EROSION CONTROL NOTES:
1. THESE NOTES SHALL APPEAR FOR ALL PROJECTS - SITE
IMPROVEMENTS, SURFACE WATER UTILITY, WASTEWATER
UTILITY, WATER UTILITY, AND TRANSPORTATION PLANS:
2. BEFORE ANY CONSTRUCTION OR DEVELOPMENT ACTIVITY
OCCURS, A PRE -CONSTRUCTION MEETING MUST BE HELD
WITH THE CITY OF RENTON, PUBLIC WORKS DESIGN
ENGINEER.
3. THE BOUNDARIES OF THE CLEARING LIMITS AND AREAS OF
VEGETATION PRESERVATION AS PRESCRIBED ON THE
PLAN(S) SHALL BE CLEARLY FLAGGED BY SURVEY TAPE OR
FENCING IN THE FIELD PRIOR TO CONSTRUCTION IN
ACCORDANCE WITH APPENDIX D OF THE SURFACE WATER
DESIGN MANUAL AND OBSERVED DURING CONSTRUCTION.
DURING THE CONSTRUCTION PERIOD, NO DISTURBANCE
BEYOND THE CLEARING LIMITS SHALL BE PERMITTED. THE
CLEARING LIMITS SHALL BE MAINTAINED BY THE
APPLICANT/ESC SUPERVISOR FOR THE DURATION OF
CONSTRUCTION.
4. STABILIZED CONSTRUCTION ENTRANCES SHALL BE
INSTALLED AT THE BEGINNING OF CONSTRUCTION AND
MAINTAINED FOR THE DURATION OF THE PROJECT.
ADDITIONAL MEASURES, SUCH AS CONSTRUCTED WHEEL
WASH SYSTEMS OR WASH PADS, MAY BE REQUIRED TO
ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN AND
TRACK OUT TO ROAD RIGHT OF WAY DOES NOT OCCUR FOR
THE DURATION OF THE PROJECT.
5. ALL REQUIRED SEDIMENTATION/EROSION CONTROL
FACILITIES MUST BE CONSTRUCTED AND IN OPERATION
PRIOR TO LAND CLEARING AND/OR CONSTRUCTION TO
PREVENT TRANSPORTATION OF SEDIMENT TO SURFACE
WATER, DRAINAGE SYSTEMS AND ADJACENT PROPERTIES.
ALL EROSION AND SEDIMENT FACILITIES SHALL BE
MAINTAINED IN A SATISFACTORY CONDITION UNTIL SUCH
TIME THAT CLEARING AND/OR CONSTRUCTION IS
COMPLETE AND POTENTIAL FOR ON -SITE EROSION HAS
PASSED. THE IMPLEMENTATION, MAINTENANCE,
REPLACEMENT AND ADDITIONS TO
EROSION/SEDIMENTATION CONTROL SYSTEMS SHALL BE
THE RESPONSIBILITY OF THE PERMITEE.
6. THE EROSION AND SEDIMENTATION CONTROL SYSTEMS
DEPICTED ON THIS DRAWING ARE INTENDED TO BE
MINIMUM REQUIREMENTS TO MEET ANTICIPATED SITE
CONDITIONS. AS CONSTRUCTION PROGRESSES AND
UNEXPECTED OR SEASONAL CONDITIONS DICTATE, THE
PERMITEE SHALL ANTICIPATE THAT MORE EROSION AND
SEDIMENTATION CONTROL FACILITIES WILL BE NECESSARY
TO ENSURE COMPLETE SILTATION CONTROL ON THE
INSPECTION SCHEDULE:
PROPOSED SITE. DURING THE COURSE OF CONSTRUCTION,
IT SHALL BE THE OBLIGATION AND RESPONSIBILITY OF THE
PERMITEE TO ADDRESS ANY NEW CONDITIONS THAT MAY
BE CREATED BY THE ACTIVITIES AND TO PROVIDE
ADDITIONAL FACILITIES, OVER AND ABOVE MINIMUM
REQUIREMENTS, AS MAY BE NEEDED, TO PROTECT
ADJACENT PROPERTIES AND WATER QUALITY OF THE
RECEIVING DRAINAGE SYSTEM.
7. APPROVAL OF THIS PLAN IS FOR EROSION/SEDIMENTATION
CONTROL ONLY. IT DOES NOT CONSTITUTE AN APPROVAL
OF STORM DRAINAGE DESIGN, SIZE NOR LOCATION OF
PIPES, RESTRICTORS, CHANNELS, OR RETENTION
FACILITIES.
8. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY
EMBANKMENTS, THAT WILL NOT BE DISTURBED FOR TWO
DAYS DURING THE WET SEASON (OCTOBER 1ST THROUGH
MARCH 30TH) OR SEVEN DAYS DURING THE DRY SEASON
(APRIL 1ST THROUGH SEPTEMBER 30) SHALL BE
IMMEDIATELY STABILIZED WITH THE APPROVED ESC COVER
METHODS (E.G., SEEDING, MULCHING, PLASTIC COVERING,
ETC.).
9. WET SEASON SEASONAL EROSION AND SEDIMENT
CONTROL REQUIREMENTS APPLY TO ALL CONSTRUCTION
SITES CLEARING BETWEEN OCTOBER 1 AND MARCH 30
INCLUSIVE, UNLESS OTHERWISE APPROVED BY THE CITY
THROUGH AN ADJUSTMENT PROCESS.
10. COVER MEASURES WILL BE APPLIED IN CONFORMANCE
WITH APPENDIX D OF THE SURFACE WATER DESIGN
MANUAL.
11. ANY AREA NEEDING ESC MEASURES, NOT REQUIRING
IMMEDIATE ATTENTION, SHALL BE ADDRESSED WITHIN
SEVEN (7) DAYS DURING NON WET SEASON.
12. THE ESC FACILITIES ON INACTIVE SITES SHALL BE
INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH
OR WITHIN 24 HOURS FOLLOWING A STORM EVENT.
13. AT NO TIME SHALL MORE THAN ONE (1) FOOT OF SEDIMENT
BE ALLOWED TO ACCUMULATE WITHIN A CATCH BASIN. ALL
CATCH BASINS AND CONVEYANCE LINES SHALL BE
CLEANED PRIOR TO PAVING. THE CLEANING OPERATION
SHALL NOT FLUSH SEDIMENT- LADEN WATER INTO THE
DOWNSTREAM SYSTEM.
1. ALL ESC MEASURES SHALL BE MAINTAINED AND REVIEWED ON A REGULAR
BASIS.
2. THE ESC SUPERVISOR SHALL REVIEW THE SITE AT LEAST WEEKLY AND
WITHIN 24 HOURS OF SIGNIFICANT STORMS. A SIGNIFICANT STORM IS ONE
WITH MORE THAN 0.5 INCHES OF RAIN IN 24 HOURS OR LESS.
3. THE CITY MAY REQUIRE THAT A WRITTEN RECORD OF THESE REVIEWS BE
KEPT ON SITE WITH COPIES SUBMITTED TO THE CITY WITHIN 48 HOURS.
HYDROSEEDING NOTES:
1. HYDROSEEDING SHALL BE APPLIED TO ALL AREAS DISTURBED BY
CONSTRUCTION ACTIVITIES UNLESS OTHERWISE NOTED.
2. HYDROSEEDING TO BE AS SPECIFIED IN LANDSCAPE
SPECIFICATIONS.
3. APPLICATION TO BE 100 LBS/ACRE.
4. 500 LBS/ACRE 10-20-20 FERTILIZER, 2000 LBS/ACRE MULCH AND 40
LBS/ACRE SOIL STABILIZER TO BE APPLIED WITH SEED MIXTURE.
5. SEED BEDS PLANTED BETWEEN MAY 1 AND OCTOBER 31 WILL
REQUIRE IRRIGATION AND OTHER MAINTENANCE AS NECESSARY
TO FOSTER AND PROTECT THE ROOT STRUCTURE. CONTRACTOR
SHALL ENSURE PROPER ROOT GROWTH REGARDLESS OF
PLANTING SCHEDULE.
6. FOR SEED BEDS PLANTED BETWEEN OCTOBER 31 AND APRIL 30,
ARMORING OF THE SEED WILL BE NECESSARY. (EG, GEOTEXTILES,
JUTE MAT, CLEAR PLASTIC COVERING.)
7. BEFORE SEEDING, INSTALL NEEDED SURFACE RUNOFF CONTROL
MEASURES SUCH AS GRADIENT TERRACES, INTERCEPTOR DIKES,
SWALES, LEVEL SPREADERS AND SEDIMENT BASINS.
8. THE SEEDBED SHALL BE FIRM WITH A FAIRLY FINE SURFACE,
FOLLOWING SURFACE ROUGHENING. PERFORM ALL OPERATIONS
ACROSS OR AT RIGHT ANGLES TO THE SLOPE.
9. FERTILIZERS ARE TO BE USED ACCORDING TO SUPPLIERS
RECOMMENDATIONS. AMOUNTS USED SHOULD BE MINIMIZED,
ESPECIALLY ADJACENT TO WATER BODIES AND WETLANDS.
10. SEE SPECIFICATIONS FOR HYDROSEED MIXTURES.
MULCHING NOTES:
14. ANY PERMANENT RETENTION/DETENTION FACILITY USED AS
A TEMPORARY SETTLING BASIN SHALL BE MODIFIED WITH
THE NECESSARY EROSION CONTROL MEASURES AND
SHALL PROVIDE ADEQUATE STORAGE CAPACITY.
15. PRIOR TO THE BEGINNING OF THE WET SEASON (OCT. 1),
ALL DISTURBED AREAS SHALL BE REVIEWED TO IDENTIFY
WHICH ONES CAN BE SEEDED IN PREPARATION FOR THE
WINTER RAINS. DISTURBED AREAS SHALL BE SEEDED
WITHIN ONE WEEK OF THE BEGINNING OF THE WET
SEASON. A SKETCH MAP OF THOSE AREAS TO BE SEEDED
AND THOSE AREAS TO REMAIN UNCOVERED SHALL BE
SUBMITTED TO THE CITY OF RENTON FOR REVIEW.
16. ALL TESC MEASURES MUST BE REMOVED AFTER
CONSTRUCTION AND SITE IS STABILIZED.
17. DISTURBED AREAS UNWORKED FOR 7 CONSECUTIVE
WORKING DAYS SHALL BE STABILIZED WITH COVER
MEASURES EXCEPT DURING THE WET SEASON. DURING
THE WET SEASON DISTURBED AREAS UNWORKED FOR TWO
CONSECUTIVE WORKING DAYS SHALL BE STABILIZED WITH
COVER MEASURES.
18. STOCKPILES AND STEEP CUT AND FILL SLOPES SHALL BE
PROTECTED IF UNWORKED FOR MORE THAN 12 HOURS.
19. COVER MATERIALS SUFFICIENT TO COVER ALL DISTURBED
AREAS SHALL BE STOCKPILED ON SITE.
20. ALL AREAS THAT ARE TO BE UNWORKED DURING THE WET
SEASON SHALL BE SEEDED WITHIN ONE WEEK OF THE
BEGINNING OF THE WET SEASON.
21. MULCH IS REQUIRED TO PROTECT ALL SEEDED AREAS.
22. FIFTY LINEAR FEET OF SILT FENCE (AND THE NECESSARY
STAKES) PER ACRE OF DISTURBANCE SHALL BE
STOCKPILED ON SITE.
23. CONSTRUCTION ROAD AND PARKING LOT STABILIZATION
ARE REQUIRED FOR ALL SITES UNLESS THE SITE IS
UNDERLAIN BY COARSE -GRAINED SOIL.
24. ANY RUNOFF GENERATED BY DEWATERING SHALL BE
REQUIRED TO DISCHARGE TO THE SANITARY SEWER (WITH
APPROPRIATE DISCHARGE AUTHORIZATION), PORTABLE
SAND FILTER SYSTEMS, OR HOLDING TANKS.
1. MULCH MATERIALS USED SHALL BE HAY OR STRAW, AND SHALL BE
APPLIED AT THE RATE OF 2 TONS/ACRE.
2. MULCHES SHALL BE APPLIED IN ALL AREAS WITH EXPOSED
SLOPES GREATER THAN 2:1.
3. MULCHING SHALL BE USED IMMEDIATELY AFTER SEEDING OR IN
AREAS WHICH CANNOT BE SEEDED BECAUSE OF THE SEASON.
4. ALL AREAS NEEDING MULCH SHALL BE COVERED BY NOVEMBER 1.
SOIL NOTES:
A. PROTECT THE SOIL MOISTURE HANDLING CAPACITY OF ALL NEW
PERVIOUS SURFACING THAT, AT PROJECT COMPLETION, WILL NOT
BE COVERED BY IMPERVIOUS SURFACING OR INCORPORATED INTO
A DRAINAGE FACILITY. THE DUFF LAYER AND NATIVE TOPSOIL SHALL
BE RETAINED IN AN UNDISTURBED STATE TO THE MAXIMUM EXTENT
FEASIBLE.
