Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Agenda
AGENDA Planning & Development Committee Regular Meeting 4:30 PM - Thursday, March 8, 2018 Council Conference Room, 7th Floor, City Hall – 1055 S. Grady Way 1. Bike Sharing Briefing Presentation 2. Online Land-use Public Notice Map Link 3. Emerging Issues in CED Presentation © 2017 LimeBike. Proprietary and confidential. Do not distribute.Helping Renton Lead in Smart Mobility with Subsidy-Free, Dockless Bike Sharing1AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.Why We’re Building LimeBikeWe Are Revolutionizing Urban Mobility by Leading the Country in First and Last Mile Transportation Solutions●More efficient, affordable and healthier transportation;●Complements existing transit options, reducing congestion and freeing up parking;●Supports more vibrant local economies;●Reduces local pollution from short, inefficient trips.AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.With cutting edge smart bikes and no stations, we can serve the entire community and scale a flexible fleetusing data to maximize potential program ridership. LimeBike seeks to revolutionize urban mobility with smart, dockless bike sharing programs at no cost to cities.3AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.GreensboroSeattleWith our first 500 bikes, we exceeded the City’s old program’s best week ever in asingle daySouth San FranciscoKey BiscayneSouth BendTahoeDallasIn the first week, riders logged 2,500 ridesImperial BeachSilver SpringTakoma Park Washington, DCAlamedaAuroraNorth Bay VillageMiami ShoresMaldenLos AngelesArkansas State UniversityNorth Carolina StateNotre Dame CharlotteScottsdaleHartfordPlanoNational CityRaleighHoly Cross CollegeSt. Mary’s CollegeNC A&T State UniversityGuilford CollegeDurhamU of WashingtonBurlingameAlbanyBarry UniversitySt. Thomas UniversityEast Carolina UniversityBothellMarket Overview:45 U.S. Markets- 31 Cities- 14 Universities2 European CitiesCalifornia State - NorthridgeEl CerritoSan DiegoAGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.What setsLimeBike apart●No funding required to operate and expand our service;●Simple, affordable pricing;●Well-funded, stable American company;●Nation-leading dockless technology;●Focused on safety, equity, collaboration.5AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.Find available bikes on our live GPS mapUnlock bikes with QR code or plate numberLock the back wheel to end the rideEasily track and pay for each rideRiders easily Locate, Unlock, Ride, and PayNew technology allows us to create seamless bike sharing experience16234AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.4Safe, Reliable & SmartOur specially designed bikesare CPSC & ISO certified, and safe and comfortable to ride.1234561.Green: Solar panel charges battery supply;2.Smart IoT Technology: 3G/GPS enabled, mobile-app synced smart lock.3.Safety-Tested: Wider tires, drum brakes, bright color, lights, and frame tested with 880 lbs of load and CPSC certified.4.Low Maintenance: Airless tires and durable parts to withstand elements and frequent use.5.Easier to Ride: Lighter frame (vs dock-based bikes) for easier use.6.1, 3, and 8-speeds for more widespread usability.8AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.Lime-E8Pedal Assist Electric BikesMAX RANGE:62 milesMAX SPEED: 14.8 MPH PRICE FOR USERS: $1 basic unlocking fee$1 for every 10 minsWhy go electric?•Lime-E senses the torque being put on the pedals and adds just the right boost to help you get where you’re going quickly and effortlessly. •No strain. No sweat. Just a simple, cost effective way to turn the last mile into the last several miles, even over the hilliest campus terrain.AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.MAX RANGE:37 milesMAX SPEED: 14.8 MPH PRICE FOR USERS:$1 unlocking fee$1/10 minsLime-S9LimeBike Electric ScooterHop on and ride! Smaller and more agile than a bike, Lime-S is a new, convenient mobility option for anyone looking to zip around the city pedal-free.Requiring less parking space, let’s be honest; it’s also just incredibly