Loading...
HomeMy WebLinkAboutR-4028100 LO ao N W zz w V O 2 't C3.4 g tF- 11 P - 126, 26 LF W O CB 04-\ Sw�Nc cq TF 1 C3.4 O I. A O� CB01 > O O P - 140, 12 LF / z W ' P - 146, 36 LF U) - 0 J BASEpib oov��� \ o '� \ / ■ P - 173, 1 8 LF \ / ■ P�948,3LF \\ / / P-176,2LF FENCE - -- ----- �/ P - 145, 185 LF, 5'O---------� ■ -D - _ - CB06 _----------- - \ \ All -- -- ^f� -� TYP. W v I LL ' v a J � � I J I O v I = I� CU ILL ILL. V i W JLL ti r - J J � 0 r- 1- LL J 0 l in co 0 I 1� C G 1 (L Ln D P-138,93LF • - 2 - 047-F C3.4 D D D D■ 10 P - 89, 173 LF 10 10 P 39, LF ■ 3.8 TYP. D DTYP. TYP. • • • • • P - 92, 120 LF D D ,' 7 P - 88, 174 LF -P - 149, DF TYP. D P - 141,112 LF, 5'QS r P - 93, 137 LF D \ P - 87, 163 LF ■ 9D 3g� P - 142, 112 LF, 5'0 P - 94, 153 LF ■ 0 D W D P - 86, 152 LF D P - 143, 1112 LF, SO W \ P - 144,112 LF, 5'0 - 95, 142 LF = \ \ D D P - 85,141 LF P - 165, 112 LF, 50 ■ W P - 96, 131 LF D D D _j D J P - 84, 130 LF 10 TYP. P - 97, 120 LF D U \ \ D P - 83, 119 LF 355D Q 8 P - 98, 108 LF ■ D // \ D P - 82 8 LF D ■ / \ 7 TYP. P - 99, 98 LF / \ 97 LF YP. F(- 10 P - 127, 253 LF \ D D D _■ i \ P-80,86LF ��� ■ J \ P-101,74LF ' D D coI� \ D P - 79, 75 LF 8 I 10 TYP. � N LL TYP. / P - 102, 68 LF Ln 00 D I D o_ m ` P - 78, 68 LF ■ cY,l / r 35:6� z I co C/ Lo o LLp _ �::: :. :. P- 103, 57 LF D ■ / n- LO w ILL. P - 77, 57 LF U I cg J \ Z z I I d 0000 LL \ � /cli � I P - 104, 46 LF 2 I J D *, : .. D C3.4 � LL y : :: P - 105, 35 LF J a F:: ■ I r Ln LL P - 136, 35 LF z.: 7 / rn (0 c� \ I P - 106, 24 7 v TYP. M y J TYP. ` n cN ALL - 135, 24 LF P - 134, 14 LF / I ^ M I a i9 \\N P - 107, 14 LF o i I � _ 9'i ■ o d ■ 6 r H1u M } + ST H jj Y x-x-x- \: BE�iCH. :: : ; TYP.:: .: 1 BLEAC S: 6 TRq C3.4 BLEACHERS.:: Cq� S P - 108, 14 LF ■ /------------ ■ ■ CB 10 �� ------ ^-�\\-■ MATCH■�� ss ■ LINE C3. 2 o ■ 4;1 4 q T` 11 y/ 16$ CB 09 ■ Pipe Table Pipe Table PIPE NAME SIZE (in) INVERT ELEVATION SLOPE PIPE NAME SIZE (in) INVERT ELEVATION SLOPE P - 76 4 354.49 1.54% P - 96 4 353.64 0.81 % P - 77 4 354.41 1.62% P - 97 4 353.84 0.88% P - 78 4 354.33 1.66% P - 98 4 354.05 1.00% P - 79 4 354.24 1.80% P - 99 4 354.25 1.12% P - 80 4 354.11 1.77% P - 100 4 354.42 1.26% P - 81 4 353.92 1.67% P - 101 4 354.50 1.29% P - 82 4 353.77 1.64% P - 102 4 354.51 1.15% P - 83 4 353.50 1.51 % P - 103 4 354.57 1.15% P - 84 4 353.29 1.45% P - 104 4 354.64 1.17% P - 85 4 353.05 1.38% P - 105 4 354.70 1.10% P - 86 4 352.92 1.39% P - 106 4 354.77 1.07% P - 87 4 352.74 1.36% P - 107 4 354.83 1.12% P - 88 