Technical Information Report
PREPARED FOR:
Renton School District 403
300 SW 7th Street
Renton, WA 98057
PROJECT:
McKnight Middle School
Play Fields Renovation
1200 Edmonds Avenue NE
Renton, WA 98058
2180059.10
PREPARED BY:
Anne M. Turpin, PE
Project Engineer
REVIEWED BY:
Adam C. Braun, PE
Project Manager
William J. Fierst, PE
Associate Principal
DATE:
September 2018
Revised November 2018
IN COMPLIANCE WITH CITY OF RENTON STANDARDS
C18005204
R 4028
DEVELOPMENT ENGINEERING
rnair 12/18/2018
REGIONAL FIRE AUTHORITY
cthomas 12/18/2018
APPROVEDSURFACE WATER UTILITY
rstraka 12/18/2018
Technical Information Report
PREPARED FOR:
Renton School District 403
300 SW 7th Street
Renton, WA 98057
PROJECT:
McKnight Middle School
Play Fields Renovation
1200 Edmonds Avenue NE
Renton, WA 98058
2180059.10
PREPARED BY:
Anne M. Turpin, PE
Project Engineer
REVIEWED BY:
Adam C. Braun, PE
Project Manager
William J. Fierst, PE
Associate Principal
DATE:
September 2018
Revised November 2018
I hereby state that this Technical
Information Report for the McKnight
Middle School Play Fields Renovation
project has been prepared by me or
under my supervision, and meets the
standard of care and expertise that is
usual and customary in this community
for professional engineers. I understand
that City of Renton does not and will not
assume liability for the sufficiency,
suitability, or performance of drainage
facilities prepared by me.
Technical Information Report
McKnight Middle School Play Fields Renovation 2180059.10
Table of Contents
Section Page
1.0 Project Overview ............................................................................................................................ 1
1.1 Purpose and Scope............................................................................................................. 1
1.2 Existing Conditions.............................................................................................................. 1
1.3 Post-Development Conditions ............................................................................................ 1
1.4 Soils .................................................................................................................................... 1
1.5 Sensitive Areas ................................................................................................................... 2
2.0 Conditions and Requirements Summary .................................................................................... 2
2.1 CR 1 – Discharge at the Natural Location .......................................................................... 2
2.2 CR 2 – Offsite Analysis ....................................................................................................... 2
2.3 CR 3 – Flow Control ............................................................................................................ 3
2.4 CR 4 – Conveyance System ............................................................................................... 3
2.5 CR 5 – Erosion and Sediment Control ................................................................................ 3
2.6 CR 6 – Maintenance and Operations.................................................................................. 3
2.7 CR 7 – Financial Guarantees and Liability ......................................................................... 4
2.8 CR 8 – Water Quality .......................................................................................................... 4
2.9 CR 9 – Onsite BMPs ........................................................................................................... 4
2.10 SR 1 – Other Adopted Requirements ................................................................................. 5
2.11 SR 2 – Flood Hazard Delineation ....................................................................................... 5
2.12 SR 3 – Flood Protection Facilities ....................................................................................... 5
2.13 SR 4 – Source Control ........................................................................................................ 5
2.14 SR 5 – Oil Control ............................................................................................................... 5
2.15 SR 6 – Aquifer Protection Area ........................................................................................... 6
3.0 Offsite Analysis .............................................................................................................................. 6
3.1 Task 1 – Study Area Definition and Maps........................................................................... 6
3.2 Task 2 – Resource Review ................................................................................................. 7
3.3 Task 3 – Field Inspection .................................................................................................... 7
3.4 Task 4 – Drainage System Description and Problem Descriptions .................................... 8
4.0 Flow Control, Low Impact Development (LID) and Water Quality Facility Analysis and
Design ............................................................................................................................................. 9
4.1 Existing Site Hydrology (Part A) .......................................................................................... 9
4.2 Developed Site Hydrology (Part B) ..................................................................................... 9
Technical Information Report
McKnight Middle School Play Fields Renovation 2180059.10
4.3 Performance Standards (Part C) ...................................................................................... 10
4.4 Flow Control System (Part D) ........................................................................................... 10
4.5 Water Quality System (Part E) .......................................................................................... 11
5.0 Conveyance System Analysis and Design ................................................................................ 11
6.0 Special Reports and Studies ...................................................................................................... 11
7.0 Other Permits ............................................................................................................................... 11
8.0 Construction Stormwater Pollution Prevention Plan (CSWPPP) Analysis and Design ....... 11
9.0 Bond Quantities, Facility Summaries, and Declaration of Covenant ..................................... 12
10.0 Operations and Maintenance Manual ........................................................................................ 12
11.0 Conclusion .................................................................................................................................... 12
Technical Information Report
McKnight Middle School Play Fields Renovation 2180059.10
Appendices
Appendix A
Figures
1-1 ............. TIR Worksheet
1-2 ............. Site Vicinity Map
1-3 ............. USDA Soil Map
3-1 ............. Downstream Analysis
3-2 ............. Off-Site Analysis Drainage System Table
3-3 ............. Erosion Hazard Map
3-4 ............. Steep Slopes Map
3-5 ............. Slide Hazard Map
3-6 ............. Flood Hazard Map
3-7 ............. Coal Mine Hazard Map
3-8 ............. Aquifer Protection Map
3-9 ............. FIRM Rate Map
3-10 ........... Basin Map
4-1 ............. Existing Basin Map
4-2 ............. Developed Basin Map
5-1 ............. Conveyance Basin Map
9-1 ............. Bond Quantity Worksheet
9-2 ............. Flow Control Facility - North
9-3 ............. Flow Control Facility - South
9-4 ............. Declaration of Covenant
Appendix B
Geotechnical Engineering Letter
Krazan & Associates, Inc.
August 17, 2018
Appendix C
WWHM Report
Appendix D
Exhibits
D-1............. Conveyance Calculations
D-2............. Conveyance Reference
D-3............. Email between AHBL and Renton School District, June 28, 2018
D-4............. Sediment Trap, Dewatering Orifice, and Spillway Design Calculations
Appendix E
Operations and Maintenance Manual
Technical Information Report
McKnight Middle School Play Fields Renovation 1 2180059.10
1.0 Project Overview
1.1 Purpose and Scope
This report accompanies the civil engineering plans and documents for the Renton School
District’s McKnight Middle School located at 1200 Edmonds Avenue NE in Renton, Washington.
The project site encompasses Tax Parcels 0423059048 and 72227801860 in the City of Renton,
King County, Washington. The parcels are located within the southwest quarter of the southwest
quarter of Section 04, Township 23 North, Range 5 East, of the Willamette Meridian. See
Appendix A, Figure 1-2 Site Vicinity Map.
The Renton School District (RSD) proposes to provide underdrainage for three existing sports
fields, two baseball fields, and one soccer field. The project site is bounded by single-family
homes on Edmonds Avenue NE to the west, by a church and duplex homes on NE 12th Street to
the south, by single-family homes on Harrington Avenue NE to the east and by McKnight Middle
School to the north. No new pollution generating surface will be created by this project.
The 2017 City of Renton Surface Water Design Manual (RSWDM) establishes the methodology
and design criteria used for the project.
1.2 Existing Conditions
Existing improvements on the site include a middle school building, athletic fields, tennis and
basketball courts, and parking areas. The area affected by the proposed work includes three
existing sports fields. The total parcel area is 20.39 acres, but the area of work is only 3.34
acres.
1.3 Post-Development Conditions
RSD proposes to install underdrains in the three sports fields. Because the existing irrigation
system in the field areas is above the proposed underdrain, the existing irrigation system will be
removed and replaced with a slightly modified system. Two trees will be removed along NE 12th
Street.
Project Land Cover Areas
Aimp Aperv Total
(sf) (ac) (sf) (ac) (sf) (ac)
Existing 0.00 0.00 145,490 3.34 145,490 3.34
Proposed 145,490 3.34 0.00 0.00 145,490 3.34
The engineered drainage system for the proposed site will not alter the existing discharge
location from the site. Runoff travels through pipes around the east and south sides of the middle
school sports fields, exits the site at the southwest corner of parcel 7227801860, and eventually
drains to Lake Washington.
1.4 Soils
The majority of the soils have been classified as Urban Land (Ur) by the USDA Natural
Resources Conservation Service. The remaining soils were classified as Alderwood (AmC) and
Indianola loamy sand (InC). See Appendix A, Figure 1-3 USDA Soil Map. Slopes vary from 0 to
15 percent.
Technical Information Report
McKnight Middle School Play Fields Renovation 2 2180059.10
A Geotechnical Engineering Letter was prepared on August 17, 2018, by Krazan & Associates,
Inc. Five soil borings were conducted during the investigation. The borings were conducted to
depths of 9, 9, 6, 10, and 7 feet below ground surface respectively. In borings 1, 2, and 4, the
undocumented fill continued to the bottom of the borings and consisted of dark gray to brown silty
sand with gravel and organics and debris. The debris included bricks, concrete, and metal
pieces. In borings 3 and 5, the undocumented fill layer was less deep, extending to 2.5 feet
below ground. The soil beneath the undocumented layer consisted of silty sand with gravel
glacial deposits. The soil borings concur with the USDA map in that the native soils are
considered as Urban Land (Ur).
The letter recommends that due to the presence of the undocumented fill, the play field areas
may not be considered for stormwater infiltration. The Geotechnical Engineering Letter is
included in its entirety as Appendix B.
1.5 Sensitive Areas
There are no known wetlands on or in the vicinity of the site.
We reviewed maps provided by the City of Renton and concluded that this site is located in the
Cedar Valley Sole Source Aquifer Review Area but otherwise, is not in any recognized sensitive
area. These maps are discussed in more detail in Section 3.2.
2.0 Conditions and Requirements Summary
The project triggers Full Drainage Review because it results in more than 7,000 square feet of
land disturbing activity and over 2,000 square feet of new and/or replaced impervious surface.
Below is a summary of how the proposed project will meet the Core Requirements (CR) and how
it will meet applicable Special Requirements (SR).
2.1 CR 1 – Discharge at the Natural Location
The proposed work site has a single discharge point to a catch basin southwest of the play field
area, which is on the middle school property. This discharge point will be maintained by this
project. See Section 3.0 for further description of the storm drainage system beyond the existing
discharge location.
2.2 CR 2 – Offsite Analysis
AHBL staff performed a Level One Downstream Analysis for the project on August 12, 2018. The
analysis included:
Defining and mapping the study area.
Reviewing available information on the study area.
Field inspecting the study area.
Analyzing the existing drainage system, including its existing and predicted problems, if
any.
Please refer to Section 3.0 for the full offsite analysis.
Technical Information Report
McKnight Middle School Play Fields Renovation 3 2180059.10
2.3 CR 3 – Flow Control
Because the existing sports fields will receive underdrains, the area qualifies as new impervious
surface. The Western Washington Hydrology Model (WWHM) was used to model the existing
stormwater conditions and design detention systems for the fields.
See the WWHM Report in Appendix C.
According to the 2016 RSWDM Reference 15-A (Figure 3.2), Flow Control Application Map, the
site is subject to the Peak Rate Flow Control Standard (Existing Site Conditions). This standard
requires that the post-development peak rates match those of the existing condition for the 2-, 10-
, and 100-year peak flows. Flow control will be provided through the use of buried detention
tanks. WWHM was used to model the hydrologic conditions.
Detention Tank Sizing Results
Detention Pipe Diameter
(IN)
Detention Pipe Length
(LF)
Storage Volume
(CF)
Baseball Detention Tank 60 853 16,749
Soccer Detention Tank 48 860 10,807
2.4 CR 4 – Conveyance System
The runoff from the sports field areas will be collected in catch basins and conveyed in pipes to
the detention facilities. Water infiltrating into the soil will be collected by the infiltration systems
and conveyed in pipes to the detention facilities. Based on Section 1.2.4.1 of the RSWDM, new
pipe systems shall be designed with sufficient capacity to convey and contain the 25-year peak
flow with a minimum of 6 inches of freeboard between the design water surface and structure
grate. In addition, runoff from the 100-year peak storm event cannot create or aggravate a
severe flooding problem or severe erosion problem. The new pipe system has sufficient capacity
for a 25-year peak flow. Catch basin rims will not overtop in the 100-year peak storm event, and
there will be more than 6 inches of freeboard between the design water surface and structure
grate during the 25-year peak storm event. No severe flooding problems or severe erosion
problems will be created or aggravated in the 100-year storm event. See Appendix D for detailed
calculations.
2.5 CR 5 – Erosion and Sediment Control
Onsite land disturbance will consist of clearing the work site, demolition, and regrading. Erosion
and sediment control will be provided with the use of temporary and permanent seeding within
the work limits, silt fence, inlet sediment protection, stabilized construction entrance, and
sedimentation ponds. See Section 8.0 for Construction Stormwater Pollution Prevention Plan
(CSWPPP) analysis and design.
2.6 CR 6 – Maintenance and Operations
Maintenance and operations of all drainage facilities will be maintained by the RSD. The project
proposes two new detention facilities and, new area drains and catch basins onsite. Operations
and Maintenance are detailed Appendix E.
Technical Information Report
McKnight Middle School Play Fields Renovation 4 2180059.10
2.7 CR 7 – Financial Guarantees and Liability
This project will provide financial guarantees and liability per City of Renton requirements. See
the City of Renton Bond Quantity Worksheet in Appendix A, Figure 9-1.
2.8 CR 8 – Water Quality
RSD is proposing to not use fertilizers or pesticides on the surface, and therefore the surfaces
should be considered as non-pollution generating (PGIS). This condition shall be included in the
covenant for stormwater facilities provided to the City.
2.9 CR 9 – Onsite BMPs
This project proposes work on a single site, and the disturbed area exceeds 22,000 square feet;
therefore, for CR 9, it must meet the requirements for Large Lot BMPs, as described in
Section 1.2.9.2.2 in the RSWDM. Due to the inability to infiltrate, meeting the LID performance
requirement is not feasible. The onsite BMPs required by the City are addressed below:
1. Full Dispersion: This option is not feasible, as the project site and its surroundings are
fully developed; and there are no forested areas to disperse to.
2. Full Infiltration: Full infiltration is not feasible because the site cannot meet the minimum
design requirements listed in Section 2.2.2 of Appendix C. Till soils on this site make
infiltration infeasible. This option is not feasible due to the inability to infiltrate. (See
Geotechnical Engineering Letter, dated August 17, 2018, by Krazan & Associates, Inc.
located in Appendix B.)
3. Limited Infiltration: The RSWDM lists two options for meeting limited infiltration: gravel
filled trenches and drywells. The specifications for use of gravel filled trenches for limited
infiltration are the same as those used for full infiltration, except that the required trench
lengths are reduced. Gravel filled trenches are infeasible because there is no area in the
baseball or soccer field areas that could accommodate a flowpath. The area outside of the
field areas has a slope in excess of 15 percent. In addition, the site soils do not meet the
design requirements listed in Section 2.3.3 of Appendix C.
4. Basic Dispersion: The RSWDM lists four options for meeting Basic Dispersion. Splash
blocks, Rock Pads, Gravel Filled Trenches, Sheet Flow
Splash Blocks do not apply, as no new roof areas are proposed.
Rock Pads: Section C2.1.4 of the 2017 RSWDM states that no more than 700 square
feet of impervious surface may be drained to a single rock pad unless the native
vegetated flow path segment is longer than the 100-foot minimum length specified in
Minimum Design Requirement 3 of Section 2.1.1. Rock pads are infeasible because
this project has 145,490 square feet of impervious surface, which would require
209 rock pads. In addition, there is no existing native vegetated surface onsite.
Gravel Filled Trenches are infeasible, as a 50-foot trench can only disperse 3,500
square feet, which would require this site to have more than 42 such trenches, and
there is not enough space on the site for the required vegetated flow paths for that
number of trenches. Gravel filled trenches required a vegetated flowpath segment of at
least 25 feet in length along the flowpath that runoff would follow upon discharge from a
dispersion trench. This length must be increased to 50 feet if the discharge is toward a
steep slope hazard area or a landslide hazard steeper than 15 percent. There is no
Technical Information Report
McKnight Middle School Play Fields Renovation 5 2180059.10
area in the field areas that could accommodate this flowpath. The area outside of the
field areas has a slope in excess of 15 percent.
Sheet Flow is infeasible, as the current layout of the site is not designed to allow this,
the site will not be reconfigured by this project, and there is no vegetated area available
to Sheet Flow to.
5. Reduced Impervious Surface Credit, Native Growth Retention Credit, or Tree
Retention Credit: Restricted Footprint, Minimum Disturbance Foundation, and Open Grid
Decking do not apply, as no buildings are proposed, a Wheel Strip Driveway is not
applicable to a play field, so the Reduced Impervious Surface Credit is not feasible. The
Native Growth Retention Credit is not feasible, as there is no native growth to retain on this
site. The Tree Retention Credit is not feasible, as there are not enough existing trees in the
work area to meet the requirement.
6. Soil Moisture Holding Capacity: All disturbed pervious surfaces will be prepared in
accordance with the soil amendment BMP described in Section C.2.13 of the RSWDM.
The majority of the site’s soil has been disturbed in the past, therefore soil retention is
infeasible. All areas subject to clearing and grading that have not been covered by
impervious surface, incorporated into a drainage facility or engineered as structural fill or
slope shall, at project completion, have a topsoil layer with a minimum organic matter
content of 5 percent dry weight and a pH from 6.0 to 8.0. The topsoil layer shall have a
minimum depth of eight inches. Subsoils below the topsoil layer shall be scarified at least 4
inches with some incorporation of the upper material to avoid stratified layers.
7. Perforated Pipe Connection: Limited infiltration is feasible by providing a perforated pipe
connection. A perforated pipe connection has been added to the plan for the soccer field
runoff. A perforated pipe connection has not been added to the plan for the baseball field
runoff because it the pipe connects to the existing storm drainage system in the field area.
2.10 SR 1 – Other Adopted Requirements
The project is included in the Cedar River / Lake Washington Drainage Basin. City and County
basin requirements will be followed where applicable.
2.11 SR 2 – Flood Hazard Delineation
The proposed project is not in or adjacent to the 100-year floodplain. See Appendix A, Figure 3-9
FIRM Rate Map.
2.12 SR 3 – Flood Protection Facilities
This project does not rely on existing flood protection facilities nor will it modify or construct new
flood protection facilities.
2.13 SR 4 – Source Control
The proposed project includes three sports fields included as part of an existing middle school.
Therefore, it does not fit the definition of a commercial, industrial, or multi-family site for source
control purposes.
2.14 SR 5 – Oil Control
The site does not meet high use criteria and is not subject to oil control measures.
Technical Information Report
McKnight Middle School Play Fields Renovation 6 2180059.10
2.15 SR 6 – Aquifer Protection Area
This project is located in the Cedar River Sole Source Aquifer zone. This area requires additional
treatment before stormwater is infiltrated. Since infiltration is not possible for this project, this
does not change the design.
3.0 Offsite Analysis
3.1 Task 1 – Study Area Definition and Maps
RSD proposes to install underdrains at three of the existing sports fields at McKnight Middle
School.
The project site lies within the Cedar River / Lake Washington Drainage Basin, as delineated by
the King County Water Features Map.
There are upstream areas from other areas of the middle school property that drain to the project
site, but no areas drain from adjacent properties.
Each field has a single discharge point to a proposed catch basin, located directly upstream of
the two proposed detention tank systems. Drainage exiting the control structure CB 03 (for the
baseball fields) is conveyed north, through an 8-inch pipe, for approximately 6 feet until it joins the
site’s existing storm system at the proposed CB 04. From there, the drainage is redirected and
conveyed 98 feet east, through a 15-inch pipe, toward the site’s existing storm system STCB 543.
From there, the drainage is redirected and conveyed approximately 182 feet, through a 15-inch
pipe, south along the western edge of the sports complex to the existing catch basin CB 11.
From there, the drainage continues approximately 370 additional feet, through a 30-inch pipe,
south along the western edge of the sports complex thru the existing catch basins CB 8, 9, and
10 until it reaches the existing drainage structure located at the southwest corner of the middle
school property (CS). Drainage exiting the drainage structure CB 09 (for the soccer field) is
conveyed south, through an 8-inch pipe, approximately 18 feet toward the proposed catch basin
CB 10 picking up a small portion of the site’s existing storm system. From there, the drainage is
conveyed approximately 8 feet, through an 8-inch pipe, further south toward the proposed catch
basin CB 11. From there, the drainage is redirected and conveyed west approximately 180 feet,
through an 8-inch pipe, along the southern edge of the sports complex to the proposed catch
basin CB 12. From there, the drainage is redirected and conveyed northwest approximately 199
feet, through an 8-inch pipe, along the southern edge of the sports complex to the existing catch
basin STCB#636. From there, the drainage is redirected and conveyed southwest approximately
12 feet, through an 8-inch pipe, to the existing control structure CB#CS where it joins the
drainage from the rest of the sports complex.
From the existing structure CB#CS, the drainage is conveyed southwest approximately 82 feet,
through a 12-inch pipe, to the southwest corner of the site where it joins the runoff from the
northern portion of the site at existing CB 2.
The drainage exits the middle school property, through an 18-inch pipe that runs south under NE
12th Street. The drainage continues south under Edmonds Avenue NE, which is past the
0.25-mile downstream point from the project’s discharge points. The discharge eventually
reaches Lake Washington 1.5 miles from the school property via a closed drainage system.
Technical Information Report
McKnight Middle School Play Fields Renovation 7 2180059.10
3.2 Task 2 – Resource Review
The following resources were reviewed to discover any existing or potential problems in the study
area. All maps provided by the City of Renton extend into unincorporated King County.
Drainage System Maps: We consulted the City of Renton online mapping system and an
as-built map of the school’s storm system prepared by Warner Engineering, prepared in
1995. The City of Renton mapping also extends into unincorporated King County.
Adopted Basin Plans: The project site lies within the Cedar River / Lake Washington
Drainage Basin. Requirements for the Cedar River / Lake Washington Basin Plan will be
followed where applicable.
Offsite Analysis Reports: AHBL staff could not locate offsite analysis reports for projects
near the McKnight Middle School project site.
FEMA Map: FIRM Rate Map 53033C0668F, dated May 16, 1995 (see Appendix A, Figure
3-9), indicates that the project site lies outside the categorized flood zones.
City of Renton Sensitive Areas Slide Hazard Map (see Appendix A, Figure 3-5): The
project site is not located within the sensitive areas Landslide Hazard Area.
City of Renton Aquifer Protection Zone Map (see Appendix A, Figure 3-8): The project site
is located in the Cedar Valley Sole Source Aquifer Review Area.
City of Renton Coal Mine Hazard Map (see Figure 3-7): The project site is located outside
the coal mine hazard area.
City of Renton Erosion Hazard Map (see Figure 3-3): The project site is not within an
erosion hazard area.
City of Renton Flood Hazard Map (see Figure 3-6): The project site is not within a flood
hazard area.
City of Renton Steep Slopes Map (see Figure 3-4): The steep slopes map shows some
areas of up to 25 percent slopes. However, most of the area is less than 15 percent
slopes; and the proposed project will not impact the steep slopes.
King County Drainage Complaint Records: King County maintains a log of drainage
complaints they have received, accessible through their online mapping system. There is
no history of complaints in the area around the school.
Soils Information: Soils have been classified as Urban Land (Ur). See Appendix A, Figure
1-3 for the soil map by the USDA. See Appendix B for the Krazan & Associates, Inc.
Geotechnical Engineering Letter.
3.3 Task 3 – Field Inspection
On August 12, 2018, AHBL staff performed a field visit of the downstream drainage system
receiving stormwater runoff from the proposed McKnight Middle School underdrain installation.
1. Investigate any problems reported or observed during the resource review: No problems
reported or observed during the resource review.
Technical Information Report
McKnight Middle School Play Fields Renovation 8 2180059.10
2. Locate all existing/potential constrictions or lack of capacity in the existing drainage system:
No constrictions or lack of capacity in the existing drainage system was observed.
3. Identify all existing/potential downstream drainage problems as defined in Section 1.2.2.1:
We found no problems with the downstream drainage on the site visit.
4. Identify existing/potential overtopping, scouring, bank sloughing, or sedimentation:
No existing/potential overtopping, scouring, bank sloughing, or sedimentation was
observed.