fun to ride. AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.PAY AS YOU GO$1 / 30min.No hidden chargessuch as going over an initial time block or not docking a bike.MONTHLY MEMBERSHIP$30for 100rides User will pay additional $0.50 for all rides exceeding 30 minutes limit.STUDENTS / CAMPUS50% OffStudents and university affiliated groups will enjoy half price on above pricing structure. Affordable PricingPlans to make biking a daily habit and increase ridershipLOW INCOME 50% OffLimeBike partners with low-income providers to give people ½ off standard pricing.10AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.Managing dockless operationsOperations: We hire a local operations team to actively manage the fleet, rebalance bikes and respond to any support calls.Customer Service: We maintain 24 hour customer service and respond to urgent issues within 2 hours during regular business hours.On-the-ground team led by a local General ManagerFleet management: Our team will rebalance under-utilized bikes to meet higher demand and ensure distribution covers service area.Maintenance: We cover all maintenance and routine checks of bikes.11AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.Our approach to smart parkingAvailable BikesRecommended Parking Spots●Educate users on legal, appropriate parking;●In-app instructions to support proper parking;●Geo-fence existing legal/unapproved parking;●Reward system for parking properly;●Partner with cities to develop more bike-friendly parking;●… worst case, operations teams respond to parking concerns.12AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.●Free of docking stations, the optimal bike sharing program can be designed based on usage and actual bike demand data;●We estimate having 1 bike per 100 residents andcan serve the entire community;●We share our data with cities for smarter mobility planning.We use datato make city mobility smarter13AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.14We invest in your CommunityWe engage with local businesses, schools, officials, and associations to nurture long-lasting partnerships leveraging:●local press ●street teams and events●social media●and online ads to educate, promote, and empower local champions and enable the change we all want to see.AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.Experienced and fundedExperienced team●US-based and HQd in Silicon Valley;●Leadership team from top universities;●Experienced team in tech, local and federal government.●Members - North American Bike Share Association●Business Council - U.S. Conference of MayorsFinancial Stability●Backed by Tier-1 Silicon Valley VC Firms led by Andreessen Horowitz;●Tens of Millions in Series A & B financing gives us the unique ability to invest in technology and bikes, laying foundation for successful programs;●Self-sustaining and well-documented long-term financial model.16AGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.16OpportunityLead the region●Launch scooters-only●Launch focus on areas underserved by other mobility options ●Operations run out of our Kent warehouse ●Work together to optimize the systemAGENDA ITEM #1. © 2017 LimeBike. Proprietary and confidential. Do not distribute.Thank YouWe are eager to serve the Renton community! 17AGENDA ITEM #1. Renton Results Development Projects 2017 Completed Projects AGENDA ITEM #3. Planning Commission Survey Please complete the attached survey. Each question will coincide with the graphics and images in this presentation. Please respond to each 2017 project with one (1) of the following items: •Project adds value, quality, and character to the community, •Project results in no change to community, or •Project degrades from the value, quality, and character of the community. Thank you for taking the time to provide us with your feedback. -Vanessa Dolbee, Current Planning Manager AGENDA ITEM #3. ATS Automation 450 Shattuck Ave S Site:0.95 acres Description:Construction of a new 3-story addition (11,526 SF) to the north side of an existing 4-story office building.AGENDA ITEM #3. CarMax Auto