HomeMy WebLinkAboutAgenda
AGENDA
Utilities Committee Regular Meeting
4:00 PM - Thursday, April 26, 2018
Council Conference Room, 7th Floor, City Hall – 1055 S. Grady Way
1. Kennydale Lakeline Sewer System Evaluation
Condition Assessment Amendment
a) AB - 2124 Utility Systems Division recommends approval of Amendment No. 1 to CAG-17-
104 with Carollo Engineers, Inc. for $526,510 for the implementation of Phase 2B for the
Kennydale Lakeline Sewer System Evaluation.
2. Emerging Issues in Utilities
AB - 2124
City Council Regular Meeting - 23 Apr 2018
SUBJECT/TITLE: Amendment No. 1 to CAG-17-104 with Carollo Engineers, Inc. for the
Kennydale Lakeline Sewer System Evaluation Phase 2A Condition
Assessment
RECOMMENDED ACTION: Refer to Utilities Committee
DEPARTMENT: Utility Systems Division
STAFF CONTACT: Dave Christensen, Wastewater Utility Engineering Manager
EXT.: 7212
FISCAL IMPACT SUMMARY:
Funding for Amendment No. 1 to CAG-17-104 in the amount of $526,510, is available from the approved 2018
Wastewater Capital Improvement Program for the Kennydale Lakeline Sewer Evaluation Project budget
(426.465512). There is sufficient funding in the budget to cover this amendment and the proposed
construction project associated with this amendment.
SUMMARY OF ACTION:
The initial Phase 2A work determined that there is a strong likelihood the lakeline has a greater than 20-year
remaining useful life. That determination allows us to proceed with the in-lake work to better lock down the
long-term life of the facility. During the previous analysis it was also determined that the existing lakeline has
at least two locations that are at 30% or lower capacity. As a result additional work is necessary, including the
installation of two new access points in the lake and the need to have a contractor clean the entire lakeline to
ensure it is back to full capacity.
This amendment will allow our consultant to perform the additional evaluation work identified as part of the
last phase of work. They will also develop a package for bid to install additional access manholes in the lake
and provide for a complete cleaning of the lakeline.
EXHIBITS:
A. Amendment No. 1
STAFF RECOMMENDATION:
Execute Amendment No. 1 to CAG-17-104 with Carollo Engineers, Inc. for $526,510 for the implementation of
Phase 2B for the Kennydale Lakeline Sewer System Evaluation.
AGENDA ITEM #1. a)
AMENDMENT NO. 1 TO AGREEMENT FOR THE KENNYDALE
LAKELINE SEWER SYSTEM EVALUATION PHASE 2A – CONDITION
ASSESSMENT CAG-17-104
THIS AMENDMENT, dated April 3, 2018, is by and between the City of Renton (the “City”), a
Washington municipal corporation, and Carollo Engineers, Inc. (“Consultant”), a Delaware
Corporation. The City and the Consultant are referred to collectively in this Amendment as the
“Parties.” Once fully executed by the Parties, this Amendment is effective as of the last date
signed by both parties.
Whereas, the City engaged the services of the Consultant under Agreement CAG-17-104, dated
May 8, 2017, to provide necessary services for the Kennydale Lakeline Sewer System Evaluation
Phase 2A – Condition Assessment (referred to herein as the “Agreement”);
Whereas, the Parties wish to amend the Agreement to change the scope, the time of
performance, and the compensation in order to implement the Phase 2B portion of work for
the project.
NOW THEREFORE, It is mutually agreed upon that CAG-17-104 is amended as follows:
1. Scope of Work: Section 1, Scope of Work, is amended as shown in Exhibit A-1, which is
attached and incorporated herein.
2. Time of Performance: Section 3, Time of Performance, is amended pursuant to the
schedule(s) set forth in Exhibit C-1, which is attached and incorporated herein. All Work
shall be performed by no later than January 31, 2020.
3. Compensation: Section 4, Compensation, is amended so that the maximum amount of
compensation payable to Consultant is increased from $961,055 to $1,487,565, plus any
applicable state and local sales taxes. The additional compensation shall be paid based
upon Work actual performed according to the rate(s) or amounts specified in Exhibit B-1
which is attached and incorporated herein.
4. All terms of the Agreement not explicitly modified herein shall remain in full force and
effect and such terms shall apply to Work performed according to this Amendment as if
fully set forth herein.