5. Identify significant destruction of aquatic habitat or organisms (e.g., severe siltation, back
erosion, or incision in a stream): No significant destruction of aquatic habitat or organisms
was observed.
6. Collect qualitative data on features such as land use, impervious surfaces, topography, and
soil types for the site: The majority of the downstream path is on the middle school site and
is used as athletic fields and a walking track. Upon leaving the middle school, runoff enters
an area of single-family and multifamily housing. The study area ends just past the
intersection of NE 12th Street and Edmonds Avenue NE. Most of the site is flat, but slopes
increase to the south of the intersection with a maximum slope of around 6 percent.
7. Collect information on pipe sizes, channel characteristics, drainage structures, and relevant
critical areas (e.g., wetlands, stream, and steep slopes): Our observations found that the
pipes directly south of the site were 18-inch in diameter. There were no channels on the
route. Drainage structures consist of Type 1 catch basins at the flow line connected to the
storm main located beneath the approximate center of the northbound lane. There were no
wetlands, stream, or steep slopes on the route.
8. Verify tributary basins delineated in Task 1: Based on the topography onsite, the basin
delineation based on the survey was confirmed.
9. Contact neighboring property owners or residents in the area about past or existing
drainage problems, and describe these in the report (optional): No problems reported or
observed during the resource review.
10. Note the date and weather conditions at the time of the inspection: The site visit occurred
on August 12, 2018. The weather was partly cloudy and 70 degrees. There was no rain
during the visit, but there was a minor storm the previous day.
3.4 Task 4 – Drainage System Description and Problem Descriptions
As noted above, no drainage problems were identified downstream. The fields were soggy with
ponding water in one location. Judging from the distinct areas of dead or thriving grass, this was
likely due to an issue with the existing irrigation system combined with low permeability soils.
The City of Renton has identified the area around the middle school as a non-erosion hazard
area. (See the City of Renton Erosion Hazard Map, Appendix A, Figure 3.3)
Technical Information Report
McKnight Middle School Play Fields Renovation 9 2180059.10
4.0 Flow Control, Low Impact Development (LID) and Water Quality Facility
Analysis and Design
4.1 Existing Site Hydrology (Part A)
The existing site is occupied by ball fields, a 100-meter asphalt track and an asphalt walking path.
See Appendix A, Figure 4-1 Existing Basin Map for delineation of the existing drainage areas in
which improvements are proposed.
The total area disturbed by construction will be 3.34 acres. The two baseball fields (Basins 1 and
2) will disturb 1.96 acres, and the soccer field (Basin 4) will disturb 1.38 acres. See Appendix A,
Figure 4-1 Existing Basin Map). Soil types in the area were determined to be undocumented fill
(Urban Land) during the on August investigation by Krazan & Associates, Inc. Land cover and
surface slope will be essentially the same in the existing and proposed conditions. Minor elevation
differences will be due to the installation of the underdrain systems. The underdrains require the
WWHM modeling criteria to change from “till lawn” in the existing condition to “100 percent
impervious” in the mitigated condition.
The total disturbed areas are summarized in the tables below.
Existing conditions:
Area (sf) Peak Flow (cfs)
Subbasin C Lawn Flat Impervious Total 2-Year 10-Year 100-Year
Baseball 85,377 0.00 85,377 0.154 0.382 0.800
Soccer 60,113 0.00 60,113 0.109 0.269 0.564
Area (AC) Peak Flow (CFS)
Subbasin C Lawn Flat Impervious Total 2-Year 10-Year 100-Year
Baseball 1.96 0.00 1.96 0.154 0.382 0.800
Soccer 1.38 0.00 1.38 0.109 0.269 0.564
4.2 Developed Site Hydrology (Part B)
The project proposes to install underdrain systems beneath the baseball and soccer play fields.
The site areas after construction are summarized in the table below.
Mitigated flows:
Area (sf) Peak Flow (cfs)
Location C Lawn Flat Impervious Total 2-Year 10-Year 100-Year
Baseball 0.00 85,377 85,377 0.154 0.342 0.796
Soccer 0.00 60,113 60,113 0.107 0.240 0.560
Technical Information Report
McKnight Middle School Play Fields Renovation 10 2180059.10
Area (AC) Peak Flow (CFS)
Location C Lawn Flat Impervious Total 2-Year 10-Year 100-Year
Baseball 0.00 1.96 1.96 0.154 0.342 0.796
Soccer 0.00 1.38 1.38 0.107 0.240 0.560
A total of 145,490 square feet (3.34 acres) will be routed to the proposed detention systems. This
area is modeled as existing in the WWHM model.
See Figure 4-2, Developed Basin Map, for delineation of the developed drainage areas and flow
routes.
4.3 Performance Standards (Part C)
According to the RSWDM Reference 15-A, Flow Control Application Map, the site is subject to
the Peak Rate Flow Control Standard (Existing Site Conditions). This standard requires that the
post-development peak rates match those of the existing condition for the 2-, 10-, and 100-year
peak flows. Flow control will be provided through the use of buried detention tanks. WWHM was
used to model the hydrologic conditions.
The RSWDM indicates that the entire City of Renton is a Basic Water Quality area. A school is
considered a commercial site for stormwater regulations; therefore, the site requires Enhanced
Basic Treatment. In accordance with the RSWDM, onsite flows from new and replaced PGIS will
be treated to meet the performance standards for the Enhanced Basic Water Quality Menu. No
new or replaced PGIS are proposed for this project. The RSD is proposing not to use any
fertilizer or chemicals on these fields. Refer to Appendix D, Exhibit D-3, Email dated June 28,
2018.
4.4 Flow Control System (Part D)
The proposed stormwater flow control system is designed to meet the requirements of Section
5.1.2.1 of the RSWDM. Flow control will be provided through the use of buried detention tanks.
WWHM was used to size the detention tanks and outlet structures.
Two separate detention systems were designed, one for the baseball fields and one for the
soccer field. The tank system for the baseball fields consists of 853 linear feet of 5-foot diameter,
aluminized, Type 2, corrugated metal pipe. The tank system for the soccer field consists of
860 linear feet of 4-foot diameter, aluminized, Type 2, corrugated metal pipe.
The bottoms of both tank systems are located 0.5 foot below the inlet and outlet to provide dead
storage for sediment. The pipes are connected with the minimum 36-inch diameter pipe, not
longer than 2 feet. Tank access is provided via access risers (City of Renton Standard Plan
235.10) constructed with a maximum of 50 feet from any location within the tank. The control
structures were sized using WWHM and are set with the minimum 2.5-foot cover. (Refer to Plan
Sheet C3.8 for the inverts of the pipe associated with the control structures and Appendix C for
the WWHM calculations.) Pipe material, joints, and protective treatment for the tanks shall be in
accordance with Sections 7.04 and 9.05 of the WSDOT/APWA Standard Specification, as
modified by the City of Renton Standard Details and AASHTO designations. Tanks shall meet
structural requirements for overburden support, buoyancy, and traffic loading of H-20.
The geotechnical report indicates the site soils are not conducive for infiltration. Therefore, a
detention system is proposed for the project area.
Technical Information Report
McKnight Middle School Play Fields Renovation 11 2180059.10
Flow control calculations were performed using WWHM. Calculations are provided as
Appendix C. The tables in Sections 4.1 and 4.2 summarize the model inputs and resulting flow
rates.
4.5 Water Quality System (Part E)
The installation of the underdrains will not qualify as creating PGIS. The RSD has stated that
they will not use chemicals or fertilizers on the areas. Therefore, no water quality treatment is
proposed. See Appendix D, Exhibit D-3, Email dated June 28, 2018. A note to this effect has
been added to the Declaration of Covenant.
5.0 Conveyance System Analysis and Design
The project proposes collection of storm drainage from the sports field areas. Underdrains will be
used to convey water to area catch basins connected to the detention tank where it will be
detained before it is released to the discharge points. All 4-inch underdrain and 8-inch collector
pipe will be ADS pipe. Downstream of the detention systems, conveyance drain pipes will be
constructed of PVC. All detention tanks shall be aluminized, Type 2, corrugated metal pipe,
meeting Section 5.1.2 of the RSWDM. (See Appendix D, Exhibit D-1 for detailed conveyance
calculations.)
6.0 Special Reports and Studies
A Geotechnical Engineering Letter dated August 2018 was prepared by Krazan & Associates,
Inc., and can be found in Appendix B.
7.0 Other Permits
Permits required include a general construction permit and a site development permit.
8.0 Construction Stormwater Pollution Prevention Plan (CSWPPP) Analysis
and Design
The proposed development shall comply with guidelines set forth in City of Renton drainage
requirements per sections 2.3.1.3 and 2.3.1.4 of the 2017 Surface Water Design Manual. The
plan will include erosion/sedimentation control features designed to prevent sediment-laden
runoff from leaving the site or adversely affecting critical water resources during construction. A
construction Stormwater Pollution Prevention Plan (CSWPPP) is provided in a separate
document.
The following measures will be shown on the ESC plans and will be used to control
sedimentation/erosion processes:
Clearing Limits – All areas to remain undisturbed during the construction of the project will
be delineated prior to any site clearing or grading.
Cover Measures – Cover measures will be implemented for the disturbed areas.
Perimeter Protection – Filter fabric fences for site runoff protection will be provided at the
downstream site perimeter.
Traffic Area Stabilization – Traffic area stabilization is not applicable for this project.
Technical Information Report
McKnight Middle School Play Fields Renovation 12 2180059.10
Sediment Retention – Inlet sediment protection will be utilized as part of this project.
Surface Water Collection – Catch basins and conveyance pipes will provide surface water
collection.
Dewatering Control – Water from dewatering operations should be discharged to a well-
vegetated area or to a temporary sediment control facility.
Dust Control – Dust control measures, including sweeping and water truck, will be
implemented when exposed soils are dry to the point that wind transport is possible; and
roadways, drainage ways, or surface waters are likely to be impacted.
Flow Control – Flow control is not required for this project, as most existing surfaces are
already 100-percent impervious.
Control Pollutants – Effective pollutant handling and disposal procedures will be followed,
materials, fuel, and other pollutants will be properly covered, petroleum products and other
pollutants will be protected from spills and drips, chemicals and fertilizers will not be
applied. The pH modification, to treat contaminated stormwater runoff, is not anticipated to
be an issue.
Protect Existing and Proposed Stormwater Facilities and On-Site BMPs – Inlet sediment
protection will be provided on all new and existing catch basins downstream of construction
activities.
Maintain Protective BMPs – Protective BMPs will be maintained.
Manage the Project – The project will be managed to maximize pollutant control and
minimize pollutant sources.
9.0 Bond Quantities, Facility Summaries, and Declaration of Covenant
Refer to Appendix A, Figure 9-1 for the Bond Quantity Worksheet, Figure 9-2 for the Flow Control
Facility - North, Figure 9-3 for the Flow Control Facility - South, and Figure 9-4 for the Declaration
of Covenant.
10.0 Operations and Maintenance Manual
Maintenance and operations of all drainage facilities will be maintained by the owner. The project
proposes two detention systems, catch basins, and pipes. Maintenance and operations are
detailed in Appendix E.
11.0 Conclusion
This site has been designed to meet or exceed the requirements of the 2016 City of Renton
Surface Water Design Manual (RSWDM). Flow calculations and modeling utilize City of Renton
standards for sizing stormwater conveyance.
Technical Information Report
McKnight Middle School Play Fields Renovation 13 2180059.10
This analysis is based on data and records either supplied to or obtained by AHBL. These documents
are referenced within the text of the analysis. The analysis has been prepared using procedures and
practices within the standard accepted practices of the industry.
AHBL, Inc.
Anne Turpin, PE
Project Engineer
AMT/el/lsk
September 2018
Revised November 2018
Q:\2018\2180059\WORDPROC\Reports\20181119 Rpt (TIR) 2180059.10.docx
Technical Information Report
McKnight Middle School Play Fields Renovation 2180059.10
Appendix A
Figures
1-1 .................... TIR Worksheet
1-2 .................... Site Vicinity Map
1-3 .................... USDA Soil Map
3-1 .................... Downstream Analysis
3-2 .................... Off-Site Analysis Drainage System Table
3-3 .................... Erosion Hazard Map
3-4 .................... Steep Slopes Map
3-5 .................... Slide Hazard Map
3-6 .................... Flood Hazard Map
3-7 .................... Coal Mine Hazard Map
3-8 .................... Aquifer Protection Map
3-9 .................... FIRM Rate Map
3-10 .................. Basin Map
4-1 .................... Existing Basin Map
4-2 .................... Developed Basin Map
5-1 .................... Conveyance Basin Map
9-1 .................... Bond Quantity Worksheet
9-2 .................... Flow Control Facility - North
9-3 .................... Flow Control Facility - South
9-4 .................... Declaration of Covenant
CITY OF RENTON SURFACE WATER DESIGN MANUAL
2017 City of Renton Surface Water Design Manual 12/12/2016
8-A-1
REFERENCE 8-A
TECHNICAL INFORMATION REPORT (TIR)
WORKSHEET
Part 1 PROJECT OWNER AND
PROJECT ENGINEER
Part 2 PROJECT LOCATION AND
DESCRIPTION
Project Owner _____________________________
Phone ___________________________________
Address __________________________________
_________________________________________
Project Engineer ___________________________
Company _________________________________
Phone ___________________________________
Project Name __________________________
CED Permit # ________________________
Location Township ________________
Range __________________
Section _________________
Site Address __________________________
_____________________________________
Part 3 TYPE OF PERMIT APPLICATION Part 4 OTHER REVIEWS AND PERMITS
Land Use (e.g., Subdivision / Short Subd.)
Building (e.g., M/F / Commercial / SFR)
Grading
Right-of-Way Use
Other _______________________
DFW HPA
COE 404
DOE Dam Safety
FEMA Floodplain
COE Wetlands
Other ________
Shoreline
Management
Structural
Rockery/Vault/_____
ESA Section 7
Part 5 PLAN AND REPORT INFORMATION
Technical Information Report Site Improvement Plan (Engr. Plans)
Type of Drainage Review
(check one):
Date (include revision
dates):
Date of Final:
Full
Targeted
Simplified
Large Project
Directed
__________________
__________________
__________________
Plan Type (check
one):
Date (include revision
dates):
Date of Final:
Full
Modified
Simplified
__________________
__________________
__________________
FIG 1-1
Renton School District
300 SW 7th St
Renton, WA 98058
Anne Turpin, PE
AHBL, Inc.
253-383-2422
McKnight Middle School Play Field
23N
5E
28
1200 Edmonds Ave NE
Renton, WA 98056
4
4
September 2018
November 2018
4
September 2018
November 2018
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual
8-A-2
Part 6 SWDM ADJUSTMENT APPROVALS
Type (circle one): Standard / Blanket
Description: (include conditions in TIR Section 2)
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
Approved Adjustment No. ______________________ Date of Approval: _______________________
Part 7 MONITORING REQUIREMENTS
Monitoring Required: Yes / No
Start Date: _______________________
Completion Date: _______________________
Describe: _________________________________
_________________________________________
_________________________________________
Re: SWDM Adjustment No. ________________
Part 8 SITE COMMUNITY AND DRAINAGE BASIN
Community Plan: ____________________________________________________________________
Special District Overlays: ______________________________________________________________
Drainage Basin: _____________________________________________________________________
Stormwater Requirements: _____________________________________________________________
Part 9 ONSITE AND ADJACENT SENSITIVE AREAS
River/Stream ________________________
Lake ______________________________
Wetlands ____________________________
Closed Depression ____________________
Floodplain ___________________________
Other _______________________________
_______________________________
Steep Slope __________________________
Erosion Hazard _______________________
Landslide Hazard ______________________
Coal Mine Hazard ______________________
Seismic Hazard _______________________
Habitat Protection ______________________
_____________________________________
FIG 1-1
None
4
Highlands
Cedar River / Lake Washington
4 None
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2017 City of Renton Surface Water Design Manual 12/12/2016
Ref 8-A-3
Part 10 SOILS
Soil Type
______________________
______________________
______________________
______________________
Slopes
________________________
________________________
________________________
________________________
Erosion Potential
_________________________
_________________________
_________________________
_________________________
High Groundwater Table (within 5 feet)
Other ________________________________
Sole Source Aquifer
Seeps/Springs
Additional Sheets Attached
Part 11 DRAINAGE DESIGN LIMITATIONS
REFERENCE
Core 2 – Offsite Analysis_________________
Sensitive/Critical Areas__________________
SEPA________________________________
LID Infeasibility________________________
Other________________________________
_____________________________________
LIMITATION / SITE CONSTRAINT
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
_______________________________________
Additional Sheets Attached
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Threshold Discharge Area:
(name or description)
Core Requirements (all 8 apply):
Discharge at Natural Location Number of Natural Discharge Locations:
Offsite Analysis Level: 1 2 3 dated:__________________
Flow Control (include facility
summary sheet)
Standard: _______________________________
or Exemption Number: ____________
On-site BMPs: _______________________________
Conveyance System Spill containment located at: _____________________________
Erosion and Sediment Control /
Construction Stormwater Pollution
Prevention
CSWPP/CESCL/ESC Site Supervisor: _____________________
Contact Phone: _________________________
After Hours Phone: _________________________
FIG 1-1
Urban Land 1-6%Low
(Undocumented Fill)
4
4 Infiltration not possible
Main
1
4 August 2018
Peak Rate Flow Control Standard Matching Existing
Detention Tanks
N/A
To be determined
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual
8-A-4
Part 12 TIR SUMMARY SHEET (provide one TIR Summary Sheet
per Threshold Discharge Area)
Maintenance and Operation Responsibility (circle one): Private Public
If Private, Maintenance Log Required: Yes No
Financial Guarantees and Liability Provided: Yes No
Water Quality (include facility
summary sheet)
Type (circle one): Basic Sens. Lake Enhanced Basic Bog
or Exemption No. _______________________
Special Requirements (as applicable):
Area Specific Drainage
Requirements
Type: SDO MDP BP Shared Fac. None
Name: ________________________
Floodplain/Floodway Delineation Type (circle one): Major Minor Exemption None
100-year Base Flood Elevation (or range): _______________
Datum:
Flood Protection Facilities Describe:
Source Control
(commercial / industrial land use)
Describe land use:
Describe any structural controls:
Oil Control High-Use Site: Yes No
Treatment BMP: _________________________________
Maintenance Agreement: Yes No
with whom? _____________________________________
Other Drainage Structures
Describe:
FIG 1-1
4
4
4
No pollution generating surfaces
4
4
None
Sports Fields
None
4
4
Underdrained Fields
REFERENCE 8-A: TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
2017 City of Renton Surface Water Design Manual 12/12/2016
Ref 8-A-5
Part 13 EROSION AND SEDIMENT CONTROL REQUIREMENTS
MINIMUM ESC REQUIREMENTS
DURING CONSTRUCTION
Clearing Limits
Cover Measures
Perimeter Protection
Traffic Area Stabilization
Sediment Retention
Surface Water Collection
Dewatering Control
Dust Control
Flow Control
Control Pollutants
Protect Existing and Proposed
BMPs/Facilities
Maintain Protective BMPs / Manage
Project
MINIMUM ESC REQUIREMENTS
AFTER CONSTRUCTION
Stabilize exposed surfaces
Remove and restore Temporary ESC Facilities
Clean and remove all silt and debris, ensure
operation of Permanent BMPs/Facilities, restore
operation of BMPs/Facilities as necessary
Flag limits of sensitive areas and open space
preservation areas
Other _______________________
Part 14 STORMWATER FACILITY DESCRIPTIONS (Note: Include Facility Summary and Sketch)
Flow Control Type/Description Water Quality Type/Description
Detention
Infiltration
Regional Facility
Shared Facility
On-site BMPs
Other
________________
________________
________________
________________
________________
________________
Vegetated Flowpath
Wetpool
Filtration
Oil Control
Spill Control
On-site BMPs
Other
________________
________________
________________
________________
________________
________________
________________
Part 15 EASEMENTS/TRACTS Part 16 STRUCTURAL ANALYSIS
Drainage Easement
Covenant
Native Growth Protection Covenant
Tract
Other ____________________________
Cast in Place Vault
Retaining Wall
Rockery > 4ƍ High
Structural on Steep Slope
Other _______________________________
FIG 1-1
4
4
4
4
4
4
4
4
4
4
4 Detention Tanks
NA
Part 17 SIGNATURE OF PROFESSIONAL ENGINEER
I, or a civil engineer under my supervision, have visited the site. Actual site conditions as observed were
incorporated into this worksheet and the attached Technical Information Report. To the best of my
knowledge the information provided here is accurate.
• /s..)Nov. c,201 acvg
Signed/Date
REFERENCE 8: PLAN REVIEW FORMS AND WORKSHEET
TECHNICAL INFORMATION REPORT (TIR) WORKSHEET
12/12/2016 2017 City of Renton Surface Water Design Manual
8-A-6
VICINITY MAP SCALE: 1" = 1,000'NSITELOCATIONFIG 1-2
Soil Map—King County Area, Washington
(McKnight Middle School)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/1/2018
Page 1 of 35261370526140052614305261460526149052615205261550526158052616105261640526167052613705261400526143052614605261490526152052615505261580526161052616405261670561380561410561440561470561500561530561560561590
561380 561410 561440 561470 561500 561530 561560 561590
47° 30' 20'' N 122° 11' 6'' W47° 30' 20'' N122° 10' 55'' W47° 30' 10'' N
122° 11' 6'' W47° 30' 10'' N
122° 10' 55'' WN
Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 10N WGS84
0 50 100 200 300
Feet
0 20 40 80 120
Meters
Map Scale: 1:1,530 if printed on A portrait (8.5" x 11") sheet.
Soil Map may not be valid at this scale.
FIG 1-3
MAP LEGEND MAP INFORMATION
Area of Interest (AOI)
Area of Interest (AOI)
Soils
Soil Map Unit Polygons
Soil Map Unit Lines
Soil Map Unit Points
Special Point Features
Blowout
Borrow Pit
Clay Spot
Closed Depression
Gravel Pit
Gravelly Spot
Landfill
Lava Flow
Marsh or swamp
Mine or Quarry
Miscellaneous Water
Perennial Water
Rock Outcrop
Saline Spot
Sandy Spot
Severely Eroded Spot
Sinkhole
Slide or Slip
Sodic Spot
Spoil Area
Stony Spot
Very Stony Spot
Wet Spot
Other
Special Line Features
Water Features
Streams and Canals
Transportation
Rails
Interstate Highways
US Routes
Major Roads
Local Roads
Background
Aerial Photography
The soil surveys that comprise your AOI were mapped at
1:24,000.
Warning: Soil Map may not be valid at this scale.
Enlargement of maps beyond the scale of mapping can cause
misunderstanding of the detail of mapping and accuracy of soil
line placement. The maps do not show the small areas of
contrasting soils that could have been shown at a more detailed
scale.
Please rely on the bar scale on each map sheet for map
measurements.
Source of Map: Natural Resources Conservation Service
Web Soil Survey URL:
Coordinate System: Web Mercator (EPSG:3857)
Maps from the Web Soil Survey are based on the Web Mercator
projection, which preserves direction and shape but distorts
distance and area. A projection that preserves area, such as the
Albers equal-area conic projection, should be used if more
accurate calculations of distance or area are required.
This product is generated from the USDA-NRCS certified data as
of the version date(s) listed below.
Soil Survey Area: King County Area, Washington
Survey Area Data: Version 13, Sep 7, 2017
Soil map units are labeled (as space allows) for map scales
1:50,000 or larger.
Date(s) aerial images were photographed: Aug 31, 2013—Oct 6,
2013
The orthophoto or other base map on which the soil lines were
compiled and digitized probably differs from the background
imagery displayed on these maps. As a result, some minor
shifting of map unit boundaries may be evident.
