of which requires specialized skills. The proposed reorganization and the addition of three new 1.0 FTE positions will fully develop operational capacity and continuity at the Airport. The existing Airport maintenance coverage structure allows for coverage by 2.0 FTE workers Monday through Friday. During days in which one of those maintenance workers is absent or on vacation, the Airport must rely on a temporary part-time Airport Safety Worker for assistance, which often delays crucial projects due to skill level or availability. The addition of a 1.0 FTE Airport Operations and Maintenance Supervisor position will allow the Airport to plan, implement and manage a number of standard maintenance programs, including providing guidance on proactive maintenance. This will be a “working supervisor” position, which will guarantee maintenance staffing of 2.0 FTEs during critical days and times five days per week, and also guarantee maintenance coverage seven days per week in situations where one maintenance worker is absent or on vacation. The addition of a 1.0 FTE Airport Operations Specialist allows the Airport to focus on programs that have been neglected due to insufficient staffing, such as fueling inspections, security and badging management, environmental programs and rule enforcement. This position would be assigned to improve access management at the Airport in order to reduce the numbers of ground vehicle incursions that have been occurring in recent years. Under the current structure, these duties are not the sole responsibility of any particular position, so by default they fall to the Assistant Airport Manager to either complete as priorities allow or to delegate. The conversion of the vacant 1.0 FTE Office Assistant I position to a 1.0 FTE Airport Business Coordinator position will allow the Airport to implement, manage and enforce tenant leases, preventative maintenance and property management, the Disadvantaged Business Enterprise (DBE) program, federal and state grant programs and invoicing. Some of these associated tasks are being conducted by the current Administrative Secretary I. These are responsibilities that should be handled by a staff member with a background and specialized skills in the areas of lease and property management and grant administration. The intent of this reorganization is to address current gaps in duties and provide staffing resources with the required background and skill sets to manage the Airport in a more professional manner. Primary responsibilities of the proposed new positions include: AGENDA ITEM #1. a) Armondo Pavone, Council President Members of the Renton City Council Page 5 of 10 August 22, 2017 Airport Business Coordinator: Manage the development and maintenance of leasing policies in conjunction with the Airport Manager and City Attorney. Develop, implement and direct property management programs such as recurrent preventative maintenance on city owned assets. Assist with the administration of Airport grants. Manage the Disadvantaged Business Enterprise program. Ensure city adherence to federal grant assurances and assist with land use issues. Enforce and act upon violations of minimum standards, rules and regulations. Obtain training and be given “limited commission” authority to cite violators. Supervise and relieve workload of Airport Administrative Secretary I. Airport Operations and Maintenance Supervisor: Supervise, schedule and coordinate the daily work and projects of the Airport Operations Specialist and the Airport Maintenance Workers. Act as a “working supervisor.” Relieve backlogs and implement maintenance improvement programs. Prioritize maintenance and operations activities and tasks to achieve maximum efficiency and impact. Act as a liaison for the Airport on public and tenant matters and delegate work as necessary to ensure efficient and timely responses to public issues and concerns. Collaborate with the Airport Civil Engineer III and Assistant Airport Manager on capital projects and maintenance activities that impact the airway system and jointly develop solutions consistent with maintenance and operational goals. Increase staffing capacity and reduce contracted vendor services. Operations Specialist: Perform aviation inspections in accordance with regulations Part 139, which could possibly become mandated with