B. ANY DUFF LAYER OR TOPSOIL REMOVED DURING GRADING SHALL
BE STOCKPILED ONSITE IN A DESIGNATED, CONTROLLED AREA NOT
ADJACENT TO PUBLIC RESOURCES AND CRITICAL AREAS. THE
MATERIAL SHALL BE REAPPLIED TO OTHER PORTIONS OF THE SITE
WHERE FEASIBLE.
C. AMEND THE SOIL TO MITIGATE FOR LOSS OF MOISTURE HOLDING
CAPACITY IN ANY AREA THAT HAS BEEN COMPACTED OR THAT HAS
HAD SOME OR ALL OF THE DUFF LAYER OR UNDERLYING TOPSOIL
REMOVED. THE AMENDMENT SHALL TAKE PLACE BETWEEN MAY 1
AND OCTOBER 1. REPLACED TOPSOIL SHALL BE A MINIMUM OF 8
INCHES THICK. REPLACED TOPSOIL SHALL HAVE AN ORGANIC
MATTER CONTENT BETWEEN 8 AND 13 PERCENT DRY WEIGHT AND A
PH SUITABLE FOR THE PROPOSED LANDSCAPE PLANTS. SEE
LANDSCAPE PLANS FOR MORE DETAILS.
y J. �r
WASfJj���
AS -BUILT ��w� ■1
I CERTIFY THAT THE INFORMATION SHOWN HEREON gE���
• WHICH WAS AS -BUILT BY AHBL , AND MAY INCLUDE o��ssIONAL1/07/2019 _
0 LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND
AS -BUILT COMMENTS, ACCURATELY REFLECTS EXISTING -D -
ALTERATION OF THIS DOCUMENT SHALL INVALDATE THE �
FIELD CONDICTIONS AS DETERMINED BY ME OR UNDER MY SON&SEa mSmiuRE.vum7mOF 13
THIS DOM ENT DOES NOT OEROGAIE FROM RESERVED
Know what's beloW. DIRECT SUPERVISION ON THIS DATE: 11/7/2019. � TACOMA SEATTLE•SPOKANE TRI-CITIES
OWY FM THE PRUM MTIFB IN THE AND IS NOT TO BE USED FOR REPAIR, R0100EL OR
Call before you dig. AHBL PROJECT NO.2180059 ADDITION TO THAT PROkECT OR FOR ANY OTHER PRGECT. 1200 6th Avenue, Suite 1620 Seattle, WA 98101
206.267.2425 TEL 206.267.2429 FAX www.ahbl.com WEB
GENERAL NOTES:
1. DEMOLITION: IT IS THE INTENT OF THE WORK UNDER
THIS CONTRACT TO INCLUDE THE DEMOLITION OF ALL
EXISTING SITE IMPROVEMENTS AS INDICATED BY THIS
DRAWING OR AS REQUIRED FOR NEW CONSTRUCTION.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO FULLY
REVIEW THE SITE CONDITIONS AND TO CORRELATE
THESE OBSERVATIONS WITH THE PROJECT WORK AND
INCLUDE ALL NECESSARY DEMOLITION, WHETHER
SHOWN OR NOT, AND INCLUDE ALL SUCH COSTS IN THE
BASE BID.
2. CLEARING: IT IS THE INTENT OF THE WORK UNDER THIS
CONTRACT TO CONDUCT ALL CLEARING NECESSARY TO
BE ABLE TO COMPLETE ALL THE WORK OF THIS
PROJECT. CONTRACTOR SHALL PERFORM ADDITIONAL
CLEARING TO CONSTRUCT ONSITE AND OFFSITE
IMPROVEMENTS IF NECESSARY.
3. GENERAL CONTRACTOR SHALL PROVIDE AN ESC
SUPERVISOR WHO IS A CERTIFIED EROSION AND
SEDIMENT CONTROL LEAD.
4. CONTRACTOR SHALL CONFORM TO ALL REQUIREMENTS
OF THE NPDES UNDER THE DOE'S GENERAL PERMIT
FOR STORMWATER DISCHARGE FROM CONSTRUCTION
ACTIVITIES AND THE SWPPP. CONTRACTOR IS
RESPONSIBLE FOR MAINTAINING ALL REQUIRED
RECORDS.