Soil Map—King County Area, Washington
(McKnight Middle School)
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/1/2018
Page 2 of 3 FIG 1-3
Map Unit Legend
Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI
AmC Arents, Alderwood material, 6
to 15 percent slopes
2.4 19.5%
InC Indianola loamy sand, 5 to 15
percent slopes
2.2 18.3%
Ur Urban land 7.6 62.2%
Totals for Area of Interest 12.2 100.0%
Soil Map—King County Area, Washington McKnight Middle School
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
6/1/2018
Page 3 of 3
FIG 1-3
King County Area, Washington
AmC—Arents, Alderwood material, 6 to 15 percent slopes
Map Unit Setting
National map unit symbol: 1hmsq
Elevation: 50 to 660 feet
Mean annual precipitation: 35 to 60 inches
Mean annual air temperature: 50 degrees F
Frost-free period: 150 to 200 days
Farmland classification: Not prime farmland
Map Unit Composition
Arents, alderwood material, and similar soils: 100 percent
Estimates are based on observations, descriptions, and transects of
the mapunit.
Description of Arents, Alderwood Material
Setting
Landform: Till plains
Parent material: Basal till
Typical profile
H1 - 0 to 26 inches: gravelly sandy loam
H2 - 26 to 60 inches: very gravelly sandy loam
Properties and qualities
Slope: 6 to 15 percent
Depth to restrictive feature: 20 to 40 inches to densic material
Natural drainage class: Moderately well drained
Capacity of the most limiting layer to transmit water (Ksat): Very
low to moderately low (0.00 to 0.06 in/hr)
Depth to water table: About 16 to 36 inches
Frequency of flooding: None
Frequency of ponding: None
Available water storage in profile: Very low (about 2.3 inches)
Interpretive groups
Land capability classification (irrigated): None specified
Land capability classification (nonirrigated): 4s
Hydrologic Soil Group: B/D
Hydric soil rating: No
Data Source Information
Soil Survey Area: King County Area, Washington
Survey Area Data: Version 13, Sep 7, 2017
Map Unit Description: Arents, Alderwood material, 6 to 15 percent slopes---King County Area,
Washington
McKnight
Natural Resources
Conservation Service
Web Soil Survey
National Cooperative Soil Survey
5/29/2018
Page 1 of 1
FIG 1-3
POC1/4 MILE DOWNSTREAMPIPES AND CATCHBASINS12" PIPE TYPICALCONTROL STRUCTUREIN CATCH BASINMCKNIGHTMIDDLESCHOOL1278910113546NCivil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMCKINLEY MIDDLE SCHOOLPLAY FIELDS RENOVATIONJOB NUMBER2180059.10DATE:JUNE 2018GRAPHIC SCALE05001" = 500 FEET250
CITY OF RENTON SURFACE WATER DESIGN MANUAL2017 City of Renton Surface WaterDesign Manual12/12/2016Ref 8-B-1 REFERENCE 8-B OFF-SITE ANALYSIS DRAINAGE SYSTEM TABLECITY OFRENTON SURFACE WATER DESIGNMANUAL, CORE REQUIREMENT #2 Basin:Subbasin Name:Subbasin Number:DateSymbolDrainage Component Type, Name, and SizeDrainage Component DescriptionSlopeDistance from Site DischargeExisting ProblemsPotential ProblemsObservations of Field Inspector, Resource Reviewer,or ResidentSee mapType: sheet flow, swale, stream, channel, pipe, pond, flow control/treatment/on-site BMP/facilitySize: diameter, surface areadrainage basin, vegetation, cover, depth, type of sensitive area, volume%¼ ml = 1,320 ft.Constrictions,under capacity, ponding, overtopping, flooding, habitat or organism destruction, scouring, bank sloughing, sedimentation, incision, other erosionTributary area, likelihood of problem, overflow pathways, potential impactsFIG 3.2Johns CreekJune 201818" pipeDrains McKnight Middle0.5-1.01320-950 ftnonenoneSchool fields212" pipeDrains McKnight School0.5-0.6950-750 ftnonenone315" pipeDrains McKnight School0.5-2.75750-570 ftnonenone4Existing Control structureDirect Building AreaNAnonenone530" pipeDrains McKnight School2.2570-50 ftnonenone6Prop Control structureSchool fieldsNA0 ftnonenone718"-24" pipemulti-family residential4.60-2000 ftnonenone824"-36" pipemulti-family residential2.92,000-6,000 ftnonenone9Wet PondRegionalNA6,000 ftnonenone10Wet PondRegionalNA6,600 ftnonenone11OutletRegionalNA8,000 ftnonenone
Lake
Desire
Shady
Lake (Mud
Lake)
Panther
Lake Lake
Youngs
Lake
Washington
Bl ack Riv e r
Gr ee n Ri
ver
Ce
darRi v erUV900
UV167
UV515
UV169
UV900
UV169
UV167BN IncBN IncBBNNIInnccSSEERReennttoonnIIssssaaqquuaahh RRdd
RReennttoonnMMaapplleeVVaalllleeyyRRdd
MMaapplleeVVaalllleeyyHHwwyy
110088tthhAAvveeSSEESSWWSSuunnsseettBBllvvdd RRaaii
nnii
eerrAAvveeNNNE 3rd St
NE 3rd S
t
SW 43rd StSW 43rd St SSEE CC aarrrrRRdd
NE 4th StNE 4th St
SSEERReennttoonn MMaapplleeVVaalllleeyyRRddLLooggaannAAvveeNN
SR 515SR 515PPaarrkkAAvveeNNOOaakkeessddaalleeAAvveeSSWWSSuunnsseettBBllvvddNNEE
DDuuvvaallllAAvveeNNEEI-405 FWYI-405 FWY II--440055FFWWYYSR 167SR 16711
4400tthh
WWaayySS
EENNEE2277tthhSStt
115566tthhAAvveeSSEEUUnniioonnAAvveeNNEE111166tthhAAvveeSSEESW 7th StSW 7th St
N 8th StN 8th St
PP uuggeettDD rrSSEE
RR
eennttoonnAAvvee SS
SSWW 2277tthhSStt BBeennssoonnRRddSSWWiilllliiaammssAAvveeSSMMoonnrrooeeAAvveeNNEESE 128th StSE 128th St
II
nntt
eerr
uurr
bbaannAAvveeSS HHooqquuiiaammAAvveeNNEE8844tthhAAvveeSSSSEEPPeett
rr
oovviitt
sskkyyRRddEEVVaalllleeyyHHwwyySE 192nd StSE 192nd St
SE 60th StSE 60th St
TTaallbboottRRddSSRRee
nntt
oo
nn
AAvveeSS116644tthhAAvveeSSEESE 208th StSE 208th St
SE 72nd StSE 72nd St
RRaaiinniieerr
AAvvee
SS 111166tthhAAvveeSSEES 128th StS 128th St
NNeewwccaassttlleeWWaayy
SS 221122tthh SStt
SS118800tthh SStt CCooaall
CCrreeeekkPPkkwwyySSEESW 41st StSW 41st St
114400tthhAAvveeSSEE112288tthhAAvveeSSEE6688tthhAAvveeSSSSEE 116688tthhSStt
NE 12th StNE 12th St
BBee
aa
ccoonnAA
vv
ee
SSFFoorreessttDDrr SSEE
SSEE116644tthhSStt 114488tthhAAvveeSSEESSEEMMaayyVVaalllleeyyRRdd
SSEE JJoonneess RRdd
SS EE 22 00 44tt hh WW aayySW 34th StSW 34th St
SE 144th StSE 144th St
114488tthhAAvveeSSEE115544tthhPP llSSEELL
aa
kk
ee
WWaa
sshhii
nnggtt
oonnBBll
vvddNNEEddmmoonnddssAAvveeNNEEAAbbeerrddeeeennAAvveeNNEEEEMM eerrcceerrWWaayyWWeessttVVaalllleeyyHHwwyyEast Valley RdEast Valley Rd,§-405
,§-405
,§-405
µ0 1 2Miles
Flow Control Application Map
Reference 1-A
Date: 01/09/2014
Flow Control Standards
Peak Rate Flow Control Standard (Existing Site Conditions)
Flow Control Duration Standard (Existing Site Conditions)
Flow Control Duration Standard (Forested Conditions)
Flood Problem Flow
Unincorporated King County Flow Control Standards
Renton City Limits
Potential Annexation Area
FIG 3.2
MCKNIGHT
MIDDLE
SCHOOL
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkDr
SW 7th St
SE 128th St
SE 192nd StLindAveSWMainAveSS 132nd St
Factory
PlN
Tal
bot
R
d
SN 3rd St
RainierAveS
164thAveSETukwilaPkwy SPugetDr
NE 4th St
S 3rd St
S1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
Interurban
A
v
eS WilliamsAveNBronsonWayN
NE7thSt
124thAveSES 7th St SERento n IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCre
ek
PkwySE
SW 41st St
Taylor Pl N
W NESunsetBlvdWellsAveNUnionAveNEN E 3 r d S tH
ardie
Av
eSWS180thSt
Maple Valley Hwy
140thAveSES Gr a d yW ayS 2 1 s tSt
BensonRdSRento
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrRd
SE168thSt
Beacon
Ave
S
68thAveSLoganAveN108thAveSEForestDrSE
S2ndSt
141s
t
AveSERainierAveS 156thAveSESE 183rdSt
B
ens
o
n Dr SS124th StS 43rd St
Airport Way
S W G ra d y Way
SE JonesRdSunsetBlvdN
Puget Dr SES E 204th W aySW 34th StMo
nsterRdSW S E 1 4 2 n d Pl
WestValleyHwySSEMayValleyRd
SunsetBlvdNSCarr RdHouserWayNNewcastleGolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWR
ainier
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWest
Vall
eyHwyWestValleyHwyParkAveN108thAveSE6
6th
A
v
e
S WMercerWayWMercerWay Lakemont
BlvdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of RentonSensitive Areas
0 0.5 10.25
Miles
Information Technology - GISmapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteedto survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended forCity display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Erosion HazardSeverity
High
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
Figure 3-3: Erosion Hazards
MCKNIGHT
MIDDLE
SCHOOL
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkDr
SW 7th St
SE 128th St
SE 192nd StLindAveSWMainAveSS 132nd St
Factory
PlN
Tal
bot
R
d
SN 3rd St
RainierAveS
164thAveSETukwilaPkwy SPugetDr
NE 4th St
S 3rd St
S1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
Interurban
A
v
eS WilliamsAveNBronsonWayN
NE7thSt
124thAveSES 7th St SERento n IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCre
ek
PkwySE
SW 41st St
Taylor Pl N
W NESunsetBlvdWellsAveNUnionAveNEN E 3 r d S tH
ardie
Av
eSWS180thSt
Maple Valley Hwy
140thAveSES Gr a d yW ayS 2 1 s tSt
BensonRdSRento
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrRd
SE168thSt
Beacon
Ave
S
68thAveSLoganAveN108thAveSEForestDrSE
S2ndSt
141s
t
AveSERainierAveS 156thAveSESE 183rdSt
B
ens
o
n Dr SS124th StS 43rd St
Airport Way
S W G ra d y Way
SE JonesRdSunsetBlvdN
Puget Dr SES E 204th W aySW 34th StMo
nsterRdSW S E 1 4 2 n d Pl
WestValleyHwySSEMayValleyRd
SunsetBlvdNSCarr RdHouserWayNNewcastleGolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWR
ainier
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWest
Vall
eyHwyWestValleyHwyParkAveN108thAveSE6
6th
A
v
e
S WMercerWayWMercerWay Lakemont
BlvdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of RentonSensitive Areas
0 0.5 10.25
Miles
Information Technology - GISmapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteedto survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended forCity display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Steep SlopesPercent Range
>15% & <=25%
>25% & <=40%
>40% & <=90%
>90%Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
Figure 3-4:
Steep Slopes
MCKNIGHT
MIDDLE
SCHOOL
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkDr
SW 7th St
SE 128th St
SE 192nd StLindAveSWMainAveSS 132nd St
Factory
PlN
Tal
bot
R
d
SN 3rd St
RainierAveS
164thAveSETukwilaPkwy SPugetDr
NE 4th St
S 3rd St
S1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
Interurban
A
v
eS WilliamsAveNBronsonWayN
NE7thSt
124thAveSES 7th St SERento n IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCre
ek
PkwySE
SW 41st St
Taylor Pl N
W NESunsetBlvdWellsAveNUnionAveNEN E 3 r d S tH
ardie
Av
eSWS180thSt
Maple Valley Hwy
140thAveSES Gr a d yW ayS 2 1 s tSt
BensonRdSRento
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrRd
SE168thSt
Beacon
Ave
S
68thAveSLoganAveN108thAveSEForestDrSE
S2ndSt
141s
t
AveSERainierAveS 156thAveSESE 183rdSt
B
ens
o
n Dr SS124th StS 43rd St
Airport Way
S W G ra d y Way
SE JonesRdSunsetBlvdN
Puget Dr SES E 204th W aySW 34th StMo
nsterRdSW S E 1 4 2 n d Pl
WestValleyHwySSEMayValleyRd
SunsetBlvdNSCarr RdHouserWayNNewcastleGolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWR
ainier
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWest
Vall
eyHwyWestValleyHwyParkAveN108thAveSE6
6th
A
v
e
S WMercerWayWMercerWay Lakemont
BlvdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of RentonSensitive Areas
0 0.5 10.25
Miles
Information Technology - GISmapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteedto survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended forCity display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Landslide HazardSeverityVery HighHighModerateUnclassified
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
Figure 3-5:
Slide Hazard
MCKNIGHT
MIDDLE
SCHOOL
RentonKent
Newcastle
King CountyTukwilaMercer Island
Bellevue
Lake Washington
Lake Youngs
Panther Lake
Lake Boren
Cedar RiverBlack River
May Creek
Springbrook Creek
Cougar MountainCougar Mountain
Coal Creek ParkCoal Creek Park
Cedar River Natural ZoneCedar River Natural Zone
May Creek ParkMay Creek Park
Soos Creek Park and TrailSoos Creek Park and Trail
Black River Riparian ForestBlack River Riparian Forest
McGarvey Open SpaceMcGarvey Open Space
Maplewood Community ParkMaplewood Community Park
ValleyValley
BensonBenson
HighlandsHighlands
West HillWest Hill
East PlateauEast Plateau
SE 192ND STTALBOT RD S140TH AVE SERAI
N
I
E
R
A
V
E
S
EAST VALLEY RDSE 168TH ST
RENTON A
V
E
S116TH AVE SENE 12TH STE M ERCER WAY148TH AVE SENE 7TH S T84TH AVE SHOQUIAM AVE NENEWCASTLE WAY
W M
E
RCER WAY
S 128TH ST
SW 41ST ST PARK AVE N128TH AVE SESE JONES R D
E VALLEY HWYSE 72ND ST
SE 164TH ST NILE AVE NEN 10TH S T
SE 183RD S
TUNION AVE NE156TH AVE SEUNION AVE SENE 2ND ST 148TH AVE SESE 164TH STLIND AVE SWUNION AVE NE116TH AVE SESW 7TH ST
N 8TH ST EDMONDS AVE NEPUGET DR S E
NE 27TH ST
156TH AVE SERENTON AVE S
BENSON RD S MONROE AVE NE116TH AVE SENE 4TH ST
SR 5
1
5
SUNSE T B LV D N E
PARK AVE NMAPLE VALLEY HWY
SW 43RD ST
NE 3RD STLOGAN AVE NSW SU
NSET BLVD
SW GRADY W
A
Y
N 3RD STRAIN
IER AVE
N
140TH WAY SESR 167108TH AVE SEN 6TH ST
S 2ND ST
108TH AVE SESR 515[^405
[^405
Effective FEMA FloodInsurance Rate Map
µ
Legend
Renton City Limits
Zone AE, A, AH, AO - Regulatory
Zone X - Non Regulatory
0 0.5 10.25 Miles
Public Works - Surface Water UtilityPrint Date: 11/05/2012
Data Sources: City of Renton, FEMA FIRM revised May 16, 1995.Cedar River flood hazard area updated with FEMA Cedar RiverLOMR (Case No. 06-10-B569P) approved December 4, 2006.
This document is a graphic representation, not guaranteedto survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended forCity display purposes only.Figure 3-6: Flood Hazard
MCKNIGHT
MIDDLE
SCHOOL
k
k
k
k
k
k
k
k
k
k k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
kk
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k
k HoquiamAveNEE Valley Hwy84thAveSNEParkDr
SW 7th St
SE 128th St
SE 192nd StLindAveSWMainAveSS 132nd St
Factory
PlN
Tal
bot
R
d
SN 3rd St
RainierAveS
164thAveSETukwilaPkwy SPugetDr
NE 4th St
S 3rd St
S1 2 9 th S t68thAveSSWSunsetBlvd
SW 16th St
116thAveSEN 4th St
Interurban
A
v
eS WilliamsAveNBronsonWayN
NE7thSt
124thAveSES 7th St SERento n IssaquahRd
Rai
ni
er
AveNNewcastle Way
CoalCre
ek
PkwySE
SW 41st St
Taylor Pl N
W NESunsetBlvdWellsAveNUnionAveNEN E 3 r d S tH
ardie
Av
eSWS180thSt
Maple Valley Hwy
140thAveSES Gr a d yW ayS 2 1 s tSt
BensonRdSRento
n
AveS87thAveS128thAveSE148thAveSESW 43rd St SEC arrRd
SE168thSt
Beacon
Ave
S
68thAveSLoganAveN108thAveSEForestDrSE
S2ndSt
141s
t
AveSERainierAveS 156thAveSESE 183rdSt
B
ens
o
n Dr SS124th StS 43rd St
Airport Way
S W G ra d y Way
SE JonesRdSunsetBlvdN
Puget Dr SES E 204th W aySW 34th StMo
nsterRdSW S E 1 4 2 n d Pl
WestValleyHwySSEMayValleyRd
SunsetBlvdNSCarr RdHouserWayNNewcastleGolfClubRd
S 133rd St
WilliamsAveSWellsAveSEMercerWay154thPlSEDuvallAveNELoganAveSMonroeAveNESunsetBlvdNEEdmondsAveNEStevens AveNWR
ainier
AveSTalbotRdSOakesdaleAveSWTaylorAveNW164thAveSERainierAveSWest
Vall
eyHwyWestValleyHwyParkAveN108thAveSE6
6th
A
v
e
S WMercerWayWMercerWay Lakemont
BlvdSE132ndAve SELakeWashingtonBlvdNE140thWaySE
East Valley Rd68thAveS³City of RentonSensitive Areas
0 0.5 10.25
Miles
Information Technology - GISmapsupport@rentonwa.govPrinted on: 11/12/2014
Data Sources: City of Renton, King County
This document is a graphic representation, not guaranteedto survey accuracy, and is based on the best informationavailable as of the date shown. This map is intended forCity display purposes only.
Renton City Limits
k Education
Fire Station
K Valley Medical Center
Coal Mine HazardsSeverity
HIGH
MODERATE
UNCLASSIFIED
Coordinate System: NAD 1983 HARN StatePlane Washington North FIPS 4601 FeetProjection: Lambert Conformal ConicDatum: North American 1983 HARN
Figure 3-7:
Coal Mine Hazard
MCKNIGHT
MIDDLE
SCHOOL
!!!
!
!
!!!!!
!
!
!!
!
!
!!
!
!!
PW-12
PW-11PW-17
PW-4
PW-9
PW-8
RW-3
RW-2
EW-3
PW-5A
PW-12
PW-10
,§-405
,§-405 115544tthhPPllSSEESW 34th StSW 34th St East Valley RdEast Valley Rd114488tthhAAvveeSSEE140th Ave SE140th Ave SE164th Ave SE164th Ave SETalbot
Rd STalbo
t
Rd
S
N 30th StN 30th St
68th Ave S68th Ave SRainie
r
A
v
e
S
Rainie
r
A
v
e
S
SE 192nd StSE 192nd St
SE May Valley
R
dSE May Valley R
d
E Valley HwyE Valley HwySE Petro
v
i
t
s
k
y
R
d
SE Petro
v
i
t
s
k
y
R
d
Forest Dr SEForest Dr SE
S 128th StS 128th St 112th Ave SE112th Ave SE84th Ave S84th Ave SSE 168th StSE 168th St
S 55th StS 55th St
N 10th StN 10th St
NE 2nd StNE 2nd St
SW 41st StSW 41st St 116th Ave SE116th Ave SE140th Ave SE140th Ave SESE 192nd StSE 192nd St
148th Ave SE148th Ave SE114400tthhAAvveeSS EE
SW 27th StSW 27th St Bens
on
Rd
SBenson
Rd
SHo
u
se
r
W
a
y
NHou
s
e
r
Wa
y
NLind Ave SWLind Ave SWN 8th StN 8th St
PP uu gg ee ttDDrrSSEERReennttoonnAAvvee SS
SW 7th StSW 7th St I-405 FWYI-405 FWYRain
ier
Ave
NRain
ie
r
Ave
N
NNEEPPaa rrkk DDrr
NE 4th StNE 4th St
SW 43rd StSW 43rd St SE Carr RdSE Carr Rd
NE 3rd StNE 3rd StLogan Ave NLogan Ave NDuvall Ave NEDuvall Ave NEI-405 FWYI-405 FWYI-405
FWY
I-405 FWY
I-405 FWYI-405 FWY I-405 FWYI-405 FWYNE 4th StNE 4th StI-405 FWYI-405 FWYII--440055FFWWYYI-405 FWYI-405 FWYI-405 FWYI-405 FWY I-405 FWYI-405 FWYI-405 FWYI-405 FWY
NE 4th StNE 4th St
BN IncBN Inc
BN
I
n
c
B
N
I
n
c
BN IncBN Inc BN IncBN IncB
N
I
n
c
B
N
I
n
c BN IncBN IncB
N
I
n
c
B
N
I
n
c BN I
n
cBN I
n
c
BB NN IInnccB
N
I
n
c
B
N
I
n
c BN IncBN IncBN IncBN Inc BN IncBN IncCedar River
Green River
Black River
May Creek
Duwamish Waterway
Springbrook Creek
Lake Washington
Lake Youngs
Panther Lake
Lake Boren
Reference 15-B
Wellfield Capture Zones
One Year Capture Zone
Five Year Capture Zone
Ten Year Capture ZoneCedar Valley Sole SourceAquifer Project Review Area
Streamflow Source Area
Cedar Valley Sole Source Aquifer
Aquifer Protection Area Zones
Zone 1
Zone 1 Modified
Zone 2Network Structure
!Production Well
!Springbrook Springs
Renton City Limits
Potential Annexation Area
Groundwater Protection Areas Date: 01/09/2014
µ0 1 2MilesDRAFT
Figure 3-8: Aquifer Protection
MCKNIGHT
MIDDLE
SCHOOL
MCKNIGHT
MIDDLE
SCHOOL
FIG 3-9: FIRM Rate Map
King CountyKing County iMapDate: 9/5/2018Notes:±The information included on this map has been compiled by King County staff from a variety of sources and is subject to changewithout notice. King County makes no representations or warranties, express or implied, as to accuracy, completeness, timeliness,or rights to the use of such information. This document is not intended for use as a survey product. King County shall not be liablefor any general, special, indirect, incidental, or consequential damages including, but not limited to, lost revenues or lost profitsresulting from the use or misuse of the information contained on this map. Any sale of this map or information on this map isprohibited except by written permission of King County.FIG 3-10: Basin MapCEDAR RIVER /
LAKE WASHINGTON
WATERSHED
Figure 3-10:
Basin Map
McKNIGHT
MIDDLE
SCHOOL
1NE 12th STREETEDMONDS AVE NE
HARRINGTO
N
A
V
E
N
E 23456EXISTING BASIN AREASFOR DETENTIONTOTAL: 1.96 AC (85,378 SF)IMPERVIOUS: 0.00 ACPERVIOUS: 1.96 ACEXISTING BASIN AREA - NO DETENTIONTOTAL: 0.84 AC (36,445 SF)IMPERVIOUS: 0.18 ACPERVIOUS: 0.66 ACEXISTING BASIN AREA FOR DETENTION:TOTAL: 1.38 AC (60,113 SF)IMPERVIOUS: 0.00 ACPERVIOUS: 1.38 ACEXISTING BASIN AREA -NO DETENTIONTOTAL: 0.30 ACIMPERVIOUS: 0.00 ACPERVIOUS: 0.30 ACEXISTING BASIN AREA -NO DETENTIONTOTAL: 0.63 ACIMPERVIOUS: 0.18 ACPERVIOUS: 0.45 ACNGRAPHIC SCALE0801" = 80 FEET40Civil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMCKNIGHT MIDDLE SCHOOLPLAY FIELDS RENOVATIONJOB NUMBER2180059.10DATE:AUG 2018GENERAL DRAINAGE DIRECTIONBASIN AREAS, IN WHICH IMPROVEMENTS ARE PROPOSEDCONVEYANCE BASIN AREASBASIN AREAS1.WESTERN BASEBALL FIELD2.EASTERN BASEBALL FIELD3.GRASS AREA BETWEEN BASEBALL AND SOCCER4.SOCCER FIELD5.AREA EAST OF SOCCER FIELD6.AREA WEST OF SOCCER FIELD
NE 12th STREETEDMONDS AVE NE
HARRINGTO
N
A
V
E
N
E345355354353 356SOCCER FILED DETENTION:STORAGE VOLUME: 10,807 CF350355356126BASEBALL FILED DETENTION:STORAGE VOLUME: 16,749 CFCB 21CB 19P 139P 138CB 17CB 18CB 20STCB#636(Existing)CS(Existing)CB 04CB 03CB 01STCB #543(Existing)CB 06CB 05P 146P 126Exist 13P 57P 56P 55P 54P 59CB 07P 129NGRAPHIC SCALE0801" = 80 FEET40Civil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMCKNIGHT MIDDLE SCHOOLPLAY FIELDS RENOVATIONJOB NUMBER2180059.10DATE:NOV 2018DETAINED BASIN AREASBASIN NO.IMPERVIOUS(AC)PERVIOUS(AC)TOTAL (AC)1 & 21.960.001.9641.380.001.38BASEBALLSOCCERBASIN AREAS1.WESTERN BASEBALL FIELD2.EASTERN BASEBALL FIELD3.GRASS AREA BETWEEN BASEBALL AND SOCCER4.SOCCER FIELD5.AREA EAST OF SOCCER FIELD6.AREA WEST OF SOCCER FIELDGENERAL DRAINAGE DIRECTIONTOC FLOW PATHDETENTION TANKCONVEYANCE BASIN AREAS
1NE 12th STREETEDMONDS AVE NE
HARRINGTO
N
A
V
E
N
E 256355356355354SOCCER FILED DETENTION:STORAGE VOLUME: 10,807 CF35035335643BASEBALL FILED DETENTION:STORAGE VOLUME: 16,749 CFCB 21CB 17CB 18CB 20STCB#636(Existing)CS(Existing)CB 04CB 03CB 01CB 19STCB #543(Existing)CB 06CB 05P 146P 126Exist 13P 57P 56P 55P 54P 59P 139P 138CB 07NGRAPHIC SCALE0801" = 80 FEET40Civil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMCKNIGHT MIDDLE SCHOOLPLAY FIELDS RENOVATIONJOB NUMBER2180059.10DATE:AUG 2018CONVEYANCE BASIN AREASBASINNO.IMPERVIOUS(AC)PERVIOUS(AC)TOTAL (AC)11.050.031.0821.000.111.1130.180.660.8441.380.001.3850.180.450.6360.000.300.30BASIN AREAS1.WESTERN BASEBALL FIELD2.EASTERN BASEBALL FIELD3.GRASS AREA BETWEEN BASEBALL AND SOCCER4.SOCCER FIELD5.AREA EAST OF SOCCER FIELD6.AREA WEST OF SOCCER FIELDGENERAL DRAINAGE DIRECTIONTOC FLOW PATHDETENTION TANKCONVEYANCE BASIN AREASUNDERDRAIN CONTRIBUTING AREASCOLLECTOR PIPE CONTRIBUTING AREAS
FOR APPROVAL
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
PROJECT INFORMATION
Planning Division 11055 South Grady Way — 6 th Floor Renton, WA 98057 (425)430-7200
Community & Economic
Development
Date Prepared: 8/16/2018
Prepared by: 'ttir -..' . • 1 er Stamp Required
,* — v original wet stamp and signature)
----A,
46434 is-rot,
x. NAL tv. Pii*
I
Name:
PE Registration No:
Firm Name:
Firm Address:
Phone No.