AGENDA ITEM #1. a)
PAGE 2 OF 2
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Denis Law
Mayor
Lara R. Kammereck
Vice President
_____________________________
Date
Attest
_____________________________
Jason A. Seth
City Clerk
Approved as to Legal Form
_____________________________
Shane Moloney
Renton City Attorney
_____________________________
Date
CONSULTANT
By:____________________________
Brian R. Matson
Senior Vice President
_____________________________
Date
Contract Template Updated 12/29/2017
AGENDA ITEM #1. a)
ExhibitA-iSCOPEOFWORKKENNYDALELAKELINESEWERSYSTEMEVALUATIONPHASE2BSCOPEOFSERVICESThefollowingScopeofServiceshasbeendevelopedtoassisttheCityofRenton(City)withtheKennydaleLakelineSewerSystemEvaluation.TheobjectiveofthisprojectistoprovideacomprehensivesystemanalysisfortheKennydaleLakelineSewerSystem(LakelineSystem)thatwilladdresstheCity’sshortandlongtermissuesconcerningthesystem.ThefollowingtasksundertheScopeofServiceshavebeenpreparedbasedonCarolloEngineer’sTeam(Consultant)currentunderstandingoftheproposedprojectandon-goingdiscussionswithCitystaff.ThisphaseoftheScope,2018Activities,willdesignandprovideconstructionservicestoinstalltwonewmanholesintheLakeline,cleantheLakeline,providerecommendationsforfuturecleaningactivities,andupdatetheremainingusefullifebasedonnewdataacquiredaspartofthisScope.Subsequentphaseswillconductanalternativesanalysisforfutureimprovements,andpotentiallyrepairorrehabilitateinfrastructuretofacilitatetheoperationandmaintenanceoftheLakelineSystem.PROJECTBACKGROUNDTheLakelineSystemwasoriginallyconstructedin1972consistingofaflushstation,servicelaterals,Lakeline,andliftstation.TheLakelineconsistsofapproximately4,800linearfeetof8-and10-inchpipewith6-inchlateralconnections.ThematerialoftheLakelineandlateralswillbeconfirmedaspartofthisscopeofwork.TheLakelineisalowpressureforcemainthatwasinstalledatorneargradeofthelakebed;resultinginadverseslopedsegmentsandseverallargesags.Lateralconnectionswereoutfittedwithshut-offvalvesin1986toallowlinecleaning;howevertheeffectivenessofthesevalveswereineffectiveandarenolongerused.In2003,theCityconductedaconditionassessmentandpredesignreportthatwillserveasareferenceforthecurrentproject.In1994,theLakeWashingtonNo.2LiftStationwasreplaced.In2004,theLakeWashingtonFlushingStationwasrehabilitated.ArecentassessmentoftheCity’sForcemainsandLiftStationshasidentifiedthesestationsashighrisk.PROJECTASSUMPTIONS•CarolloEngineers,Inc.willbereferredtoas“Consultant”inthisdocument.•TheCityofRentonanditsstaffwillbereferredtoas“City”inthisdocument.AGENDA ITEM #1. a)
•SubconsuftantBallardMarineConstruction,Inc.willbereferredtoas“BallardMarineConstruction”inthisdocument.•SubconsultantBravoEnvironmentalNW,Inc.willbereferredtoas“BravoEnvironmental”inthisdocument.•SubconsultantConfluenceEnvironmentalCompanywillbereferredtoa“ConfluenceEnvironmental”inthisdocument.•SubconsultantTetraTech,Inc.willbereferredtoas“TetraTech”inthisdocument.•SubconsultantV&AConsultingEngineerswillbereferredtoas“V&A”inthisdocument.•AllmeetingswillbeheldattheCityofficesorattheprojectsiteunlessotherwisespecified.•Draftdeliverableswillbeprovidedinelectroniccopy(PDFand/orMicrosoftWord)transmittedviaemailorsecurefiletransfer.•MeetingnotesandrelatedmaterialswillbetransmittedelectronicallyinMSWordandPDFformatsviaemail.•TheCitywillprintandproduceadditionalcopiesofalldocumentsasnecessaryforitsusebeyondwhatwillbeprovidedbytheConsultantasstatedwithinthisscopeofwork.•TheCitywillprovideavailableinformationrelatedtotheprojectandasrequestedbytheConsultantinatimelymanner.TheCityshallfurnishConsultantavailablestudies,reports,andotherdatapertinenttoConsultant’sservices;obtain,orauthorizeConsultanttoobtain,orprovideadditionalreportsanddataasrequired;furnishtoConsultantservicesofothersrequiredfortheperformanceofConsultantsserviceshereunder,andConsultantshallbeentitledtouseandrelyuponallsuchinformationandservicesprovidedbytheCityorothersinperformingConsultantsservicesunderthisAgreement.•Theprojectwill,inpart,conductdirectphysicalstudyofagingfacilities,theconditionsofwhicharenotfullyknown.TheConsultantwilltakereasonablecareduringsuchoperation5.ThisScopeofServicesincludesthejointdevelopmentbytheConsultantandCityofanEmergencyResponsePlanthatwillincludeproceduresshoulddamageoccuttotheCity’sfacilitiesduringthetermofthisproject.•TheConsultantshallperformtheservicesrequiredhereunderinaccordancewiththeprevailingengineeringstandardofcarebyexercisingtheskillandabilityordinarilyrequitedofengineersperformingthesameorsimilarservices,underthesameorsimilarcircumstances,intheStateofWashington.