5. CONTRACTOR SHALL LEGALLY DISPOSE OFF THE
OWNER'S PROPERTY, ALL DEMOLISHED AND REMOVED
MATERIALS, UNLESS INDICATED OTHERWISE.
6. BACKFILL AND COMPACT ALL VOIDS AND DEPRESSIONS
OCCURRING AS A RESULT OF DEMOLITION ACTIVITIES.
SEE SPECIFICATIONS FOR ALLOWABLE BACKFILL
MATERIALS.
7. REMOVE EXISTING SOD AND TOPSOIL AS NECESSARY
TO PROVIDE IMPROVEMENTS. CONTRACTOR SHALL
DISPOSE OF EXCESS SOD AND TOPSOIL OFFSITE.
8. CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF
CONSTRUCTION SEQUENCE:
1. STAKE THE CLEARING LIMITS BEFORE THE PRE -CONSTRUCTION MEETING.
2. ARRANGE AND ATTEND PRE -CONSTRUCTION MEETING WITH CITY OF RENTON, OWNER,
CONTRACTOR, ESC LEAD, AND ENGINEER.
3. POST NOTICE OF CONSTRUCTION ACTIVITY SIGN WITH NAME AND PHONE NUMBER OF
ESC LEAD.
4. FENCE CLEARING LIMITS AND TREE PROTECTION AREAS.
5. INSTALL CATCH BASIN SEDIMENT PROTECTION.
6. INSTALL PERIMETER PROTECTION (SILT FENCE, OR OTHER MEASURES) WHERE
SPECIFIED ON THE ESC PLAN OR REQUIRED BY THE CITY INSPECTOR.
7. GRADE AND STABILIZE CONSTRUCTION ENTRANCE.
8. DEMOLISH EXISTING PAVEMENT AREAS AS INDICATED ON PLAN.
9. CONSTRUCT SURFACE WATER CONTROLS (INTERCEPTOR SWALES, CHECK DAMS,
TEMPORARY SEDIMENT POND, ETC.) SIMULTANEOUSLY WITH CLEARING AND GRADING
FOR PROJECT DEVELOPMENT.
10. PROVIDE PLASTIC COVERING ON ALL EXPOSED SLOPES 5HAV OR GREATER. ALL FILLS
MUST BE IN ACCORDANCE WITH THE RECOMMENDATIONS OF THE GEOTECHNICAL
ENGINEER.
11. MAINTAIN EROSION CONTROL MEASURES IN ACCORDANCE WITH CITY OF RENTON
STANDARDS, NPDES PERMIT AND EROSION AND SEDIMENT CONTROL REPORT.
12. RELOCATE SURFACE WATER CONTROLS AND EROSION CONTROL MEASURES OR
INSTALL NEW MEASURES, SO THAT, AS SITE CONDITIONS CHANGE, THE EROSION AND
SEDIMENT CONTROL IS ALWAYS IN ACCORDANCE WITH THE CITY OF RENTON EROSION
AND SEDIMENT CONTROL REQUIREMENTS.
13. ANY AREAS OF EXPOSED SOILS, INCLUDING ROADWAY EMBANKMENTS, THAT WILL NOT
BE DISTURBED FOR TWO DAYS DURING THE WET SEASON (OCT 1 TO APR 30) OR SEVEN
DAYS DURING THE DRY SEASON (MAY 1 TO SEPT 30) SHALL BE IMMEDIATELY
STABILIZED WITH THE APPROVED ESC MEASURES.
14. ROUGH GRADE SITE.
15. CONSTRUCT PERMANENT STORMWATER FACILITIES.
16. CONSTRUCT ALL OTHER SITE IMPROVEMENTS.
17. STABILIZE ALL AREAS THAT REACH FINAL GRADE WITHIN SEVEN DAYS.
18. SEED OR SOD ANY AREA TO REMAIN UNWORKED FOR MORE THAN 30 DAYS.
19. UPON SUBSTANTIAL COMPLETION, ALL DISTURBED AREAS MUST BE STABILIZED.
EROSION AND SEDIMENT CONTROL MEASURES SHALL REMAIN IN PLACE UNTIL
APPROVAL IS OBTAINED FROM THE CITY OR RENTON.
20. TEST IRRIGATION SYSTEM.
TESC FACILITIES. CONTRACTOR IS RESPONSIBLE FOR
CONSTRUCTION OF ADDITIONAL FACILITIES INCLUDING
BUT NOT LIMITED TO FILTER FENCE, CATCH BASIN
PROTECTION, SWALES, MULCHING AND SEEDING.
