Loading...
HomeMy WebLinkAboutR-40282200 It 't 0 w z O Q O z w rr 0 J W LL a J In J O O VJ w J 0 75 2 z U 0 LO 0 m N W zz w N E13 z m N m m ► q M ► AT H ► EXI TIMG ► 848 I .87 568 .87 II E 1864.I9-2.32 3066i 1.07 TCH -I NG m z \" r, \� 1 I 1 I 0 11 1 N 186511.73_ 1 E 1306854.68'', 1 I N 186497.79 E 1306683.27 N 186506.03 E 1306690.71 11 II 1 : EN 1865 J 3068 4.78MV LID 1/` / / / I Know what's beIOW. Call before you dig. _--W—- --W__ y� J �r � pg TgA,$JI��� HARRINGTON AVE NE AS -BUILT 1p w� ■_ 9.� EGISTEg� 1 CERTIFY THAT THE INFORMATION SHOWN HEREON �SSIONAL E��� WHICH WAS AS -BUILT BY AHBL , AND MAY INCLUDE 1/07/2019 LOCATIONS, ELEVATIONS, DEPTHS, PIPE SIZES, AND AS -BUILT COMMENTS, ACCURATELY REFLECTS EXISTING - - ALTERATION OF THIS DOCUMENT SHALL INVALDATE THE FIELD CONDICTIONS AS DETERMINED BY ME OR UNDER MY PRWESMNA. SE& AMSNHaTURE.vueuc70OF THIS DOCUMENT DOES NOT DEROGATE FROM RESERVED DIRECT SUPERVISION ON THIS DATE: 11/7/2019. 011FERSFPWMNff. THIS DOCINIMISFOR USE TACOMA SEATTLE SPOKANE TRI-CITIES ONLY FOR THE PRUW DENTIFED N THE MERE BLOCK AND IS NOT TO BE USED FOR REPAIR, REMODEL OR AH BL PROJECT NO. 2180059 ADDFnoN TO THAT PRO,ECT OR FOR ANY OTTER PRUM. 1200 6th Avenue, Suite 1620 Seattle, WA 98101 206.267.2425 TEL 206.267.2429 FAX www.ahbl.com WEB CONSTRUCTION RECORD DRAWINGS SURVEYED: DESIGNED: STORM DRAINAGE REVISIONS AMT 09/20/2019 ACB DRAwN. AMT 1 ALTERNATE BID NO. 1: SOCCER FIELD IMPROVEMENTS AMT 01 28 2019 ACB CHECKED: BJS NO. REVISION BY DATE APPR APPROVED: WJF SCALE: AS SHOWN ONE INCH AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY VERTICAL: NAVD 1988 HORIZONTAL NAD 1983/1991 DATU M C4.3 ALTERNATE BID NO. 1 0 C4.2 KEYMAP CITY OF RENTON Planning/Building/Public Works Dept. PROPOSED LEGEND: CONCRETE SIDEWALK 2 C4.3 ASPHALT CEMENT 1 C4.3 PLAN NOTES 1. PROTECT EXISTING CURBS AND PAVEMENT FROM DAMAGE DURING CONSTRUCTION. 2. PROVIDE HOT TAR SEAL AT ALL JOINTS. COMPLETELY FILL ALL JOINTS. (TYP.) GRAPHIC SCALE 0 10 20 40 1" = 20 FEET R-402822 IN COMPLIANCE WITH CITY OF RENTON STANDARDS McKNIGHT MIDDLE SCHOOL FIELD IMPROVEMENTS RENTON SCHOOL DISTRICT GRADING, PAVING & HORIZONTAL CONTROL PLAN DATE: 1/15/2019 PAGE C4.2 SHEER OF.22 3 2 O N LO 0 00 T � u co O O O 00 1 z O Q O z w 0 w LL Q J J O O U U) J 0 0 2 /2 V z U