•TheCitywillfurnishtheConsultantcopiesofdocumentswhichareavailabletotheCitythatwillfacilitatetheConsultantsperformancetotheextentprovidedforintheScopeofWork.CitywillprovidetoConsultantalldatainCity’spossessionrelatingtoConsultantsservicesontheproject.Consultantwillreasonablyrelyupontheaccuracy,timeliness,andcompletenessoftheinformationprovidedbytheCity.Shouldfieldstudiesbeneeded,theConsultantwillperformsuchworktotheextentprovidedforintheScopeofWork.TheCitywillnotbeobligatedtoperformanysuchfieldstudies.•TheCityshallarrangeforaccesstoandmakeallprovisionsfortheConsultanttoenteruponpublicandprivatepropertyasrequiredforConsultanttoperformserviceshereunder.•Inprovidingopinionsofcost,financialanalyses,economicfeasibilityprojection5,andschedulesforpotentialprojects,theConsultanthasnocontrolovercostorpriceoflaborandmaterial;unknownorlatentconditionsofexistingequipmentorstructuresthatmayaffectoperationandmaintenancecosts;competitivebiddingproceduresandmarketconditions;timeorqualityofperformanceofthirdparties;quality,type,management,ordirectionofoperatingpersonnel;andothereconomicandoperationalfactorsthatmaymateriallyaffecttheultimateprojectcostorschedule.Therefore,theConsultantmakesnowarrantythattheCity’sactualprojectcosts,financialaspects,economicfeasibility,orscheduleswillnotvaryfromtheConsultant’sopinions,analyses,projections,orestimates.AGENDA ITEM #1. a)
Ta$ksTheConsultantshallcompletethetasksassummarizedinthetablebelowanddiscussedindetailinthetextthatfollows.Thebelowtasksamendthe2017Phase2AScopeofWork.Table1TaskSummaryTaskDeliverable100ProjectManagement200ProjectInitiation/PublicInvolvement400SiteConditions/ConditionAssessment500OperationsandMaintenance800Design900ConstructionServicesTask100—ProjectManagementTask100Subtasks101.MonthlyProgressReportsandInvoices.Thissubtaskincludespreparingandsubmittingthework-in-progressreportsandmonthlyinvoicesshowingcurrentprojectscope,budget,andschedulestatusandidentifyingkeyissues,orelementsoftheprojectthatwillneedtobeaddressedintheproceedingweeks.AnelectronicversionofthemonthlyprogressreportsandinvoiceswillbesenttotheCityforreviewandapproval.102.UpdateProjectManagementPlan.UpdatetheProjectManagementPlan(PMP)for2018activities.Describeprojectrolesandresponsibilities,listscontactinformationfortheprojectteam,describescommunicationsprotocols,thequalitymanagementplan,andincludesthe2018activitiesscopeofservices,budget,andprojectschedule.103.MeetingNo.25ProjectKickoffMeeting.Aprojectkick-offmeetingwillbeheldwiththeConsultingteamandCity.ThemeetingwillincludeareviewoftheCityexpectations,rolesandresponsibilities,andpreferredstrategies,tools,andtacticstosupport2018activities.104.TeamMeetings.Holdmonthlyteammeetings(twelvetotal—Meeting26through37)withtheCitytoreviewtheworkperformedandtaskforthenextmonth.ThiscoordinationmeetingwilloccurattheCityofficeorattheprojectsite.Assumptions•Projectisanticipatedtolasttwelve(12)months.•Fielddatacollectionisanticipatedtooccuroveratotaloffive(5)months.•SubconsultantsmayparticipateinKick-offmeetingviaphoneconferenceratherthaninperson.Meetings•Meeting25:ProjectKickoffmeeting.•Meetings26through37TeamMeetings(12).Deliverables•Monthlyprogressreportsandinvoices.AGENDA ITEM #1. a)
•Projectmanagementplan.•Meetingagendasandmeetingnotes.Task200-ProjectInitiation/PublicInvolvementThepurposeofTask200istoupdatetheemergencyresponseplan,coordinateandcollaboratewiththeCitytoupdateandcontinueimplementingapublicinvolvementplan,andconductpermitting.Task200Subtasks:206.UpdateEmergencyResponsePlan.UpdatethePhase2AEmergencyResponsePlanasrequiredtoinclude2018activitiesandpointsofcontact.Modifytherepairsectiontoincludespecificmaterials(manufacturerandpartnumber)thattheCityandContractoristoprovide.207.PublicInvolvementPlanandInformationMaterials.Thepurposeofthistaskistorefine(asappropriate)thePublicInvolvementPlan(PIP),implementkeyactivities,anddocumentthecommunityengagementprocess.Specifictasksforthiseffortareasfollows:a.UpdatePublicInvolvementPlan-BasedoninformationgatheredinPhasesIand2A,theprojectPIPwillbeupdatedtoreflectcommunicationsgoalsandobjectives,strategies,keymessages,outreachmilestones/schedule,tools,metrics,andprojectteamrolesandresponsibilitiesfor2018activities.Asneeded,thePIPwillbeupdatedatkeyprojectmilestones.b.UpdateProjectInformationMaterials-Designand/orupdateanddistributepublicinformationmaterialsidentifiedinthePIP,whichcouldinclude:i.FrequentlyAskedQuestions-Updatequestion!responsedocumentaddressinganticipatedpublicquestionsandconcernsandcontinuetoupdateasneededbasedoncommunityengagementactivities.ii.Websitecontent-Preparecontentupdatesfortheprojectwebpagethatincludebackgroundinformation,linkstokeymaterials(e.g.,FAQs),andanticipatedupcomingprojectactivities.EnvirolssueswillcoordinatewiththeCity’swebmasterwhowillmanagewebpage.Updateasneededbasedoncommunityengagementactivitiesandkeyprojectmilestones.iii.Projectfactsheet-Preparefactsheetwithprojectand2018lakelineactivitiesoverview,schedule,anticipatedfieldworkdetails,andprojectcontactinformationtopostonthewebsiteandtoshareelectronically,bymail,andin-person.iv.Fieldworknotifications-Prepareuptoeight(8)fieldworknotificationstoinformaffectedresidentsaboutplannedactivities(includingmanholeinstallation,accesstosubmergedmanholestructures,cleaningofthelakeline,CCTV,couponing,andotherin-waterwork)onorneartheirproperty.Notificationsincludeletters,doorhangerdistribution,andphonecallsasneeded.Thismayincludeuptofive(5)meetings(MeetingNo.38through42)withindividualpropertyowners.208.UpdateandMaintainStakeholderDatabase.UsingEnvirolssues’proprietarysoftware(EnviroLytical),Envirolssueswillupdateandmaintainaproject-specificsubscriptionfortrackingcontacts,organizations,communications,activities,andparcels.UsersmayincludeCityandprojectteamstaff;eachuserwillbeprovidedwithuniquelogincredentialsandbedesignatedwithread-only,editorormanagerpermissions.Uponprojectcompletion,Envirolssueswillprovidedatareports(Word,PDF)anddataexports(Excel)directlyfromEnviroLyticalandtheprojectsubscriptionwillbepermanentlydeleted.EnviroLyticaldataarebackedupdailyandstoredoffsitetoensuredatasecurity.a.EnvirolssueswillupdateEnviroLyticalasneededtorecord:i.Changesinownershipofpropertiesintheprojectareaii.Communicationstoandfrompropertyownersandotheraffectedpartiesiii.NotificationssentordeliveredtopropertiesandcontactsAGENDA ITEM #1. a)
iv.Communicationsandparcelinformationfromnotescollectedbycrewswhileinthefieldv.PermitApplications.209.PermitApplicationSupport.ConfluenceEnvironmentalwillprovidepermittingsupportforsubmittedapplicationsassociatedwiththelakelineinspectionwork(2018).Thiswillincluderespondingtoagencyreviewcommentsandquestions.Additionalinformationwillbeprovidedasappropriate,includingworkingwiththedesignteamandCitytoincorporateBMPsorotherprojectcomponentsrequestedbytheagencies.Attenduptofour(4)meetings(MeetingsNo.43through46)withvariousresourceagenciesandpermitreviewstaff.Thepermitacquisitionmatrixwillbeupdatedtotrackstatusofpermitapplicationsandpendingdecisions.Assumptions•Citytoprovideupdatedcontactlistsandcommunicationrecords(ifavailable)withaffectedpropertyowners.•RightsofEntrywillbeobtainedbytheCity.•Draftpublicinformationmaterialswillbeprovidedforuptotwo(2)roundsofCityreviewpriortofinalization.•Publicoutreachstaffwillattendmeetingswithindividualpropertyowners,uptofive(5),asneeded.•Enviroissueswilldeliveruptoeight(8)projectnotificationsinperson,withremainingcontactbyothermethods(e.g.,email,mail,etc.).•Citytoprintmaterials,managemailings,andpayforpostage.•Citytobethepermitapplicantandresponsibleforapplicablepermitfees.•Mitigationpotentiallyrequiredfortheprojectwillbedevelopedseparately•Resourceagencycommentswillonlyrequireclarificationandnotsubstantialadditionalanalysisoradditionalfieldwork•AsingleJointAquaticResourcePermitApplication(JARPA)willbeusedtosubmitforpermitamendmentsandapprovals.•Nowetlanddelineationswillberequired.•Projectwilldisturble5sthanone(1)acrecumulatively;resultinlessthan1/2acrewetlanddisturbanceandlessthan1/10acrewetlandloss.(Thesethresholdsarewhattriggeradditionalpermitrequirements)Meetings•MeetingNo.38through42Propertyownermeetings(uptofive).•MeetingsNo.43through46ResourceAgencyMeetings(uptofour).Deliverables•2018LakelineActivitiesPublicInvolvementPlan.•Publicinformationmaterials,includingFieldworknotifications(uptoeight)andPropertyownermeetingsummaries(uptofive).•EnviroLyticaldataexports(contacts,communications,etc.).•Draftcopiesofeachpermitamendmentapplication,withattachments.•Completedpermitamendmentapplications,withattachments.•Copiesofcorrespondencewithpermittingagencies.•Meetingagendasandmeetingnotes.Task400—SiteConditions/ConditionAssessmentThepurposeofTask400istoupdatetheLakelineremainingusefullife(RUL).TheLakelinewillbeevaluatedatmultipleburiedlocationsusingdivesupport.AGENDA ITEM #1. a)
Task400Subtasks:410.PipeConditionAssessment.a.UltrasonicThicknessTestingofLakeline.V&Awillconductultrasonicthicknesstesting(UT)usinganunderwatertestinggaugeatuptofivelocationswithdiveteamsupport.Thisworkisanticipatedtobecompletedintwo(2)fielddaysandataseparatetimefromthecollectionofpipesamples(410.c).Aboattosupporttheworkwillbeprovidedbythedivesupportteamaspartof410.e.b.CollectLateralCoupons.V&Awillcoordinatewiththediveteamtocollectcoupons/samplesfromthelateralsandLakeline.Thisworkisanticipatedtobecompletedintwo(2)fielddaysinconjunctionwithTask410.a.Ifaboatwillbeusedtoaccesstheshoreline,theboatwillbeprovidedbythedivesupportteamasparto1410.e.c.InspectandCollectPipeSamples.AspartoftheinstallationofnewmanholesontheLakeline,two20-footsectionsoftheLakelinewillberemovedandwillbeavailableforinspectionandsampling.V&AwillperformvisualinspectionandUTtestingontheremovedsectionsinthefield.V&AwillthencoordinatewiththeContractortocutsamplesoftheremovedsectionsforlaboratorytesting.ThisworkisanticipatedtobecompletedinonefielddayandwillbeundertakenataseparatetimefromUTtestingandcollectionofcoupons.d.EvaluationofthePipeSamplesandCoupons.ThiswillalsoincludepHtestingandqualitativeevaluationofthecementmortarlining.Atotalofsixpipesamples/couponswillbesentforlaboratorytestingasfollows(assumingthattheactualpipesamplesareDuctileIronPipe):i.Visualexaminationandphotographicdocumentationii.Metallographicevaluationiii.Chemicalcompositiontesting(C,Cr,Cu,Mg,Mn,Ni,P,Si,5,Ti,V)iv.CharpyImpactTestv.TensileTestvi.BrinellHardnessTestvii.PointmicrometerwallthicknessdimensionalmeasurementTheresultsofthelaboratorytestingreportandidentificationoftheRULofthetestedpipelocationswillbeincludedinareporttobeincludedasanappendixtoTask411.e.DiveSupport.BallardMarineConstructiontoprovidedivesupportforcollectionofUTtestsandLateralcouponretrieval.Supportwillinclude:i.Provisionofdiveboat,crewanddiveteam.ii.Diveteam.iii.Excavationpriortotesting/couponretrieval.iv.TestingandCouponretrieval(TestequipmentprovidedbyV&A,couponretrievalequipmentprovidedbyBallardMarineConstruction)v.Provisionandinstallationofuptostainlesssteelpiperepairclampsforupto4couponretrievalsites.Sizevariantswillbeprovidedtoaccountforminordeviationinpipediameterfromthoseexpected.AGENDA ITEM #1. a)
vi.Restorationoflakebedfollowingtesting/couponretrieval.vii.Provisionandimplementationofwaterqualitycontrolbestmanagementpracticesfortesting/couponretrieval.1.WaterQualityMonitoring:ConfluenceEnvironmentalwillprovidewaterqualitymonitoringduringConsultantDiveSupport(BMC)operationsthatinvolveexcavationinthelake.Thiseffortwillincludeturbiditymonitoringaccordingtoapprovedpermits.Thiseffortmayalsoincludeotherenvironmentalandspeciesmonitoring,ifrequiredbypermitconditions.411.DetermineRemainingUsefulLife(RUL).EstimatetheRULoftheLakelineandlateralsbasedonthe2017RULmeasurements,measurementscompletedinTask410,andCCTVInspectionsinTask500.TheconditionofunevaluatedportionsoftheLakelinewillbeextrapolatedbasedonthecollecteddatatotheextentpossible.a.MeetingNo.47RULWorkshop.FacilitateaworkshoptoreviewanddiscusstheRULofthelakelinebasedontheconditionassessmentactivities.DiscusstheCity’sdirectionfor2018activities,basedontheRULfindings.b.TechnicalMemorandum1RemainingUsefulLife.DocumenttheupdatedRULinashorttechnicalmemorandum.SubmitelectronicDraftTMforCityreviewandcomment.TheFinalTMwillbeincorporatedintothe2018SummaryReport.412.2018SummaryReport.PrepareaconsolidatedDraftReportincludingtherevisedTMsfrompriortasks.PrepareanExecutiveSummaryof2018activities.CitytoreviewDraftReportandcommentsaddressedinFinal2018SummaryReport.Itisanticipatedthatthefinalversionsubmittalwillincludethree(3)notebookbinders,onecamera-ready,andonePDF.a.MeetingNo.482018SummaryReportReview.FacilitateameetingwithCityStafftoreviewandcommentontheDraft2018SummaryReport.413.2019WorkPlan.Basedonthe2018activitiescreatea2019workplan.ItisanticipatedtheWorkPlanwillincludeanalternativeanalysisforshort-termandlong-termLakelineSystemRepairorReplacement.IncorporateCitydirectionfrom2019WorkPlanReviewmeeting.a.MeetingNo.492019WorkPlanReview.Reviewanddiscussthe2019workplanwithCityStaff.Assumptions•TheCitywillobtainallrights-of-entrypriortoinitiationoffieldwork.•TheCitywillberesponsibleforeffortsneededtoopenandusecleanouts,ifneeded,whichmayincludeexcavation,cleaning,repair,etc.•Siteconditionsatproposedcouponlocationsrequirepermitsforcollectionofcouponsandinstallationofrepairclamp.•CollectionofcouponsinLakewillusewetcell.Dewateringfordrycellisnotincluded.•Couponcollectionwilloccuronthesameworkdaysasultrasonicthicknesstesting.Divecrewwillperform/assistboth.•CouponlocationswillbedeterminedbyGPS.•ApproximatelyfourdaysofBallardMarineConstructionboat,boatcrewanddivecrewusewillberequiredforUTtestingandcoupongatheringontheLakelineandlaterals.Meetings•Meeting47RemainingUsefulLifeWorkshop•Meeting482018SummaryReport•Meeting492018WorkPlanReviewAGENDA ITEM #1. a)
Deliverables•TechnicalMemorandum1RemainingUsefulLife•ElectronicDraft2018SummaryReport•Three(3)notebookbinders,onecamera-ready,andonePDFFinal2018SummaryReport•MeetingagendasandmeetingnotesTask500—O&MAnalysisThepurposeof2018Task500activitiesistoevaluatetheeffectivenessofthe2018Lakelinecleaning.Itwilldeterminethetotallevelofeffort,cleaningeffectivenessbasedonCCTVInspectionandsystemhydraulics,andmakerecommendationsforfutureLakelinecleaningefforts.Task500Subtasks:502.CleaningLevelofEffort.Documentlevelofeffortofcleaningactivitiesintermsofcostsandstafftime.TheevaluationwillconsiderCity,Consultants,andContractorlevelofeffort.Potentialactivitiestobeincorporatedare:1)Planning2)Permitting3)SpecializedConsulting4)Design5)Bidding6)ContractorandCityMobilization7)ContractorandCityCleaningeffort8)ContractorandCityDemobilization9)ConsultantandCityPost-cleaningevaluationsProvidethelevelofefforttotheCityelectronicallyfortheirreviewandconfirmation.ReviewandreviseestimatesbasedonCitycommentsinMeeting50.a.MeetingNo.50CleaningLevelofEffortReview.LeadameetingwithreviewthelevelofeffortestimateandaddressanyCitycomments.503.CCTVInspectionEvaluation.Evaluatepre-andpost-cleaningCCTVinspectionvideotodetermineeffectivenessoftheLakelinecleaningefforttoremovepipedeposits,whereclearCCIVinspectionvideoisavailable.Theevaluationwillidentifyanddocument:i.LocationswithheavydepositsorFOGwillbeidentifiedandtheabilityforhydro-jettingtoremovedeposits.ii.Evidenceofdamagefromhydro-jetting,suchastheremovalofpipelining.iii.Structuraldefectsthatinhibitcleaning,suchasjointoffsets,sags,steepslopes,etc.iv.Estimateoftypeandquantitymaterialremoved.ThisestimatewillberefinedbasedonContractorrecordsofremovedsolids.v.IdentifypotentialeffectivenessoflandbasedcleaningeffortsbycomparingsegmentsoftheLakeline.a.MeetingNo.51CCTVInspectionWorkshop.FacilitateaworkshopwithCityStafftoreviewCCIVinspectionvideoandevaluationfindings.503.Post-CleaningHydraulicConditions.DeterminetheimpactsofcleaningonLakelineSystemhydraulicsusingthehydraulicmodel.i.CitystafftocollectLakelinehydraulicgradepre-andpost-cleaningwithandwithouttheFlushStationrunning.AGENDA ITEM #1. a)
ii.Updatethehydraulicmodeltoaccountforstructuralconditions(suchaspiperoughnessandminorlossesfromjointoffset)identifiedduringtheinstallationofmanholesandtheCCTVinspectionvideos.iii.Evaluatethechangeinthehydraulicgradeusingthehydraulicmodeltodeterminetheextentofblockagesremovedbythecleaning.iv.IdentifytheimpactofstructuralconditionsontheLakelineHGLbycomparingexistingconditionsto“likenew”conditions.504.FutureCleaningRecommendations.Developrecommendationsforfuturecleaningeffortsbasedonreportsforfieldactivities,levelofeffortevaluation,andCCTVinspection.a.MeetingNo.52CleaningEvaluationandRecommendations.ReviewtheeffectivenessofcleaningactivitiesandtheimpactofcleaningonLakelineSystemhydraulicswithCityStaff.Discussrecommendationsforfuturecleaningactivities.505.TechnicalMemorandum2FutureCleaningRecommendations.PrepareabriefTMtodocumentthefindingsandrecommendationsforfuturecleaningactivities.SubmitelectronicDraftTMforCityreviewandcomment.TheFinalTMwillbeincorporatedintothe2018SummaryReportinTask412.Assumptions•CitystafftocollectLakelinehydraulicgradepre-andpost-cleaningwithandwithouttheFlushStationRunning.•ItisassumedthatCCTVvideowillnotbeavailableforsagsintheLakeline,wherethecamerawilllikelybeunderwater.•Contractorwillprovidepre-andpost-cleaningCCTVinspectionsusingtheNASSCOPACPstandard.•City,Contractor,andConsultantscanprovidethelevelofeffortintermsofdollarsandstafftime.•Contractorcanprovidetypeandquantityofsolidsremovedduringcleaning.Meetings•Meeting50CleaningLevelofEffortReview•Meeting51CCTVInspectionWorkshop•Meeting52CleaningEvaluationandRecommendationsDeliverables•TechnicalMemorandum2FutureCleaningRecommendations•MeetingagendasandmeetingnotesTask200—DesignThepurposeofTask800istodesigntwonewLakelinemanholesandancillaryimprovementstofacilitateaccessandcleaningoftheLakelineSystem.Majorelementsofthedesigninclude:•2submergedandburiedmanholesontheLakeline.•Replacementofadjacentpipingformanholeconstruction.•CleaningoftheLakeline.•Restorationofprojectlocations.ThetaskwilldevelopPlans,SpecialProvisionsandEngineer’sOpinionofProbableCostforconstructionduring2018.Task800Subtasks:AGENDA ITEM #1. a)
801.DetailedSiting/surveya.Providedetailedbasemappingofuplands,docksandlakebottomwithinapproximately100’oftheproposedmanholelocations.Additionalmappingmaybenecessaryforproposedequipmentaccessroutesand/orstagingareas.b.Surveyapproximately9locationswhereUltrasonicThickness(UT)TestingandCouponsarecollected.c.SiteVisitandHabitatAssessment.ConfluenceEnvironmentaltoperformuptotwositevisits(Meeting53and54)willbeconductedtoobtainanyneededenvironmentalornaturalresourceinformation.ThesevisitswillbetriggeredbyrequestoftheCityorEngineerassociatedwithpermittingordesignneeds.Thistaskalsoincludesbriefdocumentationofinformationcollectedduringsitevisitsasappropriate802.Drawings.Prepareasetofupto7Plansincluding:1)ProjectLocation&VicinityMap&SheetIndex2)SymbolsandAbbreviations3)PlanofManholeInstallation—Sheet;4)PlanofManholeInstallation—Sheet25)Plan&ScheduleofCleaning(5locations)6)ManholeDetails7)RiserDetailsSubmit90percentdesigndrawingsforCityReviewandcomment.PreparebiddrawingsbasedonCitycommentsandinternalQualityControlreview.a.MeetingNo.5590PercentDesignReview.MeetwithCitystafftoreviewthe90percentdrawings,specifications,andEngineer’sOpinionofProbableCost.803.ContractDocumentsandEngineer’sOpinionofProbableCost.Prepareprojectspecificspecialprovisions,andanEngineer’sOpinionofProbableCost.Submit90percentdocumentsdrawingsforCityReviewandcomment.PreparebiddocumentsbasedonCitycommentsandinternalQualityControlreview.a.PrepareProjectSpecificSpecialProvisionsforbiddingpurposesi.PreparespecificspecialprovisionsforconstructionofnewLakelinemanholesandadjacentpipereplacement.ii.PrepareaspecificationforusingtheKingCountysubmergedmanholeriser.ItisassumedKingCountycanprovidestandardoperatingproceduresanddirectionsfortheuseofmanholeriser.BravoEnvironmentalwillfacilitateidentifyingthetechnicalrequirementsofthespecification.1)MeetingNo.56KingCountyManholeRiserCoordination.MeetwithKingCountystafftocoordinateuseoftheManholeRiser.Collectavailabledocumentationfortheriser.iii.PrepareO&MspecificationsforcleaningtheLakeline.Itisanticipatedthespecificationwillinclude:1)Hydrojetting2)Removalofsolids3)Disposalofliquid4)CCTVInspectionsBravowillfacilitateidentifyingthetechnicalrequirementsofthespecification.CCTVInspectionswillbeconsistentwithNASSCOPACPstandardsandCitydatabaserequirements.5)MeetingNo.57O&MSpecifications.FacilitateameetingwithCityoperationstafftoreviewtheO&MSOPs.b.PreparecontractdocumentsintheCity’sstandardformatfollowingspecificationsincluding:ii.Invitationtobidiii.Proposalandcontractdocumentsiv.AmendmentstostandardspecificationsAGENDA ITEM #1. a)
v.Projectspecificspecialprovisionsvi.Prevailingwagesvii.AppendixofCitystandarddetailsrelevantforthisproject.c.PrepareanEngineer’sOpinionofProbableCost804.BidSupport.TeamwillprovidesupportservicestotheCityduringthebidperiodincluding:a.BidderquestionswillbedirectedtoCitystaff.TeamwillcoordinatedwithCitystafftoanswerquestionsandcitystaffwillrespondtothebidder.b.Teamwill;prepareuptooneaddendumtothebiddocumentsbaseduponquestionsandcommentsreceivedfromcontractorsand/orsuppliersincoordinationwithCitystaff.c.Meeting58BidOpening.AttendtheBidOpeningtosupportCityStaffandaddressbidderquestions.Assumptions1.SurveyofUTtestingandcouponlocationswillbedonewithaidofaboatprovidedbythesurveyteam.2.NoSamplingAnalysisPlanwillbenecessary—excavatedmaterialwillbesidecastinLakeWashingtonpriortorestoration.Noremovalanddisposalinotherwaterbodyrequired.3.Contractwillbebasedon2018WSDOTStandardSpecificationforRoadBridgeandMunicipalConstruction4.CitytoprovideBoilerplateContractProvisionsforinclusioninContractDocuments5.CitytoprovidecurrentversionofCityofRentonGeneralSpecialProvisions.6.KingCountywillprovidespecificationsanddirectionsforuseofitsManholerisers.7.Designdocumentswillbesubmittedat90percentandatbiddocumentstage.8.Citytoprovideexistingdocumentationofcleaningandliquiddisposalrequirements.9.CitytoprovideCCTVdatabasestandards.10.TheCitywillbidtheprojectinadvanceofobtainingthepermitforworkfromtheArmyCorpofEngineers.ThepermitwillbeobtainedbytheCitypriortocommencementofconstructionandcleaningwork.Meetings•MeetingNo.53and54EnvironmentalSiteVisitsandHabitatAssessment•MeetingNo.5590PercentDesignReview•MeetingNo.56KingCountyManholeRiserCoordination•MeetingNo.57O&MSOPs•MeetingNo.58BidOpeningDeliverables•90percentdocumentsincludingPlans,SpecialProvisionsandEngineer’sOpinionofProbableCost(90percentandbiddocumentset)•ContractDocumentsincludingPlans,SpecialProvisionsandEngineer’sOpinionofProbableCost(90percentandbiddocumentset)•MeetingagendasandmeetingnotesTask900—ConstructionSupportServicesProvideconstructionsupportservicesfortheconstructionoftwo(2)newLakelinemanholesandsubsequentcontractorleadcleaningoftheLakeline.Task900Subtasks:901.Meeting59Preconstructionmeeting.ParticipateinthePreconstructionMeeting.902.Providefulltimeonsiteconstructioninspectionduringin-waterworkeffortAGENDA ITEM #1. a)
903.ReviewandrespondtosubmittalsasrequestedbytheCity,uptothehourlimitidentifiedinExhibitC.904.ReviewandrespondtoanyContractorgeneratedRFIsorChangeOrderrequestsonanasneededbasis,uptothehourlimitidentifiedinExhibitC.905.PreparedraftandfinalConstructionRecordDrawings(CRD’s)basedonContractorprovidedredlinesmarkups.906.WaterQualityMonitoring:ConfluenceEnvironmentalwillprovidewaterqualitymonitoringduringContractorandConsultantDiveSupport(BMC)operationsthatinvolveexcavationorconstructioninthelake.Thiseffortwillincludeturbiditymonitoringaccordingtoapprovedpermits.Thiseffortmayalsoincludeotherenvironmentalandspeciesmonitoring,ifrequiredbypermitconditions.Assumptions•Theonsiteconstructionphasedurationwillnotexceed2months.Ifthisdurationisextendedforanyreason,additionalbudgetmayberequired.•CityauthorizationisrequiredtoperformworkeffortbeyondhourlimitidentifiedinExhibitC.Workwillbeperformedonatimeandmaterialbasis.•Citywillprovidecontractcomplianceservicesexceptasnotedabove.•Consultantwillreviewandrespondtoupto8submittals,uptothehourlimitidentifiedinExhibitC.•Consultantwillreviewandrespondtoupto10RFIsandchangeorders,uptohourlimitidentifiedinExhibitC.