Email Address:
Anne Turpin
46434
AHBL
2215 N 30th St, Ste 300, Tacoma, WA 98403
253-383-2422
aturpin@ahbl.com
Project Location and Description Project Owner Information
Project Name:
CED Plan # (LUA):
CED Permit # (U):
Site Address:
Street Intersection:
Parcel #(s):
Abbreviated Legal
Description:
McKnight MS Play Fields Renovation Project Owner:
Phone:
Address:
Addt'l Project Owner:
Phone:
Address:
Renton School District
##-###### 425-204-2300
C18005204 300 SW 7th St
1200 Edmonds Ave NE Renton, WA 98056 Renton, WA 98057
NE 12th St NA
7227801860 NA
FOR 51/2 OF NW 1/4 OF SW 1/4 OF SW 1/4 & SW 1/4 OF SW 1/4 OF
SW 1/4 LESS RDS
NA
NA
Clearing and Grading Utility Providers
Clearing and grading greater than or equal to 5,000 board feet of timber?
Water Service Provided by:
Sewer Service Provided by:
Yes/No: NO CITY OF RENTON
If Yes, Provide Forest Practice Permit #: N/A CITY OF RENTON
1Select the current project status/phase from the following options:
For Approval - Preliminary Data Enclosed, pending approval from the City;
For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City;
Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal
Unit Prices Updated: 06/14/2016
Page 1 of 1
Version: 04/26/2017
Ref 8-H Bond Quantity Worksheet
SECTION I PROJECT INFORMATION Printed 11/12/2018
CED Permit #:C18005204
Unit
Reference #Price Unit Quantity Cost
Backfill & compaction-embankment ESC-1 6.50$ CY
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 80.00$ Each
Catch Basin Protection ESC-3 35.50$ Each 30 1,065.00
Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)95.00$ CY
Ditching ESC-5 9.00$ CY
Excavation-bulk ESC-6 2.00$ CY
Fence, silt ESC-7 SWDM 5.4.3.1 1.50$ LF 1300 1,950.00
Fence, Temporary (NGPE)ESC-8 1.50$ LF
Geotextile Fabric ESC-9 2.50$ SY 50 125.00
Hay Bale Silt Trap ESC-10 0.50$ Each
Hydroseeding ESC-11 SWDM 5.4.2.4 0.80$ SY
Interceptor Swale / Dike ESC-12 1.00$ LF
Jute Mesh ESC-13 SWDM 5.4.2.2 3.50$ SY
Level Spreader ESC-14 1.75$ LF
Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.50$ SY
Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.00$ SY
Piping, temporary, CPP, 6"ESC-17 12.00$ LF
Piping, temporary, CPP, 8"ESC-18 14.00$ LF
Piping, temporary, CPP, 12"ESC-19 18.00$ LF
Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.00$ SY 100 400.00
Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)45.00$ CY
Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 1,800.00$ Each
Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,200.00$ Each 1 3,200.00
Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,200.00$ Each
Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 19.00$ LF
Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 70.00$ LF
Seeding, by hand ESC-27 SWDM 5.4.2.4 1.00$ SY
Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 8.00$ SY
Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 10.00$ SY
TESC Supervisor ESC-30 110.00$ HR 200 22,000.00
Water truck, dust control ESC-31 SWDM 5.4.7 140.00$ HR
Unit
Reference #Price Unit Quantity Cost
EROSION/SEDIMENT SUBTOTAL:28,740.00
SALES TAX @ 10%2,874.00
EROSION/SEDIMENT TOTAL:31,614.00
(A)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR EROSION & SEDIMENT CONTROL
Description No.
(A)
WRITE-IN-ITEMS
Page 3 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
CED Permit #:C18005204
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
GENERAL ITEMS
Backfill & Compaction- embankment GI-1 6.00$ CY
Backfill & Compaction- trench GI-2 9.00$ CY 100 900.00
Clear/Remove Brush, by hand (SY)GI-3 1.00$ SY
Bollards - fixed GI-4 240.74$ Each
Bollards - removable GI-5 452.34$ Each
Clearing/Grubbing/Tree Removal GI-6 10,000.00$ Acre 0.4 4,000.00
Excavation - bulk GI-7 2.00$ CY 1700 3,400.00
Excavation - Trench GI-8 5.00$ CY 100 500.00
Fencing, cedar, 6' high GI-9 20.00$ LF
Fencing, chain link, 4'GI-10 38.31$ LF
Fencing, chain link, vinyl coated, 6' high GI-11 20.00$ LF 10 200.00
Fencing, chain link, gate, vinyl coated, 20' GI-12 1,400.00$ Each
Fill & compact - common barrow GI-13 25.00$ CY
Fill & compact - gravel base GI-14 27.00$ CY
Fill & compact - screened topsoil GI-15 39.00$ CY
Gabion, 12" deep, stone filled mesh GI-16 65.00$ SY
Gabion, 18" deep, stone filled mesh GI-17 90.00$ SY
Gabion, 36" deep, stone filled mesh GI-18 150.00$ SY
Grading, fine, by hand GI-19 2.50$ SY
Grading, fine, with grader GI-20 2.00$ SY 16170 32,340.00
Monuments, 3' Long GI-21 250.00$ Each
Sensitive Areas Sign GI-22 7.00$ Each
Sodding, 1" deep, sloped ground GI-23 8.00$ SY
Surveying, line & grade GI-24 850.00$ Day 2 1,700.00
Surveying, lot location/lines GI-25 1,800.00$ Acre
Topsoil Type A (imported)GI-26 28.50$ CY
Traffic control crew ( 2 flaggers )GI-27 120.00$ HR
Trail, 4" chipped wood GI-28 8.00$ SY
Trail, 4" crushed cinder GI-29 9.00$ SY
Trail, 4" top course GI-30 12.00$ SY
Conduit, 2"GI-31 5.00$ LF
Wall, retaining, concrete GI-32 55.00$ SF
Wall, rockery GI-33 15.00$ SF
SUBTOTAL THIS PAGE:43,040.00
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 4 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
CED Permit #:C18005204
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
ROAD IMPROVEMENT/PAVEMENT/SURFACING
AC Grinding, 4' wide machine < 1000sy RI-1 30.00$ SY
AC Grinding, 4' wide machine 1000-2000sy RI-2 16.00$ SY
AC Grinding, 4' wide machine > 2000sy RI-3 10.00$ SY
AC Removal/Disposal RI-4 35.00$ SY 350 12,250.00
Barricade, Type III ( Permanent )RI-5 56.00$ LF
Guard Rail RI-6 30.00$ LF
Curb & Gutter, rolled RI-7 17.00$ LF
Curb & Gutter, vertical RI-8 12.50$ LF
Curb and Gutter, demolition and disposal RI-9 18.00$ LF
Curb, extruded asphalt RI-10 5.50$ LF
Curb, extruded concrete RI-11 7.00$ LF
Sawcut, asphalt, 3" depth RI-12 1.85$ LF 60 111.00
Sawcut, concrete, per 1" depth RI-13 3.00$ LF
Sealant, asphalt RI-14 2.00$ LF 60 120.00
Shoulder, gravel, 4" thick RI-15 15.00$ SY
Sidewalk, 4" thick RI-16 38.00$ SY
Sidewalk, 4" thick, demolition and disposal RI-17 32.00$ SY
Sidewalk, 5" thick RI-18 41.00$ SY
Sidewalk, 5" thick, demolition and disposal RI-19 40.00$ SY
Sign, Handicap RI-20 85.00$ Each
Striping, per stall RI-21 7.00$ Each
Striping, thermoplastic, ( for crosswalk )RI-22 3.00$ SF
Striping, 4" reflectorized line RI-23 0.50$ LF
Additional 2.5" Crushed Surfacing RI-24 3.60$ SY
HMA 1/2" Overlay 1.5" RI-25 14.00$ SY
HMA 1/2" Overlay 2"RI-26 18.00$ SY
HMA Road, 2", 4" rock, First 2500 SY RI-27 28.00$ SY
HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 21.00$ SY
HMA Road, 4", 6" rock, First 2500 SY RI-29 45.00$ SY
HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 37.00$ SY
HMA Road, 4", 4.5" ATB RI-31 38.00$ SY
Gravel Road, 4" rock, First 2500 SY RI-32 15.00$ SY
Gravel Road, 4" rock, Qty. over 2500 SY RI-33 10.00$ SY
Thickened Edge RI-34 8.60$ LF
SUBTOTAL THIS PAGE:12,481.00
(B)(C)(D)(E)
Page 5 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
CED Permit #:C18005204
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
PARKING LOT SURFACING No.
2" AC, 2" top course rock & 4" borrow PL-1 21.00$ SY
2" AC, 1.5" top course & 2.5" base course PL-2 28.00$ SY
4" select borrow PL-3 5.00$ SY
1.5" top course rock & 2.5" base course PL-4 14.00$ SY
SUBTOTAL PARKING LOT SURFACING:
(B)(C)(D)(E)
LANDSCAPING & VEGETATION No.
Street Trees LA-1
Median Landscaping LA-2
Right-of-Way Landscaping LA-3
Wetland Landscaping LA-4
SUBTOTAL LANDSCAPING & VEGETATION:
(B)(C)(D)(E)
TRAFFIC & LIGHTING No.
Signs TR-1
Street Light System ( # of Poles)TR-2
Traffic Signal TR-3
Traffic Signal Modification TR-4
SUBTOTAL TRAFFIC & LIGHTING:
(B)(C)(D)(E)
WRITE-IN-ITEMS
2" AC, 3" top course rock 21.00$ SY 350 7,350.00
SUBTOTAL WRITE-IN ITEMS:7,350.00
STREET AND SITE IMPROVEMENTS SUBTOTAL:62,871.00
SALES TAX @ 10%6,287.10
STREET AND SITE IMPROVEMENTS TOTAL:69,158.10
(B)(C)(D)(E)
Page 6 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
CED Permit #:C18005204
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.)
Access Road, R/D D-1 26.00$ SY
* (CBs include frame and lid)
Beehive D-2 90.00$ Each
Through-curb Inlet Framework D-3 400.00$ Each
CB Type I D-4 1,500.00$ Each 7 10,500.00
CB Type IL D-5 1,750.00$ Each
CB Type II, 48" diameter D-6 2,300.00$ Each 6 13,800.00
for additional depth over 4' D-7 480.00$ FT 4 1,920.00
CB Type II, 54" diameter D-8 2,500.00$ Each 1 2,500.00
for additional depth over 4'D-9 495.00$ FT 5 2,475.00
CB Type II, 60" diameter D-10 2,800.00$ Each 2 5,600.00
for additional depth over 4'D-11 600.00$ FT 3 1,800.00
CB Type II, 72" diameter D-12 6,000.00$ Each
for additional depth over 4'D-13 850.00$ FT
CB Type II, 96" diameter D-14 14,000.00$ Each
for additional depth over 4'D-15 925.00$ FT
Trash Rack, 12"D-16 350.00$ Each
Trash Rack, 15"D-17 410.00$ Each
Trash Rack, 18"D-18 480.00$ Each
Trash Rack, 21"D-19 550.00$ Each
Cleanout, PVC, 4"D-20 150.00$ Each
Cleanout, PVC, 6"D-21 170.00$ Each
Cleanout, PVC, 8"D-22 200.00$ Each
Culvert, PVC, 4" D-23 10.00$ LF
Culvert, PVC, 6" D-24 13.00$ LF
Culvert, PVC, 8" D-25 15.00$ LF 670 10,050.00
Culvert, PVC, 12" D-26 23.00$ LF
Culvert, PVC, 15" D-27 35.00$ LF
Culvert, PVC, 18" D-28 41.00$ LF
Culvert, PVC, 24"D-29 56.00$ LF
Culvert, PVC, 30" D-30 78.00$ LF
Culvert, PVC, 36" D-31 130.00$ LF
Culvert, CMP, 8"D-32 19.00$ LF
Culvert, CMP, 12"D-33 29.00$ LF
SUBTOTAL THIS PAGE:48,645.00
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 7 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
CED Permit #:C18005204
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Quantity Remaining
(Bond Reduction)
(B)(C)
DRAINAGE (Continued)
Culvert, CMP, 15"D-34 35.00$ LF
Culvert, CMP, 18"D-35 41.00$ LF
Culvert, CMP, 24"D-36 56.00$ LF
Culvert, CMP, 30"D-37 78.00$ LF
Culvert, CMP, 36"D-38 130.00$ LF
Culvert, CMP, 48"D-39 190.00$ LF
Culvert, CMP, 60"D-40 270.00$ LF
Culvert, CMP, 72"D-41 350.00$ LF
Culvert, Concrete, 8"D-42 42.00$ LF
Culvert, Concrete, 12"D-43 48.00$ LF
Culvert, Concrete, 15"D-44 78.00$ LF
Culvert, Concrete, 18"D-45 48.00$ LF
Culvert, Concrete, 24"D-46 78.00$ LF
Culvert, Concrete, 30"D-47 125.00$ LF
Culvert, Concrete, 36"D-48 150.00$ LF
Culvert, Concrete, 42"D-49 175.00$ LF
Culvert, Concrete, 48"D-50 205.00$ LF
Culvert, CPE Triple Wall, 6" D-51 14.00$ LF
Culvert, CPE Triple Wall, 8" D-52 16.00$ LF
Culvert, CPE Triple Wall, 12" D-53 24.00$ LF
Culvert, CPE Triple Wall, 15" D-54 35.00$ LF
Culvert, CPE Triple Wall, 18" D-55 41.00$ LF
Culvert, CPE Triple Wall, 24" D-56 56.00$ LF
Culvert, CPE Triple Wall, 30" D-57 78.00$ LF
Culvert, CPE Triple Wall, 36" D-58 130.00$ LF
Culvert, LCPE, 6"D-59 60.00$ LF
Culvert, LCPE, 8"D-60 72.00$ LF
Culvert, LCPE, 12"D-61 84.00$ LF
Culvert, LCPE, 15"D-62 96.00$ LF
Culvert, LCPE, 18"D-63 108.00$ LF
Culvert, LCPE, 24"D-64 120.00$ LF
Culvert, LCPE, 30"D-65 132.00$ LF
Culvert, LCPE, 36"D-66 144.00$ LF
Culvert, LCPE, 48"D-67 156.00$ LF
Culvert, LCPE, 54"D-68 168.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 8 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
CED Permit #:C18005204
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Quantity Remaining
(Bond Reduction)
(B)(C)
DRAINAGE (Continued)
Culvert, LCPE, 60"D-69 180.00$ LF
Culvert, LCPE, 72"D-70 192.00$ LF
Culvert, HDPE, 6"D-71 42.00$ LF
Culvert, HDPE, 8"D-72 42.00$ LF
Culvert, HDPE, 12"D-73 74.00$ LF
Culvert, HDPE, 15"D-74 106.00$ LF
Culvert, HDPE, 18"D-75 138.00$ LF
Culvert, HDPE, 24"D-76 221.00$ LF
Culvert, HDPE, 30"D-77 276.00$ LF
Culvert, HDPE, 36"D-78 331.00$ LF
Culvert, HDPE, 48"D-79 386.00$ LF
Culvert, HDPE, 54"D-80 441.00$ LF
Culvert, HDPE, 60"D-81 496.00$ LF
Culvert, HDPE, 72"D-82 551.00$ LF
Pipe, Polypropylene, 6"D-83 84.00$ LF
Pipe, Polypropylene, 8"D-84 89.00$ LF
Pipe, Polypropylene, 12"D-85 95.00$ LF
Pipe, Polypropylene, 15"D-86 100.00$ LF
Pipe, Polypropylene, 18"D-87 106.00$ LF
Pipe, Polypropylene, 24"D-88 111.00$ LF
Pipe, Polypropylene, 30"D-89 119.00$ LF
Pipe, Polypropylene, 36"D-90 154.00$ LF
Pipe, Polypropylene, 48"D-91 226.00$ LF
Pipe, Polypropylene, 54"D-92 332.00$ LF
Pipe, Polypropylene, 60"D-93 439.00$ LF
Pipe, Polypropylene, 72"D-94 545.00$ LF
Culvert, DI, 6"D-95 61.00$ LF
Culvert, DI, 8"D-96 84.00$ LF
Culvert, DI, 12"D-97 106.00$ LF
Culvert, DI, 15"D-98 129.00$ LF
Culvert, DI, 18"D-99 152.00$ LF
Culvert, DI, 24"D-100 175.00$ LF
Culvert, DI, 30"D-101 198.00$ LF
Culvert, DI, 36"D-102 220.00$ LF
Culvert, DI, 48"D-103 243.00$ LF
Culvert, DI, 54"D-104 266.00$ LF
Culvert, DI, 60"D-105 289.00$ LF
Culvert, DI, 72"D-106 311.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 9 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
CED Permit #:C18005204
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Quantity Remaining
(Bond Reduction)
(B)(C)
Specialty Drainage Items
Ditching SD-1 9.50$ CY
Flow Dispersal Trench (1,436 base+)SD-3 28.00$ LF
French Drain (3' depth)SD-4 26.00$ LF
Geotextile, laid in trench, polypropylene SD-5 3.00$ SY
Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,000.00$ Each 16 32,000.00
Pond Overflow Spillway SD-7 16.00$ SY
Restrictor/Oil Separator, 12"SD-8 1,150.00$ Each
Restrictor/Oil Separator, 15"SD-9 1,350.00$ Each
Restrictor/Oil Separator, 18"SD-10 1,700.00$ Each
Riprap, placed SD-11 42.00$ CY
Tank End Reducer (36" diameter)SD-12 1,200.00$ Each 4 4,800.00
Infiltration pond testing SD-13 125.00$ HR
Permeable Pavement SD-14
Permeable Concrete Sidewalk SD-15
Culvert, Box __ ft x __ ft SD-16
SUBTOTAL SPECIALTY DRAINAGE ITEMS:36,800.00
(B)(C)(D)(E)
STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)
Detention Pond SF-1 Each
Detention Tank SF-2 198,855.00$ Each 2 397,710.00
Detention Vault SF-3 Each
Infiltration Pond SF-4 Each
Infiltration Tank SF-5 Each
Infiltration Vault SF-6 Each
Infiltration Trenches SF-7 Each
Basic Biofiltration Swale SF-8 Each
Wet Biofiltration Swale SF-9 Each
Wetpond SF-10 Each
Wetvault SF-11 Each
Sand Filter SF-12 Each
Sand Filter Vault SF-13 Each
Linear Sand Filter SF-14 Each
Proprietary Facility SF-15 Each
Bioretention Facility SF-16 Each
SUBTOTAL STORMWATER FACILITIES:397,710.00
(B)(C)(D)(E)
Page 10 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
CED Permit #:C18005204
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Quantity Remaining
(Bond Reduction)
(B)(C)
WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)
WI-1
WI-2
WI-3
WI-4
WI-5
WI-6
WI-7
WI-8
WI-9
WI-10
WI-11
WI-12
WI-13
WI-14
WI-15
SUBTOTAL WRITE-IN ITEMS:
DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:483,155.00
SALES TAX @ 10%48,315.50
DRAINAGE AND STORMWATER FACILITIES TOTAL:531,470.50
(B)(C)(D)(E)
Page 11 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
CED Permit #:C18005204
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Connection to Existing Watermain W-1 2,000.00$ Each
Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 50.00$ LF
Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 56.00$ LF
Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 60.00$ LF
Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 70.00$ LF
Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 80.00$ LF
Gate Valve, 4 inch Diameter W-7 500.00$ Each
Gate Valve, 6 inch Diameter W-8 700.00$ Each
Gate Valve, 8 Inch Diameter W-9 800.00$ Each
Gate Valve, 10 Inch Diameter W-10 1,000.00$ Each
Gate Valve, 12 Inch Diameter W-11 1,200.00$ Each
Fire Hydrant Assembly W-12 4,000.00$ Each
Permanent Blow-Off Assembly W-13 1,800.00$ Each
Air-Vac Assembly, 2-Inch Diameter W-14 2,000.00$ Each
Air-Vac Assembly, 1-Inch Diameter W-15 1,500.00$ Each
Compound Meter Assembly 3-inch Diameter W-16 8,000.00$ Each
Compound Meter Assembly 4-inch Diameter W-17 9,000.00$ Each
Compound Meter Assembly 6-inch Diameter W-18 10,000.00$ Each
Pressure Reducing Valve Station 8-inch to 10-inch W-19 20,000.00$ Each
WATER SUBTOTAL:
SALES TAX @ 10%
WATER TOTAL:
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR WATER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 12 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.d WATER
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
CED Permit #:C18005204
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Clean Outs SS-1 1,000.00$ Each
Grease Interceptor, 500 gallon SS-2 8,000.00$ Each
Grease Interceptor, 1000 gallon SS-3 10,000.00$ Each
Grease Interceptor, 1500 gallon SS-4 15,000.00$ Each
Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 80.00$ LF
Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 95.00$ LF
Sewer Pipe, PVC, 8 inch Diameter SS-7 105.00$ LF
Sewer Pipe, PVC, 12 Inch Diameter SS-8 120.00$ LF
Sewer Pipe, DI, 8 inch Diameter SS-9 115.00$ LF
Sewer Pipe, DI, 12 Inch Diameter SS-10 130.00$ LF
Manhole, 48 Inch Diameter SS-11 6,000.00$ Each
Manhole, 54 Inch Diameter SS-13 6,500.00$ Each
Manhole, 60 Inch Diameter SS-15 7,500.00$ Each
Manhole, 72 Inch Diameter SS-17 8,500.00$ Each
Manhole, 96 Inch Diameter SS-19 14,000.00$ Each
Pipe, C-900, 12 Inch Diameter SS-21 180.00$ LF
Outside Drop SS-24 1,500.00$ LS
Inside Drop SS-25 1,000.00$ LS
Sewer Pipe, PVC, ____ Inch Diameter SS-26
Lift Station (Entire System)SS-27 LS
SANITARY SEWER SUBTOTAL:
SALES TAX @ 10%
SANITARY SEWER TOTAL:
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR SANITARY SEWER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 13 of 14
Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
Planning Division |1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
Date:
Name:Project Name:
PE Registration No:CED Plan # (LUA):
Firm Name:CED Permit # (U):
Firm Address:Site Address:
Phone No.Parcel #(s):
Email Address:Project Phase:
Site Restoration/Erosion Sediment Control Subtotal (a)
Existing Right-of-Way Improvements Subtotal (b)(b)-$
Future Public Improvements Subtotal (c)-$
Stormwater & Drainage Facilities (Public & Private) Subtotal (d)(d)531,470.50$
(e)
(f)
Site Restoration
Civil Construction Permit
Maintenance Bond 106,294.10$
Bond Reduction 2
Construction Permit Bond Amount 3
Minimum Bond Amount is $10,000.00
1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.
