Loading...
HomeMy WebLinkAboutR-402831MATCH LINE- SEE L2.1 00 N O 0 LU z O Q O z LU IIr 0 J LU LL Q n J O O U J 0 C0 G rr _V z V CU G 0 LO 0 0 00 N N N J L LU c1 Know what's below. Call before you dig. REPLACE ZONE EXISTING ZOf G R. SK A � O 5 �6S EXP.03i0 �� c q P E P\ 11.07.2019 1��4W,A On a ALTERATION OF THIS DOCUMENT SHALL INVALIDATE THE m PROFESSIONAL SEAL AND SIGNATURE PUBLICATION OF THIS DOCUMENT DOES NOT DEROGATE FROM RESERVED OINJERSHIP RIGHTS IN IT. THIS DOCUMENT IS FOR USE TA C O M A • SEATTLE • SPOKANE •TRI-CITIES ONLY FOR THE PROJECT IDENTIFIED IN THE TITLE BLOCK AND IS NOT TO BE USED FOR REPAIR, REMODEL OR ADDITION TO THAT PROJECT OR FOR ANY OTHER PROJECT. 1200 6th Avenue, Suite 1620 Seattle, WA 98101 206.267.2425 TEL 206.267.2429 FAX www.ahbl.COm WEB NOTES 1. SEE L2.2 FOR IRRIGATION LEGEND. SEE L2.3 FOR IRRIGATION DETAILS AND VALVE TABLE. 2. PROVIDE CONNECTION FROM NEW VALVES TO EXISTING CONTROLLERS IN MECHANICAL ROOM 212. REMOVE CONNECTIONS TO VALVES DEMOLISHED AS PART OF PROJECT. COORDINATE ACCESS WITH SCHOOL DISTRICT. 3. EXISTING IRRIGATION SHOWN IS APPROXIMATE. SEE AS-BUILTS AVAILABLE FROM THE SCHOOL DISTRICT. VERIFY EXTENT OF EXISTING IRRIGATION SYSTEM AND VERIFY EXTENT OF DISTURBANCE AND REPLACEMENT BEFORE DEMOLITION. PROVIDE CREDIT FOR IRRIGATION WORK SHOWN ON PLANS BUT NOT REQUIRED AFTER REVIEW OF EXTENT OF CONFLICT ON SITE. PROVIDE MARK-UPS OF ANY AREAS REQUIRING WORK NOT SHOWN ON PLAN FOR CHANGE ORDER. Q 4. NO SUBSTITUTIONS OF EQUIPMENT OR DESIGN CHANGES SHALL BE PERMITTED UNLESS APPROVED BY THE OWNER. N 5. IRRIGATION LINES AND VALVES MAY BE SHOWN IN HARD SURFACE AREAS OR OUTSIDE LANDSCAPE AREAS FOR N GRAPHIC CLARITY. LOCATE ALL IRRIGATION LINES IN LANDSCAPE AREAS OR IN SLEEVES UNDER PAVEMENT. J w 6. IRRIGATION CONTRACTOR SHALL COORDINATE INSTALLATION OF IRRIGATION CONDUIT AND SLEEVES UNDER HARD w SURFACES WITH RESPECTIVE CONTRACTORS. U) 7. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING ALL PERMITS, TESTS, AND INSPECTIONS REQUIRED FOR THE W IRRIGATION SYSTEM. z 8. CALL FOR LOCATES PRIOR TO DIGGING AT 811. CONTRACTOR IS RESPONSIBLE TO VERIFY UTILITY LOCATIONS. IF J UTILITIES ARE DAMAGED IN THE COURSE OF WORK, CONTRACTOR SHALL INFORM THE OWNER AND MAKE ANY REPAIRS = REQUIRED, AT NO COST TO THE OWNER. U 9. ALL SLEEVING SHALL BE MARKED, SEALED AND STAKED. ALL SLEEVES SHALL BE TWICE THE SIZE OF OF THE LINE OR Q COMBINED LINES. MINIMUM SLEEVE SIZE SHALL BE 4-INCHES IF LOCATED UNDER ROADWAY OR DRIVE AISLE. 73 10. INSTALL CONCRETE THRUST BLOCKS ON MAINLINE 2-1/2" AND LARGER, FOR ALL CHANGES IN PIPE DIRECTION OVER 15-DEGREES. 