9. RELOCATE EROSION CONTROL MEASURES OR INSTALL
NEW MEASURES SO THAT AS SITE CONDITIONS CHANGE
THE EROSION CONTROL IS ALWAYS IN ACCORDANCE
WITH THE MINIMUM CITY OF RENTON TESC
REQUIREMENTS.
10. SEDIMENTS TRACKED ONTO PAVED SURFACES SHALL
BE REMOVED BY SWEEPING. SEDIMENTS SHALL NOT BE
WASHED DOWNSTREAM. SPRAY EXPOSED SOILS WITH
WATER TO PREVENT DUST. RUNOFF SHALL NOT BE
CREATED BY SPRAYING. EROSION CONTROL MEASURES
SHALL BE PROVIDED THROUGHOUT CONSTRUCTION.
WHEEL WASHES SHALL BE PROVIDED IF THE NOTED
EROSION CONTROL MEASURES ARE NOT ADEQUATE TO
PREVENT SEDIMENTS FROM ENTERING THE ROW
11. CONTRACTOR SHALL EXCAVATE AND FILL AS
NECESSARY TO ACHIEVE SUBGRADES IN LAWN AND
PLANTER BEDS REQUIRED BY THE LANDSCAPE PLANS.
12. PROTECT EXISTING UTILITIES WITHIN THE WORK LIMITS
NOT SPECIFICALLY INDICATED FOR DEMOLITION.
ADJUST EXISTING UTILITIES TO FINISHED GRADE.
13. CONTRACTOR SHALL INCLUDE IN BID REMOVAL OF ALL
TESC MEASURES AT COMPLETION OF PROJECT.
14. SEE LANDSCAPE PLANS FOR FINAL VEGETATED
SURFACING.
15. CONTRACTOR IS REQUIRED TO USE EXISTING TRUCK
HAUL ROUTES AS NOTED PER CITY OF RENTON
ORDINANCE 5339. ORDINANCE 5339 SPECIFIES THAT
TRUCKS TAKE THE MOST DIRECT ARTERIAL ROUTE TO
OR FROM ONE OF THE DESIGNATED TRUCK ROUTES.
NE SUNSET BLVD (STATE HIGHWAY 900) SOUTH OF THE
SITE IS A DESIGNATED TRUCK ROUTE.
EXISTING LEGEND:
SURVEY
0
SET NAIL AND WASHER
MISCELLANEOUS
BOLLARD
SIGN AS NOTED
FENCE
SANITARY SEWER
SANITARY SEWER
MANHOLE
SANITARY SEWER
CLEANOUT
SANITARY SEWER LINE
STORM DRAINAGE
❑
STORM CATCH BASIN
❑0
STORM MANHOLE
®
ROOF DRAIN
-
STORM LINE
NATURAL GAS
GAS VALVE
GAS LINE
POWER
1 ,
ELECTRICAL VAULT
z
JUNCTION BOX
0
LUMINAIRE
- - - - P
ELECTRICAL LINE
- - - - T
COMMUNICATION LINE
TREES
C=CEDAR
CW=COTTONWOOD,
M=MAPLE,
U= UNKNOWN
SURFACING
CONCRETE
ASPHALT
CONTOUR MAJOR
- -XXX- -
INTERVAL
CONTOUR MINOR
- - - -XXX- - -
INTERVAL
PROPERTY/RIGHT-OF-WAY
LINE
CONSTRUCTION RECORD DRAWINGS
STORM DRAINAGE REVISIONS
1 ALTERNATE BID NO. 1: SOCCER FIELD IMPROVEMENTS
NO. REVISION
SURVEYED:
DESIGNED:
AMT 09/20/2019 AC B DRAWN. AMT
AMT 01 28 2019 ACB CHECKED:
BJS
BY DATE APPR I APPROVED:
WJF
SCALE:
AS SHOWN
ONE INCH
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
VERTICAL: NAVD 1988
HORIZONTAL NAD 1983/1991
DATU M
CITY OF
RENTON
Planning/Building/Public Works Dept.
16. THE SITE TOPOGRAPHIC SURVEY WAS COMPLETED BY
THE OWNER'S CONSULTANT. PRIOR TO CONSTRUCTION
AND MOVING MATERIAL, THE CONTRACTOR SHALL
REVIEW THE SURVEY AND PROVIDE THE OWNER A
SIGNED LETTER INDICATING THE CONTRACTOR
AGREES WITH THE CONDITIONS NOTED BY THE
SURVEY. IF THE CONTRACTOR DOES NOT AGREE WITH
THE CONDITIONS OF THE SURVEY, THE CONTRACTOR
SHALL COMPLETE AN INDEPENDENT 3RD PARTY
SURVEY AND PROVIDE IT TO THE OWNER FOR REVIEW
PRIOR TO CONSTRUCTION OR MOVING MATERIAL.
NOTES
1. COORDINATE DEMOLITION AND SALVAGE
NECESSARY TO PROVIDE
OF IRRIGATION COMPONENTS WITH
IMPROVEMENTS. CONTRACTOR SHALL
IRRIGATION CONTRACTOR. COORDINATE
DISPOSE OF EXCESS SOD AND TOPSOIL
INSTALLATION OF IRRIGATION SLEEVING
ONSITE.
WITH PAVING INSTALLATION.
7.
SEDIMENTS TRACKED ONTO PAVED
2. DEMOLITION: IT IS THE INTENT OF THE
SURFACES SHALL BE REMOVED BY
WORK UNDER THIS CONTRACT TO
SWEEPING. SEDIMENTS SHALL NOT BE
INCLUDE THE DEMOLITION OF ALL
WASHED DOWNSTREAM. SPRAY
EXISTING SITE IMPROVEMENTS AS
EXPOSED SOILS WITH WATER TO
INDICATED BY THIS DRAWING OR AS
PREVENT DUST. RUNOFF SHALL NOT BE
REQUIRED FOR NEW CONSTRUCTION. IT
CREATED BY SPRAYING. EROSION
IS THE CONTRACTOR'S RESPONSIBILITY
CONTROL MEASURES SHALL BE
TO FULLY REVIEW THE SITE CONDITIONS
PROVIDED THROUGHOUT
AND TO CORRELATE THESE
CONSTRUCTION.
OBSERVATIONS WITH THE PROJECT
WORK AND INCLUDE ALL NECESSARY 8.
PROTECT EXISTING PLANTS AND
DEMOLITION, WHETHER SHOWN OR NOT,
VEGETATION TO REMAIN.
AND INCLUDE ALL SUCH COSTS IN THE
BASE BID. 9.
PROTECT EXISTING UTILITIES AND
PAVING WITHIN THE WORK LIMITS. RAISE
3. CLEARING: IT IS THE INTENT OF THE
EXISTING UTILITIES TO FINISHED GRADE.
O
N
L0
O
O
00
T
16
O
0
0
O
F
00
WORK UNDER THIS CONTRACT TO
REPLACE DAMAGED PAVING. PROTECT
z
CONDUCT ALL CLEARING NECESSARY TO
EXISTING UTILITIES AND PAVING BEYOND
O
BE ABLE TO COMPLETE ALL THE WORK
THE WORK LIMITS.
OF THIS PROJECT.
10.
HYDROSEED ALL NON -PAVED DISTURBED
Q
4. CONTRACTOR SHALL LEGALLY DISPOSE
AREAS FOR EROSION AND
OFF THE OWNER'S PROPERTY, ALL
SEDIMENTATION CONTROL PER SHEET
O
DEMOLISHED AND REMOVED MATERIALS,
C2.4.
z
UNLESS INDICATED OTHERWISE.
W
11.
CONTRACTOR SHALL HAVE THE OPTION
5. BACKFILL AND COMPACT ALL VOIDS AND
OF PERMANENT SODDING IN LIEU OF
DEPRESSIONS OCCURRING AS A RESULT
SEEDING FOR EROSION AND
(f�
OF DEMOLITION ACTIVITIES WITH
SEDIMENTATION CONTROL AT NO
0
APPROVED BACKFILL.
ADDITIONAL EXPENSE TO THE OWNER.
J
W
6. REMOVE EXISTING SOD AND TOPSOIL AS
Q
J
R-402807 a
0
IN COMPLIANCE WITH CITY OF RENTON STANDARDS 0
McKNIGHT MIDDLE SCHOOL
FIELD IMPROVEMENTS
RENTON SCHOOL DISTRICT
TESC NOTES & LEGEND
U
J
0
=
DATE:
1/15/2019
FIELDBOOK:
PAGE
_
z
DRAWING NO:
C2.4
SHEET: OF.
7 32