2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will
cover all remaining items to be constructed.
3 Required Bond Amounts are subject to review and modification by Development Engineering.
* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.
** Note: All prices include labor, equipment, materials, overhead and profit.
253-383-2422
aturpin@ahbl.com
McKnight MS Play Fields Renovation
##-######
1200 Edmonds Ave NE Renton, WA 98056
7227801860
FOR APPROVAL
C18005204
2215 N 30th St, Ste 300, Tacoma, WA 98403
563,084.50$
P
(a) x 100%
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
BOND CALCULATIONS
8/16/2018
Anne Turpin
46434
AHBL
R
((b x 150%) + (d x 100%))
S
(e) x 150% + (f) x 100%
Bond Reduction: Existing Right-of-Way Improvements (Quantity
Remaining)2
Bond Reduction: Stormwater & Drainage Facilities (Quantity
Remaining)2
T
(P +R - S)
Prepared by:Project Information
CONSTRUCTION BOND AMOUNT */**
(prior to permit issuance)
EST1
((b) + (c) + (d)) x 20%
-$
MAINTENANCE BOND */**
(after final acceptance of construction)
31,614.00$
-$
531,470.50$
31,614.00$
-$
531,470.50$
-$
Page 14 of 14
Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET
Unit Prices Updated: 06/14/2016
Version: 04/26/2017
Printed 11/12/2018
356DETENTIONTANK SYSTEM60" CMP PIPESFLOWRESTRICTORMANHOLEMcKNIGHT MIDDLESCHOOLPOINT OFCONNECTIONTO THEEXISTINGSTORM SYSTEM3563553
5
5
35
4
353352
EASTERNBASEBALLFIELDWESTERNBASEBALLFIELDDETENTIONTANK ACCESS(TYP.)NGRAPHIC SCALE0301" = 30 FEET15Civil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMCKNIGHT MIDDLE SCHOOLPLAY FIELDS RENOVATIONJOB NUMBER2180059.10DATE:NOV 2018
350DETENTIONPIPE SYSTEM48" CMP PIPESFLOWRESTRICTORMANHOLEPICK-UP THE EXISTING STORM SYSTEM TOCAPTURE THE AREA SOUTH OF THE FIELDDETENTIONPIPE ACCESS(TYP.)SOCCERFIELDPOINT OFCONNECTIONTO THEEXISTINGSTORM SYSTEMPICK-UP THE EXISTING STORM SYSTEM TOCAPTURE THE AREA SOUTH OF THE FIELDNGRAPHIC SCALE0301" = 30 FEET15Civil EngineersStructural EngineersLandscape ArchitectsCommunity PlannersLand SurveyorsNeighborsMCKNIGHT MIDDLE SCHOOLPLAY FIELDS RENOVATIONJOB NUMBER2180059.10DATE:NOV 2018MATCHLINE ABOVE
MATCHLINE BELOWTANKTANKDETENTION
Page 1 of
3
Return Address:
City Clerk’s
Office City of
Renton 1055 S
Grady Way
Renton, WA
98057
DECLARATION OF COVENANT AND EASEMENT FOR INSPECTION
AND MAINTENANCE OF DRAINAGE FACILITIES AND ON-SITE
BMPS
Grantor: RENTON SCHOOL DISTRICT Grantee: City of Renton
Legal Description: SEE ATTACHED
Assessor's Tax Parcel ID#: 7227801860
IN CONSIDERATION of the approved City of Renton (check one of the following)
residential building permit, commercial building permit, clearing and grading permit,
subdivision permit, or short subdivision permit for application file No.
LUA/SWP C18005204 relating to the real property ("Property") described above, the
Grantor(s), the owner(s) in fee of that Property, hereby covenants(covenant) with the City of Renton, a
political subdivision of the state of Washington, that he/she(they) will observe, consent to, and abide by
the conditions and obligations set forth and described in Paragraphs 1 through 9 below with regard to
the Property, and hereby grants(grant) an easement as described in Paragraphs 2 and 3. Grantor(s)
hereby grants(grant), covenants(covenant), and agrees(agree) as follows:
1. The Grantor(s) or his/her(their) successors in interest and assigns ("Owners ") shall at
their own cost, operate, maintain, and keep in good repair, the Property's drainage facilities
constructed as required in the approved construction plans and specifications R-4028 on file with
the City of Renton and submitted to the City of Renton for the review and approval of permit(s)
C18005204 . The property's drainage facilities are shown and/or listed on Exhibit
A. The property’s drainage facilities shall be maintained in compliance with the operation and
maintenance schedule included and attached herein as Exhibit B. Drainage facilities include pipes,
channels, flow control facilities, water quality facilities, on-site best management practices (BMPs) and
other engineered structures designed to manage and/or treat stormwater on the Property. On-site BMPs
include dispersion and infiltration devices, bioretention, permeable pavements, rainwater harvesting
systems, tree retention credit, reduced impervious surface footprint, vegetated roofs and other measures
designed to mimic pre-developed hydrology and minimize stormwater runoff on the Property. Water
quality treatment is not required based on the condition that fertilizers and/or pesticides are prohibited
from being used.
2. City of Renton shall have the right to ingress and egress over those portions of the Property
Page 2 of
3
necessary to perform inspections of the stormwater facilities and BMPs and conduct maintenance activities
specified in this Declaration of Covenant and in accordance with the Renton Municipal Code. City of
Renton shall provide at least 30 days written notice to the Owners that entry on the Property is planned for
the inspection of drainage facilities. After the 30 days, the Owners shall allow the City of Renton to enter
for the sole purpose of inspecting drainage facilities. In lieu of inspection by the City, the Owners may
elect to engage a licensed civil engineer registered in the state of Washington who has expertise in drainage
to inspect the drainage facilities and provide a written report describing their condition. If the engineer
option is chosen, the Owners shall provide written notice to the City of Renton within fifteen days of
receiving the City’s notice of inspection. Within 30 days of giving this notice, the Owners, or engineer on
behalf of the Owners, shall provide the engineer’s report to the City of Renton. If the report is not provided
in a timely manner as specified above, the City of Renton may inspect the drainage facilities without further
notice.
3. If City of Renton determines from its inspection, or from an engineer’s report provided in
accordance with Paragraph 2, that maintenance, repair, restoration, and/or mitigation work is required to
be done to any of the drainage facilities, City of Renton shall notify the Owners of the specific
maintenance, repair, restoration, and/or mitigation work (Work) required pursuant to the Renton
Municipal Code. The City shall also set a reasonable deadline for the Owners to complete the Work, or to
provide an engineer’s report that verifies completion of the Work. After the deadline has passed, the
Owners shall allow the City access to re-inspect the drainage facilities unless an engineer’s report has been
provided verifying completion of the Work. If the Work is not completed within the time frame set by the
City, the City may initiate an enforcement action and/or perform the required maintenance, repair,
restoration, and/or mitigation work and hereby is given access to the Property for such purposes. Written
notice will be sent to the Owners stating the City’s intention to perform such work. This work will not
commence until at least seven (7) days after such notice is mailed. If, within the sole discretion of the
City, there exists an imminent or present danger, the seven (7) day notice period will be waived and
maintenance and/or repair work will begin immediately.
4. The Owners shall assume all responsibility for the cost of any maintenance, repair work, or
any measures taken by the City to address conditions as described in Paragraph 3. Such responsibility
shall include reimbursement to the City within thirty (30) days of the receipt of the invoice for any such
work performed. Overdue payments will require payment of interest at the maximum legal rate allowed
by RCW 19.52.020 (currently twelve percent (12%)). If the City initiates legal action to enforce this
agreement, the prevailing party in such action is entitled to recover reasonable litigation costs and
attorney’s fees.
5. The Owners are required to obtain written approval from City of Renton prior to filling,
piping, cutting, or removing vegetation (except in routine landscape maintenance) in open vegetated
stormwater facilities (such as swales, channels, ditches, ponds, etc.), or performing any alterations or
modifications to the drainage facilities referenced in this Declaration of Covenant.
6. Any notice or consent required to be given or otherwise provided for by the provisions of this
Agreement shall be effective upon personal delivery, or three (3) days after mailing by Certified Mail,
return receipt requested.
7. With regard to the matters addressed herein, this agreement constitutes the entire agreement
between the parties, and supersedes all prior discussions, negotiations, and all agreements whatsoever
whether oral or written.
8. This Declaration of Covenant is intended to protect the value and desirability and promote
efficient and effective management of surface water drainage of the real property described above, and
shall inure to the benefit of all the citizens of the City of Renton and its successors and assigns. This
Page 3 of
3
Declaration of Covenant shall run with the land and be binding upon Grantor(s), and Grantor's(s')
successors in interest, and assigns.
9. This Declaration of Covenant may be terminated by execution of a written agreement by the
Owners and the City that is recorded by King County in its real property records.
IN WITNESS WHEREOF, this Declaration of Covenant for the Inspection and Maintenance of
Drainage Facilities is executed this day of _, 20 .
GRANTOR, owner of the Property
GRANTOR, owner of the Property
STATE OF WASHINGTON )
COUNTY OF KING )ss.
On this day personally appeared before me:
, to me known to be the individual(s) described in
and who executed the within and foregoing instrument and acknowledged that they signed the same as
their free and voluntary act and deed, for the uses and purposes therein stated.
Given under my hand and official seal this day of , 20 .
Printed name
Notary Public in and for the State of Washington,
residing at
My appointment expires
Technical Information Report
McKnight Middle School Play Fields Renovation 2180059.10
Appendix B
Geotechnical Engineering Letter
Krazan & Associates, Inc.
August 17, 2018
Technical Information Report
McKnight Middle School Play Fields Renovation 2180059.10
Appendix C
WWHM Report
APPENDIX C
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: McKnight Sports Fields
Site Name: Baseball Field Detention
Site Address: 1200 Edmonds
City : Renton
Report Date: 8/10/2018
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2018/03/08
Version : 4.2.14
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Lawn, Flat 1.96
Pervious Total 1.96
Impervious Land Use acre
Impervious Total 0
Basin Total 1.96
___________________________________________________________________
APPENDIX C
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
Pervious Total 0
Impervious Land Use acre
SIDEWALKS FLAT 1.96
Impervious Total 1.96
Basin Total 1.96
___________________________________________________________________
APPENDIX C
Element Flows To:
Surface Interflow Groundwater
Tank 1 Tank 1
___________________________________________________________________
Name : Tank 1
Tank Name: Tank 1
Dimensions
Depth: 5 ft.
Tank Type : Circular
Diameter : 5 ft.
Length : 853 ft.
Discharge Structure
Riser Height: 4.5 ft.
Riser Diameter: 12 in.
Orifice 1 Diameter: 1.9 in. Elevation: 0.5 ft.
Orifice 2 Diameter: 6.8 in. Elevation: 3.93 ft.
Element Flows To:
Outlet 1 Outlet 2
APPENDIX C
___________________________________________________________________
Tank Hydraulic Table
Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
0.0000 0.000 0.000 0.000 0.000
0.0556 0.020 0.000 0.000 0.000
0.1111 0.028 0.002 0.000 0.000
0.1667 0.035 0.003 0.000 0.000
0.2222 0.040 0.006 0.000 0.000
0.2778 0.044 0.008 0.000 0.000
0.3333 0.048 0.011 0.000 0.000
0.3889 0.052 0.013 0.000 0.000
0.4444 0.055 0.016 0.000 0.000
0.5000 0.058 0.020 0.000 0.000
0.5556 0.061 0.023 0.023 0.000
0.6111 0.064 0.026 0.032 0.000
0.6667 0.066 0.030 0.040 0.000
APPENDIX C
0.7222 0.068 0.034 0.046 0.000
0.7778 0.071 0.038 0.051 0.000
0.8333 0.073 0.042 0.056 0.000
0.8889 0.074 0.046 0.061 0.000
0.9444 0.076 0.050 0.065 0.000
1.0000 0.078 0.054 0.069 0.000
1.0556 0.079 0.059 0.073 0.000
1.1111 0.081 0.063 0.076 0.000
1.1667 0.082 0.068 0.080 0.000
1.2222 0.084 0.072 0.083 0.000
1.2778 0.085 0.077 0.086 0.000
1.3333 0.086 0.082 0.089 0.000
1.3889 0.087 0.087 0.092 0.000
1.4444 0.088 0.092 0.095 0.000
1.5000 0.089 0.097 0.098 0.000
1.5556 0.090 0.102 0.100 0.000
1.6111 0.091 0.107 0.103 0.000
1.6667 0.092 0.112 0.105 0.000
1.7222 0.093 0.117 0.108 0.000
1.7778 0.093 0.122 0.110 0.000
1.8333 0.094 0.127 0.113 0.000
1.8889 0.094 0.133 0.115 0.000
1.9444 0.095 0.138 0.117 0.000
2.0000 0.095 0.143 0.120 0.000
2.0556 0.096 0.149 0.122 0.000
2.1111 0.096 0.154 0.124 0.000
2.1667 0.097 0.159 0.126 0.000
2.2222 0.097 0.165 0.128 0.000
2.2778 0.097 0.170 0.130 0.000
2.3333 0.097 0.175 0.132 0.000
2.3889 0.097 0.181 0.134 0.000
2.4444 0.097 0.186 0.136 0.000
2.5000 0.097 0.192 0.138 0.000
2.5556 0.097 0.197 0.140 0.000
2.6111 0.097 0.203 0.142 0.000
2.6667 0.097 0.208 0.144 0.000
2.7222 0.097 0.214 0.146 0.000
2.7778 0.097 0.219 0.147 0.000
2.8333 0.097 0.224 0.149 0.000
2.8889 0.096 0.230 0.151 0.000
2.9444 0.096 0.235 0.153 0.000
3.0000 0.095 0.240 0.154 0.000
3.0556 0.095 0.246 0.156 0.000
3.1111 0.094 0.251 0.158 0.000
3.1667 0.094 0.256 0.160 0.000
3.2222 0.093 0.262 0.161 0.000
3.2778 0.093 0.267 0.163 0.000
3.3333 0.092 0.272 0.164 0.000
3.3889 0.091 0.277 0.166 0.000
3.4444 0.090 0.282 0.168 0.000
3.5000 0.089 0.287 0.169 0.000
3.5556 0.088 0.292 0.171 0.000
3.6111 0.087 0.297 0.172 0.000
3.6667 0.086 0.302 0.174 0.000
3.7222 0.085 0.307 0.175 0.000
3.7778 0.084 0.311 0.177 0.000
3.8333 0.082 0.316 0.178 0.000
APPENDIX C
3.8889 0.081 0.320 0.180 0.000
3.9444 0.079 0.325 0.332 0.000
4.0000 0.078 0.329 0.515 0.000 (25 year flow 0.488991)
4.0556 0.076 0.334 0.629 0.000 (interpolated elev was 3.99)
4.1111 0.074 0.338 0.720 0.000 (used 4.0’)
4.1667 0.073 0.342 0.798 0.000 (100 year flow 0.79596)
4.2222 0.071 0.346 0.867 0.000
4.2778 0.068 0.350 0.930 0.000
4.3333 0.066 0.354 0.988 0.000
4.3889 0.064 0.357 1.043 0.000
4.4444 0.061 0.361 1.094 0.000
4.5000 0.058 0.364 1.143 0.000
4.5556 0.055 0.367 1.328 0.000
4.6111 0.052 0.370 1.624 0.000
4.6667 0.048 0.373 1.980 0.000
4.7222 0.044 0.376 2.364 0.000
4.7778 0.040 0.378 2.741 0.000
4.8333 0.035 0.380 3.080 0.000
4.8889 0.028 0.382 3.355 0.000
4.9444 0.020 0.383 3.558 0.000
5.0000 0.000 0.384 3.709 0.000
5.0556 0.000 0.000 3.887 0.000
___________________________________________________________________
___________________________________________________________________
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:1.96
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0
Total Impervious Area:1.96
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.154379
5 year 0.28001
10 year 0.382244
25 year 0.532699
50 year 0.66008
100 year 0.800483
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.154354 (Q2 used for sediment trap calculations in D-4)
5 year 0.253161
10 year 0.34241
25 year 0.488991(Q25 used for conveyance calculations in D-1)
50 year 0.62758
100 year 0.79596 (Q100 used for Sediment trap calculations in D-4)
(Q100 used for conveyance calculations in D-1)
APPENDIX C
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2018; All Rights Reserved.
Per the Core
Requirement #3,
the Peak Rate
Control Standard
applies because
the runoff is
discharging to
Washington Lake.
The project must
match existing site
conditions for the
2, 10 and 100 year
peaks.
APPENDIX C
WWHM2012
PROJECT REPORT
___________________________________________________________________
Project Name: McKnight Sports Fields
Site Name: Soccer Field Detention
Site Address: 1200 Edmonds
City : Renton
Report Date: 8/9/2018
Gage : Seatac
Data Start : 1948/10/01
Data End : 2009/09/30
Precip Scale: 1.00
Version Date: 2018/03/08
Version : 4.2.14
___________________________________________________________________
Low Flow Threshold for POC 1 : 50 Percent of the 2 Year
___________________________________________________________________
High Flow Threshold for POC 1: 50 year
___________________________________________________________________
PREDEVELOPED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
C, Lawn, Flat 1.38
Pervious Total 1.38
Impervious Land Use acre
Impervious Total 0
Basin Total 1.38
APPENDIX C
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
___________________________________________________________________
MITIGATED LAND USE
Name : Basin 1
Bypass: No
GroundWater: No
Pervious Land Use acre
Pervious Total 0
Impervious Land Use acre
SIDEWALKS FLAT 1.38
Impervious Total 1.38
Basin Total 1.38
APPENDIX C
___________________________________________________________________
Element Flows To:
Surface Interflow Groundwater
Tank 1 Tank 1
___________________________________________________________________
Name : Tank 1
Tank Name: Tank 1
Dimensions
Depth: 4 ft.
Tank Type : Circular
Diameter : 4 ft.
Length : 860 ft.
Discharge Structure
Riser Height: 3.5 ft.
Riser Diameter: 12 in.
Orifice 1 Diameter: 1.6 in. Elevation: 0.5 ft.
Orifice 2 Diameter: 2.25 in. Elevation: 2.6 ft.
Element Flows To:
Outlet 1 Outlet 2
APPENDIX C
__________________________________________________________________
Tank Hydraulic Table Stage(feet) Area(ac.) Volume(ac-ft.) Discharge(cfs) Infilt(cfs)
0.0000 0.000 0.000 0.000 0.000
0.0444 0.016 0.000 0.000 0.000
0.0889 0.023 0.001 0.000 0.000
0.1333 0.028 0.002 0.000 0.000
0.1778 0.032 0.003 0.000 0.000
0.2222 0.036 0.005 0.000 0.000
0.2667 0.039 0.007 0.000 0.000
0.3111 0.042 0.008 0.000 0.000
0.3556 0.044 0.010 0.000 0.000
0.4000 0.047 0.012 0.000 0.000
0.4444 0.049 0.015 0.000 0.000
APPENDIX C
0.4889 0.051 0.017 0.000 0.000
0.5333 0.053 0.019 0.012 0.000
0.5778 0.055 0.022 0.019 0.000
0.6222 0.057 0.024 0.024 0.000
0.6667 0.058 0.027 0.028 0.000
0.7111 0.060 0.029 0.031 0.000
0.7556 0.061 0.032 0.035 0.000
0.8000 0.063 0.035 0.038 0.000
0.8444 0.064 0.038 0.040 0.000
0.8889 0.065 0.041 0.043 0.000
0.9333 0.066 0.044 0.045 0.000
0.9778 0.067 0.047 0.048 0.000
1.0222 0.068 0.050 0.050 0.000
1.0667 0.069 0.053 0.052 0.000
1.1111 0.070 0.056 0.054 0.000
1.1556 0.071 0.059 0.056 0.000
1.2000 0.072 0.062 0.058 0.000
1.2444 0.073 0.065 0.059 0.000
1.2889 0.073 0.069 0.061 0.000
1.3333 0.074 0.072 0.063 0.000
1.3778 0.075 0.075 0.065 0.000
1.4222 0.075 0.079 0.066 0.000
1.4667 0.076 0.082 0.068 0.000
1.5111 0.076 0.085 0.069 0.000
1.5556 0.077 0.089 0.071 0.000
1.6000 0.077 0.092 0.072 0.000
1.6444 0.077 0.096 0.074 0.000
1.6889 0.078 0.099 0.075 0.000
1.7333 0.078 0.103 0.077 0.000
1.7778 0.078 0.106 0.078 0.000
1.8222 0.078 0.110 0.079 0.000
1.8667 0.078 0.113 0.081 0.000
1.9111 0.078 0.117 0.082 0.000
1.9556 0.079 0.120 0.083 0.000
2.0000 0.079 0.124 0.085 0.000
2.0444 0.079 0.127 0.086 0.000
2.0889 0.078 0.131 0.087 0.000
2.1333 0.078 0.134 0.088 0.000
2.1778 0.078 0.138 0.090 0.000
2.2222 0.078 0.141 0.091 0.000
2.2667 0.078 0.145 0.092 0.000
2.3111 0.078 0.148 0.093 0.000
2.3556 0.077 0.152 0.094 0.000
2.4000 0.077 0.155 0.095 0.000
2.4444 0.077 0.158 0.096 0.000
2.4889 0.076 0.162 0.098 0.000
2.5333 0.076 0.165 0.099 0.000
2.5778 0.075 0.169 0.100 0.000
2.6222 0.075 0.172 0.121 0.000
2.6667 0.074 0.175 0.137 0.000
2.7111 0.073 0.179 0.149 0.000
2.7556 0.073 0.182 0.158 0.000
2.8000 0.072 0.185 0.166 0.000
2.8444 0.071 0.188 0.174 0.000
2.8889 0.070 0.191 0.181 0.000
2.9333 0.069 0.195 0.187 0.000
2.9778 0.068 0.198 0.193 0.000
APPENDIX C
3.0222 0.067 0.201 0.199 0.000
3.0667 0.066 0.204 0.205 0.000
3.1111 0.065 0.207 0.210 0.000
3.1556 0.064 0.209 0.215 0.000
3.2000 0.063 0.212 0.220 0.000
3.2444 0.061 0.215 0.225 0.000
3.2889 0.060 0.218 0.230 0.000
3.3333 0.058 0.220 0.234 0.000
3.3778 0.057 0.223 0.239 0.000
3.4222 0.055 0.226 0.243 0.000
3.4667 0.053 0.228 0.247 0.000
3.5111 0.051 0.230 0.264 0.000
3.5556 0.049 0.233 0.394 0.000 (25 year flow 0.343143)
3.6000 0.047 0.235 0.593 0.000 (100 year flow 0.560482)
3.6444 0.044 0.237 0.836 0.000
3.6889 0.042 0.239 1.106 0.000
3.7333 0.039 0.241 1.386 0.000
3.7778 0.036 0.242 1.658 0.000
3.8222 0.032 0.244 1.906 0.000
3.8667 0.028 0.245 2.116 0.000
3.9111 0.023 0.246 2.281 0.000
3.9556 0.016 0.247 2.403 0.000
4.0000 0.000 0.248 2.495 0.000
4.0444 0.000 0.000 2.619 0.000
___________________________________________________________________
___________________________________________________________________
Per the Core
Requirement #3,
the Peak Rate
Control Standard
applies because
the runoff is
discharging to
Washington Lake.