4 352.54 1.33% P - 88 4 354.70 0.16% P - 89 4 352.44 1.44% P - 109 4 354.67 0.75% P - 90 4 352.57 2.84% P - 110 4 354.63 0.93% P - 91 4 352.76 2.18% P - 126 8 345.00 1.68% P - 92 4 352.92 1.43% P - 127 8 354.45 1.92% P - 93 4 353.08 1.01 % P - 132 4 354.77 1.40% P - 94 4 353.28 0.72% P - 134 4 354.93 1.93% P - 95 4 353.47 0.78% P - 135 4 354.79 1.70% N 187044.25 E 1306519.76 N 186866.36 E 1306787.27 LEGEND: STORM STRUCTURE TABLE STRUCTURE NAME STRUCTURE DETAILS CB 01 RIM = 352.21 CB TYPE 1 IE =9 (4" S) N 187025.70 IE =349.68 (8" NE) E 1306488.73 IE =349.69 (8" E) CB 03 RIM=352.38 60" TYPE 2 CB IE=346.99 (36" NE) N 187033.48 IE = 345.00 (8" NW) E 1306498.18 IE = 348.79 (8" SW) CB 04 48" TYPE 2 CB RIM = 35233- N 187038.82 IE =344-88 (8" SE) E 1306494.39 IE =33 .86(,14" NE, SW) CB 09 RIM=353.64 AREA DRAIN IE=359-58 (8" W) N 186888.79 IE=358.58 (8" NE) E 1396:7:78.99- CB 10 AREA DRAIN RIM 363.61 N 186852.35 IE=351.28 (8" E) E 1306658.76 ■ STORM CATCH BASIN Q■ STORM MANHOLE ® DETENTION TANK ACCESS RISER - - - - GB GRADE BREAK D STORM LINE PERFORATED PIPE STORM LINE DETENTION TANK 1 2 C3.4 C3.4 XXX CONTOUR LINE PROPERTY/RIGHT-OF-WAY LINE FLOW DIRECTION n ADS N-12 S-P, 4" CAP N GRAPHIC SCALE 0 10 20 40 I=i =� - `�� I = 20 FEET yy� ,Y WASgj����j W CONSTRUCTION RECORD DRAWINGS AS -BUILT �� w� ■_ �.� EGISTEg� I CERTIFY THAT THE INFORMATION SHOWN HEREON �SSIONAL E�SURVEYED: • WHICH WAS AS -BUILT BY AHBL , AND MAY INCLUDE 1/07/2019 LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND DESIGNED: AS -BUILT COMMENTS, ACCURATELY REFLECTS EXISTING - - umESM OF THIS L DOCI1SIDI sHML INVMDA7E THE STORM DRAINAGE REVISIONS AMT 09/20/2019 AC B DEW" AMT FIELD CONDICTIONS AS DETERMINED BY ME OR UNDER MY ON�LSEaLaNDSNwaTUNE.vuBucATIa+aF THIS DOMNIM DOES NOT DEROGATE FM RESERVED Know what's beloW. DIRECT SUPERVISION ON THIS DATE: 11/7/2019. DOERSHIP WIM N ff. THIS DOMMM � TACOMA SEATTLE•SPOKANE TRI-CITIES 1 ALTERNATE BID NO. 1: SOCCER FIELD IMPROVEMENTS AMT 01 28 2019 ACB CHECKED: OWY FM THE PRMW MIFEI) IN THE AND IS NOT TO BE USED FOR FOAR, FBIODEL OR Call before you dig. AHBL PROJECT NO.2180059 AWN M IIHAT MIXEM OR FAR ANYmNER MM. 1200 6th Avenue, Suite 1620 Seattle, WA98101 NO. REVISION BY DATE APPR APPROVED: 206.267.2425 TEL 206.267.2429 FAX www.ahbl.com WEB WJF 0.43% Pipe Table PIPE NAME SIZE (in) UPPER INVERT ELEVATION SLOPE P - 136 4 354.64 1.63% P - 140 4 349.99 1.65% P - 141 60 344.50 0.00% P - 142 60 344.50 0.00% P - 143 60 344.50 0.00% P - 144 60 344.50 0.00% P - 145 60 