11. SPLICE CONTROL WIRES WITHIN VALVE BOXES ONLY, USING 3M-DBY, OR APPROVED SPLICE KITS, AND PROVIDE A 24" EXPANSION LOOP FOR ALL CONTROL WIRES WITHIN EACH VALVE BOX. KEEP WIRE SPLICES TO A MINIMUM. PROVIDE CLEAN WIRE CUTS WITH NEW SPLICE KITS AT ALL SPLICES INCLUDING ANY SPLICE THAT IS DISCONNECTED AND RECONNECTED FOR ANY REASON OR PERIOD OF TIME. 12. VALVE BOXES SHALL BE COMMERICAL -GRADE POLYETHYLENE OR HDPE AND SUITABLE FOR LIGHT DUTY APPLICATIONS. 13. INSTALLER TO ADJUST ALL ZONE CONTROL VALVES TO THE CORRECT OPERATING PRESSURE. SEE VALVE SCHEDULE FOR OPERATING PSI. 14. CONTRACTOR SHALL HAND TRENCH IRRIGATION DITCHES WHEN WITHIN 20 FEET, OR WITHIN A DELINEATED ROOT PROTECTION ZONE, OF EXISTING TREES TO REMAIN. AVOID CUTTING ANY ROOTS OVER 3" - 4" IN DIAMETER WITHIN THE ROOT PROTECTION ZONE. 15. INSTALLER SHALL BE RESPONSIBLE FOR KEEPING EXACT ACCURATE NOTES AND "AS-BUILTS" FOR THE CREATION OF THE "RECORD DRAWINGS" OF THE INSTALLED SYSTEM. 16. CONTRACTOR SHALL PROVIDE IRRIGATION MAINTENANCE THROUGH THE PLANT ESTABLISHMENT PERIOD INCLUDING WINTERIZATION(S) ,�bPrT8 fK0)CT I O N RECORD D RAW I N G S 1 ALTERNATE BID NO 1: SOCCER FIELD IMPROVEMENTS AG 1/28/19 KG SURVEYED: SCALE VERTICAL- HOR ONTAL: NAD T9a3/T99T DESIGNED: AS SHOWN DRAWN: MS ONE INCH DATUM CHECKED: AT FULL SCALE KG IF NOT ONE INCH NO. REVISION BY DATE AP P R APPROVED: SCALE ACCORDINGLY J. Morse IRRIGATION SYSTEM DESIGN NOTES 2 3 ll GRAPHIC SCALE WATER PURVEYOR: KING COUNTY WATER DISTRICT 90. CONTACT INFORMATION: 425-255-9600,http://www.kcwd9O.com/ THIS DESIGN REPLACES PORTIONS OF AN EXISTING IRRIGATION SYSTEM AFFECTED BY THE RESURFACING OF SOFTBALL AND SOCCER FIELDS. FIELD VERIFY ALL EXISTING IRRIGATION EQUIPMENT AND ZONES IMPACTED BY THE CONSTRUCTION OF THIS PROJECT PRIOR TO CONSTRUCTION. CONTACT SCHOOL DISTRICT FOR COPIES OF IRRIGATION AS -BUILT DRAWINGS. PROVIDE TEMPORARY IRRIGATION TO ALL UNDISTURBED ZONES DURING CONSTRUCTION BETWEEN APRIL AND OCTOBER OR AS REQUESTED BY SCHOOL DISTRICT. POINT OF CONNECTION NOTES 1. POINT OF CONNECTION WORK NOT WITHIN SCOPE OF PROJECT. 2. CONTRACTOR SHALL VERIFY EXISTING STATIC PRESSURE AT THE METER AND SUBMIT WRITTEN VERIFICATION TO THE LANDSCAPE ARCHITECT. NOTIFY THE LANDSCAPE ARCHITECT OF DISCREPANCIES GREATER THAN 5 POUNDS OF DESIGN PRIOR TO INSTALLATION OF ANY IRRIGATION EQUIPMENT. 3. POC NUMBER 1: EXISTING 4" IRRIGATION METER. 3.1. THE SYSTEM DESIGN IS BASED ON OPERATING 1 ZONE AT A TIME USING THE EXISTING IRRIGATION METER ON A 6" SCH. 40 PVC SUPPLY LINE. CONTRACTOR SHALL FIELD VERIFY SIZE AND LOCATION. NV f-' CITY OF ME RENTON n� Planning/Building/Public Works Dept. O N O 0 00 co 0 0 0 06 OC 0— z 0 a 0 z w cr J P LU } Q LL R-402831 _j 0 IN COMPLIANCE WITH CITY OF RENTON STANDARDS 0 KEYMA McKNIGHT MIDDLE SCHOOL FIELD IMPROVEMENTS RENTON SCHOOL DISTRICT ALTERNATE NO. 1 IRRIGATION PLAN U W J 0 = R DATE 11/07/2019 FIELDBOOK: PAGE: v_ z DRAWING NO: L2.3 G SHEEr.31 OF*325U