The project must
match existing site
conditions for the
2, 10 and 100 year
peaks.
APPENDIX C
ANALYSIS RESULTS
Stream Protection Duration
___________________________________________________________________
Predeveloped Landuse Totals for POC #1
Total Pervious Area:1.38
Total Impervious Area:0
___________________________________________________________________
Mitigated Landuse Totals for POC #1
Total Pervious Area:0
Total Impervious Area:1.38
___________________________________________________________________
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.108695
5 year 0.19715
10 year 0.269131
25 year 0.375064
50 year 0.46475
100 year 0.563606
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.107437 (Q2 used for Sediment trap calculations in D-4)
5 year 0.176828
10 year 0.239677
25 year 0.343143 (Q25 used for conveyance calculations in D-1)
50 year 0.441174
100 year 0.560482 (Q100 used for Sediment trap calculations in D-4)
(Q100 used for conveyance calculations in D-1)
___________________________________________________________________
Perlnd and Implnd Changes
No changes have been made.
___________________________________________________________________
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear Creek
Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either expressed
or implied, including but not limited to implied warranties of program and accompanying documentation.
In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever (including without
limitation to damages for loss of business profits, loss of business information, business
interruption, and the like) arising out of the use of, or inability to use this program even if Clear
Creek Solutions Inc. or their authorized representatives have been advised of the possibility of such
damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2018; All Rights Reserved.
Technical Information Report
McKnight Middle School Play Fields Renovation 2180059.10
Appendix D
Exhibits
D-1.................... Conveyance Calculations
D-2.................... Conveyance Reference
D-3.................... Email between AHBL and Renton School District, June 28, 2018
D-4.................... Sediment Trap, Dewatering Orifice, and Spillway Design Calculations
4-inch Underdrain (Baseball Field)
ROUTEHYD [] THRU [Untitled] USING TYPE1A AND [25 year] NOTZERO
RELATIVE SCS/SBUH
Reach ID Area
(ac)
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft) Size nVel
(ft/s)
fVel
(ft/s)
CBasin /
Hyd
Collector
Pipe 0.0500 0.0318 0.2371 0.13 0.0824 4-
inch 1.8968 2.7171 Developed
The pipe chosen (P-150) was one with the maximum contributing area to represent a worst case. The
surface area was considered ½ pervious and ½ impervious.
The pipe is 0.13 percent full during the 25 year event. If the pipe fails during the 100 year, there should
be no students using the field anyway.
D-1
Layout Report: Untitled
Event Precip (in)
25 year 3.4000
100 year 3.9000
Reach Records
Record Id: Collector Pipe
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0090
Routing Method: Travel Time Translation DnNode To Collector pipe UpNode Baseball Field
Material Plastic Size 4-inch
Ent Losses Beveled ring, 33.7 deg bevels
Length 181.4800 ft Slope 0.74%
Up Invert 351.1500 ft Dn Invert 349.8070 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 349.8070 ft Dn Invert 351.1500 ft
Match inverts.
DnNode To Collector pipe UpNode Baseball Field
Node Records
Record Id: Baseball Field
Descrip: Prototype Record Increment 0.10 ft
Start El. 351.1500 ft Max El. 352.6500 ft
Dummy Type Node
D-1
Record Id: To Collector pipe
Descrip: Prototype Record Increment 0.10 ft
Start El. 349.8100 ft Max El. 352.2400 ft
Dummy Type Node
Contributing Drainage Areas
Record Id: Developed
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.00 ac DCIA 0.05 ac
Pervious CN 0.00 DC CN 92.00
Pervious TC 0.00 min DC TC 6.00 min
Directly Connected CN Calc
Description SubArea Sub cn
Impervious surfaces 0.03 ac 98.00
Open spaces, lawns,parks (>75% grass) 0.03 ac 86.00
DC Composited CN (AMC 2) 92.00
Directly Connected TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Grass 5.00 ft 2.00% 0.0110 0.00 in 0.00 min
Channel (interm) Pipe 288.00 ft 0.00% 0.0120 0.00 min
Fixed Pipe 6.00 min
Directly Connected TC 6.00min
D-1
8-inch Collector Pipe (Baseball Field)
ROUTEHYD [] THRU [Untitled] USING TYPE1A AND [25 year] NOTZERO
RELATIVE SCS/SBUH
Reach ID Area
(ac)
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft) Size nVel
(ft/s)
fVel
(ft/s)
CBasin /
Hyd
Collector
Pipe 0.9100 0.5808 2.5663 0.23 0.2158 8"
Diam 5.9364 7.3518 Developed
The pipe chosen (P-138) was one with the maximum contributing area to represent a worst case. The
surface area was considered ½ pervious and ½ impervious.
The pipe is 0.23 percent full during the 25 year event. If the pipe fails during the 100 year, there should
be no students using the field anyway.
Layout Report: Untitled
Event Precip (in)
25 year 3.4000
100 year 3.9000
D-1
Reach Records
Record Id: Collector Pipe
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0090
Routing Method: Travel Time Translation DnNode To Detention UpNode Baseball Field
Material Plastic Size 8" Diam
Ent Losses Beveled ring, 33.7 deg bevels
Length 93.1600 ft Slope 2.15%
Up Invert 349.9500 ft Dn Invert 347.9471 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 347.9471 ft Dn Invert 349.9500 ft
Match inverts.
DnNode To Detention UpNode Baseball Field
Node Records
Record Id: Baseball Field
Descrip: Prototype Record Increment 0.10 ft
Start El. 349.9500 ft Max El. 354.3200 ft
Dummy Type Node
Record Id: To Detention
Descrip: Prototype Record Increment 0.10 ft
Start El. 347.9500 ft Max El. 354.3600 ft
Dummy Type Node
D-1
Contributing Drainage Areas
Record Id: Developed
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.00 ac DCIA 0.91 ac
Pervious CN 0.00 DC CN 92.07
Pervious TC 0.00 min DC TC 6.00 min
Directly Connected CN Calc
Description SubArea Sub cn
Impervious surfaces 0.46 ac 98.00
Open spaces, lawns,parks (>75% grass) 0.45 ac 86.00
DC Composited CN (AMC 2) 92.07
Directly Connected TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Grass 5.00 ft 2.00% 0.0110 0.00 in 0.00 min
Channel (interm) Pipe 288.00 ft 0.00% 0.0120 0.00 min
Fixed Pipe 6.00 min
Directly Connected TC 6.00min
D-1
4-inch Underdrain (Soccer Field)
ROUTEHYD [] THRU [Untitled] USING TYPE1A AND [25 year] NOTZERO
RELATIVE SCS/SBUH
Reach ID Area
(ac)
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft) Size nVel
(ft/s)
fVel
(ft/s)
CBasin /
Hyd
Connection
pipe 0.0360 0.0242 0.3551 0.07 0.0589 4-
inch 2.3246 4.0695 Developed
The pipe chosen (P-43) was one with the maximum contributing area to represent a worst case. The
surface area was considered ½ pervious and ½ impervious.
The pipe is 0.07 percent full during the 25 year event. If the pipe fails during the 100 year, there should
be no students using the field anyway.
Layout Report: Untitled
Event Precip (in)
25 year 3.4000
100 year 3.9000
D-1
Reach Records
Record Id: Connection pipe
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0090
Routing Method: Travel Time Translation DnNode Collector Pipe UpNode Soccer Field
Material Plastic Size 4-inch
Ent Losses Beveled ring, 33.7 deg bevels
Length 141.4400 ft Slope 1.66%
Up Invert 355.2300 ft Dn Invert 352.8821 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 352.8821 ft Dn Invert 355.2300 ft
Match inverts.
DnNode Collector Pipe UpNode Soccer Field
Node Records
Record Id: Collector Pipe
Descrip: Prototype Record Increment 0.10 ft
Start El. 350.8800 ft Max El. 352.5900 ft
Dummy Type Node
Record Id: Soccer Field
Descrip: Prototype Record Increment 0.10 ft
Start El. 355.2300 ft Max El. 365.2300 ft
Dummy Type Node
D-1
Contributing Drainage Areas
Record Id: Developed
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.00 ac DCIA 0.04 ac
Pervious CN 0.00 DC CN 92.00
Pervious TC 0.00 min DC TC 1.22 min
Directly Connected CN Calc
Description SubArea Sub cn
Impervious surfaces 0.02 ac 98.00
Open spaces, lawns,parks (>75% grass) 0.02 ac 86.00
DC Composited CN (AMC 2) 92.00
Directly Connected TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Pavement 86.00 ft 2.00% 0.0110 2.50 in 1.22 min
Channel (interm) Pipe 113.00 ft 0.00% 0.0120 0.00 min
Channel (interm) Pipe 41.00 ft 0.00% 0.0120 0.00 min
Directly Connected TC 1.22min
D-1
8-inch Collector Pipe (Soccer Field)
ROUTEHYD [] THRU [Untitled] USING TYPE1A AND [25 year] NOTZERO
RELATIVE SCS/SBUH
Reach ID Area
(ac)
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft) Size nVel
(ft/s)
fVel
(ft/s)
CBasin /
Hyd
Collector
Pipe 0.6000 0.3819 2.3153 0.16 0.1833 8"
Diam 4.8978 6.6328 Developed
The pipe chosen (P-52) was one with the maximum contributing area to represent a worst case. The
surface area was considered ½ pervious and ½ impervious.
The pipe is 0.16 percent full during the 25 year event. If the pipe fails during the 100 year, there should
be no students using the field anyway.
Layout Report: Untitled
Event Precip (in)
25 year 3.4000
100 year 3.9000
D-1
Reach Records
Record Id: Collector Pipe
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0090
Routing Method: Travel Time Translation DnNode To Detention UpNode Soccer Field
Material Plastic Size 8" Diam
Ent Losses Beveled ring, 33.7 deg bevels
Length 288.0000 ft Slope 1.75%
Up Invert 352.0700 ft Dn Invert 347.0300 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 347.0300 ft Dn Invert 352.0700 ft
Match inverts.
DnNode To Detention UpNode Soccer Field
Node Records
Record Id: Soccer Field
Descrip: Prototype Record Increment 0.10 ft
Start El. 352.0700 ft Max El. 354.1600 ft
Dummy Type Node
Record Id: To Detention
Descrip: Prototype Record Increment 0.10 ft
Start El. 347.0400 ft Max El. 349.3000 ft
Dummy Type Node
D-1
Contributing Drainage Areas
Record Id: Developed
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.00 ac DCIA 0.60 ac
Pervious CN 0.00 DC CN 92.00
Pervious TC 0.00 min DC TC 6.00 min
Directly Connected CN Calc
Description SubArea Sub cn
Impervious surfaces 0.30 ac 98.00
Open spaces, lawns,parks (>75% grass) 0.30 ac 86.00
DC Composited CN (AMC 2) 92.00
Directly Connected TC Calc
Type Description Length Slope Coeff Misc TT
Sheet Grass 5.00 ft 2.00% 0.0110 0.00 in 0.00 min
Channel (interm) Pipe 288.00 ft 0.00% 0.0120 0.00 min
Fixed Pipe 6.00 min
Directly Connected TC 6.00min
D-1
D-1
25 YEAR
Detention for the
baseball fields
Detention for
the soccer field
Dummy basins were
sized to simulate the
raDetention for the
baseball fieldste of
discharge
In addition to the
dummy basin, this CB
receives runoff from
the surrounding area
This area runoff
bypasses the
proposed detention
by entering the
existing storm system
beneath the baseball
fields
D-1
Appended on: 13:54:00 Friday, November 16, 2018
ROUTEHYD [] THRU [Untitled] USING TYPE1A AND [25 year] NOTZERO RELATIVE SCS/SBUH
Reach
ID
Area
(ac)
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft) Size nVel
(ft/s)
fVel
(ft/s) CBasin / Hyd
P-146 1.0800 0.8324 2.8468 0.29 0.2471 8"
Diam 7.0742 8.1554 1 Western Baseball
P-147 1.0800 0.8324 2.6240 0.32 0.2581 8"
Diam 6.6685 7.5173
P-138 1.1100 0.8544 1.5470 0.55 0.3538 8"
Diam 4.5401 4.4317 2 Eastern Baseball
P-54 1.1600 0.7558 0.9228 0.82 0.4590 8"
Diam 2.9492 2.6436
5 East of Soccer Field
Dummy Det Basin
South 25 yr
P-55 1.1600 0.7558 0.9617 0.79 0.4450 8"
Diam 3.0531 2.7552
P-56 1.4600 0.9101 2.6494 0.34 0.4038 12"
Diam 3.0631 3.3733 6 area west of soccer
field
P-57 1.4600 0.9101 2.6494 0.34 0.4038 12"
Diam 3.0631 3.3733
P-126 0.8100 0.5435 1.5983 0.34 0.2679 8"
Diam 4.1430 4.5788 Dummy Det Basin
North 25 yr
Exist 13 1.6500 1.0827 5.1102 0.21 0.3906 15"
Diam 3.3045 4.1642 3 Area between fields
Layout Report: Untitled
Event Precip (in)
2 year 2.5000
10 year 2.9000
25 year 3.4000
100 year 3.9000
D-1
Reach Records
Record Id: Exist 13
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode STCB 543 UpNode CB 04
Material Plastic Size 15" Diam
Ent Losses Groove End w/Headwall
Length 98.0000 ft Slope 0.62%
Up Invert 344.8900 ft Dn Invert 344.2800 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 344.2800 ft Dn Invert 344.8900 ft
Match inverts.
DnNode STCB 543 UpNode CB 04
Record Id: P-126
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode CB 04 UpNode CB 03
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 7.0000 ft Slope 1.74%
Up Invert 345.0000 ft Dn Invert 344.8782 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 344.8782 ft Dn Invert 345.0000 ft
Match inverts.
DnNode CB 04 UpNode CB 03
D-1
Record Id: P-138
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode Detention North UpNode CB 05
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 10.0000 ft Slope 1.63%
Up Invert 349.9500 ft Dn Invert 349.7870 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 349.7870 ft Dn Invert 349.9500 ft
Match inverts.
DnNode Detention North UpNode CB 05
Record Id: P-146
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode CB 02 UpNode CB 01
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 10.0000 ft Slope 5.52%
Up Invert 349.6000 ft Dn Invert 349.0480 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 349.0480 ft Dn Invert 349.6000 ft
Match inverts.
DnNode CB 02 UpNode CB 01
D-1
Record Id: P-147
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode Detention North UpNode CB 02
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 4.0000 ft Slope 4.69%
Up Invert 349.0400 ft Dn Invert 348.8524 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 348.8524 ft Dn Invert 349.0400 ft
Match inverts.
DnNode Detention North UpNode CB 02
Record Id: P-54
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode CB 18 UpNode CB 17
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 26.0000 ft Slope 0.58%
Up Invert 342.7500 ft Dn Invert 342.5992 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 342.5992 ft Dn Invert 342.7500 ft
Match inverts.
DnNode CB 18 UpNode CB 17
D-1
Record Id: P-55
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode CB 19 UpNode CB 18
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 62.0000 ft Slope 0.63%
Up Invert 342.6000 ft Dn Invert 342.2094 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 342.2094 ft Dn Invert 342.6000 ft
Match inverts.
DnNode CB 19 UpNode CB 18
Record Id: P-56
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode CB 20 UpNode CB 19
Material Plastic Size 12" Diam
Ent Losses Groove End w/Headwall
Length 117.0000 ft Slope 0.55%
Up Invert 342.1900 ft Dn Invert 341.5465 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 341.5465 ft Dn Invert 342.1900 ft
Match inverts.
DnNode CB 20 UpNode CB 19
D-1
Record Id: P-57
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode STCB 636 UpNode CB 20
Material Plastic Size 12" Diam
Ent Losses Groove End w/Headwall
Length 199.0000 ft Slope 0.55%
Up Invert 341.5500 ft Dn Invert 340.4555 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 340.4555 ft Dn Invert 341.5500 ft
Match inverts.
DnNode STCB 636 UpNode CB 20
Node Records
Record Id: CB 01
Descrip: Prototype Record Increment 0.10 ft
Start El. 349.6000 ft Max El. 352.2100 ft
Classification Manhole Structure Type CB-TYPE 1-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 1.5000 ft Bottom Area 19.6350 sf
Condition Existing
Record Id: CB 02
Descrip: Prototype Record Increment 0.10 ft
Start El. 349.0400 ft Max El. 352.4200 ft
Classification Manhole Structure Type CB-TYPE 1-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 1.5000 ft Bottom Area 19.6350 sf
Condition Existing
D-1
Record Id: CB 03
Descrip: Prototype Record Increment 0.10 ft
Start El. 345.0000 ft Max El. 352.4400 ft
Classification Manhole Structure Type CB-TYPE 2-60
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 19.6340 sf
Condition Existing
Record Id: CB 04
Descrip: Prototype Record Increment 0.10 ft
Start El. 344.8900 ft Max El. 352.3300 ft
Classification Manhole Structure Type CB-TYPE 2-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 12.5664 sf
Condition Existing
Record Id: CB 05
Descrip: Prototype Record Increment 0.10 ft
Start El. 349.9500 ft Max El. 354.3200 ft
Classification Manhole Structure Type CB-TYPE 1-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 1.5000 ft Bottom Area 19.6350 sf
Condition Existing
Record Id: CB 17
Descrip: Prototype Record Increment 0.10 ft
Start El. 342.7500 ft Max El. 348.4600 ft
Classification Manhole Structure Type CB-TYPE 2-60
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 19.6340 sf
Condition Existing
D-1
Record Id: CB 18
Descrip: Prototype Record Increment 0.10 ft
Start El. 342.6000 ft Max El. 348.5500 ft
Classification Manhole Structure Type CB-TYPE 2-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 12.5664 sf
Condition Existing
Record Id: CB 19
Descrip: Prototype Record Increment 0.10 ft
Start El. 342.1900 ft Max El. 347.4000 ft
Classification Manhole Structure Type CB-TYPE 2-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 12.5664 sf
Condition Existing
Record Id: CB 20
Descrip: Prototype Record Increment 0.10 ft
Start El. 341.5500 ft Max El. 346.9300 ft
Classification Manhole Structure Type CB-TYPE 2-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 12.5664 sf
Condition Existing
Record Id: Detention North
Descrip: Prototype Record Increment 0.10 ft
Start El. 344.5000 ft Max El. 349.5000 ft
Dummy Type Node
Record Id: Detention South
Descrip: Prototype Record Increment 0.10 ft
Start El. 342.2500 ft Max El. 346.2500 ft
Dummy Type Node
D-1
Record Id: STCB 543
Descrip: Prototype Record Increment 0.10 ft
Start El. 344.2800 ft Max El. 351.0900 ft
Classification Manhole Structure Type CB-TYPE 1-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 1.5000 ft Bottom Area 19.6350 sf
Condition Existing
Record Id: STCB 636
Descrip: Prototype Record Increment 0.10 ft
Start El. 340.4555 ft Max El. 343.4000 ft
Classification Manhole Structure Type CB-TYPE 1-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 1.5000 ft Bottom Area 19.6350 sf
Condition Existing
1 Western Baseball Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.6034 8.00 0.2043 1.0800 SBUH TYPE1A
10 year 0.7054 8.00 0.2401 1.0800 SBUH TYPE1A
25 year 0.8324 8.00 0.2849 1.0800 SBUH TYPE1A
100 year 0.9590 8.00 0.3298 1.0800 SBUH TYPE1A
Record Id: 1 Western Baseball
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 1.08 ac DCIA 0.00 ac
Pervious CN 97.99 DC CN 0.00
Pervious TC 6.00 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.03 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 1.05 ac 98.00
D-1
Pervious Composited CN (AMC 2) 97.78
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Fixed 6.00 min
Pervious TC 6.00 min
2 Eastern Baseball Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.6188 8.00 0.2092 1.1100 SBUH TYPE1A
10 year 0.7238 8.00 0.2460 1.1100 SBUH TYPE1A
25 year 0.8544 8.00 0.2921 1.1100 SBUH TYPE1A
100 year 0.9846 8.00 0.3382 1.1100 SBUH TYPE1A
Record Id: 2 Eastern Baseball
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 1.11 ac DCIA 0.00 ac
Pervious CN 97.92 DC CN 0.00
Pervious TC 6.00 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.11 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 1.00 ac 98.00
Pervious Composited CN (AMC 2) 97.21
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Fixed 6.00 min
Pervious TC 6.00 min
D-1
3 Area between fields Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.3559 8.00 0.1208 0.8400 SBUH TYPE1A
10 year 0.4371 8.00 0.1471 0.8400 SBUH TYPE1A
25 year 0.5391 8.00 0.1805 0.8400 SBUH TYPE1A
100 year 0.6413 8.00 0.2142 0.8400 SBUH TYPE1A
Record Id: 3 Area between fields
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.84 ac DCIA 0.00 ac
Pervious CN 92.39 DC CN 0.00
Pervious TC 6.79 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.66 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 0.18 ac 98.00
Pervious Composited CN (AMC 2) 91.71
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet grass 115.00 ft 1.00% 0.0500 2.50 in 6.79 min
Pervious TC 6.79 min
4 Soccer Field Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.6921 8.00 0.2611 1.3800 SBUH TYPE1A
10 year 0.8096 8.00 0.3069 1.3800 SBUH TYPE1A
25 year 0.9559 8.00 0.3642 1.3800 SBUH TYPE1A
100 year 1.1017 8.00 0.4215 1.3800 SBUH TYPE1A
Record Id: 4 Soccer Field
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
D-1
Pervious Area (AMC 2) 1.38 ac DCIA 0.00 ac
Pervious CN 98.00 DC CN 0.00
Pervious TC 13.73 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Impervious surfaces (asphalt, underdrained areas) 1.38 ac 98.00
Pervious Composited CN (AMC 2) 98.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet something 248.00 ft 0.80% 0.0500 0.00 in 0.00 min
Pervious TC 13.73 min
5 East of Soccer Field Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.2480 8.00 0.0939 0.6300 SBUH TYPE1A
10 year 0.3032 8.00 0.1138 0.6300 SBUH TYPE1A
25 year 0.3726 8.00 0.1390 0.6300 SBUH TYPE1A
100 year 0.4418 8.00 0.1645 0.6300 SBUH TYPE1A
Record Id: 5 East of Soccer Field
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.63 ac DCIA 0.00 ac
Pervious CN 93.10 DC CN 0.00
Pervious TC 13.73 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.45 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 0.18 ac 98.00
Pervious Composited CN (AMC 2) 92.29
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet something 248.00 ft 0.80% 0.0500 2.50 in 13.73 min
Pervious TC 13.73 min
D-1
6 area west of soccer field Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.0965 8.00 0.0383 0.3000 SBUH TYPE1A
10 year 0.1219 8.00 0.0473 0.3000 SBUH TYPE1A
25 year 0.1543 8.00 0.0589 0.3000 SBUH TYPE1A
100 year 0.1870 8.00 0.0706 0.3000 SBUH TYPE1A
Record Id: 6 area west of soccer field
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.30 ac DCIA 0.00 ac
Pervious CN 90.00 DC CN 0.00
Pervious TC 13.73 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.30 ac 90.00
Pervious Composited CN (AMC 2) 90.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet something 248.00 ft 0.80% 0.0500 0.00 in 0.00 min
Pervious TC 13.73 min
Dummy Det Basin North 25 yr Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.3801 8.00 0.1374 0.8100 SBUH TYPE1A
10 year 0.4530 8.00 0.1638 0.8100 SBUH TYPE1A
25 year 0.5435 8.00 0.1970 0.8100 SBUH TYPE1A
100 year 0.6336 8.00 0.2304 0.8100 SBUH TYPE1A
Record Id: Dummy Det Basin North 25 yr
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
D-1
Pervious Area (AMC 2) 0.81 ac DCIA 0.00 ac
Pervious CN 95.75 DC CN 0.00
Pervious TC 12.07 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.43 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 0.38 ac 98.00
Pervious Composited CN (AMC 2) 93.75
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Fixed 6.00 min
Sheet 100.00 ft 1.00% 0.0500 2.50 in 6.07 min
Pervious TC 12.07 min
Dummy Det Basin South 25 yr Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.2687 8.00 0.0900 0.5300 SBUH TYPE1A
10 year 0.3198 8.00 0.1073 0.5300 SBUH TYPE1A
25 year 0.3832 8.00 0.1290 0.5300 SBUH TYPE1A
100 year 0.4464 8.00 0.1508 0.5300 SBUH TYPE1A
Record Id: Dummy Det Basin South 25 yr
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.53 ac DCIA 0.00 ac
Pervious CN 95.77 DC CN 0.00
Pervious TC 7.06 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.28 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 0.25 ac 98.00
Pervious Composited CN (AMC 2) 93.77
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
D-1
Fixed 6.00 min
Sheet 100.00 ft 1.00% 0.0500 0.00 in 0.00 min
Pervious TC 12.07 min
D-1
100 YEAR
Per Section 1.2.4.1: “New pipe systems shall be designed with sufficient capacity to convey and contain (at minimum) the
25-year peak flow, assuming developed conditions for onsite tributary areas and existing conditions for any offsite
tributary areas. The tailwater elevation for the baseball fields was set at 345.08. The tailwater elevation for the soccer
fields was set at 341.11. Pipes P-54 and P-55 exceed capacity by 0.10% and 0.05% respectively. Neither of these
exceedances should cause issues. Any excess water will simply pond in the paly area, which won’t be in use during a
100 year storm event.