the update of the Airport Master Plan and Part 77, which is currently mandated. Assist the Airport Business Coordinator in executing property management inspections and functions. Provide a dedicated presence to monitor and resolve operational issues concerning flight conditions, including access management for vehicles using the Airport in order to reduce the incidence of vehicle incursion. Monitor and enforce minimum standards and Airport rules. Obtain training and be given “limited commission” authority to cite violators. Relieve workload of Assistant Airport Manager. AGENDA ITEM #1. a) Armondo Pavone, Council President Members of the Renton City Council Page 6 of 10 August 22, 2017 Existing Airport Staffing Level: 1.0 FTE Airport Manager 1.0 FTE Assistant Airport Manager 1.0 FTE Civil Engineer III 1.0 FTE Administrative Secretary I 2.0 FTE Airport Maintenance Workers 1.0 FTE Office Assistant I (unfilled) 5 Temporary Part-time Airport Safety Workers and 1 Airport Intern Proposed Airport Staffing Level: 1.0 FTE Airport Manager 1.0 FTE Assistant Airport Manager 1.0 FTE Civil Engineer III 1.0 FTE Airport Business Coordinator (new) 1.0 FTE Airport Operations and Maintenance Supervisor (new) 1.0 FTE Airport Operations Specialist (new) 1.0 FTE Administrative Secretary I 2.0 FTE Airport Maintenance Workers 1-2 Temporary Part-time Airport Safety Workers, including the Airport Intern, up to 6 months (this is a reduction of at least 4 temporary part-time Airport Safety Workers/Airport Intern). In the past, temporary part-time Airport Safety Workers have been used extensively to support the Airport operation. The Airport is interested in structuring staffing and budget resources to retain a portion of the intermittent salary classification to be utilized for temporary workers or address staffing shortages if needed. Temporary part- time duties will be restricted to landscaping, janitorial and assistance with special events and projects. The Airport intends to continue its internship program, which is also classified as a temporary part-time Airport Safety Worker staffing. The above changes would result in the following total compensation impacts to the Airport budget: Proposed Personnel Changes 2018 Cost Add New 1.0 FTE Airport Business Coordinator (Pay Grade a20) by converting vacant 1.0 FTE Office Assistant III 118,123 Add New 1.0 FTE Operations and Maintenance Supervisor (Pay Grade a21)120,172 Add New 1.0 FTE Airport Operations Specialist (Pay Grade a15)108,548 2 New Workstation Technology Cost (one-time cost; includes computer, software and phone)4600 3 Ongoing Workstation Technology Cost (ongoing cost; includes computer, software and phone)6150 SUB-TOTAL $357,593 Eliminate 1.0 FTE Office Assistant I (unfilled)(94,786) Reduce 2018 Intermittent Salaries budget to from $148,928 to $35,000 (113,928) Total Budget Shortfall $148,879 AGENDA ITEM #1. a) Armondo Pavone, Council President Members of the Renton City Council Page 7 of 10 August 22, 2017 These changes will increase staffing hours of regular employees by 80 hours per week (2.0 FTEs x 40 hours/week). At the same time, the current unfilled Office Assistant I will be converted to the Airport Business Coordinator. The reduction of 6 temporary part- time employees to two will reduce the 2018 Intermittent Salaries budget by $113,928. Adding in one-time costs for new and ongoing work stations brings the total budget increase needed in 2018 to $148,879. The current beginning balance of the Salaries and Wages line item for 2018 is $572,483. The Intermittent Salaries and Wages line item has a beginning balance of $148,928 for 2018. A soft transfer of $113,928 from the Intermittent Salaries and Wages line item to the Salaries and Wages line item will increase Salaries and Wages beginning 2018 balance to $686,411. It is intended that the additional 2018 cost of this reorganization ($148,879) will be funded by anticipated additional revenue from the new Boeing building lease rate agreement. These adjustments to the Airport budget will be included as part of the mid-biennium budget adjustment ordinance. The Airport anticipates an increase in revenue for 2018 through 2023 from The Boeing Company for building lease rate increases that are currently being negotiated. According to the building appraisal performed by the City in 2016, the value