344.50 0.00% P - 146 8 349.60 6 62 P - 148 36 345.00 0.00% P - 149 4 349.96 3.03% P - 150 4 351.15 0.74% P - 151 4 351.39 0.74% P - 152 4 351.63 0.74% P - 153 4 351.93 0.79% P - 154 4 352.21 0.83% P - 155 4 352.50 0.90% P - 156 4 352.75 0.93% P - 157 4 353.00 0.99% P - 158 4 353.29 1.1 1 % P - 159 4 353.56 1.21 IE = 349.85 (4" S) IE = 349.63 (8" NE) IE = 349.70 (8" E) RIM = 352.58 IE = 344.86 (36" NE) RIM = 352.27 IE = 344.83 (8" SE) IE = 344.77 (14" NE, SW) IE = 348.92 (4" S) DISCOVERED DURING CONSTRUCTION RIM = 353.70 IE = 350.70 (8" W) IE = 350.70 (8" NE) RIM = 353.44 IE = 351.57 (8" E) ix NN X �� 0 C3.3 KEYMAP SCALE: VERTICAL* AS SHOWN HORIZONTAL- N1983/1991 CITY OF RENTON ONE INCH DATUM AT FULL SCALE Planning/Building/Public Works Dept. IF NOT ONE INCH SCALE ACCORDINGLY KEYNOTES: 2.24% Pipe Table PIPE NAME SIZE (in) UPPER INVERT ELEVATION SLOPE P - 160 4 353.84 1.36% P - 161 4 354.03 1.40% P - 162 4 354.22 1.48% P - 163 4 354.39 1.51 % P - 164 4 354.54 1.57% P - 165 60 344.50 0.00% P - 166 4 350.90 0.52% P - 167 4 354.65 1.43% P - 168 8 351.28 0.60% P - 169 8 350.50 1.14% P - 173 60 344.50 0.00% P - 176 1 60 345.50 0.22% TYPE 1 CATCH BASIN 10 WITH HERRINGBONE 1 GRATE C3.N O TYPE 1 CATCH BASIN 1 2 WITH SOLID COVER C3.5 TYPE 2 CATCH BASIN O3 WITH HERRINGBONE 2 GRATE C3.5 OWITH TYPE 2 CATCH BASIN ROUND SOLID LID 2 C3.5 FLOW CONTROL 1 O5 MANHOLE C3.8 OCLEANOUT COLLECTOR DRAIN 2 C3.9 NOTES: O N LO 00 T 16 4" PERFORATED 3 OUNDERDRAIN, TYP. C3.9 O Iql- 8" COLLECTOR DRAIN 4 (D8 O C3.9 Q CONNECTION TO OO O9 COLLECTOR DRAIN, TYP. C3.9 DETENTION TANK 4 10 ACCESS RISER, TYP. C3.8 CONVEYANCE PIPE 11 1. SEE SHEETS C3.5 FOR GENERAL STORM DRAINAGE NOTES. 2. CONTRACTOR SHALL FIELD VERIFY EXISTING INVERT ELEVATION PRIOR TO CONSTRUCTION WHERE NOTED. z 3. UNDERDRAIN LINES SHALL BE ADS N-12 S-P AND ARE O DESIGNED TO MAINTAIN A MINIMUM 18" DEPTH FROM FINISH GRADE. Q 4. ALL CONVEYANCE PIPE SHALL BE PVC. MINIMUM REQUIRED O COVER FOR PVC PIPE IS 3 FEET. z 5. ALL COLLECTOR PIPE SHALL BE ADS N-12 S-P. U-1 6. ALL DETENTION TANK SHALL BE ALUMINIZED TYPE 2, MEETING U) SECTION 5.1.2 OF THE CITY OF RENTON SURFACE WATER DESIGN MANUAL. 0 J 7. PROVIDE CDF ABOVE THE EXISTING WATERLINE PER DETAIL 6 LU ON SHEET C3.9. LL ALL PROPOSED PIPE SHOWN ON THIS Q SHEET WILL BE PRIVATE J a_ R-40281 0 J O IN COMPLIANCE WITH CITY OF RENTON STANDARDS O U LU 0 0 2 McKNIGHT MIDDLE SCHOOL DATE. 2019 ~ FIELD IMPROVEMENTS FlELDBOOK: = RENTON SCHOOL DISTRICT PAGE - DRAVANG NO: z DRAINAGE PLAN SHEET:OF. R 10 F:32 G