TW Elev:
Exist 13 Pipe Invert + backwater
(calculated in D-2)
344.28' + 9.6" = 345.08
12
TW Elev:
P-57 Pipe Invert + backwater
(calculated in D-2)
340.46' + 7.74" = 341.11
12"
The tank stage elevation (for each tank) was determined from the
"Tank Hydraulic Table", of the WWHM calculations, located in
Appendix C.
The 100 year flow rate was interpolated in the table and the
corresponding stage was added to the invert elevation of the
tank.
This elevation was
determined in the
same manner as
the baseball field
tank.
D-1
ROUTEHYD [] THRU [Untitled] USING TYPE1A AND [100 year] NOTZERO RELATIVE SCS/SBUH
Reach
ID
Area
(ac)
Flow
(cfs)
Full Q
(cfs)
Full
ratio
nDepth
(ft) Size nVel
(ft/s)
fVel
(ft/s) CBasin / Hyd
P-146 1.0800 0.9590 2.8468 0.34 0.2666 8"
Diam 7.3577 8.1554 1 Western Baseball
P-147 1.0800 0.9590 2.6240 0.37 0.2790 8"
Diam 6.9267 7.5173
P-138 1.1100 0.9846 1.5470 0.64 0.3864 8"
Diam 4.6942 4.4317 2 Eastern Baseball
P-54 1.3000 1.0145 0.9228 1.10 ----- 8"
Diam 2.9064 2.6436
5 East of Soccer Field
Dummy Det Basin
South 100 yr
P-55 1.3000 1.0145 0.9617 1.05 ----- 8"
Diam 2.9064 2.7552
P-56 1.6000 1.2015 2.6494 0.45 0.4722 12"
Diam 3.2929 3.3733 6 area west of soccer
field
P-57 1.6000 1.2015 2.6494 0.45 0.4722 12"
Diam 3.2929 3.3733
P-126 0.9500 0.8004 1.5983 0.50 0.3337 8"
Diam 4.5804 4.5788 Dummy Det Basin
North 100 yr
Exist 13 1.7900 1.4417 5.1102 0.28 0.4544 15"
Diam 3.5771 4.1642 3 Area between fields
From
Node To Node Rch Loss
(ft)
App
(ft)
Bend
(ft)
Junct Loss
(ft)
HW Loss Elev
(ft)
Max El
(ft)
349.3172
CB 02 Detention
North 349.7596 0.1172 0.0190 ------ 349.6614 352.4200
CB 01 CB 02 350.3168 ------ ------ ------ 350.3168 352.2100
CB 05 Detention
North 350.6942 ------ ------ ------ 350.6942 354.3200
CB 20 STCB 636 342.2242 0.1684 0.0032 ------ 342.0591 346.9300
CB 19 CB 20 342.8642 0.1312 0.0005 ------ 342.7335 347.4000
CB 18 CB 19 343.4680 0.1312 0.0013 ------ 343.3382 348.5500
CB 17 CB 18 343.6778 ------ ------ ------ 343.6778 348.4600
CB 04 STCB 543 345.5482 0.0816 0.0034 ------ 345.4699 352.3300
CB 03 CB 04 346.2840 ------ ------ ------ 346.2840 352.4400
D-1
Layout Report: Untitled
Event Precip (in)
2 year 2.5000
10 year 2.9000
25 year 3.4000
100 year 3.9000
Reach Records
Record Id: Exist 13
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode STCB 543 UpNode CB 04
Material Plastic Size 15" Diam
Ent Losses Groove End w/Headwall
Length 98.0000 ft Slope 0.62%
Up Invert 344.8900 ft Dn Invert 344.2800 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 344.2800 ft Dn Invert 344.8900 ft
Match inverts.
DnNode STCB 543 UpNode CB 04
Record Id: P-126
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode CB 04 UpNode CB 03
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 7.0000 ft Slope 1.74%
D-1
Up Invert 345.0000 ft Dn Invert 344.8782 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 344.8782 ft Dn Invert 345.0000 ft
Match inverts.
DnNode CB 04 UpNode CB 03
Record Id: P-138
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode Detention North UpNode CB 05
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 10.0000 ft Slope 1.63%
Up Invert 349.9500 ft Dn Invert 349.7870 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 349.7870 ft Dn Invert 349.9500 ft
Match inverts.
DnNode Detention North UpNode CB 05
Record Id: P-146
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode CB 02 UpNode CB 01
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 10.0000 ft Slope 5.52%
D-1
Up Invert 349.6000 ft Dn Invert 349.0480 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 349.0480 ft Dn Invert 349.6000 ft
Match inverts.
DnNode CB 02 UpNode CB 01
Record Id: P-147
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode Detention North UpNode CB 02
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 4.0000 ft Slope 4.69%
Up Invert 349.0400 ft Dn Invert 348.8524 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 348.8524 ft Dn Invert 349.0400 ft
Match inverts.
DnNode Detention North UpNode CB 02
Record Id: P-54
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode CB 18 UpNode CB 17
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 26.0000 ft Slope 0.58%
D-1
Up Invert 342.7500 ft Dn Invert 342.5992 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 342.5992 ft Dn Invert 342.7500 ft
Match inverts.
DnNode CB 18 UpNode CB 17
Record Id: P-55
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode CB 19 UpNode CB 18
Material Plastic Size 8" Diam
Ent Losses Groove End w/Headwall
Length 62.0000 ft Slope 0.63%
Up Invert 342.6000 ft Dn Invert 342.2094 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 342.2094 ft Dn Invert 342.6000 ft
Match inverts.
DnNode CB 19 UpNode CB 18
Record Id: P-56
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode CB 20 UpNode CB 19
Material Plastic Size 12" Diam
Ent Losses Groove End w/Headwall
Length 117.0000 ft Slope 0.55%
D-1
Up Invert 342.1900 ft Dn Invert 341.5465 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 341.5465 ft Dn Invert 342.1900 ft
Match inverts.
DnNode CB 20 UpNode CB 19
Record Id: P-57
Section Shape: Circular
Uniform Flow Method: Manning's Coefficient: 0.0130
Routing Method: Travel Time Translation DnNode STCB 636 UpNode CB 20
Material Plastic Size 12" Diam
Ent Losses Groove End w/Headwall
Length 199.0000 ft Slope 0.55%
Up Invert 341.5500 ft Dn Invert 340.4555 ft
Conduit Constraints
Min Vel Max Vel Min Slope Max Slope Min Cover
2.00 ft/s 15.00 ft/s 0.50% 2.00% 3.00 ft
Drop across MH 0.0000 ft Ex/Infil Rate 0.0000 in/hr
Up Invert 340.4555 ft Dn Invert 341.5500 ft
Match inverts.
DnNode STCB 636 UpNode CB 20
Node Records
Record Id: CB 01
Descrip: Prototype Record Increment 0.10 ft
Start El. 349.6000 ft Max El. 352.2100 ft
Classification Manhole Structure Type CB-TYPE 1-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 1.5000 ft Bottom Area 19.6350 sf
Condition Existing
D-1
Record Id: CB 02
Descrip: Prototype Record Increment 0.10 ft
Start El. 349.0400 ft Max El. 352.4200 ft
Classification Manhole Structure Type CB-TYPE 1-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 1.5000 ft Bottom Area 19.6350 sf
Condition Existing
Record Id: CB 03
Descrip: Prototype Record Increment 0.10 ft
Start El. 345.0000 ft Max El. 352.4400 ft
Classification Manhole Structure Type CB-TYPE 2-60
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 19.6340 sf
Condition Existing
Record Id: CB 04
Descrip: Prototype Record Increment 0.10 ft
Start El. 344.8900 ft Max El. 352.3300 ft
Classification Manhole Structure Type CB-TYPE 2-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 12.5664 sf
Condition Existing
Record Id: CB 05
Descrip: Prototype Record Increment 0.10 ft
Start El. 349.9500 ft Max El. 354.3200 ft
Classification Manhole Structure Type CB-TYPE 1-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 1.5000 ft Bottom Area 19.6350 sf
Condition Existing
D-1
Record Id: CB 17
Descrip: Prototype Record Increment 0.10 ft
Start El. 342.7500 ft Max El. 348.4600 ft
Classification Manhole Structure Type CB-TYPE 2-60
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 19.6340 sf
Condition Existing
Record Id: CB 18
Descrip: Prototype Record Increment 0.10 ft
Start El. 342.6000 ft Max El. 348.5500 ft
Classification Manhole Structure Type CB-TYPE 2-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 12.5664 sf
Condition Existing
Record Id: CB 19
Descrip: Prototype Record Increment 0.10 ft
Start El. 342.1900 ft Max El. 347.4000 ft
Classification Manhole Structure Type CB-TYPE 2-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 12.5664 sf
Condition Existing
Record Id: CB 20
Descrip: Prototype Record Increment 0.10 ft
Start El. 341.5500 ft Max El. 346.9300 ft
Classification Manhole Structure Type CB-TYPE 2-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 2.0000 ft Bottom Area 12.5664 sf
Condition Existing
D-1
Record Id: Detention North
Descrip: Prototype Record Increment 0.10 ft
Start El. 344.5000 ft Max El. 349.5000 ft
Dummy Type Node
Record Id: Detention South
Descrip: Prototype Record Increment 0.10 ft
Start El. 342.2500 ft Max El. 346.2500 ft
Dummy Type Node
Record Id: STCB 543
Descrip: Prototype Record Increment 0.10 ft
Start El. 344.2800 ft Max El. 351.0900 ft
Classification Manhole Structure Type CB-TYPE 1-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 1.5000 ft Bottom Area 19.6350 sf
Condition Existing
Record Id: STCB 636
Descrip: Prototype Record Increment 0.10 ft
Start El. 340.4555 ft Max El. 343.4000 ft
Classification Manhole Structure Type CB-TYPE 1-48
Ent Ke Groove End w/Headwall (ke=0.20) Channelization Curved or Deflector
Catch 1.5000 ft Bottom Area 19.6350 sf
Condition Existing
Record Id: 1 Western Baseball
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 1.08 ac DCIA 0.00 ac
Pervious CN 97.99 DC CN 0.00
D-1
Pervious TC 6.00 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.03 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 1.05 ac 98.00
Pervious Composited CN (AMC 2) 97.78
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Fixed 6.00 min
Pervious TC 6.00 min
2 Eastern Baseball Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.6188 8.00 0.2092 1.1100 SBUH TYPE1A
10 year 0.7238 8.00 0.2460 1.1100 SBUH TYPE1A
25 year 0.8544 8.00 0.2921 1.1100 SBUH TYPE1A
100 year 0.9846 8.00 0.3382 1.1100 SBUH TYPE1A
Record Id: 2 Eastern Baseball
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 1.11 ac DCIA 0.00 ac
Pervious CN 97.92 DC CN 0.00
Pervious TC 6.00 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.11 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 1.00 ac 98.00
Pervious Composited CN (AMC 2) 97.21
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Fixed 6.00 min
Pervious TC 6.00 min
D-1
3 Area between fields Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.3559 8.00 0.1208 0.8400 SBUH TYPE1A
10 year 0.4371 8.00 0.1471 0.8400 SBUH TYPE1A
25 year 0.5391 8.00 0.1805 0.8400 SBUH TYPE1A
100 year 0.6413 8.00 0.2142 0.8400 SBUH TYPE1A
Record Id: 3 Area between fields
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.84 ac DCIA 0.00 ac
Pervious CN 92.39 DC CN 0.00
Pervious TC 6.79 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.66 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 0.18 ac 98.00
Pervious Composited CN (AMC 2) 91.71
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet grass 115.00 ft 1.00% 0.0500 2.50 in 6.79 min
Pervious TC 6.79 min
4 Soccer Field Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.6921 8.00 0.2611 1.3800 SBUH TYPE1A
10 year 0.8096 8.00 0.3069 1.3800 SBUH TYPE1A
25 year 0.9559 8.00 0.3642 1.3800 SBUH TYPE1A
100 year 1.1017 8.00 0.4215 1.3800 SBUH TYPE1A
Record Id: 4 Soccer Field
Design Method SBUH Rainfall type TYPE1A
D-1
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 1.38 ac DCIA 0.00 ac
Pervious CN 98.00 DC CN 0.00
Pervious TC 13.73 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Impervious surfaces (asphalt, underdrained areas) 1.38 ac 98.00
Pervious Composited CN (AMC 2) 98.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet something 248.00 ft 0.80% 0.0500 0.00 in 0.00 min
Pervious TC 13.73 min
5 East of Soccer Field Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.2480 8.00 0.0939 0.6300 SBUH TYPE1A
10 year 0.3032 8.00 0.1138 0.6300 SBUH TYPE1A
25 year 0.3726 8.00 0.1390 0.6300 SBUH TYPE1A
100 year 0.4418 8.00 0.1645 0.6300 SBUH TYPE1A
Record Id: 5 East of Soccer Field
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.63 ac DCIA 0.00 ac
Pervious CN 93.10 DC CN 0.00
Pervious TC 13.73 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.45 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 0.18 ac 98.00
Pervious Composited CN (AMC 2) 92.29
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
D-1
Sheet something 248.00 ft 0.80% 0.0500 2.50 in 13.73 min
Pervious TC 13.73 min
6 area west of soccer field Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.0965 8.00 0.0383 0.3000 SBUH TYPE1A
10 year 0.1219 8.00 0.0473 0.3000 SBUH TYPE1A
25 year 0.1543 8.00 0.0589 0.3000 SBUH TYPE1A
100 year 0.1870 8.00 0.0706 0.3000 SBUH TYPE1A
Record Id: 6 area west of soccer field
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.30 ac DCIA 0.00 ac
Pervious CN 90.00 DC CN 0.00
Pervious TC 13.73 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.30 ac 90.00
Pervious Composited CN (AMC 2) 90.00
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Sheet something 248.00 ft 0.80% 0.0500 0.00 in 0.00 min
Pervious TC 13.73 min
Dummy Det Basin North 100 yr Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.4820 8.00 0.1615 0.9500 SBUH TYPE1A
10 year 0.5735 8.00 0.1925 0.9500 SBUH TYPE1A
25 year 0.6873 8.00 0.2314 0.9500 SBUH TYPE1A
100 year 0.8004 8.00 0.2705 0.9500 SBUH TYPE1A
Record Id: Dummy Det Basin North 100 yr
D-1
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.95 ac DCIA 0.00 ac
Pervious CN 95.78 DC CN 0.00
Pervious TC 7.06 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.50 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 0.45 ac 98.00
Pervious Composited CN (AMC 2) 93.79
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Fixed 6.00 min
Sheet 100.00 ft 1.00% 0.0500 0.00 in 0.00 min
Pervious TC 12.07 min
Dummy Det Basin South 100 yr Event Summary
Event Peak Q (cfs) Peak T (hrs) Hyd Vol (acft) Area (ac) Method Raintype
2 year 0.3495 8.00 0.1173 0.6700 SBUH TYPE1A
10 year 0.4137 8.00 0.1393 0.6700 SBUH TYPE1A
25 year 0.4934 8.00 0.1669 0.6700 SBUH TYPE1A
100 year 0.5727 8.00 0.1946 0.6700 SBUH TYPE1A
Record Id: Dummy Det Basin South 100 yr
Design Method SBUH Rainfall type TYPE1A
Hyd Intv 10.00 min Peaking Factor 484.00
Abstraction Coeff 0.20
Pervious Area (AMC 2) 0.67 ac DCIA 0.00 ac
Pervious CN 96.40 DC CN 0.00
Pervious TC 7.06 min DC TC 0.00 min
Pervious CN Calc
Description SubArea Sub cn
Open spaces, lawns, parks (50-75% grass) 0.30 ac 90.00
Impervious surfaces (asphalt, underdrained areas) 0.37 ac 98.00
D-1
Pervious Composited CN (AMC 2) 94.42
Pervious TC Calc
Type Description Length Slope Coeff Misc TT
Fixed 6.00 min
Sheet 100.00 ft 1.00% 0.0500 0.00 in 0.00 min
Pervious TC 12.07 min
-3,000
F--2,000
—0.99 — 120
— 114
— 108
— 102
—96
—90
—84
—78
—72
6
,-500
r-400
-2-300
F.-200
0.90
E-0.80
E-0.70
D = 12" diameter pipe
—0.20
dc = 3.48"
12
Baseball EXAMPLE
FIGURE 4.3.1F CRITICAL DEPTH OF 0 FOR CIRCULAR C
0.60
.2750
.1-40
2-30
-20 Ts°
Baseball
dc= 0.28 D= DIAMETER —0.30 0 = 15" diameter pipe
dc = 4.2"
15
Soccer
dc= 0.28
all cross-sectional
es, de can be calculated by
nal and error knowing that the
quantity (Q2T/gA3)=1.0 at critical
depth.
12
Baseball
D = 15" diameter pipe
(Dim = 0.796 cfs (see WWHM - Appendix C)
Soccer
D = 12" diameter pipe
()too = 0.560 cfs (see WWHM - Appendix C)
D = 66 inches, Q = 100cfs
dc/D - Ratio = 0.50
d = (0.50)(66 inches)= 33 inches -4 (12 inches/ft)
d= 2.75 feet
Soccer
0.50
SECTION 4.3 CULVERTS AND BRIDGES
12/12/2016 2017 City of Renton Surface Water Design Manual
4-48
D-2
SECTION 4.2 PIPES, OUTFALLS, AND PUMPS
R CALCULATION SHEET NOTE
Column (1) Design flow to be conveyed by pipe segment.
Column (2) Length of pipe segment.
Column (3) Pipe Size; indicate pipe diameter or span x rise.
Column (4) Manning's "n" value.
Column (5) Outlet Elevation of pipe segment.
Column (6) Inlet Elevation of pipe segment.
Column (7) Barrel Area; this is the full cross-sectional area of the pipe. (12" + 3.48") = 7.74"
Column (8) Barrel Velocity; this is the full velocity in the pipe as determined by: 2
= OrA or Col.(8) = Col.(I) / Col.(7)
Column (9) - Barrel Velocity Head = 1//2g or (CoD8))'/2g
where g = 32.2 fl/sec' (acceleration due to gravity)
Column (10) - Tajjwaw (Ttn -gl.s..**iOn; this is the water surface elevation at the outlet of the pipe segment. lithe pipe's outlet is not submerged by
the TW and the TWdepfliliS:leSthan:(D3-di.)/2, set TW equal to (D+d)i2 to keep the analysis simple and still obtain reasonable results
(D = pipe barrel height ana:4,..tiEorik410.131,kbothirifeet;See Figure'4.3.1.Efor determination of
Column (II) Friction Loss = Srx I. [or Sf Col.(2)]
where Sf is the friction slope or head loss per linear foot of pipe as determined by .Manning's equation expressed in the form:
Sr = (17 r1/2.22
Column (12) - Hydraulic Grade Line (HGL) Elevation just inside the entrance of the pipe barrel; this is determined by adding the friction loss to the
7-11% elevation:
Col.(12) = Col.(Il)+ Col.(10)
If this elevation falls below the pipe's inlet crown, it no longer represents the true HGL when computed in this manner. The true
HGL will fall somewhere between the pipe's crown and either normal flow depth or critical 'flow depth, whichever is greater. To
keep the analysis simple and still obtain reasonable results (i.e., erring on the conservative side), set the HGL elevation equal to
the crown elevation.
Column (13) - Entrance Head Loss = K,. x I//2g [or K x Col.(9)1
where K. = Entrance Loss Coefficient (from Table 4.3.1.13). This is the head lost due to flow contractions at the pipe entrance.
Column (14) Exit Head Loss = 1.0 x I/12g or 1.0 x Col.(9)
This is the velocity head lost or transferred downstream.
Column (15) - Outlet Control Elevation = Col.(12) + Col.(13) + Col.(14)
This is the maximum headwater elevation assuming the pipe's barrel and inlet/outlet characteristics are controlling capacity. It does
not include structure losses or approach velocity considerations.
Column (16) - Inlet Control Elevation (see Section 4.3.1.2, for computation of inlet control 011 culverts); this is the maximum headwater elevation
assuming the pipe's inlet is controlling capacity. It does not include structure losses or approach velocity considerations.
Column (17) - Approach Velocity Head; this is the amount of head/energy being supplied by the discharge frt»n an upstream pipe or channel section,
which serves to reduce the headwater elevation. If the discharge is from a pipe, the approach velocity head is equal to the barrel
velocity head computed for the upstream pipe. If the upstream pipe outlet is significantly higher in elevation (as in a drop manhole) or
lower in elevation such that its discharge energy would be dissipated, an approach velocity head of zero should be assumed.
Column (18) - Bend Head Loss = Kbx V./2g [or Kb x Col.( 17)]
where Kb — Bend Loss Coefficient (from Figure 4.2.1 .K). This is the loss of head/energy required to change direction of flow in an
access structure.
Column (19) Junction Head Loss. This is the loss in headlenergy that results from the turbulence created when two or more streams are merged into
one within the access structure. Figure 4.2.1.1, may be used to determine this loss, or it may be computed using the following
equations derived from Figure 4.2.1.L:
Junction Head Loss = KJ x V'/2g [or Kj x Col.(1.7)]
where Ki is the junction Loss Coefficient determined by:
= (Q3/01)/(1.18 0.63(03/Q0)
Column (20) - Headwater (14W) Elevation; this is determined by combining the energy heads in Columns 17, 18, and 19 with the highest control
elevation in either Column 15 or 16, as follows:
Col.(20) = Col.(15 or 16) - Col.(17) + Col.(18) + Col.(19)
D-2
Baseball
(15" + 4.2") = 9.6"
2
Soccer
12/12/2016 2017 City of Renton Surface Water Design Manual
4-26
SECTION 1.2 CORE REQUIREMENTS
1.2.4 CORE REQUIREMENT #4 CONVEYANCE SYSTEM
All engineered conveyance system elements for proposed projects must be analyzed, designed, and
constructed to provide a minimum level of protection against overtopping, flooding, erosion, and structural
failure as specified in the following groups of requirements:
• "Conveyance Requirements for New Systems," Section 1.2.4.1
• "Conveyance Requirements for Existing Systems," Section 1.2.4.2
• "Conveyance System Implementation Requirements," Section 1.2.4.3
Intent: To ensure proper design and construction of engineered conveyance system elements. Conveyance
systems are natural and engineered drainage facilities that provide for the collection and transport of
surface water or stormwater runoff. This core requirement applies to the engineered elements of
conveyance systems (primarily pipes, culverts, and ditches/channels).