of Boeing’s buildings would have resulted in a building lease rate increase of $500,000 annually for the next six years. The Boeing Company is performing its own appraisal of the buildings. The City and The Boeing Company will negotiate the building lease rates in the fall of 2018. It is anticipated that the negotiated Boeing building lease rate increase will cover the $148,879 cost of the reorganization in 2018 and the following years. AGENDA ITEM #1. a) Armondo Pavone, Council President Members of the Renton City Council Page 8 of 10 August 22, 2017 Exhibit A below compares staffing and operations at the Renton Municipal Airport to other local facilities. Exhibit A Airport FTEs vs. Operations Comparison RENTON BELLINGHAM PAINE FIELD BOEING FIELD Number of Full-Time Staff 7*20 37 52 Number of Operations 2016 128,013 84,600 106,969 169,641 Runways 1 1 3 2 Passenger Service N Y N N Number of Based Aircraft 267 190 533 361 Aircraft Mix Small and medium jets, helicopter, seaplanes, single engine trainers, military Small and medium jets, single engine trainer, military Small through large jets, single engine trainer, military Small through large jets, helicopter, single engine trainer Acreage 170 356 634 1315 Percentage of Staff Time Dedicated to Passenger Activities 0%, no passenger service 15-20%, terminal customer service, ARFF 0%, no passenger service currently 0%, no passenger service Towered 7 a.m.-7 p.m. daily 7 a.m.-7 p.m. daily 12 a.m-11:59 p.m. daily 12 a.m-11:59 p.m. daily Non-Standard Features Seaplane base, airframe service, Customs and Border Patrol presence Customs and Border Patrol presence, commercial traffic Customs and Border Patrol presence Customs and Border Patrol presence, airframe service *Currently there are 6 staff employed – the Airport Office Assistant I position budgeted for 2017 has gone unfilled. AGENDA ITEM #1. a) Armondo Pavone, Council President Members of the Renton City Council Page 9 of 10 August 22, 2017 The first table of Exhibit B provides a summary of Airport maintenance coverage as it currently exists with 2 full-time Airport Maintenance Workers and 5 temporary part- time Airport Safety Workers and 1 Airport Intern. The second table of Exhibit B demonstrates how maintenance coverage will increase based on the proposed reorganization plan. Exhibit B Scheduling Impacts Previous Maintenance Worker Schedule with Temporary Part-Time Support Staff Member Hours Sun Mon Tues Weds Thurs Fri Sat Maintenance 1 6 a.m.-3:30 p.m. 2-hour call 2-hour call Maintenance 2 6 a.m.-3:30 p.m. Temporary 1 Flexible Night Night Night Night Temporary 2 Flexible Day Day Temporary 3 Flexible Day Day Temporary 4 Flexible Night Night Temporary 5 Flexible Night Night Night Temporary 6 Flexible Day Day Day Daytime coverage Nighttime coverage Scheduling Considerations Airport Maintenance Workers only worked Monday through Friday shift and one of the two was expected to report on Saturday and Sunday mornings for inspections, which incurred overtime and double-time costs. One Airport Maintenance Worker was assigned on-call duty during non-working hours and on weekends. Since they worked the same schedule, this generated 124 hours weekly in additional on-call costs. Temporary part-time Airport Safety Workers and the Airport Intern allowed extreme flexibility in scheduling to avoid high turnover and establish some staffing continuity. The tradeoff is that the Airport often goes unstaffed during critical hours. Holiday and day off coverage has been a challenge. Temporary part-time Airport Safety Workers and the Airport Intern received no extra compensation and thus resisted volunteering to work. Permanent staff had scheduling challenges as well. AGENDA ITEM #1. a) Armondo Pavone, Council President Members of the Renton City Council Page 10 of 10 August 22, 2017 Planned Maintenance and Operations Schedule .Hours Sun Mon Tues Weds Thurs Fri Sat Maintenance 1 6 a.m - 3:30 p.m. Maintenance 2 12:30- 9 p.m. Operations and Maintenance Supervisor 6 a.m.- 3:30 p.m. Operations Specialist 12:30- 9 p.m. Temporary 1 As needed As needed As needed As needed As needed As needed 9 a.m.- 5 p.m. 9 a.m.- 5 p.m. Temporary 2/Intern As needed 9 a.m.- 5 p.m. 9 a.m.- 5 p.m. As needed As needed As needed As needed As needed Daytime coverage Nighttime coverage Weekend coverage Scheduling Considerations: Achieves 7-day per week coverage. Shifts burden to permanent staff across 6 positions, versus the previous model which relied heavily on 5 temporary Airport Safety Workers, 1 Airport Intern and 2 permanent staff. Reduces overtime and double-time while creating more continuity. cc: Ellen Bradley-Mak, Human Resources Risk Management Administrator Jan Hawn, Administrative Services Administrator Jim Seitz, Transportation Systems Director Jamie Thomas, Fiscal Services Director Harry Barrett, Jr., Airport Manager Kim Gilman, Human Resources Labor Manager Michele Favors, Assistant Airport Manager Hai Nguyen, Finance Analyst Pat Miller, AFSCME Union Local 2170 President Heather Gregersen, Transportation Administrative Secretary I AGENDA ITEM #1. a) Public Works DepartmentAirportAirport ManagerHarry Barrett Jr.Administrative Secretary ISusan Campbell-HehrCivil Engineer IIIKamran YazdidoostAssistant Airport ManagerMichele FavorsOffice Assistant IVacantAirport Maintenance WorkerStephanie CampbellChristopher MesaAGENDA ITEM #1. a) Administrative Secretary I Dedicated receptionist, inventory/supplies, appointments, records management, accounts payable, fee/fine assessment mail distribution Airport Manager Planning/Strategy, Inter-agency coordination, High level Negotiations, identify opportunities that meet city development and business goals, FAA reporting, 5010 updating Civil Engineer III Major facilities/asset development; pavement management, construction; contracting/sourcing; support recurring maintenance planning Airport Business Coordinator Landside coordinator work, leasing/property management, grants, invoicing/compliance; revenue analyst; assist with business planning and contracting; administrative support when needed Assistant Airport Manager Assumes Airport Manager role when needed; assist with aviation operations; implement and manage regulatory changes/compliance programs (AEP, Cert/Self Inspection, etc.); collaborates with Civil Engineer III to achieve operational goals Operations & Maintenance Supervisor Coordinate, schedule, and assign daily frontline operations workflow; tenant engagement; act as a “working supervisor” aviation operations and maintenance duties and must have both expertise Airport Operations Specialist Airfield self-inspections, NOTAMS, pilot/ATC coordination, wildlife, landscaping/FOD, snow removal; assist with maintenance “on call;” works as an extension of maintenance when necessary Airport Maintenance Workers Special projects and skilled maintenance work that falls within Maintenance Management program; facilities and asset upkeep, mowing/landscaping, chemical application –strictly maintenance PROPOSED AIRPORT ORGANIZATIONAL STRUCTURE Airport Safety Workers (2); Intern (1) Landscaping; janitorial; assist with special events and projects AGENDA ITEM #1. a) AB - 1990 City Council Regular Meeting - 18 Sep 2017 SUBJECT/TITLE: Contract Award: 2017 Sidewalk Rehabilitation & Replacement & Street Overlay Project; CAG-17-167 RECOMMENDED ACTION: Refer to Finance Committee DEPARTMENT: City Clerk STAFF CONTACT: Jason Seth, City Clerk EXT.: ext. 6502 FISCAL IMPACT SUMMARY: Sufficient funding is available from the Overlay budget (its funding source, 317.122108) to cover Schedule A ($2,180,000 budgeted for 2017, of which $1,669,122 is dedicated to the annual Overlay contract awarded earlier this summer, leaving $510,878 for Schedule A of this contract). The additional $260,000 needed for Schedule B can be made available by reallocating $250,000 from the 2018 Walkway program and $10,000 from the 2018 Sidewalk Rehabilitation budget (its funding source, 317.120009). It is recommended that the $260,000 be shifted accordingly in the next available budget adjustments. Schedule A (Overlay) - $264,294 Schedule B (Sidewalk Rehab) - $520,050 Total: $796,584 SUMMARY OF ACTION: Engineer's Estimate: Schedule A - $343,324 Schedule B - $292,860 Total: $636,184 In accordance with Council procedures, the lowest responsible and responsive bid met two of the three required criteria: 1) There was more than one bid; 2) There were no major irregularities with the low bid; However, the low bid was not within budget. Therefore, staff recommends awarding CAG-17-167 - 2017 Sidewalk Rehabilitation & Replacement & Street Overlay Project - to the low bidder, R.W. Scott in the amount of $796,584, and