•Itisassumedthatinitialcontractorsubmittalswillmeetthespecificationrequirementsforcontentandformat.Iftheserequirementsarenotmet,thesubmittalwillbereturnedtotheContractorforrevisionpriortocommencementofreview.EvaluationofproposedalternatematerialswillbeconsideredextraworktobeperformedattheContractor’sexpense.Reviewofoneresubmittalforeachsubmittalisassumed,unlessnotedotherwise.•TheConsultantshallnotberesponsibleforthemeans,methods,techniques,sequences,orproceduresofconstructionselectedbytheconstructioncontractorsorthesafetyprecautionsandprogramsincidenttotheworkoftheconstructioncontractorsandwillnotberesponsiblefortheconstructioncontractors’failuretocarryoutworkinaccordancewiththeContractDocuments.•CRDdrawingswillbebasedoncontractorredlines.ThecontractorwillmaintainanaccuratesetofredlinerecorddrawingsonthesiteinaccordancewiththespecificationsandsuitableforuseinproducingCRDdrawingswithoutfurtherfieldverification.CRDsiteinvestigationandsurveyarenotincludedinthisscopeofwork.•BoatandcrewtosupportwaterqualitymonitoringshallbeprovidedbyConfluenceEnvironmental.•SubmittalswillbereviewedforgeneralconformancewiththeprojectdesignconceptandgeneralcompliancewiththeinformationgivenintheContractdocuments.•Constructionrecorddrawingswillbecompletedinasingleiterationbasedonclearmarkupsbyteamrepresentativeandcontractor.•RecorddrawingswillbeprovideinPDFformatelectronicallyandfullsizef22”x34”)MylarperCityrequirements.Meetings•MeetingNo.59PreconstructionMeeting•WeeklyConstructionMeetingsbyResidentProjectRepresentativeDeliverables•Draftpreconstructionsitemeetingagenda•OnsiteconstructionfieldreportsAGENDA ITEM #1. a)
•Reviewresponsesforsubmittals•ResponsestocontractorRFI’s•ReponsestomiscellaneousconstructionquestionsfromtheCity•Onsiteconstructionobservationreportsforsitevisits.RecordDrawingsAGENDA ITEM #1. a)
SummaryThefollowingtablesprovideasummaryofthemeetingsanddeliverablesanticipatedforthisscopeofservicesTable2MeetingsSummaryTaskMeetingNo.MeetingLocation10025ProjectKickoffCity10026—37TeamMeetings(12)Consultant20038-42Propertyownermeetings(uptofive).Onsite20043-46ResourceAgencyMeetings(uptofour)AtResourceAgency40047RemainingUsefulLifeWorkshopCity400482018SummaryReportReviewCity400492019WorkPlanReviewCity50050LevelofEffortReviewCity50051CCTVInspectionWorkshopCity50052O&MEvaluationandRecommendationsCity80053&54EnvironmentalSiteVisitandHabitatAssessmentOnsite8005590PercentDesignReviewCity800KCManholeRiserCoordination56KingCounty80057O&MSpecificationCity80058BidOpeningCity90059PreconstructionMeetingOnsite900NAWeeklyConstructionMeetingsOnsiteAGENDA ITEM #1. a)
Table3DeliverableSummaryTaskDeliverable100Monthlyprogressreportsandinvoices100ProjectManagementPlan100___
_
__MeetingAgendasandnotes200___
_
_Emergency_ResponsePlanUpdate400DraftTM1RemainingUsefulLife__
_
_
__
_
_
__
_
_
__
_
_
_400DraftandFinal2018SummaryReport500DraftTM2FutureCleaningRecommendations80090percentPlans,SpecialProvisionsandEngineer’sOpinionofProbable__
_
_
__
_
_
__
_
_
__
_Cost___
__
_
__
_
___
_
__
_
__
_
___
_800ContractDocuments,includingBidSetofPlans,SpecialProvisionsandEngineer’sOpinionofProbableCost900DraftpreconstructionsitemeetingagendaooOnsiteconstructionfieldreports____
_
_
__900ReviewresponsesforsubmittaIs900ResponsestocontractorRFI’s900Reponsestomiscellaneousconstruction_questionsfromtheCity_____900Onsiteconstructionobservationreportsforsitevisits900RecordDrawingsAGENDA ITEM #1. a)
Exhibit B-i
Kennydale Lakeline Sewer System Evaluation
Phase 2B
Level of Effort
SubCarobTTTotalElTotalBravoKPGV&A CE Total BMC Remaining New 2018 Work
Total Cost Cost Cost Total Cost Total Cost Total Cost Cost Total Cost Markup Work Effort Effort
—-=@ 10%-
Task 100-Project $39,540 $27,812 $8,680 $1,208 $-$4,466 $5,820 $3,709 $5,170 $96,405 $52,000Management
Task 200 -Project $25,332 $24,145 $37,992 $-$-$-$37,200 $-$9,934 $134,603 $34,000Initiation/Public Involvement
Task 400 -Site Conditions I $47,791 $58,387 $4,536 $-$-$64,948 $9,200 $31,885 $16,896 $233,643 $128,877ConditionAssessment
$48,266 $16,328 $-$-$-$-$-$-$1633 $66,226 $16,000Task500-O&M Analysis
$34,810 $54,363 $-$5,192 $7,860 $-$12,100 $-$7,952 $122,277 $122,277Task800-Design
Task 900 -Construction $37,860 $104,699 $-$-$4,440 $-$14,040 $-$12,318 $173,357 $173,357SupportServices
$233,599 $285,734 $51,208 $6,400 $12,300 $69,414 $78,360 $35,594 $53,901 $826,510 $526,510Total
3/27/2018
AGENDA ITEM #1. a)
Exhibit C-i
Kennydale Sewer System Evaluation
Phase 2B
Schedule
201$2019 2020
Task May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr :Jan
Task 100 -Project Management I
Task 200 -Project Initiation/Invol I
Task 400 -Site Cond.I Assessment
Task 500 -O&M Analysis
Task 800 -Design I
Services I
C I
LEGEND Carollo Working Periods
PROJECT COMPLETION DATE OF JANUARY 31,2020