1.2.4.1 CONVEYANCE REQUIREMENTS FOR NEW SYSTEMS
All new conveyance system elements,30 both onsite and offsite, shall be analyzed, designed, and
constructed according to the following requirements. Also see Section 4.1 for route design and easement
requirements.
Pipe Systems
I. New pipe systems shall be designed with sufficient capacity to convey and contain (at minimum) the
25-year peak flow, assuming developed conditions for onsite tributary areas and existing conditions
for any offsite tributary areas.
2. Pipe system structures may overtop for runoff events that exceed the 25-year design capacity,
provided the overflow from a 100-year runoff event does not create or aggravate a severe flooding
problem or severe erosion problem as described in Core Requirement #2, Section 1.2.2. Any overflow
occurring onsite for runoff events up to and including the 100-year event must discharge at the natural
location for the project site. In residential subdivisions, this overflow must be contained within an
onsite drainage easement, tract, covenant, or public right-of-way.
3. The upstream end of a pipe system that receives runoff from an open drainage feature (pond, ditch,
etc.) shall be analyzed and sized as a culvert as described below.
Culverts
1. New culverts shall be designed with sufficient capacity to meet the headwater requirements in Section
4.3.1 and convey (at minimum) the 25-year peak flow, assuming developed conditions for onsite
tributary areas and existing conditions for any offsite tributary areas.
2. New culverts must also convey as much of the 100-year peak flow as is necessary to preclude creating
or aggravating a severe flooding problem or severe erosion problem as described in Core
Requirement #2, Section 1.2.2. Any overflow occurring onsite for runoff events up to and including
the 100-year event must discharge at the natural location for the project site. In residential
subdivisions, this overflow must be contained within an onsite drainage easement, tract, covenant, or
public right-of-way.
3. New culverts proposed in streams with salmonids shall be designed to provide for fish passage as
detailed in Section 4.3.2. Note: The City's critical areas regulations (RMC 4-3-050) or the state
Department of Fish and Wildlife may require a bridge to facilitate fish passage.
30 New conveyance system elements are those that are proposed to be constructed where there are no existing constructed
conveyance elements. D-2
12/12/2016 2017 City of Renton Surface Water Design Manual
1-50
1
Anne Turpin
From:Stewart Shusterman <stewart.shusterman@rentonschools.us>
Sent:Thursday, June 28, 2018 3:09 PM
To:Rohini Nair
Cc:Adam Braun
Subject:McKnight Middle School Field Improvements
Attachments:Re: McKnight Middle School - Field Drainage Improvements
Categories:Filed by Newforma
Hi Rohinni,
I apologize for taking so long to get back to you, but attached is the email from Vanessa stating that a formal
pre-app isn’t required.
I also checked with our Central Grounds Lead, and was told that no chemicals or fertilizers are intended to be
used in maintaining the upgraded fields.
Please let me know if you need any additional information from me at this time.
Thank you,
Stewart L. Shusterman
7812 S 124th Street - Seattle, WA 98178
Office: 425.204.4479 - Cell: 206.755.1743
D-2D-3
Because no chemicals or
fertilizers will be used on
the play fields and no
PSIG surfaces existing in
the project limits, the area
is not required to treat the
runoff for water quality.
Technical Information Report
McKnight Middle School Play Fields Renovation 2180059.10
D-4 Sediment Trap, Dewatering Orifice, and Spillway Design
Calculations
Per D.2.1.5.1, temporary sediment traps will be installed during construction.
The minimum depth from the top of the weir to the bottom of the pond is 3.5 feet.
The maximum interior side slopes are 3:1.
One foot of freeboard has been provided between the top of the weir and the crest of the emergency
spillway.
The trap has a flat bottom.
The spillway has a minimum 1-foot depth, 6-foot length.
The trap has a length to width ratio between 3:1 and 6:1.
TESC Trap Sizing – Baseball Fields
(for the 2-year flow, Q2, see the WWHM calculations, Appendix C)
The Q2 flow for the baseball field area is 0.547501.
Q2 = 0.154354 cfs
The required surface area for the top of the riser was calculated as SA = Surface Area of Trap
SA = 2 x Q2/0.00096 = 2080 sf per cfs of inflow
SA = 2080 x 0.154354
SA = 321 sq ft
Emergency Overflow Spillway
(for the 100-year flow, Q100, see the WWHM calculations, Appendix C)
Q100 = Peak Flow for 100-year runoff event (cfs)
Q100 = 0.79596 cfs
L = Width of the Weir (Spillway)
H = Height of Water over Weir (ft)
H = 1 ft
L = [Q100/(3.21H3/2)] – 2.4 H
L = [0.79596/(3.21x1.03/2) – 2.4(1.0)
L = 0.98 feet (use 6.0 foot minimum)
Technical Information Report
McKnight Middle School Play Fields Renovation 2180059.10
D-4 Continued
TESC Trap Sizing – Soccer Field
(for the 2-year flow, Q2, see the WWHM calculations, Appendix C)
The Q2 flow for the soccer field area is 0.107437.
Q2 = 0.107437 cfs
The required surface area for the top of the riser was calculated as SA = Surface Area of Trap
SA = 2 x Q2/0.00096 = 2080 sf per cfs of inflow
SA = 2080 x 0.107437
SA = 223 sq ft
Emergency Overflow Spillway
(for the 100-year flow, Q100, see the WWHM calculations, Appendix C)
Q100 = Peak Flow for 100-year runoff event (cfs)
Q100 = 0.560482 cfs
L = Width of the Weir (Spillway)
H = Height of Water over Weir (ft)
H = 1 ft
L = [Q100/(3.21H3/2)] – 2.4 H
L = [0.79596/(3.21x1.03/2) – 2.4(1.0)
L = 0.69 feet (use 6.0 foot minimum)
Technical Information Report
McKnight Middle School Play Fields Renovation 2180059.10
Appendix E
Operations and Maintenance Manual
CITY OF RENTON SURFACE WATER DESIGN MANUAL
2017 City of Renton Surface Water Design Manual 12/12/2016
A-1
MAINTENANCE REQUIREMENTS FOR
STORMWATER FACILITIES AND ON-SITE
BMPS
This appendix contains the maintenance requirements for the following typical stormwater flow control
and water quality facilities and on-site BMPs (ctrl/click the title to follow the link):
No. 3 – Detention Tanks and Vaults
No. 4 – Control Structure/Flow Restrictor
No. 5 – Catch Basins and Manholes
No. 6 – Conveyance Pipes and Ditches
No. 11 – Grounds (landscaping)
APPENDIX E
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual
A-6
NO. 3 – DETENTION TANKS AND VAULTS
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Site Trash and debris Any trash and debris which exceed 1 cubic
foot per 1,000 square feet (this is about
equal to the amount of trash it would take
to fill up one standard size office garbage
can).In general, there should be no visual
evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which
may constitute a hazard to City personnel
or the public.
Noxious and nuisance vegetation removed
according to applicable regulations.No
danger of noxious vegetation where City
personnel or the public might normally be.
Contaminants and
pollution
Any evidence of contaminants or pollution
such as oil, gasoline, concrete slurries or
paint.
Materials removed and disposed of
according to applicable regulations.Source
control BMPs implemented if appropriate.
No contaminants present other than a
surface oil film.
Excessive growth of
grass/groundcover
Grass or groundcover exceeds 18 inches
in height.
Grass or groundcover mowed to a height
no greater than 6 inches.
Tank or Vault
Storage Area
Trash and debris Any trash and debris accumulated in vault
or tank (includes floatables and non-
floatables).
No trash or debris in vault.
Sediment
accumulation
Accumulated sediment depth exceeds
10% of the diameter of the storage area for
½ length of storage vault or any point
depth exceeds 15% of diameter.Example:
72-inch storage tank would require
cleaning when sediment reaches depth of
7 inches for more than ½ length of tank.
All sediment removed from storage area.
Tank Structure Plugged air vent Any blockage of the vent.Tank or vault freely vents.
Tank bent out of
shape
Any part of tank/pipe is bent out of shape
more than 10% of its design shape.
Tank repaired or replaced to design.
Gaps between
sections, damaged
joints or cracks or
tears in wall
A gap wider than ½-inch at the joint of any
tank sections or any evidence of soil
particles entering the tank at a joint or
through a wall.
No water or soil entering tank through
joints or walls.
Vault Structure Damage to wall,
frame, bottom, and/or
top slab
Cracks wider than ½-inch, any evidence of
soil entering the structure through cracks
or qualified inspection personnel
determines that the vault is not structurally
sound.
Vault is sealed and structurally sound.
Inlet/Outlet Pipes Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in
inlet/outlet pipes (includes floatables and
non-floatables).
No trash or debris in pipes.
Damaged inlet/outlet
pipes
Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil
entering at the joints of the inlet/outlet
pipes.
No cracks more than ¼-inch wide at the
joint of the inlet/outlet pipe.
Access Manhole Cover/lid not in place Cover/lid is missing or only partially in
place.Any open manhole requires
immediate maintenance.
Manhole access covered.
APPENDIX E
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016
A-7
NO. 3 – DETENTION TANKS AND VAULTS
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Access Manhole
(cont.)
Locking mechanism
not working
Mechanism cannot be opened by one
maintenance person with proper tools.
Bolts cannot be seated.Self-locking
cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to
remove
One maintenance person cannot remove
cover/lid after applying 80 lbs of lift.
Cover/lid can be removed and reinstalled
by one maintenance person.
Ladder rungs unsafe Missing rungs, misalignment, rust, or
cracks.
Ladder meets design standards. Allows
maintenance person safe access.
Large access
doors/plate
Damaged or difficult
to open
Large access doors or plates cannot be
opened/removed using normal equipment.
Replace or repair access door so it can
opened as designed.
Gaps, doesn't cover
completely
Large access doors not flat and/or access
opening not completely covered.
Doors close flat; covers access opening
completely.
Lifting rings missing,
rusted
Lifting rings not capable of lifting weight of
door or plate.
Lifting rings sufficient to lift or remove door
or plate.
APPENDIX E
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual
A-8
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Structure Trash and debris Trash or debris of more than ½ cubic foot
which is located immediately in front of the
structure opening or is blocking capacity of
the structure by more than 10%.
No Trash or debris blocking or potentially
blocking entrance to structure.
Trash or debris in the structure that
exceeds 1/3 the depth from the bottom of
basin to invert the lowest pipe into or out of
the basin.
No trash or debris in the structure.
Deposits of garbage exceeding 1 cubic
foot in volume.
No condition present which would attract or
support the breeding of insects or rodents.
Sediment
accumulation
Sediment exceeds 60% of the depth from
the bottom of the structure to the invert of
the lowest pipe into or out of the structure
or the bottom of the FROP-T section or is
within 6 inches of the invert of the lowest
pipe into or out of the structure or the
bottom of the FROP-T section.
Sump of structure contains no sediment.
Damage to frame
and/or top slab
Corner of frame extends more than ¾ inch
past curb face into the street (If
applicable).
Frame is even with curb.
Top slab has holes larger than 2 square
inches or cracks wider than ¼ inch.
Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e.,
separation of more than ¾ inch of the
frame from the top slab.
Frame is sitting flush on top slab.
Cracks in walls or
bottom
Cracks wider than ½ inch and longer than
3 feet, any evidence of soil particles
entering structure through cracks, or
maintenance person judges that structure
is unsound.
Structure is sealed and structurally sound.
Cracks wider than ½ inch and longer than
1 foot at the joint of any inlet/outlet pipe or
any evidence of soil particles entering
structure through cracks.
No cracks more than 1/4 inch wide at the
joint of inlet/outlet pipe.
Settlement/
misalignment
Structure has settled more than 1 inch or
has rotated more than 2 inches out of
alignment.
Basin replaced or repaired to design
standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil
entering the structure at the joint of the
inlet/outlet pipes.
No cracks more than ¼-inch wide at the
joint of inlet/outlet pipes.
Contaminants and
pollution
Any evidence of contaminants or pollution
such as oil, gasoline, concrete slurries or
paint.
Materials removed and disposed of
according to applicable regulations.Source
control BMPs implemented if appropriate.
No contaminants present other than a
surface oil film.
Ladder rungs missing
or unsafe
Ladder is unsafe due to missing rungs,
misalignment, rust, cracks, or sharp edges.
Ladder meets design standards and allows
maintenance person safe access.
FROP-T Section Damaged FROP-T T section is not securely attached to
structure wall and outlet pipe structure
should support at least 1,000 lbs of up or
down pressure.
T section securely attached to wall and
outlet pipe.
Structure is not in upright position (allow up
to 10% from plumb).
Structure in correct position.
APPENDIX E
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016
A-9
NO. 4 – CONTROL STRUCTURE/FLOW RESTRICTOR
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
FROP-T Section
(cont.)
Damaged FROP-T
(cont.)
Connections to outlet pipe are not
watertight or show signs of deteriorated
grout.
Connections to outlet pipe are water tight;
structure repaired or replaced and works
as designed.
Any holes—other than designed holes—in
the structure.
Structure has no holes other than designed
holes.
Cleanout Gate Damaged or missing
cleanout gate
Cleanout gate is missing.Replace cleanout gate.
Cleanout gate is not watertight.Gate is watertight and works as designed.
Gate cannot be moved up and down by
one maintenance person.
Gate moves up and down easily and is
watertight.
Chain/rod leading to gate is missing or
damaged.
Chain is in place and works as designed.
Orifice Plate Damaged or missing
orifice plate
Control device is not working properly due
to missing, out of place, or bent orifice
plate.
Plate is in place and works as designed.
Obstructions to orifice
plate
Any trash, debris, sediment, or vegetation
blocking the plate.
Plate is free of all obstructions and works
as designed.
Overflow Pipe Obstructions to
overflow pipe
Any trash or debris blocking (or having the
potential of blocking) the overflow pipe.
Pipe is free of all obstructions and works
as designed.
Deformed or
damaged lip of
overflow pipe
Lip of overflow pipe is bent or deformed.Overflow pipe does not allow overflow at
an elevation lower than design
Inlet/Outlet Pipe Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in
inlet/outlet pipes (includes floatables and
non-floatables).
No trash or debris in pipes.
Damaged inlet/outlet
pipe
Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil
entering at the joints of the inlet/outlet
pipes.
No cracks more than ¼-inch wide at the
joint of the inlet/outlet pipe.
Metal Grates
(If applicable)
Unsafe grate opening Grate with opening wider than 7/8 inch.Grate opening meets design standards.
Trash and debris Trash and debris that is blocking more
than 20% of grate surface.
Grate free of trash and debris.footnote to
guidelines for disposal
Damaged or missing
grate
Grate missing or broken member(s) of the
grate.
Grate is in place and meets design
standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in
place.Any open structure requires
urgent maintenance.
Cover/lid protects opening to structure.
Locking mechanism
not working
Mechanism cannot be opened by one
maintenance person with proper tools.
Bolts cannot be seated.Self-locking
cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to
remove
One maintenance person cannot remove
cover/lid after applying 80 lbs. of lift.
Cover/lid can be removed and reinstalled
by one maintenance person.
APPENDIX E
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual
A-10
NO. 5 – CATCH BASINS AND MANHOLES
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Structure Sediment
accumulation
Sediment exceeds 60% of the depth from
the bottom of the catch basin to the invert
of the lowest pipe into or out of the catch
basin or is within 6 inches of the invert of
the lowest pipe into or out of the catch
basin.
Sump of catch basin contains no sediment.
Trash and debris Trash or debris of more than ½ cubic foot
which is located immediately in front of the
catch basin opening or is blocking capacity
of the catch basin by more than 10%.
No Trash or debris blocking or potentially
blocking entrance to catch basin.
Trash or debris in the catch basin that
exceeds 1/3 the depth from the bottom of
basin to invert the lowest pipe into or out of
the basin.
No trash or debris in the catch basin.
Dead animals or vegetation that could
generate odors that could cause
complaints or dangerous gases (e.g.,
methane).
No dead animals or vegetation present
within catch basin.
Deposits of garbage exceeding 1 cubic
foot in volume.
No condition present which would attract or
support the breeding of insects or rodents.
Damage to frame
and/or top slab
Corner of frame extends more than ¾ inch
past curb face into the street (If
applicable).
Frame is even with curb.
Top slab has holes larger than 2 square
inches or cracks wider than ¼ inch.
Top slab is free of holes and cracks.
Frame not sitting flush on top slab, i.e.,
separation of more than ¾ inch of the
frame from the top slab.
Frame is sitting flush on top slab.
Cracks in walls or
bottom
Cracks wider than ½ inch and longer than
3 feet, any evidence of soil particles
entering catch basin through cracks, or
maintenance person judges that catch
basin is unsound.
Catch basin is sealed and is structurally
sound.
Cracks wider than ½ inch and longer than
1 foot at the joint of any inlet/outlet pipe or
any evidence of soil particles entering
catch basin through cracks.
No cracks more than 1/4 inch wide at the
joint of inlet/outlet pipe.
Settlement/
misalignment
Catch basin has settled more than 1 inch
or has rotated more than 2 inches out of
alignment.
Basin replaced or repaired to design
standards.
Damaged pipe joints Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil
entering the catch basin at the joint of the
inlet/outlet pipes.
No cracks more than ¼-inch wide at the
joint of inlet/outlet pipes.
Contaminants and
pollution
Any evidence of contaminants or pollution
such as oil, gasoline, concrete slurries or
paint.
Materials removed and disposed of
according to applicable regulations.Source
control BMPs implemented if appropriate.
No contaminants present other than a
surface oil film.
Inlet/Outlet Pipe Sediment
accumulation
Sediment filling 20% or more of the pipe. Inlet/outlet pipes clear of sediment.
Trash and debris Trash and debris accumulated in
inlet/outlet pipes (includes floatables and
non-floatables).
No trash or debris in pipes.
APPENDIX E
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016
A-11
NO. 5 – CATCH BASINS AND MANHOLES
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITION WHEN MAINTENANCE
IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Inlet/Outlet Pipe
(cont.)
Damaged inlet/outlet
pipe
Cracks wider than ½-inch at the joint of the
inlet/outlet pipes or any evidence of soil
entering at the joints of the inlet/outlet
pipes.
No cracks more than ¼-inch wide at the
joint of the inlet/outlet pipe.
Metal Grates
(Catch Basins)
Unsafe grate opening Grate with opening wider than 7/8 inch.Grate opening meets design standards.
Trash and debris Trash and debris that is blocking more
than 20% of grate surface.
Grate free of trash and debris.footnote to
guidelines for disposal
Damaged or missing
grate
Grate missing or broken member(s) of the
grate. Any open structure requires
urgent maintenance.
Grate is in place and meets design
standards.
Manhole Cover/Lid Cover/lid not in place Cover/lid is missing or only partially in
place.Any open structure requires
urgent maintenance.
Cover/lid protects opening to structure.
Locking mechanism
not working
Mechanism cannot be opened by one
maintenance person with proper tools.
Bolts cannot be seated.Self-locking
cover/lid does not work.
Mechanism opens with proper tools.
Cover/lid difficult to
remove
One maintenance person cannot remove
cover/lid after applying 80 lbs. of lift.
Cover/lid can be removed and reinstalled
by one maintenance person.
APPENDIX E
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
12/12/2016 2017 City of Renton Surface Water Design Manual
A-12
NO. 6 – CONVEYANCE PIPES AND DITCHES
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Pipes Sediment & debris
accumulation
Accumulated sediment or debris that
exceeds 20% of the diameter of the pipe.
Water flows freely through pipes.
Vegetation/root
growth in pipe
Vegetation/roots that reduce free
movement of water through pipes.
Water flows freely through pipes.
Contaminants and
pollution
Any evidence of contaminants or pollution
such as oil, gasoline, concrete slurries or
paint.
Materials removed and disposed of
according to applicable regulations.Source
control BMPs implemented if appropriate.
No contaminants present other than a
surface oil film.
Damage to protective
coating or corrosion
Protective coating is damaged; rust or
corrosion is weakening the structural
integrity of any part of pipe.
Pipe repaired or replaced.
Damaged pipes Any dent that decreases the cross section
area of pipe by more than 20% or is
determined to have weakened structural
integrity of the pipe.
Pipe repaired or replaced.
Ditches Trash and debris Trash and debris exceeds 1 cubic foot per
1,000 square feet of ditch and slopes.
Trash and debris cleared from ditches.
Sediment
accumulation
Accumulated sediment that exceeds 20%
of the design depth.
Ditch cleaned/flushed of all sediment and
debris so that it matches design.
Noxious weeds Any noxious or nuisance vegetation which
may constitute a hazard to City personnel
or the public.
Noxious and nuisance vegetation removed
according to applicable regulations.No
danger of noxious vegetation where City
personnel or the public might normally be.
Contaminants and
pollution
Any evidence of contaminants or pollution
such as oil, gasoline, concrete slurries or
paint.
Materials removed and disposed of
according to applicable regulations.Source
control BMPs implemented if appropriate.
No contaminants present other than a
surface oil film.
Excessive vegetation
growth
Vegetation that reduces free movement of
water through ditches.
Water flows freely through ditches.
Erosion damage to
slopes
Any erosion observed on a ditch slope.Slopes are not eroding.
Rock lining out of
place or missing (If
applicable)
One layer or less of rock exists above
native soil area 5 square feet or more, any
exposed native soil.
Replace rocks to design standards.
APPENDIX E
APPENDIX A MAINTENANCE REQUIREMENTS FOR STORMWATER FACILITIES AND ON-SITE BMPS
2017 City of Renton Surface Water Design Manual 12/12/2016
A-17
NO. 11 – GROUNDS (LANDSCAPING)
MAINTENANCE
COMPONENT
DEFECT OR
PROBLEM
CONDITIONS WHEN
MAINTENANCE IS NEEDED
RESULTS EXPECTED WHEN
MAINTENANCE IS PERFORMED
Site Trash and debris Any trash and debris which exceed 1 cubic
foot per 1,000 square feet (this is about
equal to the amount of trash it would take
to fill up one standard size office garbage
can).In general, there should be no visual
evidence of dumping.
Trash and debris cleared from site.
Noxious weeds Any noxious or nuisance vegetation which
may constitute a hazard to City personnel
or the public.
Noxious and nuisance vegetation removed
according to applicable regulations.No
danger of noxious vegetation where City
personnel or the public might normally be.
Contaminants and
pollution
Any evidence of contaminants or pollution
such as oil, gasoline, concrete slurries or
paint.
Materials removed and disposed of
according to applicable regulations.Source
control BMPs implemented if appropriate.
No contaminants present other than a
surface oil film.
Excessive growth of
grass/groundcover
Grass or groundcover exceeds 18 inches
in height.
Grass or groundcover mowed to a height
no greater than 6 inches.
Trees and Shrubs Hazard tree identified Any tree or limb of a tree identified as
having a potential to fall and cause
property damage or threaten human life.A
hazard tree identified by a qualified
arborist must be removed as soon as
possible.
No hazard trees in facility.
Damaged tree or
shrub identified
Limbs or parts of trees or shrubs that are
split or broken which affect more than 25%
of the total foliage of the tree or shrub.
Trees and shrubs with less than 5% of total
foliage with split or broken limbs.
Trees or shrubs that have been blown
down or knocked over.
No blown down vegetation or knocked over
vegetation.Trees or shrubs free of injury.
Trees or shrubs which are not adequately
supported or are leaning over, causing
exposure of the roots.
Tree or shrub in place and adequately
supported; dead or diseased trees
removed.
APPENDIX E