Superstore 3751 East Valley Rd Site: 12.28 acres Description: 20,220 SF auto dealership, service building and non-public car wash with 244 parking stalls and 610 sales spaces.AGENDA ITEM #3. Cedar River Station 15221, 15279, and 15301 Maple Valley Hwy (SR 169) Site:3.01 acres Description:Construction of a 3 buildings for general retail space (21,703 SF) with 97 parking stalls.AGENDA ITEM #3. Cedar River Chevron 15355 Maple Valley Hwy (SR 169) Site:0.80 acres Description:Construction of a 3,612 SF convenience store, 2,982 SF fueling facility under an overhead canopy with 8 surface parking spaces. Phase II includes an 1,801 SF car wash.AGENDA ITEM #3. CHILD School 2640 Benson Rd. S. Remodel of a former church to a private school. Including new frontage improvements, plat ground and building façade improvements. AGENDA ITEM #3. Dutch Brothers Coffee Stand 735 Hardie Ave SW Site:0.24 acres Description:Construction of a 2-story coffee stand (480 SF).AGENDA ITEM #3. Hampton Inn & Suites 1300 Lake Washington Blvd N Site:1.26 acres Description:A 5-story 110 hotel rooms with outdoor terrace, roof decks, indoor pool, and 110 parking spaces (primarily below grade parking garage).AGENDA ITEM #3. IKEA 601 SW 41rd St Site:28.99 acres Description:Construction of a 399,179 SF facility consisting of the IKEA showroom, retail area, restaurant, and 1,666 parking stalls.AGENDA ITEM #3. Kaiser Permanente 1300 SW 27th St Site:29.18 acres at Longacres Description:4 tilt-up concrete panel buildings: A) 3-story general office (146,910 SF); B) 2-story general office, laboratory and warehouse (103,915 SF); C) 3-story general office (113,000 SF); D) 3-story general office (147,000 SF). +1,853 total parking stalls AB C D AGENDA ITEM #3. Maplewood Park Apartments Clubhouse 3815 NE 4th St Site:0.40 acres Description:Construction of a new 2,975 SF clubhouse with a pool.AGENDA ITEM #3. Mary Ryan B & B 123 Main Ave. S Bed and Breakfast located in a new two-story garage located behind the existing home. AGENDA ITEM #3. Meadowcrest Early Childhood Learning Center 1800 Index Ave. NE New Education Facility for Renton School District, including an inclusive playground, tree retention, and frontage improvements. AGENDA ITEM #3. S & S Petroleum Remodel (Mobil) 4715 NE Sunset Blvd Site:0.81 acres Description:Remodel of existing gas station convenience store and auto repair shop to a large convenience/retail space.AGENDA ITEM #3. My Dental 525 Park Ave N Site:0.32 acres Description:Two new dental offices totaling 3,471 SF. New parking and access off the public alley.AGENDA ITEM #3. Renton Academy 2607 Jones Ave. S. Interior and exterior upgrade to the existing Spring Glen Elementary School. Including a new play ground and frontage improvements for safe routes to schools. AGENDA ITEM #3. RTC Automotive Complex 3000 NE 4th St Site:31.92 acres (RTC Campus) Description:Renovation of three existing buildings: K1, K2, K4, and replacement of K3. Resulting in a new Automotive Complex for the college campus. AGENDA ITEM #3. Second and Main 207 Main Ave S Site:0.61 acres Description:Construction of a 6-story mixed use building with 101 residential units, 3,553 SF of retail space and 101 structured parking spaces.AGENDA ITEM #3. Hyatt Regency Hotel 1053 Lake Washington Blvd N Site:5.49 acres Description:New lakefront 12-story, 347 room four-star hotel, 43,000 SF meeting/ conference space, Water’s Table restaurant, indoor swimming pool, and 447 structured parking stalls.AGENDA ITEM #3. Talbot Rd. Townhomes 306 S 47th St. 18 new condominium townhomes. Range in size from 1,386 SF –1,537 SF. AGENDA ITEM #3. Vigor Fitness Before After After Site:332 Burnett Ave S Description: Façade and interior improvements to H&H Plaza building. New fitness center and juice bar as anchor tenant. New building owner utilized the City’s Façade Improvement Program to assist with building’s rehabilitation.AGENDA ITEM #3. Enclave 6501 SE 7th Pl. Subdivision of an 8.8 acre project site located within the R-4 zone into 31 lots and 2 tracts and a new looped public street.AGENDA ITEM #3. THANK YOU!!AGENDA ITEM #3.