to reallocate $250,000 from the 2018 Walkway program budget and $10,000 from the 2018 Sidewalk Rehabilitation program budget to this project to cover the budget shortfall. EXHIBITS: A. Staff Recommendation B. Bid Tab STAFF RECOMMENDATION: AGENDA ITEM #2. a) Award the 2017 Sidewalk Rehabilitation & Replacement & Street Overlay Project to the low bidder, R.W. Scott, in the amount of $796,584, and reallocate $260,000 to the project from the 2018 Walkway and Sidewalk Rehabilitation programs in the next available budget adjustment ordinance. AGENDA ITEM #2. a) AGENDA ITEM #2. a) Jason Seth, City Clerk Page 2 of 2 September 8, 2017 The Engineer's Estimate is as follows: Schedule A (Overlay) Schedule B Total $343,324 $292,860 $636,184 All of the bids exceeded, least of all R.W. Scott's by 25%, the Total Engineer's Estimate, but whereas the Overlay portion of the low bid was 19% less than the Schedule A Estimate, the Schedule B portion exceeds that Estimate by $227,190 or 76%. Unexpectedly high lump sum mobilization and traffic control bid amounts (much higher than for a previous phase of this work done in Maplewood in 2011) account for $145,000 of that excess. $65,000 of the other $82,190 is attributable to considerably higher unit bid item amounts for new concrete sidewalks, driveways, curb & gutter, with the rest due to various bid items. The overall projected cost of the Schedule B portion, including the contract amount and engineering and construction support costs and contingency, is projected to be $674,000, which exceeds the $414,000 Sidewalk Rehabilitation budget (its funding source, 317.122801) allocated to 2017 by $260,000. Sufficient funding is available from the Overlay budget (its funding source, 317.122108) to cover Schedule A ($2,180,000 budgeted for 2017, of which $1,669,122 is dedicated to the annual Overlay contract awarded earlier this summer, leaving $510,878 available for Schedule A of this contract). The additional $260,000 needed for Schedule B can be made available by reallocating $250,000 from the 2018 Walkway program and $10,000 from the 2018 Sidewalk Rehabilitation budget (its funding source, 317.120009). It is recommended that the $260,000 be shifted accordingly and the contract be awarded to R.W. Scott in the amount of $796,584 ($276,534 for Schedule A Overlay and $520,050 for Schedule B), with the reallocations to be made during the next available budget adjustments. Attachments: Bid Tabs cc: Bob Hanson, Transportation Design Manager Vicki Grover, Transportation Planning Manager James Wilhoit, Project Manager Michelle Faltaous, Transportation Program Coordinator Jayson Grant, Pavement Managing Specialist Project File h:\division.s\transpor.tat\design.eng\jwilhoit\walkways\2011contract\2011contractfollowon2015\project files setup\600 pre-construction\620 advertising and award\mwood2017cag17167contract awardmemo -rev.doc AGENDA ITEM #2. a) AGENDA ITEM #2. a) AGENDA ITEM #2. a) AGENDA ITEM #2. a) AGENDA ITEM #2. a) CITY OF RENTON BID TABULATION SHEET Project: 2017 Sidewalk Curb Ramp Rehabilitation Replacement Street Overlay Project-CAG-17-167 Date: September 5, 2017 FORMS Bidder Proposal Bid Non-Addenda &Aff. Bond Collusion Ack. (3) Global Telecom Engineering & Cons., LLC. 1851 Central Place South, Suite #101 1 Kent X X X X WA 98030 Bassam Farhat Jansen, Inc. 1215 W. Holly Street 2 Bellingham X X X X WA 98225 Grant Jansen Kamins Construction P.O. Box 867 3 Bothell X X X X WA 98041 Chad Kamis R.W. Scott Contruction Co. 4005 West Valley Highway, Suite A 4 Auburn X X X X WA 98001 Jeff 1 of 1 Bid Total from Schedule of Prices A) $297,708.00 B) $555,285.00 C) $852,993.00 A) $257,629.14 B) $563,406.96 C) $821,036.10 A) $272,250.06 B) $590,521.60 C) $862,771.66 A) $276,534.00 B) $520,550.00 C) $797,084.00 AGENDA ITEM #2. a) CITY OF RENTON BID TABULATION SHEET Project: 2017 Sidewalk Curb Ramp Rehabilitation Replacement Street Overlay Project-CAG-17-167 Date: September 5, 2017 FORMS Bidder Proposal Bid Non-Addenda & Aff. Bond Collusion Ack. (3) Scott Road Construction Northwest, Inc. P.O. Box 2228 5 Renton X X X X WA 98058 Matthew Wagestar Engineer's Estimate: A) Schedule A ($343,324.00) B) Schedule B ($292,860.00) C) Total Engineer's Estimate ($636,184.00) 1 of 2 Bid Total from Schedule of Prices A) $272,648.25 B) $726,210.00 C) $998,858.25 AGENDA ITEM #2. a)