BASE BID
185 LF 60" @ 0.00%
108 LF 60" 0.00%
2 LF 60" @ 0 ,22%7 1�
DETENTION TANK
ACCESS RISER (TYP.)
3 �
2 LF 36" @ 0.00%
112 LF 60" @ 0.00%-
112 LF 60" @ 0.00%�
112 LF 60 @ 0.00%
112 LF 60" @ 0.00%
-M -
112 LF 60" @ 0.00%-\
104 LF 4" @ 2.18% 'Z•
ID
O-
3°�°
/ O
13�
�O
>00-
p l`s.a/ l / / • V o�0
`ID
ID
1ol0 51 .
(Q
\ \ 4 ID 1 , @1' $ LF p°�° 2.5' TYP. pC11d
0 ID No
lJ C
BASEBALL DETENTION TANK SYSTEM PLAN VIEW
1 NOT TO SCALE
2"S
CC
36" ALUMINIZE
CORRUGATI
PIPE TO MANI
ALL DETENTION TANK
ALUMINIZED TYPE 2
CORRUGATED METAL, X"
1", (16 Ga.), AT S=0.0%.
ALUMINIZED OR
GALVANIZED WITH
TREATMENTS 1, 2 OR 5.
DETENTION TANK SYSTEM TYPICAL SECTION
NOT TO SCALE
Of
ZW
20
0
U
DETENTION TANK
ID DIAMETER INVERT CROWN
BASEBALL 60" O 84 .69'849.59, BASE BID
344.43 349.43
rr
GRAVEL BACKFILL
FOR DRAINS
WSDOT 9-03.12(4)
')fASgj������
cjg
Ok
w
. r
AS -BUILT
CERTIFY THAT THE INFORMATION SHOWN HEREON
�SSIONAL E��l
EEI
WHICH WAS AS -BUILT BY AHBL , AND MAY INCLUDE
1/07/2019
O
LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND
AS -BUILT COMMENTS, ACCURATELY REFLECTS EXISTING
-
1010130
FIELD CONDICTIONS AS DETERMINED BY ME OR UNDER MY
ALTERATION aF THIS DOCUMENT SHALL INVALDATE THE
ksEALAmsmiumPueLtcAToOF
Know what's below.
DIRECT SUPERVISION ON THIS DATE: 11/7/2019.
THIS DOCUIOIT DOES NOT DEIMTE FM RESETtVEO
00111 WM IN ff. THIS DODASIT �
TAC0MA•SEATTLE•SPOKANE•TRI-CITIESONLY
1
Call before you dig.
AHBL PROJECT NO.2180059
FOR THE PRUM IDENTIFIED IN THE
AND IS NOT TO BE USED FOR REPAR" RENOUEL OR
Ate+'M THAT FRO,ECT OR FOR ANT UM I>ROM.
1200 6th Avenue, Suite 1620 Seattle, WA 98101
NO.
206.267.2425 TEL 206.267.2429 FAX www.ahbl.com WEB
D_
31 LF 48" @ 0.00%
CONTROL
STRUCTURE
2 LF 36" @ 0.00%
--�-D--
_ _D
62 LF 8" 8"-@W
ALTERNATE BID NO. 7
SOCCER DETENTION TANK SYSTEM PLAN
NOT TO SCALE
mmpection
itt
: � tea, limits of pipe
compaction
for pipe beddi g foundations when specified
n0.15 rise Mn.
Rigid Pipe NOTES:
1. Pipe compaction limits shown on this plan are for pipe
construction in an embankment. For pipe construction
in a trench, the horizontal limits of the pipe compaction
zone shall be the walls of the trench.
2. All steel and aluminum pipe and pipe -arches shall be
installed in accordance with design A.
3. Concrete pipe with elliptical reinforcement shall be
installed in accordance with design A.
4. Concrete pipe, plain or with circular reinforcement, shall
be installed with design A.
5. D.D. Is equal to the outside diameter of a pipe or the
outside span of pipe -arch. The dimensions shown as
O.D. with T maximum shall be O.D. until O.D. equals
3'; at which point 3' shall be used.
* 1'-0" for diameters 12" through 42" and spans through
50". 2'-0" for diameters greater than 42" and spans
greater than 50".
W(see note 4)
limit of pipe one
beddng
material c
forfle:dble
pipe (see
note 6)
m O.D.
foundation
level
" Am 4" min. 27" I.D. and under
6" min., over 27" I.D.
Bedding for Flexible Pipe
Flexible Pipe NOTES:
1. Provide uniform support under barrels.
2. Hand tamp under haunches.
3. Compact bedding material to 95 % max. density; directly
over pipe, hand tamp only.
4. See 'Excavation and Preparation of Trench" in sanitary
sewers section of the standard WSDOT/APWA
specifications for trench width "W" and trenching
options. The pipe zone will be the actual trench width.
The minimum concrete width shall be 1 z I.D. = 18".
5. Trench backfill shall conform to "Backfilling Sewer
Trenches" in the sanitary sewers section of the
WSDOT/APWA standard specifications, except that
rocks or lumps larger than 1" per foot of pipe diameter
shall not be used In the backNll material.
6. See "Bedding Material for Flexible Pipe" In aggregates
section of the WSDOT/APWA standard specifications
for the material specifications.
®Backfill material placed in 0.5' loose layers and
compacted to 95 % maximum density.
Method B or C compaction (WSDOT/APWA)
standard specifications.)
Pipe
Size
Min. dist.
between
barrels
circular pipe
conc., LCPE, CMP
(diameter)
12" to 24"
12"
30" to 96"
diam. / 2
102" to 180"
48"
pipe - arch
metal only
(span)
18" to 36"
12"
43" to 142"
span / 3
148" to 199"
48"
TY o PUBLIC WORKS PIPE COMPACTION STD. PLAN - 220.00
DEPARTMENT DESIGN AND BACKFILL MARCH 2O08
PIPE COMPACTION DESIGN AND BACKFILL
(COR STD. PLAN 220.00)
NOT TO SCALE
CONSTRUCTION RECORD DRAWINGS
SURVEYED: SCALE:
VERTICAL:L: p 13/1991
DESIGNED: AS SHOWN HORIZONTAL: N 98
STORM DRAINAGE REVISIONS AMT 09/20/2019 ACB DRAWN. AMT
ONE INCH DATUM
ALTERNATE BID NO. 1: SOCCER FIELD IMPROVEMENTS AMT 01 28 2019 ACB CHECKED: AT FULL SCALE
BJS IF NOT ONE INCH
REVISION BY DATE A P P R APPROVED: SCALE ACCORDINGLY
WJF
" CITY OF
RENTON
Plonning/Building/Public Works Dept.
41 FG: 349.81
-160 LF 48" @ 0.00%
-160 LF 48" @ 0.00%
160 LF 48" @ 0.00%
QLF 48" @ 0.00%
V r.." L r
48" TYPE 2 CB
RIM: 349.30
_ IE: 342.75 36" (W)
FEE. 346.96 8" (NE)
191
4
't
O
L0
O
00
16
O
O
CIS
W
z
0
a
O
z
w
0
J
W
LL
Q
R-402817 a
J
IN COMPLIANCE WITH CITY OF RENTON STANDARDS 0
McKNIGHT MIDDLE SCHOOL
FIELD IMPROVEMENTS
RENTON SCHOOL DISTRICT
NOTES & DETAILS
U
J
0
=
' R
DATE:
1/15/2019
FIELDBOOK:
PAGE:
v_
z
DRAWNG NO:
C3.7
SHEET:OF: 1 7 32